CN205933127U - Erection equipment of various steel inner panel in factory building roof - Google Patents

Erection equipment of various steel inner panel in factory building roof Download PDF

Info

Publication number
CN205933127U
CN205933127U CN201620911452.XU CN201620911452U CN205933127U CN 205933127 U CN205933127 U CN 205933127U CN 201620911452 U CN201620911452 U CN 201620911452U CN 205933127 U CN205933127 U CN 205933127U
Authority
CN
China
Prior art keywords
wire rope
steel wire
longitudinal steel
inner panel
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620911452.XU
Other languages
Chinese (zh)
Inventor
张德祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201620911452.XU priority Critical patent/CN205933127U/en
Application granted granted Critical
Publication of CN205933127U publication Critical patent/CN205933127U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an erection equipment of various steel inner panel in factory building roof, including the hanging flower basket, the transverse steel wire rope, vertical wire rope in a left side and the vertical wire rope in the right side, install respectively on two piece left stands in the factory building at the vertical wire rope's in a left side both ends, install respectively on two right stands on factory building right side at the vertical wire rope's in the right side both ends, the both ends of transverse steel wire rope respectively with vertical wire rope in a left side and the vertical wire rope sliding connection in the right side, install on the transverse steel wire rope hanging flower basket slidable, install on the hanging flower basket and be used for the fixed couple of hook on the steel construction crossbeam, be connected with lateral shifting stay cord and longitudinal movement stay cord on the hanging flower basket. The utility model is simple in operation, the installer is located the utility model discloses just can realize vertical, lateral shifting in the hanging flower basket to the time on roof about saving, safe more high -efficient, construction cost also can reduce.

Description

The installation equipment of factory roof coloured silk steel inner panel
Technical field
This utility model is related to the steel-structure factory building construction applications such as industrial, civilian, is especially a kind of factory roof coloured silk steel The installation equipment of inner panel.
Background technology
The construction span of existing steel-structure factory building is increasing, factory building height also more and more higher, lightweight steel construction gate-type Factory Building Roof mainly uses color steel and goes along with sb. to guard him closing, and from decorations aesthetical point, color steel inner and outer plates expose roof Steel construction (as pull bar, c-type etc.) component carries out hidden parcel.At present, when constructing roof coloured silk steel inner panel, following two are generally adopted The method of kind:First method, is installed to color steel inner panel using hanging indigo plant, install color steel inner panel (size about 900mm × Before 6000mm), need to produce 3 or more than 3 extension indigo plants in advance, then it is suspended on respectively the steel structure beam on roof Upper and length direction arrangement along color steel inner panel, after complete first piece color steel inner panel to be onstructed, installer upper on roof, by institute Have extension indigo plant to move to Board position in the color steel of second piece of pre-installation, be subsequently mounted workman be transferred to from roof extension basket in continuation to the Two pieces of color steel inner panels are constructed, by that analogy, could be the coloured silk whole installation of steel inner panel of whole roof;Second method, Set up moveable frame on the ground, installer stands in and carries out operation on adjustable shelf, equally install first block of coloured silk By way of mobile adjustable shelf, after steel inner panel, to carry out the installation of next block coloured silk steel inner panel, by that analogy, the most whole room All construction completes the color steel inner panel on top.Above-mentioned first method when constructing each piece of color steel inner panel, not only to make 3 with Upper extension is blue, and installer also otherwise stops ground on roof, and the length and width direction of edge coloured silk steel inner panel is mobile to hang indigo plant, no It is difficult to see, this method not only wastes time and energy, inefficient, and safety coefficient is very low;Above-mentioned second method is passed through to take If the rolling on the ground of adjustable shelf bottom roller installing color steel inner panel, this method is to the flatness requirement on ground very Height, needed to carry out smooth process to ground in advance, this virtually can increase operating expenses before setting up adjustable shelf, additionally, Easily topple over when the adjustable shelf set up is slightly higher, safety coefficient is also low.
Utility model content
The technical problems to be solved in the utility model be to provide a kind of simple to operate, construction cost is low, safely and efficiently factory The installation equipment of house top coloured silk steel inner panel.
Technical solution of the present utility model is to provide a kind of peace of the factory roof coloured silk steel inner panel with following structure Installing is standby, and including hanging basket, transverse steel wire rope, left longitudinal steel wire rope and right longitudinal steel wire rope, the two ends of left longitudinal steel wire rope are divided It is not arranged on two left columns on the left of Factory Building, two right sides that the two ends of right longitudinal steel wire rope are separately mounted on the right side of Factory Building are stood On post, the two ends of transverse steel wire rope are slidably connected with left longitudinal steel wire rope and right longitudinal steel wire rope respectively, and hanging basket is slidably pacified It is contained on transverse steel wire rope, hanging basket is provided with the fixed hook for being hooked on steel structure beam, hanging basket is connected with horizontal stroke To mobile drawstring with vertically move drawstring.
The installation equipment of factory roof described in the utility model coloured silk steel inner panel, wherein, one end of left longitudinal steel wire rope with Wherein one left column is fixedly connected, and the other end of left longitudinal steel wire rope is connected with another left column by jack, right longitudinal direction One end of steel wire rope is fixedly connected with wherein right column, and the other end of right longitudinal steel wire rope is passed through jack and stood with another right side Post connects, and one end of transverse steel wire rope is connected with left longitudinal steel wire rope or right longitudinal steel wire rope by jack.
The installation equipment of factory roof coloured silk steel inner panel described in the utility model, wherein, the cunning that hanging basket is installed by top Wheel and transverse steel wire rope slidable connection, the two ends of transverse steel wire rope pass through pulley and left longitudinal steel wire rope and right longitudinal steel respectively Cord is slidably connected.
After above structure, compared with prior art, the installation equipment tool of this utility model factory roof coloured silk steel inner panel Have the advantage that:
1 and prior art hang blue or promote adjustable shelf that color steel inner panel is installed by frequently mobile, cause the plenty of time all Be wasted in different in the movement hang blue and adjustable shelf, this utility model directly by transverse shifting drawstring or vertically move drawstring come right Hanging basket carries out lateral or longitudinal movement, and in moving process, installer need not go up on roof, can achieve in hanging basket Mobile, therefore, this utility model not only operates very simply, also a saving the plenty of time, thus substantially increasing efficiency of construction;
2nd, just achieve that vertical, horizontal moves because installer is located in this utility model hanging basket, thus overcoming existing Technology needs installer frequently to go up on roof could to move extension blue, and the safe drawback that adjustable shelf is easily toppled over, erector People, under the safeguard protection of this utility model hanging basket, adds the parts such as jack, steel wire rope, pulley quality really up to the mark itself, construction Very safe;
3 from prior art need to make multiple hang blue or ground carried out smooth in advance process different, this utility model leads to Cross the mobile construction that hanging basket achieves that installer, the shortening of engineering time, in addition hanging basket can achieve on a steel cord vertical, Slide laterally movement, without any requirement to the flatness on ground, therefore, this utility model greatly reduces the cost of construction;
4th, this utility model makes the personal safety of installer be protected, and excludes trouble and worry, accordingly in construction The construction quality of inner panel can be greatly promoted.
The setting of jack can be convenient when left longitudinal steel wire rope, right longitudinal steel wire rope and transverse steel wire rope fixedly mount Take up.
Brief description
Fig. 1 is that plan structure when being contained on roof for the installation equipment of this utility model factory roof coloured silk steel inner panel is illustrated Figure.
Specific embodiment
With reference to the accompanying drawings and detailed description to this utility model factory roof coloured silk steel inner panel installation equipment make into One step describes in detail:
For sake of convenience, the left and right direction of "left", "right" described below and accompanying drawing itself is consistent.As shown in figure 1, In this embodiment, the installation equipment of this utility model factory roof coloured silk steel inner panel includes hanging basket 11, transverse steel wire rope 9th, left longitudinal steel wire rope 8 and right longitudinal steel wire rope 12, the two ends of left longitudinal steel wire rope 8 are separately mounted to two on the left of Factory Building On left column 50, the two ends of right longitudinal steel wire rope 12 are separately mounted on two right columns 60 on the right side of Factory Building, transverse steel wire rope 9 Two ends be slidably connected with left longitudinal steel wire rope 8 and right longitudinal steel wire rope 12 respectively, hanging basket 11 is slidably mounted in horizontal steel In cord 9, move for ensureing that hanging basket 11 is stable, described transverse steel wire rope 9 adopts two, and hanging basket 11 is provided with for being hooked on Fixed hook (not shown) on steel structure beam, hanging basket 11 is connected with transverse shifting drawstring 10 and vertically moves drawstring 13.
Preferably, the pulley 6 installed by top of hanging basket 11 and transverse steel wire rope 9 slidable connection, transverse steel wire rope 9 Two ends be slidably connected with left longitudinal steel wire rope 8 and right longitudinal steel wire rope 12 by pulley 6 respectively.
During assembling, for the ease of straining left longitudinal steel wire rope 8, one end of left longitudinal steel wire rope 8 and wherein one left column 50 are fixedly connected, and the other end of left longitudinal steel wire rope 8 is connected with the crampon of jack 7, and the chain drum of jack 7 is linked up with and another Left column 50 connects, by pull jack 7 pull chain can easily by left longitudinal steel wire rope 8 give tension.During assembling, it is It is easy to strain right longitudinal steel wire rope 12, one end of right longitudinal steel wire rope 12 is fixedly connected with wherein right column 60, right vertical It is connected to the other end of steel wire rope 12 with the crampon of jack 7, the chain drum hook of jack 7 is connected with another right column 60, By pull jack 7 pull chain can easily by right longitudinal steel wire rope 12 give tension.During assembling, horizontal for the ease of tension To steel wire rope 9, the left end of transverse steel wire rope 9 is connected with the crampon of jack 7, and the chain drum of jack 7 links up with the pulley 6 with left end Connect, the pulley 6 of left end is slidably connected with left longitudinal steel wire rope 8, the chain that pulls by pulling jack 7 can be easily by horizontal stroke Give tension to steel wire rope 9, certainly, jack 7 can also be arranged on the right-hand member of transverse steel wire rope 9, its set-up mode and above-mentioned setting Identical in left end, therefore here does not repeat.
See Fig. 1, the installation method of factory roof coloured silk steel inner panel, comprise the following steps:
1) span according to Factory Building intercepts left longitudinal steel wire rope 8 and right longitudinal steel wire rope 12;
2) two ends of left longitudinal steel wire rope 8 are separately mounted on two left columns 50 on the left of Factory Building, by right longitudinal steel The two ends of cord 12 are separately mounted on two right columns 60 on the right side of Factory Building;
3) lateral length according to Factory Building intercepts two transverse steel wire ropes 9;
4) two ends of transverse steel wire rope 9 are slidably connected with left longitudinal steel wire rope 8 and right longitudinal steel wire rope 12 respectively;
5) make hanging basket 11 according to the length of color steel inner panel, and install on hanging basket 11 and be used for being hooked on steel structure beam Fixed hook (not shown);
6) intercept transverse shifting drawstring 10 as needed and vertically move drawstring 13;
7) transverse shifting drawstring 10 is connected on hanging basket 11 with the one end vertically moving drawstring 13;
8) hanging basket 11 is slidably mounted on transverse steel wire rope 9.
Preferably, the pulley 6 installed by top of hanging basket 11 and transverse steel wire rope 9 slidable connection, transverse steel wire rope 9 Two ends be slidably connected with left longitudinal steel wire rope 8 and right longitudinal steel wire rope 12 by pulley 6 respectively.
During assembling, for the ease of straining left longitudinal steel wire rope 8, one end of left longitudinal steel wire rope 8 and wherein one left column 50 are fixedly connected, and the other end of left longitudinal steel wire rope 8 is connected with the crampon of jack 7, and the chain drum of jack 7 is linked up with and another Left column 50 connects, by pull jack 7 pull chain can easily by left longitudinal steel wire rope 8 give tension.During assembling, it is It is easy to strain right longitudinal steel wire rope 12, one end of right longitudinal steel wire rope 12 is fixedly connected with wherein right column 60, right vertical It is connected to the other end of steel wire rope 12 with the crampon of jack 7, the chain drum hook of jack 7 is connected with another right column 60, By pull jack 7 pull chain can easily by right longitudinal steel wire rope 12 give tension.During assembling, horizontal for the ease of tension To steel wire rope 9, the left end of transverse steel wire rope 9 is connected with the crampon of jack 7, and the chain drum of jack 7 links up with the pulley 6 with left end Connect, the pulley 6 of left end is slidably connected with left longitudinal steel wire rope 8, the chain that pulls by pulling jack 7 can be easily by horizontal stroke Give tension to steel wire rope 9, certainly, jack 7 can also be arranged on the right-hand member of transverse steel wire rope 9, its set-up mode and above-mentioned setting Identical in left end, therefore here does not repeat.
The installation method of this factory roof of this utility model coloured silk steel inner panel is simple, convenient, and human input is few, operation Efficiency high, safe and reliable, economy, using this method, construction speed can be greatly improved and save great amount of cost.This Utility model has no requirement to the flatness on ground and the height on roof.
This utility model, according to the length of color steel inner panel, makes corresponding hanging basket length, when installing color steel inner panel, installs Personnel can walk in the enterprising every trade of hanging basket 11, walking, and the length direction nailing of an edge coloured silk steel inner panel is fixed, and treats first piece After color steel inner panel installation, ground staff passes through to pull transverse shifting drawstring 10 or vertically move drawstring 13 to realize hanging basket 11 Laterally (left and right directions in Fig. 1) or longitudinal (above-below direction in Fig. 1) is mobile, and after moving to correct position, installation personnel will be consolidated Fixed being hooked on is fixed with the position to hanging basket 11 on steel structure beam, after installing second piece of color steel inner panel, again Moving hanging basket 11 by the way, by that analogy, the whole construction of the most color steel inner panel on whole roof completes.Just because installing Workman is located in this utility model hanging basket 11 and achieves that vertical, horizontal moves, thus overcoming prior art to need installer Frequently go up that could to move extension on roof blue, and the safe drawback that adjustable shelf is easily toppled over, installer hangs in this utility model Under the safeguard protection of basket 11, add part itself quality really up to the mark such as jack 7, steel wire rope, pulley 6, construction is very safe.
In this embodiment, in the industry also known as " chain block ", it is commercially available prod to described jack 7, therefore Here does not repeat concrete structure.
Embodiment described above is only preferred implementation of the present utility model to be described, not to this practicality New scope is defined, and on the premise of without departing from this utility model design spirit, those of ordinary skill in the art are to this Various modifications and improvement that the technical scheme of utility model is made, all should fall in protection domain of the present utility model.

Claims (3)

1. a kind of factory roof coloured silk steel inner panel installation equipment it is characterised in that:Including hanging basket (11), transverse steel wire rope (9), a left side Longitudinal steel wire rope (8) and right longitudinal steel wire rope (12), the two ends of described left longitudinal steel wire rope (8) are separately mounted on the left of Factory Building Two left columns (50) on, the two ends of described right longitudinal steel wire rope (12) are separately mounted to two right columns on the right side of Factory Building (60), on, slided even with left longitudinal steel wire rope (8) and right longitudinal steel wire rope (12) respectively in the two ends of described transverse steel wire rope (9) Connect, described hanging basket (11) is slidably mounted on transverse steel wire rope (9), described hanging basket (11) is provided with for being hooked on steel Fixed hook on structural beams, described hanging basket (11) is connected with transverse shifting drawstring (10) and vertically moves drawstring (13).
2. factory roof according to claim 1 coloured silk steel inner panel installation equipment it is characterised in that:Described left longitudinal steel wire One end of rope (8) is fixedly connected with wherein left column (50), the other end of left longitudinal steel wire rope (8) pass through jack (7) and Another left column (50) connects, and one end of described right longitudinal steel wire rope (12) is fixedly connected with wherein right column (60), The other end of right longitudinal steel wire rope (12) is connected with another right column (60) by jack (7), described transverse steel wire rope (9) One end is connected with left longitudinal steel wire rope (8) or right longitudinal steel wire rope (12) by jack (7).
3. factory roof according to claim 2 coloured silk steel inner panel installation equipment it is characterised in that:Described hanging basket (11) is led to Cross pulley (6) and transverse steel wire rope (9) slidable connection of top installation, the two ends of described transverse steel wire rope (9) are passed through respectively Pulley (6) is slidably connected with left longitudinal steel wire rope (8) and right longitudinal steel wire rope (12).
CN201620911452.XU 2016-08-19 2016-08-19 Erection equipment of various steel inner panel in factory building roof Active CN205933127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620911452.XU CN205933127U (en) 2016-08-19 2016-08-19 Erection equipment of various steel inner panel in factory building roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620911452.XU CN205933127U (en) 2016-08-19 2016-08-19 Erection equipment of various steel inner panel in factory building roof

Publications (1)

Publication Number Publication Date
CN205933127U true CN205933127U (en) 2017-02-08

Family

ID=57948288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620911452.XU Active CN205933127U (en) 2016-08-19 2016-08-19 Erection equipment of various steel inner panel in factory building roof

Country Status (1)

Country Link
CN (1) CN205933127U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115573A (en) * 2016-08-19 2016-11-16 中国化学工程第三建设有限公司 The installation equipment of factory roof coloured silk steel inner panel and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115573A (en) * 2016-08-19 2016-11-16 中国化学工程第三建设有限公司 The installation equipment of factory roof coloured silk steel inner panel and installation method

Similar Documents

Publication Publication Date Title
CN201458596U (en) Crane with self-dismounting device
CN103821340B (en) The mounting method of adhering lifting multilayer operation platform
CN103495265B (en) High-rise Super High climb type fire-fighting and rescue system
CN204804298U (en) Building material hoist and mount construction scaffold
CN105672642A (en) Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN105638312A (en) Large-span and high-strength one-piece greenhouse
CN205933127U (en) Erection equipment of various steel inner panel in factory building roof
CN203128099U (en) Slipping type pipeline lifting device
CN205100531U (en) Lift scaffold support body assembly
CN105672641A (en) Double-guide-frame multi-stage synchronous lifting working platform and construction method thereof
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN108487621A (en) Assembled movement shield cage and its construction method
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN105781091A (en) Adjustable-length single-guide-frame multilevel synchronous lifting working platform and construction method thereof
CN106115573A (en) The installation equipment of factory roof coloured silk steel inner panel and installation method
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN103821339B (en) Operation platform modular unit and operation platform thereof
CN204081433U (en) Steel structural roof liner profiled sheet construction Special-purpose hanger basket support
CN107060347A (en) A kind of big encorbelmented across metal decorates prefabricated roof and air translation splicing structure
RU120692U1 (en) DEVICE FOR MOUNTING THE TOWER TYPE DRILL RIGS
CN208578156U (en) Fast assembling-disassembling can plug-type heat preservation steel structure
CN203319589U (en) Hoisting machine for installing air hose
CN203624847U (en) Simple lifting device for assembling roadheader

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant