CN206724304U - A kind of pre-buried construction of the hook of radiator - Google Patents

A kind of pre-buried construction of the hook of radiator Download PDF

Info

Publication number
CN206724304U
CN206724304U CN201720565569.1U CN201720565569U CN206724304U CN 206724304 U CN206724304 U CN 206724304U CN 201720565569 U CN201720565569 U CN 201720565569U CN 206724304 U CN206724304 U CN 206724304U
Authority
CN
China
Prior art keywords
reinforcing bar
hook
buried
walls
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720565569.1U
Other languages
Chinese (zh)
Inventor
丁俊杰
高峰
孙舰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Dongjie Construction Engineering Co Ltd
Original Assignee
Qingdao Dongjie Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Dongjie Construction Engineering Co Ltd filed Critical Qingdao Dongjie Construction Engineering Co Ltd
Priority to CN201720565569.1U priority Critical patent/CN206724304U/en
Application granted granted Critical
Publication of CN206724304U publication Critical patent/CN206724304U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pre-buried construction of the hook of radiator, include scissors reinforcing bar within the walls, template and the split bolt for drawknot between template, link up with pre-buried construction and also include at least two groups of pre-buried hook component within the walls, component includes the Y shape reinforcing bar being embedded in wall to every group of pre-buried hook within the walls, Y shape reinforcing bar includes top V-arrangement reinforcing bar and the straight reinforcing bar being connected with V-arrangement reinforcing bar bottom, straight reinforcing bar is not with one end that V-arrangement reinforcing bar is connected with setting female sleeve to be connected, the other end of sleeve is close to template, reinforcing bar is fixedly connected V-arrangement reinforcing bar within the walls with scissors;Link up with pre-buried construction and also include L-shaped hook, L-shaped hook includes coupler body and gib head, and the external screw thread of coupler body is connected with the internal thread of sleeve.The pre-buried construction of hook of radiator of the present utility model, it is simple in construction, reasonable in design, in advance will hook component is pre-buried in wall within the walls, installation is firm, and the activity of being not easy comes off, and does not influence reparation and the aesthetic property in metope later stage.

Description

A kind of pre-buried construction of the hook of radiator
Technical field
Construction engineering technical field is the utility model is related to, more particularly to a kind of pre-buried construction of the hook of radiator.
Background technology
The heat exchanger of the radiator of architectural engineering installation is molded using cast iron mostly, and hot water or vapours enter hot friendship In parallel operation, it is improved indoor environment temperature by way of heat radiation.The installation of building installation engineering radiator usually requires Hook or support, but building installation engineering usually used hook when installing radiator, in the prior art, hook is typically to exist Before radiator installation, in the installation site the impact drilling of radiator, and insert a hook into, and fixed with timber wedge, through long After the use of time, link up with and easily loosen, influence the normal use of radiator;Radiator installation fitting currently on the market is basic On be all to hang wall mounting hook or support, it is necessary to beat mounting hole on wall, the above operates not only to enter the bearing of wall Destruction is gone, and when carrying out the replacing of heat sink location in the later stage, the mounting hole on wall is difficult to later stage reparation, influences The aesthetic property of metope.
Utility model content
For defect present in prior art or deficiency, the utility model innovatively proposes a kind of extension of radiator The pre-buried construction of hook, it is simple in construction, reasonable in design, in advance will hook component is pre-buried in wall within the walls, installation is firm, is not easy activity Come off, and do not influence reparation and the aesthetic property in metope later stage.
What the technical solution of the utility model was realized in:
A kind of pre-buried construction of the hook of radiator, include scissors reinforcing bar, template and for drawknot between template within the walls Split bolt, the pre-buried construction of hook also include at least two groups of pre-buried hook component within the walls, every group of pre-buried hook Component includes the Y shape reinforcing bar being embedded in wall within the walls, the Y shape reinforcing bar include top V-arrangement reinforcing bar and with V-arrangement reinforcing bar bottom Hold the straight reinforcing bar that is connected, be provided with external screw thread outside the straight reinforcing bar, one end that the straight reinforcing bar is not connected with V-arrangement reinforcing bar with Female sleeve is set to be connected, the other end of the sleeve is close to template, and the V-arrangement reinforcing bar with scissors consolidate within the walls by reinforcing bar Fixed connection;The pre-buried construction of hook also includes L-shaped hook, and the L-shaped, which is linked up with, includes coupler body and gib head, on the coupler body External screw thread is provided with, the external screw thread of the coupler body is connected with the internal thread of sleeve, L-shaped hook is passed through sleeve and Y shape reinforcing bar It is connected.
Preferably, the V-arrangement reinforcing bar is integrally formed with straight reinforcing bar.
Preferably, the connected mode of reinforcing bar is to weld to the V-arrangement reinforcing bar within the walls with scissors.
Compared with prior art, the beneficial effects of the utility model are:
The utility model discloses a kind of pre-buried construction of the hook of radiator, is the progress reinforcing bar colligation before concreting During formwork, Y shape reinforcing bar is being buried within the walls, the one end for adding sleeve is connected with Y shape screw thread steel, the other end of sleeve With template proximate, then pouring for concrete is carried out, wait form removal after pouring, the exposed sleeve plane of metope, L-shaped is linked up with and covered Cylinder threaded connection, realize that L-shaped hook is connected with Y shape reinforcing bar by sleeve, do not influence the decorations of metope.The utility model A kind of radiator the pre-buried construction of hook, it is simple in construction, reasonable in design, in advance will hook component is pre-buried in wall within the walls, Install firm, the activity of being not easy comes off, and does not influence reparation and the aesthetic property in metope later stage.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is use state figure of the present utility model;
Reference:1st, scissors reinforcing bar within the walls;2nd, template;3rd, split bolt;4th, Y shape reinforcing bar;5th, V-arrangement reinforcing bar;6th, straight steel Muscle;7th, sleeve;8th, L-shaped is linked up with;9th, coupler body;10th, gib head.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1 and 2, the utility model provides a kind of pre-buried construction of the hook of radiator, includes scissors wall Interior reinforcing bar 1, template 2 and the split bolt 3 for drawknot between template 2, the pre-buried construction of hook also include at least two groups Pre-buried hook component within the walls, component includes the Y shape reinforcing bar 4 being embedded in wall, the Y to every group of pre-buried hook within the walls Shape reinforcing bar 4 includes top V-arrangement reinforcing bar 5 and the straight reinforcing bar 6 being connected with the bottom of V-arrangement reinforcing bar 5, the V-arrangement reinforcing bar 5 and straight reinforcing bar 6 are integrally formed, and external screw thread is provided with outside the straight reinforcing bar 6, one end and setting that the straight reinforcing bar 6 is not connected with V-arrangement reinforcing bar 5 Female sleeve 7 is connected, and the other end of the sleeve 7 is close to template 2, the V-arrangement reinforcing bar 5 and scissors reinforcing bar 1 within the walls It is fixedly connected, the connected mode of reinforcing bar 1 is to weld to the V-arrangement reinforcing bar 5 within the walls with scissors;The pre-buried construction of hook also includes L-shaped hook 8, the L-shaped hook 8 include coupler body 9 and gib head 10, external screw thread are provided with the coupler body 9, the coupler body 9 External screw thread is connected with the internal thread of sleeve 7, L-shaped hook 8 is connected by sleeve 7 with Y shape reinforcing bar 4.
Scissors is carried out before concreting within the walls during the colligation of reinforcing bar 1 and supporting module 2, it is pre-buried within the walls in scissors Y shape reinforcing bar 4, the one end for adding sleeve 7 are threadedly coupled with Y shape reinforcing bar 4, and the other end of sleeve 7 is close to template 2, then is mixed Solidifying soil pours, and waits form removal after pouring, the exposed plane of sleeve 7 of metope, L-shaped hook 8 is threadedly coupled with sleeve 7, realizes L Shape hook 8 is connected with Y shape reinforcing bar 4 by sleeve 7, links up with component within the walls by pre-buried, solve needs in the prior art Mounting hook or support again are beaten after mounting hole on wall, the technology that the mounting hole left on wall influences the decorations of metope is asked Topic.
The preferred embodiment of the upper only utility model, it is all in this practicality not to limit the utility model Within new spirit and principle, any modification, equivalent substitution and improvements made etc., guarantor of the present utility model should be included in Within the scope of shield.

Claims (3)

1. a kind of pre-buried construction of the hook of radiator, include scissors reinforcing bar, template and pair for drawknot between template within the walls Draw bolt, it is characterised in that pre-buried construct of the hook also includes at least two groups of pre-buried hook component within the walls, described every group Component includes the Y shape reinforcing bar being embedded in wall to pre-buried hook within the walls, and the Y shape reinforcing bar includes top V-arrangement reinforcing bar and and V The straight reinforcing bar that shape reinforcing bar bottom is connected, the straight reinforcing bar are provided with external screw thread outside, and the straight reinforcing bar is not connected with V-arrangement reinforcing bar One end with setting female sleeve to be connected, the other end of the sleeve is close to template, the V-arrangement reinforcing bar and scissors wall Interior reinforcing bar is fixedly connected;The pre-buried construction of hook also includes L-shaped hook, and the L-shaped hook includes coupler body and gib head, institute State and external screw thread be provided with coupler body, the external screw thread of the coupler body is connected with the internal thread of sleeve, make L-shaped hook by sleeve with Y shape reinforcing bar is connected.
2. the pre-buried construction of the hook of radiator according to claim 1, it is characterised in that:The V-arrangement reinforcing bar and straight reinforcing bar It is integrally formed.
3. the pre-buried construction of the hook of radiator according to claim 1, it is characterised in that:The V-arrangement reinforcing bar and scissors wall The connected mode of interior reinforcing bar is welding.
CN201720565569.1U 2017-05-21 2017-05-21 A kind of pre-buried construction of the hook of radiator Expired - Fee Related CN206724304U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720565569.1U CN206724304U (en) 2017-05-21 2017-05-21 A kind of pre-buried construction of the hook of radiator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720565569.1U CN206724304U (en) 2017-05-21 2017-05-21 A kind of pre-buried construction of the hook of radiator

Publications (1)

Publication Number Publication Date
CN206724304U true CN206724304U (en) 2017-12-08

Family

ID=60513948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720565569.1U Expired - Fee Related CN206724304U (en) 2017-05-21 2017-05-21 A kind of pre-buried construction of the hook of radiator

Country Status (1)

Country Link
CN (1) CN206724304U (en)

Similar Documents

Publication Publication Date Title
CN103422620B (en) A kind of prefabricated hollow profile steel concrete column and splicing construction thereof and joining method
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN204781970U (en) Template fixing device with adjustable
CN104153495B (en) A kind of attachment structure of Multi-function light concrete curtain wall
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN205857693U (en) A kind of canalization template being applied to movement joint both sides shear wall synchronous construction
CN206724304U (en) A kind of pre-buried construction of the hook of radiator
CN208168032U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node
CN208777720U (en) Wall hangs the detachable straight thread reinforced bar pedestal of mould diagonal brace
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN207063177U (en) Cast-in-place concrete floor hanging built-in fitting
CN208294057U (en) A kind of scaffold wall connecting piece and its mounting structure
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN203891470U (en) Fastening bolt for shear wall formwork
CN208105502U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN204899034U (en) Prefabricated wall post
CN204826220U (en) Location built -in fitting with U type groove
CN105178503B (en) A kind of prefabricated strap-on insulation wallboard
CN204728474U (en) Precast wall panel connecting box
CN204491953U (en) Floor slab structure between architecture pipe
CN204450817U (en) Pin-connected panel small box girder core mold plate fixture
CN204418696U (en) Vertical reinforcement spreading lifting assistor
CN216839960U (en) Pin-connected panel post-cast strip shutoff subassembly

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208