CN205881128U - Mountain landslide intelligent early warning equipment - Google Patents

Mountain landslide intelligent early warning equipment Download PDF

Info

Publication number
CN205881128U
CN205881128U CN201620407133.5U CN201620407133U CN205881128U CN 205881128 U CN205881128 U CN 205881128U CN 201620407133 U CN201620407133 U CN 201620407133U CN 205881128 U CN205881128 U CN 205881128U
Authority
CN
China
Prior art keywords
steel pipe
massif
landslide
intelligent early
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620407133.5U
Other languages
Chinese (zh)
Inventor
徐建民
Original Assignee
SHENZHEN LULUTONG NETWORK COMMUNICATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN LULUTONG NETWORK COMMUNICATION Co Ltd filed Critical SHENZHEN LULUTONG NETWORK COMMUNICATION Co Ltd
Priority to CN201620407133.5U priority Critical patent/CN205881128U/en
Application granted granted Critical
Publication of CN205881128U publication Critical patent/CN205881128U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a mountain landslide intelligent early warning equipment, includes massif vibration detection ware (11), solar energy power supply system (16) and telemetering measurement terminal (17), and wherein massif vibration detection ware (11) include galvanized steel pipe (12), and in galvanized steel pipe (12) pre -buried income massif, galvanized steel pipe (12) top mouth of pipe department is fixed with iron plate, and the iron plate center is fixed with the lifting rope, and lifting rope and miniature sash weight (13) are connected with its suspension at the positive center of galvanized steel pipe (12), respectively in contact with the signal line, the signal line connects at telemetering measurement terminal (17) signal port on galvanized steel pipe (12) and sash weight (13), the edge of locating iron plate at galvanized steel pipe (12) the mouth of pipe is fixed in spirit level (14), install at the iron plate center of the mouth of pipe department electronic gyroscope (15), and it is last that the electron chip transmitting port of electronic gyroscope (15) is connected to telemetering measurement terminal (17) signal port with the signal line, telemetering measurement terminal (17) are connected with solar energy power supply system (16).

Description

A kind of landslide intelligent early-warning equipment
Technical field
This utility model relates to a kind of prior-warning device, specifically, relates to a kind of landslide intelligent early-warning equipment.
Background technology
Landslide refers to that on massif slope, certain a part of ground is at gravity (including the gravity of ground own and the dynamic and static pressures of subsoil water) Under effect, produce shear displacemant and the integrally effect of movement and phenomenon below slope along certain weak structural face (carrying). It is commonly called as " walking mountain ", " collapse mountain ", " sliding ", " solifluction " etc..It it is one of common geological disaster.
During December in 2015 20 days 11 40 points, there is massif in Heng Taiyu industry park, phoenix community, light new district, Shenzhen City, Guangdong Province Landslide.This time disaster landslide area coverage about 380,000 square metres, causes 33 solitary buildings buried or the most impaired, When December 21 days 6, the lost contact total number of persons that disaster causes has risen to 91 people, wherein male 59 people, and women 32 People.Through investigation, find generation landslide, Liu Xi industry park, light new district, Shenzhen, it is judged that pipeline is impaired to be let out in order to thereby result in Leakage, and explode.By night on January 12nd, 2016, field rescue headquarter give out information title, it has been found that 69 Victim, verified all lost contact personnel announced before this.Additionally also have 8 people's lost contacts.
According to information it can be appreciated that China also has a lot of areas that the case of landslide occurred at present, the most also have A lot of devices detecting landslide, but it is installed and uses the most complicated, and it is difficult to reach the function of timely early warning, If early warning not in time, may result in production development accident, casualties can be caused time serious, therefore, need research and development one badly Can the landslide intelligent early-warning equipment of early warning in time.
Utility model content
For the drawbacks described above of prior art, this utility model provides a kind of landslide intelligent early-warning equipment.
In order to solve above-mentioned technical problem, this utility model is addressed by following technical proposals:
A kind of landslide intelligent early-warning equipment, including massif vibrating detector 11, solar electric power supply system 16 and telemetry terminal system 17, wherein massif vibrating detector 11 includes that coating steel pipe 12, coating steel pipe 12 are embedded into 60-70cm in massif, galvanized steel Pipe 12 top exceeds massif gradient 15cm, is fixed with iron plate at the mouth of pipe of coating steel pipe 12 top, and iron plate center is fixed with lifting rope, Lifting rope and small-sized sash weight 13 connect and are suspended at coating steel pipe 12 center so that the lifting rope that sash weight 13 stretches longitudinally hangs down Directly it is arranged in coating steel pipe 12;Connecting signal line respectively on coating steel pipe 12 with sash weight 13, signal line is connected on remote measurement Terminal 17 signal port;Level indicator 14 is fixed on the edge of iron plate at coating steel pipe 12 mouth of pipe;Electronic gyroscope 15 is installed Iron plate center at the mouth of pipe, holding wire is connected to telemetry terminal system 17 signal by the electronic chip transmission port of electronic gyroscope 15 On port;Telemetry terminal system 17 is connected with solar electric power supply system 16.
Further, the preburying part of coating steel pipe 12 sets up separately and is equipped with moistureproof hole.
Further, solar electric power supply system 16 includes that solar panels 20, solar panels 20 are arranged on open air, uses iron Frame 21 is fixed on outdoor pedestal, is provided with equipment box 22 in the middle part of iron support 21, and accumulator is placed in outdoor base interior, Solar panels 20 are connected with equipment box 22 by circuit, and equipment box 22 is connected with accumulator.
Further, the top stage+module discharging rod 24 of iron support 21, discharging rod 24 top is away from iron support top 1 meter.
Further, bottom iron support 21, it is provided with access hole 23.
Further, in telemetry terminal system 17 is fixed on equipment box 22.
Further, telemetry terminal system 17 and remote control terminal wireless connections.
A kind of landslide of the present utility model intelligent early-warning equipment is very convenient in installation process, safety, can synchronize, accurately The situation that vibration occurs before landslide is transferred to warning center by ground quickly, easily, and cost is little, can be in economy instantly Construction plays preferably effect.In line with the principle of " relying mainly on prevention, people-oriented ", in disaster of mountain massif coast Yi Fa district, build This prior-warning device vertical, can monitor massif status information in real time by this device, and device stability is good, easily operates, before can accomplishing calamity Can early warning, can collect evidence after calamity, for avoiding economic loss and casualties to provide reliable guarantee.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by of the present utility model, constitutes the part of the application, this practicality Novel schematic description and description is used for explaining this utility model, is not intended that improper restriction of the present utility model.? In accompanying drawing:
Fig. 1 is landslide of the present utility model intelligent early-warning device structure composition schematic diagram;
Fig. 2 is massif vibrating detector structural representation;
Fig. 3 is massif vibrating detector nozzle structure schematic diagram;
Fig. 4 is solar electric power supply system structural representation.
Detailed description of the invention
For making the purpose of this utility model embodiment, technical scheme and advantage clearer, implement below in conjunction with this utility model The accompanying drawing of example, is clearly and completely described the technical scheme of this utility model embodiment.Obviously, described embodiment It is a part of embodiment of the present utility model rather than whole embodiments.Based on described embodiment of the present utility model, The every other embodiment that those of ordinary skill in the art are obtained on the premise of without creative work, broadly falls into this practicality new The scope of type protection.
Refer to Fig. 1-4, for the structural representation of a kind of landslide of the present utility model intelligent early-warning equipment preferred embodiment.
As shown in Figure 1-2, a kind of landslide of the present utility model intelligent early-warning equipment includes massif vibrating detector 11, the sun Can electric power system 16 and telemetry terminal system 17, wherein the GB coating steel pipe 12 of massif vibrating detector 11 mainly use Φ 50 As load bearing equipment, in being embedded into massif, (concrete embedment size need to be according to on-site land survey and mountain for about about 60-70cm Depending on the structure situation of body), coating steel pipe 12 top exceeds the massif gradient about 15cm, it is ensured that massif is occurring vibration bursts Situation under steel pipe can along with massif vibration and run-off the straight change.Further, the preburying part of coating steel pipe 12 is the best anti- Tide hole, such that it is able to effectively prevent pipe internal water accumulation, just can imbed after being wrapped by inlet part by geotextiles during installation.? Coating steel pipe 12 top is fixed with iron plate, and iron plate center is fixed with lifting rope, lifting rope and small-sized sash weight 13 and connects and suspended In coating steel pipe 12 center so that lifting rope that sash weight 13 stretches is longitudinally perpendicular to be arranged in coating steel pipe 12.Massif vibration inspection Survey device 11 to be connected with telemetry terminal system 17 by signal line.After once massif vibrating detector 11 being imbedded massif, massif occurs While vibration, sash weight 13 can clash into coating steel pipe 12, and signal line connects, and connects respectively on sash weight 13 at coating steel pipe 12 Upper signal line, is connected on telemetry terminal system 17 signal port, when occurring sash weight 13 to rock shock coating steel pipe 12, just may be used Signal is transferred back in telemetry terminal system 17, by telemetry terminal system 17, signal is sent.
In a kind of embodiment of the present utility model, as it is shown on figure 3, the coating steel pipe 12 at massif vibrating detector 11 buries Enter massif, and after connecting lifting rope and sash weight, making one piece of sealing platform size at the mouth of pipe is the iron plate of 15cm*15cm, by water Level 14 is fixed on edge, and observation massif vibrating detector 11 has kept horizontal vertical state.Level indicator 14 device Mainly guarantee massif vibrating detector 11 vertical-horizontal state to be maintained at after embedment massif.
In a kind of embodiment of the present utility model, the instrument that electronic gyroscope 15 is used is the type with electronic chip, Gyro movable signal can be transmitted and dock mutually in transmission equipment.The main purpose disposing electronic gyroscope 15 is to allow massif vibrate When detector 11 occurs vibration informing, can be corrected by electronic gyroscope 15, comparative information the most accurate.Such as Fig. 3 institute Showing, electronic gyroscope 15 installation site is to dispose the iron plate center of fixing level indicator 14, and level indicator 14 is guaranteeing massif vibration inspection When surveying the level of device 11, also to detect whether electronic gyroscope 15 keeps level simultaneously.Electronic gyroscope 15 is fixed During installation, the electronic chip in electronic gyroscope 15 transmits port and is connected on telemetry terminal system 17 signal port by holding wire, When massif occurs vibration, signal also can be reached telemetry terminal system 17 by electronic gyroscope 15, will in real time by telemetry terminal system 17 Information sends.
In a kind of embodiment of the present utility model, as shown in Figure 4, solar electric power supply system 16 includes solar panels 20, Solar panels 20 are arranged on open air, use iron support 21 to be fixed on outdoor pedestal.It is provided with equipment in the middle part of iron support 21 Case 22, accumulator is placed in outdoor base interior, and solar panels 20 are connected with equipment box 22 by circuit, equipment box 22 and Accumulator connects.Further, equipment is in high-altitude and sets up, in order to reduce the thunder-strike phenomenon destruction to equipment, and iron support 21 Top stage+module discharging rod 24, discharging rod 24 top is away from iron support top 1 meter.Further, at iron Access hole 23 it is provided with bottom frame 21.
In this utility model, telemetry terminal system 17 integrates data acquisition, transmits, stores function, uses low power dissipation design, special It is not applicable to solar powered monitoring field, solar powered cost can be greatly reduced and reduce difficulty of construction, being widely used in The industries such as meteorology, hydrology and water conservancy, geology.Telemetry terminal system 17 at Main Function of the present utility model is, allows massif vibration detection set Signal can be transferred out by the standby signal with electronic gyroscope 15 by the SMS of telemetry terminal system 17.Telemetry terminal system 17 with Solar electric power supply system 16 connects, in a preferred embodiment, in telemetry terminal system 17 is fixed on equipment box 22 and carry out close Envelope protection, it is ensured that the pot life of equipment.In a preferred embodiment, telemetry terminal system 17 and the wireless company of remote control terminal Connect.
Detecting instrument is installed: be ready for the embedding coating steel pipe 12 held apopore successfully and wrapped up geotextiles at hillside, will Fix lifting rope on top after the embedding massif of coating steel pipe 12 and bound sash weight, after burying and discharging into, holding wire is connected on respectively plating On zinc steel pipe 12 inwall and sash weight, it is ensured that sash weight strikes steel pipe inner wall can produce open circuit closure signal.After detection completes, use Secure the steel plate of level indicator 14 by ferrule, then electronic gyroscope 15 is fixed on iron plate.Electronic gyroscope 15 After transmitting normally with software test communication and signal, signal connecting line road is connected, and in the holding wire one of massif vibration tester Rising and be arranged in the equipment box of solar energy vertical rod of side by built-in pipe, 1#, 2# signal being attempted by telemetry terminal system 17 receives Port.
Operation principle: when complete equipment installs and after the test that is energized, has 2-3 complete equipment at the section installed, the most sheathed Standby telemetry terminal system 17 has independent communication number, and the numbering of front end telemetry terminal system 17 is written as trivial by the heart in the background Domain name claims.When massif occurs vibration when, the coating steel pipe 12 being embedded in massif can change along with the vibration of massif soil, Sash weight in steel pipe 12 can strike coating steel pipe 12 simultaneously, once occurs shock will produce open circuit closure signal, signal meeting Directly being administered in telemetry terminal system 17, signal can be transmitted back to background terminal by the GSM of telemetry terminal system 17 in time.When massif occurs The when of vibration, electronic gyroscope 15 can produce deviation equally, and the when of there is deviation, corresponding signal will be given by electronic chip In telemetry terminal system 17, signal can be transmitted back to background terminal by the GSM of telemetry terminal system 17 in time.
At remote control terminal, we are mainly with note processor, GIS platform and data server for Main Analysis processing equipment, The signal that front end massif vibratory equipment and electronic gyroscope 15 are passed back carries out background analysis process, and is shown by data process On GIS platform.
Note processor: install a note processor device load onto phonecard at central machine room, is used for receiving and installs existingly Detection equipment in landslide sends the alarming short message of returning, and is processed by note processor so that it is display is in GIS platform On, and can mass-send to related personnel needs send pre-alert notification when, it is simple to the crowd in evacuation and pre-alarming region, make burst The loss of event is preferably minimized.
GIS platform: each telemetry terminal system 17 of front end has its corresponding regional location to number, and center to be monitored receives After the alarming short message that front end is beamed back, note processor will occur the short message sending hands to this region relevant staff of alarm region On plane No. code.The numbering of alarm region can display in GIS platform, can quickly lock onto alarm region, and with meteorology The weather condition of office carries out aggregate background analysis, if there is the phenomenon such as torrential rain or earthquake this area, and will be at once with note Formal group issues relevant staff.
Data server: on data server, can allow monitoring personnel be clearly seen that the detailed letter that massif vibration area occurs Breath, monitoring personnel can according to these information and combine the recent weather condition of this panel region and the report of front end staff, Landslide will occur when drawing this section, if there being the omen of landslide, just can be at once by mountain flood early warning system Uniting and send instruction to note processor secondary development software, editor formulates early warning information and is sent to front end management personnel, reminds the people Carrying out and withdraw preparation, the loss that be will result in landslide is preferably minimized.
Although it should be understood that with reference to its exemplary embodiment, this utility model carried out particularly shown and described, It should be understood by those skilled in the art that without departing substantially from by spirit of the present utility model as defined in the claims and Under conditions of scope, the change of various forms and details can be carried out wherein, the combination in any of various embodiment can be carried out.

Claims (7)

1. a landslide intelligent early-warning equipment, it is characterised in that: include massif vibrating detector (11), solar powered System (16) and telemetry terminal system (17), wherein massif vibrating detector (11) includes coating steel pipe (12), coating steel pipe (12) Being embedded into 60-70cm in massif, coating steel pipe (12) top exceeds massif gradient 15cm, at coating steel pipe (12) head tube Being fixed with iron plate at Kou, iron plate center is fixed with lifting rope, lifting rope and small-sized sash weight (13) and connects and be suspended at galvanized steel Pipe (12) center so that lifting rope that sash weight (13) stretches is longitudinally perpendicular to be arranged in coating steel pipe (12);At galvanized steel Connecting signal line respectively on pipe (12) and sash weight (13), signal line is connected on telemetry terminal system (17) signal port;Level Instrument (14) is fixed on the edge of iron plate at coating steel pipe (12) mouth of pipe;Electronic gyroscope (15) is arranged on the ferrum at the mouth of pipe Plate center, holding wire is connected on telemetry terminal system (17) signal port by the electronic chip transmission port of electronic gyroscope (15); Telemetry terminal system (17) is connected with solar electric power supply system (16).
A kind of landslide the most according to claim 1 intelligent early-warning equipment, it is characterised in that: coating steel pipe (12) Preburying part sets up separately and is equipped with moistureproof hole.
A kind of landslide the most according to claim 1 and 2 intelligent early-warning equipment, it is characterised in that: solar powered system System (16) includes that solar panels (20), solar panels (20) are arranged on open air, uses iron support (21) to be fixed on open air On pedestal, iron support (21) middle part is provided with equipment box (22), and accumulator is placed in outdoor base interior, solar panels (20) Being connected with equipment box (22) by circuit, equipment box (22) is connected with accumulator.
A kind of landslide the most according to claim 3 intelligent early-warning equipment, it is characterised in that: iron support (21) Top stage+module discharging rod (24), discharging rod (24) top is away from iron support top 1 meter.
A kind of landslide the most according to claim 3 intelligent early-warning equipment, it is characterised in that: in iron support (21) Bottom is provided with access hole (23).
A kind of landslide the most according to claim 3 intelligent early-warning equipment, it is characterised in that: telemetry terminal system (17) is solid It is scheduled in equipment box (22).
A kind of landslide the most according to claim 1 intelligent early-warning equipment, it is characterised in that: telemetry terminal system (17) with Remote control terminal wireless connections.
CN201620407133.5U 2016-05-09 2016-05-09 Mountain landslide intelligent early warning equipment Expired - Fee Related CN205881128U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620407133.5U CN205881128U (en) 2016-05-09 2016-05-09 Mountain landslide intelligent early warning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620407133.5U CN205881128U (en) 2016-05-09 2016-05-09 Mountain landslide intelligent early warning equipment

Publications (1)

Publication Number Publication Date
CN205881128U true CN205881128U (en) 2017-01-11

Family

ID=57686753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620407133.5U Expired - Fee Related CN205881128U (en) 2016-05-09 2016-05-09 Mountain landslide intelligent early warning equipment

Country Status (1)

Country Link
CN (1) CN205881128U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107146383A (en) * 2017-07-05 2017-09-08 成都磁动势科技有限公司 Landslide, avalanche precaution device installation method
CN107248264A (en) * 2017-06-28 2017-10-13 依塔科技有限公司 A kind of debris flow early-warning device and method for early warning
CN108109344A (en) * 2017-12-25 2018-06-01 陈小辉 A kind of geo-hazard early-warning equipment
CN109785585A (en) * 2019-01-31 2019-05-21 山东盛隆安全技术有限公司 Based on optical fiber sensing network monitoring and pre-warning system and method
CN114758477A (en) * 2022-06-16 2022-07-15 湖北高路公路工程监理咨询有限公司 Multisource information monitoring and early warning device for highway geological disasters
CN114863644A (en) * 2022-04-27 2022-08-05 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) Novel geological environment monitoring and early warning device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107248264A (en) * 2017-06-28 2017-10-13 依塔科技有限公司 A kind of debris flow early-warning device and method for early warning
CN107146383A (en) * 2017-07-05 2017-09-08 成都磁动势科技有限公司 Landslide, avalanche precaution device installation method
CN108109344A (en) * 2017-12-25 2018-06-01 陈小辉 A kind of geo-hazard early-warning equipment
CN109785585A (en) * 2019-01-31 2019-05-21 山东盛隆安全技术有限公司 Based on optical fiber sensing network monitoring and pre-warning system and method
CN114863644A (en) * 2022-04-27 2022-08-05 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) Novel geological environment monitoring and early warning device
CN114863644B (en) * 2022-04-27 2023-07-18 山东省地质矿产勘查开发局第五地质大队(山东省第五地质矿产勘查院) Novel geological environment monitoring and early warning device
CN114758477A (en) * 2022-06-16 2022-07-15 湖北高路公路工程监理咨询有限公司 Multisource information monitoring and early warning device for highway geological disasters
CN114758477B (en) * 2022-06-16 2022-10-14 湖北高路公路工程监理咨询有限公司 Multisource information monitoring and early warning device for highway geological disasters

Similar Documents

Publication Publication Date Title
CN205881128U (en) Mountain landslide intelligent early warning equipment
CN107817744B (en) Communal facility safety monitoring system
CN102789674B (en) Geological disaster networking monitoring pre-warning system
CN206987892U (en) A kind of prior-warning device for being used to monitor Propagation in Tunnel Disaster
CN108492532B (en) Mountain landslide geological disaster early warning system and early warning method thereof
CN109949549A (en) A kind of Geological Disaster Warning System
CN205582211U (en) Integration disconnection warning automatic monitoring station
CN208861441U (en) A kind of Geological Hazards Monitoring early warning system based on big-dipper satellite and mobile communication
US20240045063A1 (en) Iot-based groundwater monitoring system using lidar sensor technology
CN113112759A (en) Beidou-based geological disaster monitoring Beidou early warning and alarming system and method
CN108765880A (en) Geological disaster monitors in real time and early warning system
CN111007538B (en) Emergency monitoring equipment for global navigation satellite system
CN212158696U (en) Natural disaster emergency rescue monitoring system structure
CN109801478A (en) A kind of intelligent monitor system of disaster of mountain massif coast
CN208722386U (en) A kind of geological disaster monitors acoustooptic alarm system automatically
KR20170004206A (en) The danger notification system of object
CN110264673A (en) A kind of multi-functional geological disaster monitoring device and system of integrated GNSS and microseism information
CN207182625U (en) A kind of debris flow early-warning system
CN210466680U (en) Multifunctional ground disaster monitoring device and system integrating GNSS and microseismic information
CN107248264A (en) A kind of debris flow early-warning device and method for early warning
CN206470919U (en) Mud-rock flow three-level precaution device and debris flow early-warning system
CN204066341U (en) Based on the geologic hazard real-time monitoring system of Internet of Things
CN110491094A (en) A kind of prior-warning device for mountain landslide supervision
CN215906867U (en) Mountain area high slope stability monitoring and early warning system
CN206179176U (en) Geological environment and mine monitoring and early warning system

Legal Events

Date Code Title Description
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170824

Address after: Ezhou City, Hubei Province, 436099 Avenue in the city of Hubei No. 13 2 floor

Patentee after: Xu Jianmin

Address before: 518100, B, building 5, building three, village of fragrant honey village, Hongli West Road, Shenzhen, Guangdong, Futian District, 28G

Patentee before: SHENZHEN LULUTONG NETWORK COMMUNICATION CO., LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20190509

CF01 Termination of patent right due to non-payment of annual fee