CN205857693U - A kind of canalization template being applied to movement joint both sides shear wall synchronous construction - Google Patents

A kind of canalization template being applied to movement joint both sides shear wall synchronous construction Download PDF

Info

Publication number
CN205857693U
CN205857693U CN201620857951.5U CN201620857951U CN205857693U CN 205857693 U CN205857693 U CN 205857693U CN 201620857951 U CN201620857951 U CN 201620857951U CN 205857693 U CN205857693 U CN 205857693U
Authority
CN
China
Prior art keywords
template
support bar
canalization
frame support
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620857951.5U
Other languages
Chinese (zh)
Inventor
孟军
胡海军
闫洪伦
曾兵
闫富强
王思佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Original Assignee
China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd filed Critical China Construction Xinjiang Construction Engineering Group First Construction Engineering Co Ltd
Priority to CN201620857951.5U priority Critical patent/CN205857693U/en
Application granted granted Critical
Publication of CN205857693U publication Critical patent/CN205857693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

nullThis utility model belongs to the research and development technology field of Architectural Equipment equipment,It is specifically related to a kind of canalization template being applied to movement joint both sides shear wall synchronous construction,Including rectangle template,Frame support bar is set in template surrounding thus forms Form board frame support,In frame support, longitudinally at equal intervals vertical supporting bar is set apart from uniform,In frame support, laterally at equal intervals transverse support bar is set apart from uniform on vertical supporting bar,Affixed in transverse support bar some connectors are set,It is positioned at vertical supporting bar and the non-junction of transverse support bar,At the main center of described connector, reach through hole is set,Inside reach through hole, the affixed diameter that arranges is more than or equal to the sleeve pipe of reach through hole diameter,Described sleeve pipe front end passes transverse support bar and template,Or after directly through template,The securing member of sleeve pipe front end is to template surface returning,Thus fix template.This utility model is easy for installation, remarkably productive;Material-saving, repeatable utilization, attenuating engineering cost.

Description

A kind of canalization template being applied to movement joint both sides shear wall synchronous construction
Technical field
This utility model belongs to the research and development technology field of Architectural Equipment equipment, is specifically related to one and is applied to movement joint both sides The canalization template of shear wall synchronous construction.
Background technology
In current domestic Residential structure, shear wall structure application is very universal, and owing to building length is long, Typically will arrange movement joint, the width of movement joint is generally 200mm-400mm, and movement joint both sides mostly are shear wall.Carry out During construction, movement joint both sides need synchronous construction, and movement joint is the narrowest, and operator cannot be introduced into installing in movement joint and adding Solid model plate, and how to install the template of movement joint both sides, just become a difficult problem of puzzlement construction.
Summary of the invention
The purpose of this utility model: for solve tradition movement joint both sides shear wall formwork install present in technical problem, Design a kind of canalization template of movement joint both sides shear wall, movement joint two in work progress in building construction process The synchronization formwork construction of side shear wall.
The technical solution of the utility model: a kind of canalization template being applied to movement joint both sides shear wall synchronous construction, Including rectangle template, frame support bar is set in template surrounding thus forms Form board frame support, in frame support longitudinally At equal intervals vertical supporting bar is set apart from uniform, laterally at equal intervals apart from uniform setting on vertical supporting bar in frame support Transverse support bar, affixed in transverse support bar arrange some connectors, it is positioned at vertical supporting bar and transverse support bar Non-junction, arranges reach through hole at the main center of described connector, inside reach through hole affixed arrange diameter more than or Equal to the sleeve pipe of reach through hole diameter, described sleeve pipe front end passes transverse support bar and template, or directly through template after, before sleeve pipe The securing member of end is to template surface returning, thus fixes template.The length of described transverse support bar is more than the horizontal stroke of frame support To width.Described transverse support bar is one or two steel pipes.Spacing between described transverse support bar is more than longitudinal bracing Spacing between bar.Described connector main body is mountain type card or flute profile card.Affixed outside described connector main body reach through hole set Put and the nut of reach through hole equal diameters.It is laid with gauged distance graduation mark on described frame support bar.Described frame Frame support bar above support has been provided with hanger.Frame support bar below described frame support is provided with anti-skidding rib Base pads.
Beneficial effect: easy for installation, remarkably productive;Material-saving, repeatable utilization, attenuating engineering cost.Deform as one The canalization template of seam both sides shear wall, can meet the synchronous construction of movement joint both sides shear wall, replace in original movement joint Clogging the construction method of benzene plate, the template of canalization is called in movement joint by tower crane, and workman not be used in movement joint operation, at shearing The inner side of wall achieves that installation and the reinforcing of template.Both model sheetinstallat and the reinforcing of movement joint both sides shear wall can have been realized, and And easy and simple to handle, apply effective, and reduce the security risk of construction operation.
Accompanying drawing explanation
Accompanying drawing 1 is main TV structure schematic diagram of the present utility model, and accompanying drawing 2 is A-A sectional view.
Detailed description of the invention
Embodiment 1. 1 kinds is applied to the canalization template of movement joint both sides shear wall synchronous construction, such as Fig. 1 and Fig. 2 institute Show, including rectangle template 1, frame support bar 2 is set in template 1 surrounding thus forms Form board frame support, at frame support Interior longitudinal direction arranges vertical supporting bar 5 apart from uniform at equal intervals, horizontal distance the most at equal intervals on vertical supporting bar 5 in frame support Uniform arranging transverse support bar 3, affixed in transverse support bar 3 arrange some connectors 4, it is positioned at vertical supporting bar 5 Junction non-with transverse support bar 3, arranges reach through hole at the main center of described connector 4, affixed inside reach through hole sets Putting diameter more than or equal to the sleeve pipe of reach through hole diameter, described sleeve pipe front end passes transverse support bar 3 and template 1, or directly After template 1, the securing member 6 of sleeve pipe front end is to template 1 surface returning, thus fixes template 1.Described transverse support bar 3 Length more than the transverse width of frame support.Described transverse support bar 3 is one or two steel pipes.Described transverse support bar Spacing between 3 is more than the spacing between vertical supporting bar 5.Described connector 4 main body is mountain type card or flute profile card.Described company The affixed nut 7 arranged with reach through hole equal diameters outside fitting 3 main body reach through hole.All lay on described frame support bar 2 There is gauged distance graduation mark 10.The described frame support bar above frame support has been provided with hanger 8.Under described frame support The frame support bar of side is provided with the base pads 9 with anti-skidding rib.
In practice, using clad can plank sheathing thick for 15mm as panel (template), flitch, square steel are as secondary stupefied (longitudinal Strut), steel pipe is as main stupefied (transverse support bar), and mountain type card (connector) conduct is together with steel-pipe welding, and Φ 12 screw rod (overlaps Pipe) and mountain type card weld together, (sleeve pipe) end strips 2mm thickness galvanized sheet iron (securing member) catch on plank sheathing.Typified form Arranging pull bar according to the spacing of template construction scheme, plank sheathing is worn and is burrowed with carpenter's auger at pull bar, eye and wearing pull bar Mountain type card eye (reach through hole) be in straight line.

Claims (9)

1. being applied to a canalization template for movement joint both sides shear wall synchronous construction, including rectangle template (1), its feature exists In: frame support bar (2) is set in template (1) surrounding thus forms Form board frame support, between longitudinally waiting in frame support Spacing and arrange vertical supporting bar (5) from uniform, in frame support, the upper distance the most at equal intervals of vertical supporting bar (5) is all laid Putting transverse support bar (3), the most affixed arrange some connectors (4) transverse support bar (3) is upper, it is positioned at vertical supporting bar (5) and transverse support bar (3) non-junction, at the main center of described connector (4), reach through hole is set, inside reach through hole The affixed diameter that arranges is more than or equal to the sleeve pipe of reach through hole diameter, and described sleeve pipe front end passes transverse support bar (3) and template (1), or directly through template (1) after, the securing member (6) of sleeve pipe front end is to template (1) surface returning, thus fixes template (1).
Canalization template the most according to claim 1, it is characterised in that: the length of described transverse support bar (3) is more than limit The transverse width of frame bracket.
Canalization template the most according to claim 1 and 2, it is characterised in that: described transverse support bar (3) be one or Two steel pipes.
Canalization template the most according to claim 3, it is characterised in that: the spacing between described transverse support bar (3) is big Spacing between vertical supporting bar (5).
Canalization template the most according to claim 1, it is characterised in that: described connector (4) main body be mountain type card or Flute profile card.
Canalization template the most according to claim 1 or 5, it is characterised in that: outside described connector (4) main body reach through hole The affixed nut (7) arranged with reach through hole equal diameters.
7. according to the canalization template described in any one in claim 1,2,4,5, it is characterised in that: described frame support bar (2) gauged distance graduation mark (10) it is laid with on.
8. according to the canalization template described in any one in claim 1,2,4,5, it is characterised in that: described frame support The frame support bar of top has been provided with hanger (8).
9. according to the canalization template described in any one in claim 1,2,4,5, it is characterised in that: under described frame support The frame support bar of side is provided with the base pads (9) with anti-skidding rib.
CN201620857951.5U 2016-08-10 2016-08-10 A kind of canalization template being applied to movement joint both sides shear wall synchronous construction Active CN205857693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620857951.5U CN205857693U (en) 2016-08-10 2016-08-10 A kind of canalization template being applied to movement joint both sides shear wall synchronous construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620857951.5U CN205857693U (en) 2016-08-10 2016-08-10 A kind of canalization template being applied to movement joint both sides shear wall synchronous construction

Publications (1)

Publication Number Publication Date
CN205857693U true CN205857693U (en) 2017-01-04

Family

ID=57657383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620857951.5U Active CN205857693U (en) 2016-08-10 2016-08-10 A kind of canalization template being applied to movement joint both sides shear wall synchronous construction

Country Status (1)

Country Link
CN (1) CN205857693U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284978A (en) * 2016-08-10 2017-01-04 中建新疆建工集团第建筑工程有限公司 A kind of movement joint both sides shear wall synchronous construction technique and canalization template
CN108571166A (en) * 2017-03-10 2018-09-25 五冶集团上海有限公司 A kind of deformation joint formwork construction method
CN110439265A (en) * 2019-08-23 2019-11-12 重庆建工第三建设有限责任公司 Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284978A (en) * 2016-08-10 2017-01-04 中建新疆建工集团第建筑工程有限公司 A kind of movement joint both sides shear wall synchronous construction technique and canalization template
CN108571166A (en) * 2017-03-10 2018-09-25 五冶集团上海有限公司 A kind of deformation joint formwork construction method
CN110439265A (en) * 2019-08-23 2019-11-12 重庆建工第三建设有限责任公司 Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint

Similar Documents

Publication Publication Date Title
CN205857693U (en) A kind of canalization template being applied to movement joint both sides shear wall synchronous construction
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN102518300B (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN106284978A (en) A kind of movement joint both sides shear wall synchronous construction technique and canalization template
CN102926554A (en) Steel hanging seat template supports and construction method thereof
CN204326313U (en) The residence outer wall plate of gas concrete batten assembling
CN203701597U (en) Outer wall formwork supporting and bearing device
CN102605945B (en) Manufacturing method of big wood formwork
CN104863347A (en) Building scaffold wall connecting structure and construction process
CN213741807U (en) Heavy stone curtain wall structure installed in pulling and hanging combination manner
CN204676875U (en) For the removable shaped steel anchor ring of builder's jack
CN103195235A (en) Design and calculation for detachable steel plate type steel fixture
CN209723610U (en) A kind of pipeline that adjustable recycles hangs mould
CN207686313U (en) The bending section high pressure ground slow pressure bracing means of pump line
CN107524292A (en) A kind of formwork-support vertical rod spreading method
CN206951856U (en) A kind of portable manual Multipurpose bending machine
CN111236626A (en) Side wall unilateral template support system combining composite fiber template and steel truss
CN204826220U (en) Location built -in fitting with U type groove
CN205206368U (en) Instrument formula floor protector
CN202899436U (en) B-type beam-column member
CN206724304U (en) A kind of pre-buried construction of the hook of radiator
CN216839971U (en) Setting device for controlling verticality line of external wall insulation board
CN215331468U (en) Brickwork corner constructional column template design reinforcing apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant