CN104947792A - Simply-built green light steel fabricated building and installation method - Google Patents

Simply-built green light steel fabricated building and installation method Download PDF

Info

Publication number
CN104947792A
CN104947792A CN201510341157.5A CN201510341157A CN104947792A CN 104947792 A CN104947792 A CN 104947792A CN 201510341157 A CN201510341157 A CN 201510341157A CN 104947792 A CN104947792 A CN 104947792A
Authority
CN
China
Prior art keywords
wallboard
mainboard
combo box
light steel
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510341157.5A
Other languages
Chinese (zh)
Other versions
CN104947792B (en
Inventor
肖中发
赵洋
周黎军
姚春胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Baoli assembly housing industry Co., Ltd
Original Assignee
Beijing Dagong Jianzhu Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Dagong Jianzhu Science & Technology Co Ltd filed Critical Beijing Dagong Jianzhu Science & Technology Co Ltd
Priority to CN201510341157.5A priority Critical patent/CN104947792B/en
Publication of CN104947792A publication Critical patent/CN104947792A/en
Application granted granted Critical
Publication of CN104947792B publication Critical patent/CN104947792B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a simply-built green light steel fabricated building and an installation method. The fabricated building comprises wall plates, main plates, composite frame columns and main connection pieces. The two wall plates are connected by means of the corresponding main connection pieces through self-tapping screws. The composite frame columns and the wall plates are connected by means of the corresponding main connection pieces through self-tapping screws. In the connection process, firstly the main connection pieces abut against the composite frame columns, the self-tapping screws are screwed into the composite frame columns to fix the composite frame columns, the wall plates are then arranged in place, and the main connection pieces are clamped into lateral side grooves of the wall plates. The main boards are connected with the composite frame columns, and body column sleeves of the portions, on the top layers of the main plates, of the composite frame columns are inserted in upwards-exposed tenon columns in a sleeved mode and are then fixed through bolts. By means of the full industrialized prefabrication of the wall plates and the main plates, the prefabrication rate of main components of the building is greatly increased, and therefore the structure safety and quality of the building are better facilitated, site workloads are reduced, the construction environment pollution is reduced, the construction period is shortened, and cost is saved.

Description

Green light steel assembling house and mounting method are built in a kind of letter
Technical field
The present invention relates to green house technical field of buildings, particularly relate to a kind of letter and build green light steel assembling house and mounting method.
Background technology
Advance industrialization of construction industry, be conducive to realizing energy-saving and emission-reduction, advance green safety construction, improve workmanship, improve human settlement, promote upgrading of industrial structures.Assembled architecture is the inevitable choice realizing industrialization of construction industry.Prefabricated building adopt prefabricate standardized component, carries out in-site installation.At present, the use of prefabricated building gets more and more, but, existing prefabricated building mostly adopt steel structure frame and concrete prefabricated board system or adopt the light steel of thin-walled close rib keel composite construction system, assemblingization degree is lower, concrete material deadweight is comparatively large, and the workload of light steel close rib keel composite construction is general comparatively large, and mounting means is single and installation process is complicated simultaneously.How to found a kind of structural system clear, easy for installation, more save the duration thus the novel fabricated house reduced costs and mounting method thereof, be a current difficult problem urgently to be resolved hurrily.
Summary of the invention
Object of the present invention provides a kind of letter to build green light steel assembling house and mounting method, makes its structural system clear, easy for installation, to save the duration thus to reduce costs.
For achieving the above object, the technical solution used in the present invention is as follows, and green light steel assembling house is built in a kind of letter, and this house comprises wallboard (1), mainboard (2), combo box trestle (3) and main connector (4).
Described wallboard (1) is prefabricate composite plate, and wallboard (1) comprises light steel section bar (101), connector a (102), heat insulating material (103), LIFT (104), the lightgage steel joist of frame with Baltimore groove; The section of light steel section bar (101) and lightgage steel joist is M type or shape for hat or C type shape.Be interconnected by connector a (102) with self-tapping screw between light steel section bar (101) and lightgage steel joist.Wallboard (1) central filler has heat insulating material (103); The outermost of wallboard (1) is the LIFT (104) of modified cement mortar or light aggregate concrete material; Heat insulating material (103) is polyphenyl plate or stalk board or glass silk floss or foam cement.
Described mainboard (2) is also prefabricate composite plate, when factory process, first be interconnected with self-tapping screw by the connector b (202) in mainboard bight by the light steel truss structure beam (201) of surrounding, afterwards light steel secondary beam (203) is inserted the montant in light steel truss structure beam (201) by design interval, two ends are fixed with self-tapping screw, light steel secondary beam (203) lays pressure profiled steel decking sheets (204) and steel mesh reinforcement (205) successively, the top of mainboard (2) is LIFT (206), the LIFT material of LIFT (206) is light aggregate concrete or other mixed slurry.
Described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) comprises main column (301), tenon post (302) and surface layer plate (303).Main column (301) and tenon post (302) are shaped steel of remaining silent, and both section configurations are rectangle or circle.The bottom of main column (301) and tenon post (302) are all reserved with bolt hole (304).The cross sectional shape of tenon post (302) and the identical of main column (301), and be in same central axis, size is that equal proportion is shunk to central axis.The top of tenon post (302) is shunk further, and form pyramidal structure, the grafting being up and down beneficial to combo box trestle (3) is in place.
When being prefabricated in the factory, first by one end welded closure that main column (301) is connected with tenon post (302) by steel plate, then weld tenon post (302).Surface layer plate (303) outside combo box trestle is for sticking production board or building plate, and production board selects GRC plate or leisure plate or cement fibrolite plate or calcium silicate board, builds plate and selects modified cement mortar or light aggregate concrete.
Combo box trestle (3) is when building on different positions, for the coupled column welded together by main column (301) that 1-4 radical amount does not wait, coupled column top is the tenon post (302) be separated from each other that corresponding 1-4 radical amount does not wait.
Described two wallboards (1) are connected with self-tapping screw by main connector (4).Main connector (4) is light steel section bar, and its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, at different link positions, and its sectional dimension or its twice identical with the side grooves degree of depth of wallboard (1).When main connector (4) is for opening-closed sectional material, at its side minor face, be interval with preformed hole.When wallboard (1) straight line connects, first main connector (4) embedded the side grooves of first piece of wallboard (1) and expose half, being screwed into self-tapping screw afterwards makes connector (4) and wallboard fix, then by place for another block wallboard (1), main connector (4) remaining half is made to snap in the side grooves of wallboard (1).When wallboard (1) vertically connects, first the minor face of main connector (4) is close to wallboard (1), be screwed into self-tapping screw to wallboard (1) to be fixed, then by place for another block wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
Described combo box trestle (3) is connected with self-tapping screw by main connector (4) with wallboard (1).First main connector (4) is close to combo box trestle (3) during connection, being screwed into self-tapping screw to combo box trestle (3) makes it fix, then by place for wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
Described mainboard (2) is connected with combo box trestle (3), carry out in place by the tenon post (302) at combo box trestle (3) top through the connector b (202) in mainboard (2) bight, and then be inserted on the tenon post (302) of dew by main column (301) cover of the combo box trestle (3) of mainboard (2) top layer, then use bolt (305) to be fixed.
Described mainboard (2) is connected by main connector (4) with wallboard (1).First main connector (4) is close to mainboard (2) during connection, being screwed into self-tapping screw to mainboard (2) makes it fix, then mainboard (2) is overlapped on wallboard (1) top together with main connector (4), makes main connector (4) snap in the top groove of wallboard (1).
Described wallboard (1) is flush-mounted between combo box trestle (3) and mainboard (2), and the combo box trestle (3) of periphery, house and wallboard (1) are on same central axis.
In described wallboard (1), mainboard (2) and combo box trestle (3) adopt light steel section bar and main connector (4) to adopt light steel section bar be cold bending thin wall galvanized steel.
A mounting method for green light steel assembling house is built in letter, comprises the steps,
S1 carries out patten construction according to construction design drawing, and pre-buried good stone bolt, is arranged on combo box trestle (3) on patten by design sequence, and makes tenon post (302) expose to design elevation;
S2 lifts mainboard (2) as base plate, and lift and be socketed on the tenon post (302) of combo box trestle (3), tenon post (302) stretches out mainboard (2) corner connector b (202);
S3 by combo box trestle (3) by number inserting stretched out the tenon post (302) in mainboard (2) bight, be joined with bolts;
Special main connector (4) is separately fixed at the upper surface of light steel truss structure beam (201) and the side of combo box trestle (3) of mainboard (2) by S4 along body of wall center line;
S5 is by prefabricated wallboard (1) hoisted in position make horizontal side and lower side groove snap in main connector (4) successively in order;
Special main connector (4) is fixed on the soffit of the light steel truss structure beam (201) of mainboard (2) by S6 by design attitude;
S7 by mainboard (2) together with main connector (4) hoisted in position of soffit in wallboard 1 top, make main connector (4) snap in the groove at the top of wallboard (1), make the tenon post (302) of combo box trestle (3) insert simultaneously and stretch out the corner connector b (202) of mainboard (2);
S8 grafting upper strata combo box trestle (3), connects with bolt (305);
S9 installs wallboard (1) as parapet, then carries out roof slope making, waterproof and roof tile and mats formation.
Compared with prior art, the present invention has the following advantages:
1, prefabricated by the full batch production of wallboard, mainboard, greatly improve the prefabricated rate of building main member, thus be more conducive to the structural safety and the quality that ensure building, decrease field operation amount, reduce construction environment and pollute, shorten construction period, cost-saving.
2, by optimizing the connected mode of light steel frame formula structural system and parts, greatly reducing constructional materials consumption and job site workload, really achieving rapid green construction.
3, factory-made component selects more green, low-carbon (LC), environmental protection, energy-conservation material.
4, sturdy and durable, the thermal insulation of building integral, and quality is light, energy-conserving and environment-protective, is applicable to various building construction, and applicability is strong, will bring good economic benefit and social benefit.
Accompanying drawing explanation
Above-mentioned is only the general introduction of technical solution of the present invention, and in order to better understand technological means of the present invention, below in conjunction with accompanying drawing and detailed description of the invention, the present invention is described in further detail.
Fig. 1 is that the wallboard of green light steel assembling house, mainboard and combo box trestle mounting structure schematic diagram are built in a kind of letter of the present invention.
Fig. 2 is wallboard installing structure schematic diagram of the present invention.
Fig. 3 is the mounting structure schematic diagram of mainboard of the present invention.
Fig. 4 .1 is the structural representation of combo box trestle of the present invention.
Fig. 4 .2 is the structural representation of coupled column of the present invention.
Fig. 5 is the annexation schematic diagram between wallboard of the present invention.
Fig. 6 .1 is the annexation of steel structure frame post of the present invention and wallboard and combination one schematic diagram of combo box trestle.
Fig. 6 .2 is the annexation of steel structure frame post of the present invention and wallboard and combination two schematic diagram of combo box trestle.
Fig. 6 .3 is the annexation of steel structure frame post of the present invention and wallboard and combination three schematic diagram of combo box trestle.
Fig. 6 .4 is the annexation of steel structure frame post of the present invention and wallboard and combination four schematic diagram of combo box trestle.
Fig. 7 is the annexation schematic diagram of steel structure frame post of the present invention and mainboard.
Fig. 8 is the annexation schematic diagram of wallboard of the present invention and mainboard.
In figure: 1, wallboard, 2, mainboard, 3, combo box trestle, 4, main connector, 101, light steel section bar, 102, connector a, 103, heat insulating material, 104, LIFT, 201, light steel truss structure beam, 202, connector b, 203, light steel secondary beam, 204, pressure profiled steel decking sheets, 205, steel mesh reinforcement, 206, LIFT, 301, main column, 302, tenon post, 303, surface layer plate, 304, bolt hole, 305, bolt.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, technical scheme of the present invention is described in further details.
Green light steel assembling house is built in a kind of letter, and this house comprises wallboard (1), mainboard (2), combo box trestle (3) and main connector (4).
With reference to shown in Fig. 2, described wallboard (1) is prefabricate composite plate, and wallboard (1) comprises light steel section bar (101), connector a (102), heat insulating material (103), LIFT (104), the lightgage steel joist of frame with Baltimore groove; The section of light steel section bar (101) and lightgage steel joist is M type or shape for hat or C type shape.Be interconnected by connector a (102) with self-tapping screw between light steel section bar (101) and lightgage steel joist.Wallboard (1) central filler has heat insulating material (103); The outermost of wallboard (1) is the LIFT (104) of modified cement mortar or light aggregate concrete material; Heat insulating material (103) is polyphenyl plate or stalk board or glass silk floss or foam cement.
With reference to shown in Fig. 3, described mainboard (2) is also prefabricate composite plate, when factory process, first be interconnected with self-tapping screw by the connector b (202) in mainboard bight by the light steel truss structure beam (201) of surrounding, afterwards light steel secondary beam (203) is inserted the montant in light steel truss structure beam (201) by design interval, two ends are fixed with self-tapping screw, light steel secondary beam (203) lays pressure profiled steel decking sheets (204) and steel mesh reinforcement (205) successively, the top of mainboard (2) is LIFT (206), the LIFT material of LIFT (206) is light aggregate concrete or other mixed slurry.
With reference to shown in Fig. 4 .1, described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) comprises main column (301), tenon post (302) and surface layer plate (303).Main column (301) and tenon post (302) are shaped steel of remaining silent, and both section configurations are rectangle or circle.The bottom of main column (301) and tenon post (302) are all reserved with bolt hole (304).The cross sectional shape of tenon post (302) and the identical of main column (301), and be in same central axis, size is that equal proportion is shunk to central axis.The top of tenon post (302) is shunk further, and form pyramidal structure, the grafting being up and down beneficial to combo box trestle (3) is in place.
When being prefabricated in the factory, first by one end welded closure that main column (301) is connected with tenon post (302) by steel plate, then weld tenon post (302).Surface layer plate (303) outside combo box trestle is for sticking production board or building plate, and production board selects GRC plate or leisure plate or cement fibrolite plate or calcium silicate board, builds plate and selects modified cement mortar or light aggregate concrete.
Combo box trestle (3) is when building on different positions, for the coupled column (shown in Fig. 4 .2) welded together by main column (301) that 1-4 radical amount does not wait, coupled column top is the tenon post (302) be separated from each other that corresponding 1-4 radical amount does not wait.
With reference to shown in Fig. 5, described two wallboards (1) are connected with self-tapping screw by main connector (4).Main connector (4) is light steel section bar, and its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, at different link positions, and its sectional dimension or its twice identical with the side grooves degree of depth of wallboard (1).When main connector (4) is for opening-closed sectional material, at its side minor face, be interval with preformed hole.When wallboard (1) straight line connects, first main connector (4) embedded the side grooves of first piece of wallboard (1) and expose half, being screwed into self-tapping screw afterwards makes connector (4) and wallboard fix, then by place for another block wallboard (1), main connector (4) remaining half is made to snap in the side grooves of wallboard (1).When wallboard (1) vertically connects, first the minor face of main connector (4) is close to wallboard (1), be screwed into self-tapping screw to wallboard (1) to be fixed, then by place for another block wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
Shown in Fig. 6 .1-6.4, described combo box trestle (3) is connected with self-tapping screw by main connector (4) with wallboard (1).First main connector (4) is close to combo box trestle (3) during connection, being screwed into self-tapping screw to combo box trestle (3) makes it fix, then by place for wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
With reference to shown in Fig. 7, described mainboard (2) is connected with combo box trestle (3), carry out in place by the tenon post (302) at combo box trestle (3) top through the connector b (202) in mainboard (2) bight, and then be inserted on the tenon post (302) of dew by main column (301) cover of the combo box trestle (3) of mainboard (2) top layer, then use bolt (305) to be fixed.
With reference to shown in Fig. 8, described mainboard (2) is connected by main connector (4) with wallboard (1).First main connector (4) is close to mainboard (2) during connection, being screwed into self-tapping screw to mainboard (2) makes it fix, then mainboard (2) is overlapped on wallboard (1) top together with main connector (4), makes main connector (4) snap in the top groove of wallboard (1).
Described wallboard (1) is flush-mounted between combo box trestle (3) and mainboard (2), and the combo box trestle (3) of periphery, house and wallboard (1) are on same central axis.
In described wallboard (1), mainboard (2) and combo box trestle (3) adopt light steel section bar and main connector (4) to adopt light steel section bar be cold bending thin wall galvanized steel.
A mounting method for green light steel assembling house is built in letter, comprises the steps,
S1 carries out patten construction according to construction design drawing, and pre-buried good stone bolt, is arranged on combo box trestle (3) on patten by design sequence, and makes tenon post (302) expose to design elevation;
S2 lifts mainboard (2) as base plate, and lift and be socketed on the tenon post (302) of combo box trestle (3), tenon post (302) stretches out mainboard (2) corner connector b (202);
S3 by combo box trestle (3) by number inserting stretched out the tenon post (302) in mainboard (2) bight, be joined with bolts;
Special main connector (4) is separately fixed at the upper surface of light steel truss structure beam (201) and the side of combo box trestle (3) of mainboard (2) by S4 along body of wall center line;
S5 is by prefabricated wallboard (1) hoisted in position make horizontal side and lower side groove snap in main connector (4) successively in order;
Special main connector (4) is fixed on the soffit of the light steel truss structure beam (201) of mainboard (2) by S6 by design attitude;
S7 by mainboard (2) together with main connector (4) hoisted in position of soffit in wallboard 1 top, make main connector (4) snap in the groove at the top of wallboard (1), make the tenon post (302) of combo box trestle (3) insert simultaneously and stretch out the corner connector b (202) of mainboard (2);
S8 grafting upper strata combo box trestle (3), connects with bolt (305);
S9 installs wallboard (1) as parapet, then carries out roof slope making, waterproof and roof tile and mats formation.

Claims (9)

1. a green light steel assembling house is built in letter, it is characterized in that: this house comprises wallboard (1), mainboard (2), combo box trestle (3) and main connector (4);
Described wallboard (1) is prefabricate composite plate, and wallboard (1) comprises light steel section bar (101), connector a (102), heat insulating material (103), LIFT (104), the lightgage steel joist of frame with Baltimore groove; The section of light steel section bar (101) and lightgage steel joist is M type or shape for hat or C type shape; Be interconnected by connector a (102) with self-tapping screw between light steel section bar (101) and lightgage steel joist; Wallboard (1) central filler has heat insulating material (103); The outermost of wallboard (1) is LIFT (104);
Described mainboard (2) is also prefabricate composite plate, when factory process, first be interconnected with self-tapping screw by the connector b (202) in mainboard bight by the light steel truss structure beam (201) of surrounding, afterwards light steel secondary beam (203) is inserted the montant in light steel truss structure beam (201) by design interval, two ends are fixed with self-tapping screw, light steel secondary beam (203) lays pressure profiled steel decking sheets (204) and steel mesh reinforcement (205) successively, and the top of mainboard (2) is LIFT (206);
Described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) comprises main column (301), tenon post (302) and surface layer plate (303); The bottom of main column (301) and tenon post (302) are all reserved with bolt hole (304); The cross sectional shape of tenon post (302) and the identical of main column (301), and be in same central axis, size is that equal proportion is shunk to central axis; The top of tenon post (302) is shunk further, and form pyramidal structure, the grafting being up and down beneficial to combo box trestle (3) is in place;
When being prefabricated in the factory, first by one end welded closure that main column (301) is connected with tenon post (302) by steel plate, then weld tenon post (302);
Combo box trestle (3) is when building on different positions, for the coupled column welded together by main column (301) that 1-4 radical amount does not wait, coupled column top is the tenon post (302) be separated from each other that corresponding 1-4 radical amount does not wait;
Described two wallboards (1) are connected with self-tapping screw by main connector (4); Main connector (4) is light steel section bar, and its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, at different link positions, and its sectional dimension or its twice identical with the side grooves degree of depth of wallboard (1); When main connector (4) is for opening-closed sectional material, at its side minor face, be interval with preformed hole; When wallboard (1) straight line connects, first main connector (4) embedded the side grooves of first piece of wallboard (1) and expose half, being screwed into self-tapping screw afterwards makes connector (4) and wallboard fix, then by place for another block wallboard (1), main connector (4) remaining half is made to snap in the side grooves of wallboard (1); When wallboard (1) vertically connects, first the minor face of main connector (4) is close to wallboard (1), be screwed into self-tapping screw to wallboard (1) to be fixed, then by place for another block wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1);
Described combo box trestle (3) is connected with self-tapping screw by main connector (4) with wallboard (1); First main connector (4) is close to combo box trestle (3) during connection, being screwed into self-tapping screw to combo box trestle (3) makes it fix, then by place for wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1);
Described mainboard (2) is connected with combo box trestle (3), carry out in place by the tenon post (302) at combo box trestle (3) top through the connector b (202) in mainboard (2) bight, and then be inserted on the tenon post (302) of dew by main column (301) cover of the combo box trestle (3) of mainboard (2) top layer, then use bolt (305) to be fixed;
Described mainboard (2) is connected by main connector (4) with wallboard (1); First main connector (4) is close to mainboard (2) during connection, being screwed into self-tapping screw to mainboard (2) makes it fix, then mainboard (2) is overlapped on wallboard (1) top together with main connector (4), makes main connector (4) snap in the top groove of wallboard (1).
2. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: wallboard (1) is flush-mounted between combo box trestle (3) and mainboard (2), the combo box trestle (3) of periphery, house and wallboard (1) are on same central axis.
3. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: heat insulating material (103) is polyphenyl plate or stalk board or glass silk floss or foam cement.
4. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: LIFT (104) is modified cement mortar or light aggregate concrete material.
5. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: the LIFT material of LIFT (206) is light aggregate concrete or mixed slurry.
6. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: the surface layer plate (303) outside combo box trestle is for sticking production board or building plate, production board selects GRC plate or leisure plate or cement fibrolite plate or calcium silicate board, builds plate and selects modified cement mortar or light aggregate concrete.
7. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: main column (301) and tenon post (302) are shaped steel of remaining silent, and both section configurations are rectangle or circle.
8. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: in described wallboard (1), mainboard (2) and combo box trestle (3) adopt light steel section bar and main connector (4) to adopt light steel section bar be cold bending thin wall galvanized steel.
9. a mounting method for green light steel assembling house is built in letter, it is characterized in that: the method comprises the steps,
S1 carries out patten construction according to construction design drawing, and pre-buried good stone bolt, is arranged on combo box trestle (3) on patten by design sequence, and makes tenon post (302) expose to design elevation;
S2 lifts mainboard (2) as base plate, and lift and be socketed on the tenon post (302) of combo box trestle (3), tenon post (302) stretches out mainboard (2) corner connector b (202);
S3 by combo box trestle (3) by number inserting stretched out the tenon post (302) in mainboard (2) bight, be joined with bolts;
Special main connector (4) is separately fixed at the upper surface of light steel truss structure beam (201) and the side of combo box trestle (3) of mainboard (2) by S4 along body of wall center line;
S5 is by prefabricated wallboard (1) hoisted in position make horizontal side and lower side groove snap in main connector (4) successively in order;
Special main connector (4) is fixed on the soffit of the light steel truss structure beam (201) of mainboard (2) by S6 by design attitude;
S7 by mainboard (2) together with main connector (4) hoisted in position of soffit in wallboard 1 top, make main connector (4) snap in the groove at the top of wallboard (1), make the tenon post (302) of combo box trestle (3) insert simultaneously and stretch out the corner connector b (202) of mainboard (2);
S8 grafting upper strata combo box trestle (3), connects with bolt (305);
S9 installs wallboard (1) as parapet, then carries out roof slope making, waterproof and roof tile and mats formation.
CN201510341157.5A 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter Active CN104947792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510341157.5A CN104947792B (en) 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510341157.5A CN104947792B (en) 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter

Publications (2)

Publication Number Publication Date
CN104947792A true CN104947792A (en) 2015-09-30
CN104947792B CN104947792B (en) 2017-11-14

Family

ID=54162805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510341157.5A Active CN104947792B (en) 2015-06-18 2015-06-18 Green light steel assembling house and installation method are built in a kind of letter

Country Status (1)

Country Link
CN (1) CN104947792B (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544799A (en) * 2015-12-08 2016-05-04 智房科技股份有限公司 Fabricated horizontal external wall panel module, wall body, and assembling method
CN106368386A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Reinforcing steel bar angle iron frame for simplified house
CN106368326A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Multilayer stacking type simplified house
CN106368311A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Simplified house
CN106400970A (en) * 2016-10-26 2017-02-15 南宁众创空间科技有限公司 Stacked type simplified house
CN106436892A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Makeshift house
CN106436914A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified house
CN106436915A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified building
CN106436912A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simple room
CN106522367A (en) * 2016-12-27 2017-03-22 北京善筑科技股份有限公司 Assembly type building main body structure
CN106545180A (en) * 2016-10-26 2017-03-29 南宁众创空间科技有限公司 Firm simplified room
CN106545091A (en) * 2016-10-26 2017-03-29 南宁众创空间科技有限公司 A kind of firm simplified room
CN106639060A (en) * 2017-02-24 2017-05-10 李波 Partition assembly of exhibition room
CN106836502A (en) * 2017-03-09 2017-06-13 陈阳 Modularized house assembling structure
WO2017133257A1 (en) * 2016-02-04 2017-08-10 中清大科技股份有限公司 Prefabricated house
CN107587604A (en) * 2016-07-08 2018-01-16 曹海彦 Spigot-and-socket sheet-pile assembling structure and its installation method
CN107587603A (en) * 2016-07-08 2018-01-16 曹海彦 Structure with assembled lightweight steel and its installation method
CN107780576A (en) * 2016-08-30 2018-03-09 谢志强 A kind of assembled architecture bottom composite floor and its connected mode
CN108222270A (en) * 2018-01-11 2018-06-29 张家口绿汇建筑科技有限公司 Prefabricated buildings and its construction method
CN109424202A (en) * 2017-09-05 2019-03-05 中铁十局集团电务工程有限公司 A kind of secondary assembled wallboard building method
CN112012524A (en) * 2020-08-22 2020-12-01 深圳市炎唐装饰有限公司 Energy-saving assembled steel structure residential system and installation method
CN113463946A (en) * 2021-07-07 2021-10-01 航达建设集团有限公司 Structure is built in interim room easy to assemble
CN113668712A (en) * 2021-09-02 2021-11-19 驻马店职业技术学院 Rapid Assembly formula building structure
CN114016769A (en) * 2021-12-03 2022-02-08 南京九趾装备科技有限公司 Unit structure of prefabricated building, production method and assembly method
CN114278019A (en) * 2021-12-30 2022-04-05 中建八局第一建设有限公司 Assembled roof frame and preparation process and construction method thereof
WO2022133617A1 (en) * 2020-12-21 2022-06-30 Universidad Diego Portales System and method for high-rise prefabricated modular construction, with staggered connecting columns
CN115003922A (en) * 2020-01-27 2022-09-02 米勒销钉公司 Construction using collar and threaded stepped pin

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172353A (en) * 2006-10-31 2008-05-07 刘贵堂 Process for producing fireproof, heat-preserving and noise-insulation metal framework structure, and products produced thereby
US20080168735A1 (en) * 2007-01-16 2008-07-17 Clement Guevremont Building panel
WO2011089273A1 (en) * 2010-01-22 2011-07-28 Tempero 2000 S.L. Energy-collecting building-covering structure
US20110197518A1 (en) * 2010-02-14 2011-08-18 Burnett William S System and Method For Modular Roof Apparatus
CN103882977A (en) * 2013-12-16 2014-06-25 清华大学建筑设计研究院有限公司 Frame structure based on three-side-grooved strip precast concrete wallboard assembly and construction method thereof
CN104060853A (en) * 2014-07-02 2014-09-24 河南信宇石油机械制造股份有限公司 Lightweight steel structure modularized residential building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101172353A (en) * 2006-10-31 2008-05-07 刘贵堂 Process for producing fireproof, heat-preserving and noise-insulation metal framework structure, and products produced thereby
US20080168735A1 (en) * 2007-01-16 2008-07-17 Clement Guevremont Building panel
WO2011089273A1 (en) * 2010-01-22 2011-07-28 Tempero 2000 S.L. Energy-collecting building-covering structure
US20110197518A1 (en) * 2010-02-14 2011-08-18 Burnett William S System and Method For Modular Roof Apparatus
CN103882977A (en) * 2013-12-16 2014-06-25 清华大学建筑设计研究院有限公司 Frame structure based on three-side-grooved strip precast concrete wallboard assembly and construction method thereof
CN104060853A (en) * 2014-07-02 2014-09-24 河南信宇石油机械制造股份有限公司 Lightweight steel structure modularized residential building

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544799A (en) * 2015-12-08 2016-05-04 智房科技股份有限公司 Fabricated horizontal external wall panel module, wall body, and assembling method
WO2017133257A1 (en) * 2016-02-04 2017-08-10 中清大科技股份有限公司 Prefabricated house
CN107587604B (en) * 2016-07-08 2021-07-16 肖中发 Socket type plate column assembly structure and installation method thereof
CN107587603A (en) * 2016-07-08 2018-01-16 曹海彦 Structure with assembled lightweight steel and its installation method
CN107587604A (en) * 2016-07-08 2018-01-16 曹海彦 Spigot-and-socket sheet-pile assembling structure and its installation method
CN107780576A (en) * 2016-08-30 2018-03-09 谢志强 A kind of assembled architecture bottom composite floor and its connected mode
CN106436912A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simple room
CN106436915A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified building
CN106436914A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Firm simplified house
CN106545180A (en) * 2016-10-26 2017-03-29 南宁众创空间科技有限公司 Firm simplified room
CN106545091A (en) * 2016-10-26 2017-03-29 南宁众创空间科技有限公司 A kind of firm simplified room
CN106436892A (en) * 2016-10-26 2017-02-22 南宁众创空间科技有限公司 Makeshift house
CN106400970A (en) * 2016-10-26 2017-02-15 南宁众创空间科技有限公司 Stacked type simplified house
CN106368311A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Simplified house
CN106368326A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Multilayer stacking type simplified house
CN106368386A (en) * 2016-10-26 2017-02-01 南宁众创空间科技有限公司 Reinforcing steel bar angle iron frame for simplified house
CN106522367A (en) * 2016-12-27 2017-03-22 北京善筑科技股份有限公司 Assembly type building main body structure
CN106639060A (en) * 2017-02-24 2017-05-10 李波 Partition assembly of exhibition room
CN106836502A (en) * 2017-03-09 2017-06-13 陈阳 Modularized house assembling structure
CN109424202A (en) * 2017-09-05 2019-03-05 中铁十局集团电务工程有限公司 A kind of secondary assembled wallboard building method
CN108222270B (en) * 2018-01-11 2019-12-10 张家口绿汇建筑科技有限公司 Assembling construction building method of prefabricated building
CN108222270A (en) * 2018-01-11 2018-06-29 张家口绿汇建筑科技有限公司 Prefabricated buildings and its construction method
CN115003922A (en) * 2020-01-27 2022-09-02 米勒销钉公司 Construction using collar and threaded stepped pin
CN115003922B (en) * 2020-01-27 2023-10-27 米勒销钉公司 Construction using a binding cylinder and threaded step pins
CN112012524A (en) * 2020-08-22 2020-12-01 深圳市炎唐装饰有限公司 Energy-saving assembled steel structure residential system and installation method
CN112012524B (en) * 2020-08-22 2021-08-24 深圳市炎唐装饰有限公司 Energy-saving assembled steel structure residential system and installation method
WO2022133617A1 (en) * 2020-12-21 2022-06-30 Universidad Diego Portales System and method for high-rise prefabricated modular construction, with staggered connecting columns
CN113463946A (en) * 2021-07-07 2021-10-01 航达建设集团有限公司 Structure is built in interim room easy to assemble
CN113668712A (en) * 2021-09-02 2021-11-19 驻马店职业技术学院 Rapid Assembly formula building structure
CN114016769A (en) * 2021-12-03 2022-02-08 南京九趾装备科技有限公司 Unit structure of prefabricated building, production method and assembly method
CN114278019A (en) * 2021-12-30 2022-04-05 中建八局第一建设有限公司 Assembled roof frame and preparation process and construction method thereof
CN114278019B (en) * 2021-12-30 2023-07-07 中建八局第一建设有限公司 Assembled roof frame and preparation process and construction method thereof

Also Published As

Publication number Publication date
CN104947792B (en) 2017-11-14

Similar Documents

Publication Publication Date Title
CN104947792A (en) Simply-built green light steel fabricated building and installation method
CN104947788B (en) A kind of modular assembly formula building systems and its method of construction
CN204983131U (en) DGC modularization prefabricated buildings system
CN204753811U (en) Green light steel prefabricated buildings are built in letter
CN105863067B (en) A kind of modularization low layer assembled Special-Shaped Column steel house system
CN105696817A (en) Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
CN203821627U (en) Wall structure system with light steel keels, and wall
CN108222270B (en) Assembling construction building method of prefabricated building
CN104153462A (en) Staggered floor hanging type prefabricated bay window
CN106703201A (en) Fabricated integrated building and production method thereof
CN111705996A (en) Prefabricated wall module unit, assembled composite wall and construction method
CN111927248B (en) Integrally prefabricated externally hung bay window, connecting node and manufacturing method
CN206655314U (en) The board-like assembling building systems of DGC
CN103352569A (en) Construction method of integrally-poured architecture building
CN106351358A (en) Method for manufacturing and mounting fabricated steel structure house sandwich thermal insulation concrete external wall panel
CN102660995A (en) Prefabricated composite plate formwork wall post-pouring concrete frame shear structure house and construction method
CN2931627Y (en) Framework and wall panel combination floor
CN103362307B (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN218374567U (en) Can fix a position ALC wallboard reinforced structure that can exempt from to plaster
CN111927249A (en) Integrally prefabricated embedded bay window, connecting joint and manufacturing method
CN104047457A (en) Light steel structure anti-seismic house
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN204112529U (en) The residence outer wall plate of gas concrete
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN204174729U (en) The prefabricated window that wafts of a kind of staggered floor suspension type

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171208

Address after: No. 1, Yongning Road, Xu Zhuang Street, Gaogang Hi-tech Zone, Taizhou City, Jiangsu Province

Patentee after: Jiangsu Baoli Automation Technology Co., Ltd.

Address before: 101100 Beijing city Tongzhou District Lu Yuan South Street No. 109 2-778

Co-patentee before: Xiao Zhongfa

Patentee before: BEIJING DAGONG JIANZHU SCIENCE & TECHNOLOGY CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190306

Address after: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee after: Taizhou Baoli Assembled Residential Industry Co., Ltd.

Address before: 225324 No. 1 Yongning Road, Xuzhuang Street, Gaogang High-tech Zone, Taizhou City, Jiangsu Province

Patentee before: Jiangsu Baoli Automation Technology Co., Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee after: Jiangsu Baoli assembly housing industry Co., Ltd

Address before: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee before: Taizhou Baoli Assembled Residential Industry Co., Ltd.

CP01 Change in the name or title of a patent holder