CN110439265A - Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint - Google Patents

Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint Download PDF

Info

Publication number
CN110439265A
CN110439265A CN201910782419.XA CN201910782419A CN110439265A CN 110439265 A CN110439265 A CN 110439265A CN 201910782419 A CN201910782419 A CN 201910782419A CN 110439265 A CN110439265 A CN 110439265A
Authority
CN
China
Prior art keywords
template
wall
bar
dedicated
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910782419.XA
Other languages
Chinese (zh)
Inventor
牛光蓉
李梁玮
龚靖翮
张雪梅
覃毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
No 3 Construction Co Ltd of Chongqing Construction Engineering Group
Original Assignee
CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING JIANGONG THIRD CONSTRUCTION Co Ltd
Priority to CN201910782419.XA priority Critical patent/CN110439265A/en
Publication of CN110439265A publication Critical patent/CN110439265A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/18—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring for double walls
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001—Corner fastening or connecting means for forming or stiffening elements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/26—Strutting means for wall parts; Supports or the like, e.g. for holding in position prefabricated walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint, comprising the following steps: template processing makes with material;Reserved diagonal brace anchor ring and installation template pedestal spacer bar;Line setting;Bind column wall reinforcing bar;Wall conduit is led in the installation of inner, external wall template and installation;Inner, external wall template and dedicated lateral bi-steel back cord, diagonal brace are reinforced, correction;Concreting;Form removable;The material that heap is put well after demoulding is adjusted to construction surface from discharging platform using tower crane and is used in turn.Operation of the present invention is easy, is easily mastered, and construction technology is easily operated, and form removable is easy, and synchronous construction quality easily guarantees.

Description

Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint
Technical field
The invention belongs to technical field of civil engineering, specifically, it is same to be related to bilateral column or wall at a kind of narrow expansion joint Walk construction method.
Background technique
In engineering construction, the expansion joint for being frequently encountered building only has 100mm~200mm, and seam two sides are concrete Column or shear wall.Due to narrow space in expansion joint, worker can not be operated.In the prior art through frequently with following two technique into Row is implemented: first, disposable template is done using polystyrene foam plate and is used, concreting is poured smash after on the inside of expansion joint In the presence of displacement, quick-fried mould phenomenon, cross section size not can guarantee, and doing over again, it is costly to rectify and improve.Second, using seam two side columns wall Staggered floor construction method, but the difficulty of the security protection up and down and dynamic management to operation layer is increased, there are security risks, and apply The work period is longer.
Concrete works are a great Zi branches of building construction main structure, to the structure of building construction safety and use function The influence of energy is self-evident.It is limited by existing construction technology level, concrete construction quality common fault also compares at narrow expansion joint It is more prominent, more problems.
Summary of the invention
In view of this, the present invention provides bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint.
In order to solve the above-mentioned technical problem, the invention discloses bilateral column or wall synchronous construction sides at a kind of narrow expansion joint Method, comprising the following steps:
Step 1, template processing make with material;
Step 2, reserved diagonal brace anchor ring and installation template pedestal spacer bar;
Step 3, line setting;
Step 4, binding column wall reinforcing bar;
Wall conduit is led in step 5, the installation of inner, external wall template and installation;
Step 6, inner, external wall template and dedicated lateral bi-steel back cord, diagonal brace are reinforced, correction;
Step 7, concreting;
Step 8, form removable.
Optionally, the template processing in the step 1 makes with material specifically:
The production of step 1.1, dedicated lateral bi-steel back cord:
Internal diameter >=14mm hexagonal feed screw nut is placed in parallel among two Φ 18mm reinforcing bars placed side by side, steel bar clamping Nut, nut place spacing Wei≤450mm, and nut is 300mm from end reinforced starting distance;Solid welding is first put after placing Fixed, guarantee nut and reinforcing steel bar center line are in same plane, then start welding, it is ensured that nut upper and lower surface and two reinforcement weldings exist Together, it does not interspace, eyelet, it is necessary to which solid and reliable, welding finished product ensures nut brush oil;
Step 1.2, template processing and fabricating:
1) exterior wall or outer column template use: stitching inner side template thickness 10mm, remaining direction template thickness >=15mm, template Specification is 1830*915mm plank sheathing;
2) before splicing according to the long and high production template of column wall, the height of template lengthening 200mm higher than wall, and on template top Place of increasing get into the cave reserved suspension hook lifting hole(eyelet);
3) template spliced by wall size remaining tripartite in addition to top surface is followed closely with 20mm thickness batten into frame;
4) ohm card and screw rod hole position are determined according to stencil design drawing ruler and ink fountain snap the line, wherein ohm card Vertical direction placement 5, horizontal space 150mm, screw rod hole spacing be 450*450mm, two side templates are respectively from board bottom 200,250mm starts to arrange;
5) the two pieces of template ohm cards in left and right and screw rod hole position should misplace arrangement in seam;
6) inner side template ohm card and vertical stupefied quarter bend installation are stitched, bores screw rod hole, Φ 20mm is placed according to the positioning line of ink marker Vertical stupefied quarter bend is fixed in template by vertical stupefied quarter bend with Φ 22mm finished product ohm card;Φ is drilled according to position line The screw rod hole in 20mm screw rod hole, the two pieces of templates in left and right is staggered 70mm, and one piece of length and width 50* of boat nail in the case where being close to screw rod hole up and down The trapezoidal wood particle of 30mm can preferably guarantee that nut center and screw rod hole center exist convenient for shelving dedicated lateral bi-steel back cord On straight line, convenient for later period screw rod through walls.
Optionally, the reserved diagonal brace anchor ring and installation template pedestal spacer bar in the step 2 specifically: stretched in construction Before contracting seam, diagonal brace anchor ring should be reserved in the floor or flooring of lower layer's expansion joint shear wall or shear column interior wall side, anchor ring is answered Using the reinforcing bar of >=Φ 16, for ring width preferably in 100~150mm, reinforcing bar exposes structural plane 60mm;It, need to also be if not being first floor construction Lower layer has poured every spacing 500mm at the top of the shear wall body of expansion joint two sides, cuts a 14*50*14's with cutting machine Sulculus is placed in the bar dowel embedded groove of 1 Φ 14 and is used to support outer wall template.
Optionally, the line setting in the step 3 specifically: template installs preceding discharging structure sideline and apart from sideline 300 wide template contral lines.
Optionally, the binding column wall reinforcing bar in the step 4 specifically: intersect by the reinforcing bar at capital position it is intensive, must be Setting-out is carried out before reinforcing bar binding, determines that the reinforcing bar of crossover sites puts sequence, avoids the overstocked influence reinforcing bar binding of reinforcing bar and lower step Construction;Joist is bidirectional stress reinforcing bar, and all reinforcing bar crosspoints should be bound point by point, and the lap of splice and position will meet specification and want It asks;Wall column cushion block of concrete bar protective layer, spacing 1m are installed, quincuncial arrangement installs the quincunx cloth of wall connecting lacing wire by design requirement It sets, reinforcing bar spacer ferrule is added at column, wall top, to guarantee that wall double steel bar is smooth vertical and horizontal, spacing is uniformly correct;To guarantee wall Thickness, increase short 14 reinforcing bar inner support of Φ at Screw arbor with nut at both-ends, bar dowel both ends are smooth.
Optionally, wall conduit is led in the inner, external wall template installation in the step 5 and installation specifically:
Step 5.1, outer wall template erection sequence:
First, the lifting positioning of exterior wall vertical formwork;Second, side end shuttering supporting is fixed;Third, the double steel of dedicated transverse direction Muscle back cord is placed and is supported on side end template horizontal reinforcing steel pipe;4th, it is through walls to the installation of wire drawing bar conduit, alignment; 5th, it is through walls that wire drawing bar is connect with dedicated lateral bi-steel back cord, the 6th, internal model installation is fixed;
Step 5.2, template and conduit installation:
Step 5.2.1, after the completion of deformation joint wall steel bar is bound, with two pieces of dedicated outer wall templates of deformation joint of tower crane handling In place, it is fixed temporarily after leveling;
Step 5.2.2, side end template is fixed according to positioning line of ink marker splicing support, and vertically the wooden a tree, used in making timber for boats time is stupefied end, The installation of horizontal reinforcement back cord is fixed;
Step 5.2.3, dedicated lateral bi-steel back cord is supported on the trapezoidal wood particle that mouth is followed closely under outer wall template screw rod hole And on the horizontal reinforcing steel pipe of side both ends template, adjusts two pieces of outer wall template conduit holes and lateral expansion stitches dedicated transverse direction pair Φ 20PVC casing is placed after making its centering in reinforcing bar back cord nut hole site;
Step 5.2.4, the main stupefied bone of setting exterior wall transverse direction: PVC conduit is passed through using 14 wall-punching pair-pulling threaded spindle of Φ, with dedicated cross Connection is tightened to bi-steel back cord nut, nut 20mm is at least exceeded to wire drawing head, makes to lead stupefied reinforcing bar and dedicated through walls to drawing Screw rod connects to form entirety;Dedicated transverse direction bi-steel back cord length longer than wall should exceed 200mm, reinforce, remove convenient for the later period, specially It when being placed with lateral bi-steel back cord, should place from bottom to top, convenient for construction;
Step 5.2.5, when every one of dedicated lateral bi-steel back cord of setting, just interior wall has been spliced according to the positioning line of ink marker simultaneously Template is simultaneously fixed, so that screw rod through walls passes through inside wall formwork hole.
Optionally, the inner, external wall template in the step 6 and dedicated lateral bi-steel back cord, diagonal brace are reinforced, and correction is specific Are as follows:
After inner, external wall template is fixed by positioning line of ink marker molding support, then set gradually that the wooden a tree, used in making timber for boats is time stupefied, steel pipe master is stupefied, It is reinforced using to wire drawing bar and three type cards;Adjustable steel pipe diagonal brace one end is arranged again, and with fastener timber wedge to be fixed on flooring reserved On anchor ring reinforcing bar;The other end is separately connected: being connected on the stupefied steel pipe of level master of inside wall formwork and is played a supportive role, is connected to exterior wall Play drawknot on dedicated transverse direction bi-steel back cord, and is securely reinforced with fastener or three type clamping locks;It is used after reinforcing Ceiling hammer or level carry out the inspection correction of template.
Optionally, the concreting in the step 7 specifically: ensure before concreting using glue on formwork edge joint Item sealing;Form lateral pressure is excessive in order to prevent causes quick-fried mould, and two side column of expansion joint (wall) is synchronous layered when casting concrete pours It builds, be layered and vibrate, concreting height difference in two sides is no more than 1000mm, and vibration compacting;It is covered at the top of expansion joint when pouring One layer of gummed paper prevents concrete from trickling down in expansion joint, and pays attention to whether trickling down concrete in expansion joint at any time, uses in time if any unrestrained Water is rinsed well, avoids later period demoulding difficult.
Optionally, the form removable in the step 8 specifically: concrete strength can guarantee its surface and corner angle not because Form removal and be damaged, its dismountable template of at least 1 old name for the Arabian countries in the Middle East after the concreting of usual situation lower prop, first expose wall to drawing spiral shell Bar extracts dedicated lateral bi-steel back cord out, then is vertical top-down dismounting inside wall formwork, exterior wall quarter bend stupefied, template, cuts Except pedestal spacer bar, the template that finally removes, accessory, and accomplish to clear up in time, repair and painting brushes interleaving agent, dedicated transverse direction After bi-steel back cord is removed, nut eyelet is cleared up, brushes oily antirust treatment.
Optionally, the construction method is suitable for building Shen contracting slit width Du≤100mm range inner frame, shear wall knot The multilayer of structure, high-rise industry and the two sides concrete construction of civil buildings expansion joint.
Compared with prior art, the present invention can be obtained including following technical effect:
1) stencil design of the invention is designed by wall single surface formwork, to stitch internal model when ensuring twin columns (wall) concrete placings Plate stress is minimum, and template, which can remove, to be repeatedly used in turn.It stitches inner template support and uses template+quarter bend, and by dedicated to drawing spiral shell Bar is fixed.It replaces flitch that the stress of time stupefied bone can be improved with quarter bend, increases the rigidity, intensity, stability of template, and section Area is small, increases demoulding gap, it is ensured that seam inner template is smoothly removed, and can effectively avoid two side columns wall common fault of concrete quality Occur.
2) operation of the present invention is easy, is easily mastered, and construction technology is easily operated, and form removable is easy, synchronous construction quality Easily guarantee.
3) present invention seam inner template, screw rod, quarter bend can be removed, and be repeatedly used in turn, save the cost.
4) of the invention since quarter bend area of section is small, it is self-possessed lighter, labour can be reduced, accelerate construction progress, reduce work Cheng Chengben.
5) twin columns (wall) concrete synchronous construction of the present invention avoids staggered floor construction to the security protection up and down of work layer and dynamic The difficulty of management reduces security risk, and accelerates construction speed.
Certainly, it implements any of the products of the present invention it is not absolutely required to while reaching all the above technical effect.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes a part of the invention, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the process flow chart of bilateral column or wall method for synchronously constructing at the narrow expansion joint of the present invention;
Fig. 2 is the dedicated lateral bi-steel back cord full-page proof of the present invention;
Fig. 3 is template manuscript of the present invention;
Fig. 4 is the anchor ring of the reserved diagonal brace of the present invention;
Fig. 5 is installation template bottom of the present invention spacer bar;
Fig. 6 is line setting of the invention;
Fig. 7 is the narrow expansion joint formwork vertical profile figure drawing of the present invention;
Fig. 8 is the narrow expansion joint formwork horizontal sectional drawing drawing of the present invention.
Specific embodiment
Carry out the embodiment that the present invention will be described in detail below in conjunction with embodiment, whereby to the present invention how application technology hand Section solves technical problem and reaches the realization process of technical effect to fully understand and implement.
The invention discloses bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint, process flow such as Fig. 1 institutes Show, comprising the following steps:
Step 1, template processing make with material:
The production of step 1.1, dedicated lateral bi-steel back cord:
Internal diameter >=14mm hexagonal feed screw nut is placed in parallel among two Φ 18mm reinforcing bars placed side by side, steel bar clamping Nut, nut place spacing Wei≤450mm, and nut is from end reinforced starting distance according to construction concrete condition adjustment, this work Journey is 300mm.First spot welding is fixed after placing, and guarantee nut and reinforcing steel bar center line are in same plane, then start welding, it is ensured that spiral shell Female upper and lower surface does not interspace, eyelet together with two reinforcement weldings, it is necessary to solid and reliable (such as Fig. 2);
Welding finished product ensures nut brush oil, so that screw rod is lubricated, convenient for taking out horizontal main stupefied reinforcing bar.
Step 1.2, template processing and fabricating:
1) exterior wall (column) template uses: stitching inner side template thickness 10mm, remaining direction template thickness >=15mm, template specification For 1830*915mm plank sheathing.
2) according to the long and high production template of column wall, lengthening 200mm highly higher than wall before splicing, and increase place on top and get into the cave Reserved suspension hook lifting hole(eyelet) so that fixation is shelved in later period lifting and bottom, and can prevent concrete when concreting from not trickling down in seam.
3) template spliced by wall size remaining tripartite in addition to top surface is followed closely with 20mm thickness batten into frame, consolidate It is fixed.
4) ohm card (vertical direction placement 5, horizontal space are determined according to stencil design drawing ruler and ink fountain snap the line For 150mm) and screw rod hole position, (screw rod hole spacing is 450*450mm, and two side templates are respectively since board bottom 200,250mm Arrangement).
5) the two pieces of template ohm cards in left and right and screw rod hole position should misplace arrangement in seam.
6) inner side template ohm card and vertical stupefied quarter bend installation are stitched, bores screw rod hole.
Vertical stupefied quarter bend of 20*20mm is placed according to the positioning line of ink marker, it will vertical stupefied quarter bend with 22*22mm finished product ohm card It is fixed in template.
It is drilled Φ 20mm screw rod hole according to position line, be staggered 70mm above and below the screw rod hole of the two pieces of templates in left and right, and is being close to The trapezoidal wood particle of one piece of length and width 50*30mm of boat nail under screw rod hole can be protected preferably convenient for shelving dedicated lateral bi-steel back cord Nut center and screw rod hole center are demonstrate,proved point-blank, convenient for later period screw rod through walls.
7) template manuscript is detailed in Fig. 3.
Step 2, reserved diagonal brace anchor ring and installation template pedestal spacer bar:
Before expansion joint of constructing, diagonal brace anchor should be reserved in the floor or flooring of lower layer's expansion joint shear wall (column) interior wall side Ring, anchor ring should be using the reinforcing bars of >=Φ 16, and for ring width preferably in 100~150mm, reinforcing bar exposes structural plane 60mm (being detailed in Fig. 4);If not It is first floor construction, need to have also poured every spacing 500mm at the top of the shear wall body of expansion joint two sides in lower layer, with cutting machine-cut The sulculus for cutting a 14*50*14 is placed in the bar dowel embedded groove of 1 Φ 14 and is used to support outer wall template.It is detailed in Fig. 5.
Step 3, line setting:
Discharging structure sideline and the template contral line wide apart from sideline 300 before template is installed.It is detailed in Fig. 6.
Step 4, binding column wall reinforcing bar:
Intersect intensively by the reinforcing bar at capital position, setting-out must be carried out before reinforcing bar is bound, determine the reinforcing bar pendulum of crossover sites Sequence is put forward, the overstocked influence reinforcing bar binding of reinforcing bar and the construction of lower step are avoided.Joist is bidirectional stress reinforcing bar, and all reinforcing bar crosspoints are answered Point-by-point binding, the lap of splice and position will meet code requirement.Wall column cushion block of concrete bar protective layer is installed, spacing 1m is quincunx Arrangement installs wall connecting lacing wire quincuncial arrangement by design requirement, reinforcing bar spacer ferrule is added at column, wall top, to guarantee that wall is double Layer reinforcing bar is smooth vertical and horizontal, and spacing is uniformly correct.For the thickness for guaranteeing wall, increase short 14 reinforcing bar inner support of Φ at Screw arbor with nut at both-ends, it is short Reinforcing bar both ends are smooth.
The binding of column wall reinforcing bar will be carried out according to design drawing and code requirement.
Wall conduit is led in step 5, the installation of inner, external wall template and installation:
Step 5.1, outer wall template erection sequence:
First, the lifting positioning of exterior wall vertical formwork;Second, side end shuttering supporting is fixed;Third, the double steel of dedicated transverse direction Muscle back cord is placed and is supported on side end template horizontal reinforcing steel pipe;4th, it is through walls to the installation of wire drawing bar conduit, alignment; 5th, it is through walls that wire drawing bar is connect with dedicated lateral bi-steel back cord, the 6th, internal model installation is fixed.
Step 5.2, narrow expansion joint formwork and conduit installation:
1) in place with two pieces of dedicated outer wall templates of deformation joint of tower crane handling after the completion of deformation joint wall steel bar is bound, it adjusts It is fixed temporarily after flat.
2) side end template is fixed according to positioning line of ink marker splicing support, and vertical secondary stupefied, the horizontal reinforcement of the wooden a tree, used in making timber for boats in end Back cord installation is fixed.
3) dedicated lateral bi-steel back cord is supported on the trapezoidal wood particle and side two that mouth is followed closely under outer wall template screw rod hole On the horizontal reinforcing steel pipe of end template, two pieces of outer wall template conduit holes and the dedicated lateral bi-steel back cord of lateral expansion seam are adjusted Φ 20PVC casing is placed after making its centering in nut hole site.
4) the main stupefied bone of setting exterior wall transverse direction: passing through PVC conduit using 14 wall-punching pair-pulling threaded spindle of Φ, with dedicated lateral bi-steel Back cord nut tightens connection, at least exceeds nut 20mm to wire drawing head.Make to lead stupefied reinforcing bar and the connection of dedicated wall-punching pair-pulling threaded spindle It is formed whole.Dedicated transverse direction bi-steel back cord length longer than wall should exceed 200mm, reinforce, remove convenient for the later period.Dedicated transverse direction is double It when reinforcing bar back cord is placed, should place from bottom to top, convenient for construction.
5) every setting together dedicated lateral bi-steel back cord when, just spliced inside wall formwork according to the positioning line of ink marker simultaneously and added With fixation, so that screw rod through walls passes through inside wall formwork hole, narrow expansion joint formwork vertical profile figure full-page proof is shown in Fig. 7, narrow to stretch Contracting seam formwork horizontal sectional drawing full-page proof is shown in Fig. 8.
Step 6, inner, external wall template and dedicated lateral bi-steel back cord, diagonal brace are reinforced, correction:
After inner, external wall template is fixed by positioning line of ink marker molding support, then set gradually that the wooden a tree, used in making timber for boats is time stupefied, steel pipe master is stupefied, It is reinforced using to wire drawing bar and three type cards.Adjustable steel pipe diagonal brace one end is arranged again, and with fastener timber wedge to be fixed on flooring reserved On anchor ring reinforcing bar.The other end is separately connected: being connected on the stupefied steel pipe of level master of inside wall formwork and is played a supportive role, is connected to exterior wall Play drawknot on dedicated transverse direction bi-steel back cord, and is securely reinforced with fastener or three type clamping locks.It is used after reinforcing Ceiling hammer or level carry out the inspection correction of template.
Step 7, concreting:
Ensure before concreting being sealed on formwork edge joint with adhesive tape.In order to prevent form lateral pressure it is excessive cause it is quick-fried Mould, two side column of expansion joint (wall) is synchronous layered when casting concrete pours, is layered and vibrates (using people's formula vibrating spear is inserted), and two sides are mixed Solidifying soil pours height difference and is no more than 1000mm, and vibration compacting.One layer of gummed paper can be covered when pouring at the top of expansion joint prevents coagulation Soil is trickled down in expansion joint, and pays attention to whether trickling down concrete in expansion joint at any time, is rinsed with water completely, after avoiding in time if any unrestrained Phase demoulding is difficult.
Wherein, it inserts people's formula vibrating spear and is unable to direct collision wall form, while to control vibrating time, insertion is vibrated every time Time be 20-30 seconds or so, when concrete surface without obviously collapse, have cement slurry appearance, no longer bubble when, should terminate It vibrates at the position.
Step 8, form removable:
Its process flow are as follows: remove wall-punching pair-pulling threaded spindle;Remove dedicated lateral bi-steel back cord in seam;Remove interior wall mould Plate;Remove vertical stupefied, template of exterior wall quarter bend;Remove pedestal reinforcing bar;Template and accessory transport, maintenance.
Its work progress are as follows: should can guarantee that its surface and corner angle are not damaged because of form removal in concrete strength, usually Its dismountable template of at least 1 old name for the Arabian countries in the Middle East after the concreting of situation lower prop, first tears wall-punching pair-pulling threaded spindle open, extracts the double steel of dedicated transverse direction out Muscle back cord, then be vertical top-down dismounting inside wall formwork, exterior wall quarter bend stupefied, template, cut off pedestal spacer bar.Finally Template, accessory for removing etc. are forbidden to toss, and someone to scoop out transmitting, stack by designated place, and accomplish to clear up in time, repair Interleaving agent is brushed with painting, after especially dedicated lateral bi-steel back cord is removed, centainly nut eyelet is cleared up, it is anti-to brush oil Rust processing, and storehouse keeping is specially placed, in case using.
Wherein, it when form removal, the strict control form removal time, avoids form removal too early, damages wall concrete.
Step 9 is used in turn:
The material that heap is put well after demoulding is adjusted to construction surface from discharging platform using tower crane and is used in turn.
Technological principle of the invention is as follows:
1, this method stencil design is designed by wall single surface formwork, to stitch inner template when ensuring twin columns (wall) concrete placings Stress is minimum, and template, which can remove, to be repeatedly used in turn.
2, wall (column) inner side template is using traditional wood formwork system, and diagonal brace is using adjustable steel pipe diagonal brace;Seam inner template is got rid of It abandons conventional method and disposable template or two sides wallboard staggered floor construction method is done with polystyrene foam plate, use template+quarter bend instead, It is fixed by opposite-pull screw special, dedicated lateral bi-steel back cord, seam internal expanding mould is avoided to occur.
It 3, is the dismounting convenient for outer wall template after concreting, after template is placed in deformation joint, it is necessary to which there are certain Gap.Therefore, it replaces flitch that the stress of time stupefied bone can be improved using quarter bend, increases the rigidity, intensity, stability of template, and cut Face area is small, increases demoulding gap, it is ensured that outer wall template is smoothly removed.Templates for expansion joints makes template using 10mm thickness plank sheathing Panel, 20 quarter bend of Φ is that vertical stupefied fixed by ohm is scheduled in template, after placing dedicated lateral bi-steel back cord, from spiral shell Screw rod through walls in female hole.Two side template ohm cards and screw rod through walls, horizontal reinforcement shift to install in stitching.Face die plate outer in this way Overall thickness are as follows: thick+vertical quarter bend back cord+level of template leads stupefied reinforcing bar=20mm+40mm+18=78mm, is with the expansion joint 100mm Standard has the gap 22mm, it can be ensured that outer wall template is smoothly removed.
4, expansion joint two side columns (wall) is synchronous layered when casting concrete pours, is layered and vibrates, and two sides concreting is high Difference is no more than 1000mm.
5, its dismountable template of at least 1 old name for the Arabian countries in the Middle East after column concreting, first tears wall-punching pair-pulling threaded spindle open, extracts dedicated transverse direction out Bi-steel back cord, then be vertical top-down dismounting inside wall formwork, exterior wall quarter bend stupefied, template, cut off pedestal spacer bar. It is used in turn again after template maintenance.
In above-mentioned construction method,
1, stencil design of the invention is designed by wall single surface formwork, to stitch internal model when ensuring twin columns (wall) concrete placings Plate stress is minimum, and template, which can remove, to be repeatedly used in turn.
2, wall (column) inner side template is using traditional wood formwork system, and diagonal brace is using adjustable steel pipe diagonal brace;Seam inner template is got rid of It abandons conventional method and disposable template or two sides wallboard staggered floor construction method is done with polystyrene foam plate, use template+quarter bend instead, It is fixed by opposite-pull screw special, dedicated lateral bi-steel back cord, seam internal expanding mould is avoided to occur.
It 3, is the dismounting convenient for outer wall template after concreting, after template is placed in deformation joint, it is necessary to which there are certain Gap.Therefore, it replaces flitch that the stress of time stupefied bone can be improved using quarter bend, increases the rigidity, intensity, stability of template, and cut Face area is small, increases demoulding gap, it is ensured that outer wall template is smoothly removed.Templates for expansion joints makes template using 10mm thickness plank sheathing Panel, 20 rectangular tube of Φ is that vertical stupefied fixed by ohm is scheduled in template, after placing dedicated lateral bi-steel back cord, from Screw rod through walls in nut bore.Two side template ohm cards and screw rod through walls, horizontal reinforcement shift to install in stitching.Face mould outer in this way Plate overall thickness are as follows: thick+vertical main stupefied reinforcing bar=20mm+40mm+18=78mm of quarter bend back cord+level of template, with the expansion joint 100mm Subject to, there is the gap 22mm, it can be ensured that outer wall template is smoothly removed.
4, expansion joint two side columns (wall) is synchronous layered when casting concrete pours, is layered and vibrates, and two sides concreting is high Difference is no more than 1000mm.
5, its dismountable template of at least 1 old name for the Arabian countries in the Middle East after column concreting, first tears wall-punching pair-pulling threaded spindle open, extracts dedicated transverse direction out Bi-steel back cord, then be vertical top-down dismounting inside wall formwork, exterior wall quarter bend stupefied, template, cut off pedestal spacer bar. It is used in turn again after template maintenance.
It is illustrated below with reference to specific experimental data:
One, preferable using this construction method twin columns (wall) concrete formation quality, the mould that rises is avoided the occurrence of, structure wall column is influenced Sectional dimension, and the generation of the mass defects such as honeycomb, pitted skin is reduced, quality defect of concrete renewal expense can be saved.
Two, the present invention can be improved income:
Economic and Efficiency Analysis is done for building by the Chongqing mansion Heng great Yu (one phase of the plot B17-2) 67-68#
Project profile: the building 67-68# is made of three adjacent cells, and ± 0.000 or more roofing height about 24m, standard is layer by layer High 2.95m, 8F/-1F layers total, construction area 6543.45m2.Safety classes of building structures is second level, seismic fortification intensity 6 Degree, architectural design service life are 50 years.Base form is strip footing under rotary digging stake, wall.Main body is shear wall structure, structure Strength grade of concrete C30~C35.The engineering has one to have the expansion joint 100mm wide, shear wall between 25-26 axis shear wall For L-type, long 1.7m, totally 4 wall shear wall.The engineering is developer's Housing Project, and the duration is tight, it is desirable that twin columns (wall) concrete at expansion joint It must synchronous Construction Technology.Obvious economic benefit is obtained using the engineering method construction technology, as follows:
One), compared with staggered floor construction:
1, save period of construction cost: general standard layer can save the duration 3 days.This engineering economy duration 24 days.24 days * 3660 Member/day=87840 yuan (daily expense: tower crane rental charge: 360 yuan/day, tower crane labour cost: 300 yuan/day, administrator employee Money: by 150 yuan/day people=3000 yuan 20 people */day;Total 3660 yuan/day);
2, saving labour: * 24 days=21600 yuan of 3 people *, 300 yuan/day;
3, Master Cost saving: 16m3* 1750 yuan/m3- 0.1*3850 member/t=27615 member (saves flitch: 16m3;Square Pipe: 100kg (quarter bend can have enough to meet the need)) 4, save safety management expense: by 1 security official management calculating: 1 people *, 300 yuan/day * 24 days= 7200 yuan;
Total saving expense: 87840+21600+27615+7200=144255 member.
Two), compared with doing disposable template with polystyrene foam plate:
1, polystyrene foam sheet material is saved to take: 2.95 (seam is high) * 8 layers * 350 yuan of * 3.4 (seam is grown) * 0.1 (slit width)/ m3=2808.4 yuan;
2, save concrete repair expense: artificial, the Master Cost that surface irregularity processing generates are repaired by 3cm thickness concrete Mend and fee of material is as follows: (concrete unit price presses 280 yuan/m3Calculate, other fragment datas are not counted) 160.48m2×0.03m× 280 yuan/m3(fee of material)+160.48m2× 1 yuan/m2(labour cost)=1508.51 yuan;
3, labour cost: 600 yuan;It employs new technology the expenses of needs: 0.1t (quarter bend) * 3850 yuan/t=385 member;Dedicated silk The auxiliary materials such as bar and steel pipe: 1000 yuan;Labour cost: 1000 yuan;
4, * 3660 yuan/days=25620 yuan of 7 days: the 7 days duration of repairing is saved;
Total saving expense: 2808.4+1508.51+600-385-1000-1000+25620=29051.9 member.
Three, construction efficiency is improved:
One), two side columns wall synchronous construction in expansion joint of the present invention, the work efficiency improved reduce the work holdup.
Two), present invention optimizes construction process, improve speed of application, once high-quality to survive, and reduction, which is done over again, to be delayed.
Four, environmental benefit:
Polystyrene foam plate itself is a kind of micro radiation of petroleum product heavy oil composition, common gas componant measuring instrument It cannot test, ventilation, activated carbon adsorption, flowers, which absorb, not to work.Radiation hazradial bundle degree can not determine, because avoid using.This Invention reduces the use of styrofoam, is made that certain contribution to protection environment.
Five, present invention reduces the duration, construction quality is improved, in construction, saving metal material and energy reduces environmental pollution, and plays Energy-saving and environment-friendly effect.
Six, application examples:
1 journey application example of table
1, implement in the Chongqing mansion Heng great Yu (one phase of the plot the B17-2) building 67-68#, compare disposable polystyrene foam Plate does template, saves the duration 7 days, 29051.9 yuan of save the cost, ensure that quality;Compared to two side columns wallboard staggered floor construction method, It saves the duration 24 days, 144255 yuan of save the cost, ensure that quality.
2, implement in the Chongqing mansion Heng great Yu (one phase of the plot the B17-2) building 55-56#, compare disposable polystyrene foam Plate does template, saves the duration 7 days, 28233.1 yuan of save the cost, ensure that quality;Compared to two side columns wallboard staggered floor construction method, It saves the duration 21 days, 129675 yuan of save the cost, ensure that quality.
3, implement in the Chongqing mansion Heng great Yu (one phase of the plot the B17-2) building 71-72#, compare disposable polystyrene foam Plate does template, saves the duration 7 days, 29051.9 yuan of save the cost, ensure that quality;Compared to two side columns wallboard staggered floor construction method, It saves the duration 24 days, 144255 yuan of save the cost, ensure that quality.
The above construction quality is greatly improved, and effectively reduces column wall common fault of concrete quality at expansion joint, for enterprise Industry brings good economic benefit.
Above description has shown and described several preferred embodiments of invention, but as previously described, it should be understood that invention is not It is confined to form disclosed herein, should not be regarded as an exclusion of other examples, and can be used for various other combinations, modification And environment, and can be carried out within that scope of the inventive concept describe herein by the above teachings or related fields of technology or knowledge Change.And changes and modifications made by those skilled in the art do not depart from the spirit and scope of invention, then it all should be in the appended power of invention In the protection scope that benefit requires.

Claims (10)

1. bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint, which comprises the following steps:
Step 1, template processing make with material;
Step 2, reserved diagonal brace anchor ring and installation template pedestal spacer bar;
Step 3, line setting;
Step 4, binding column wall reinforcing bar;
Wall conduit is led in step 5, the installation of inner, external wall template and installation;
Step 6, inner, external wall template and dedicated lateral bi-steel back cord, diagonal brace are reinforced, correction;
Step 7, concreting;
Step 8, form removable.
2. construction method according to claim 1, which is characterized in that the template processing in the step 1 makes with material Specifically:
The production of step 1.1, dedicated lateral bi-steel back cord:
Internal diameter >=14mm hexagonal feed screw nut is placed in parallel among two Φ 18mm reinforcing bars placed side by side, steel bar clamping spiral shell Mother, nut place spacing Wei≤450mm, and nut is 300mm from end reinforced starting distance;First spot welding is fixed after placing, Guarantee nut and reinforcing steel bar center line are in same plane, then start welding, it is ensured that nut upper and lower surface and two reinforcement weldings are one It rises, does not interspace, eyelet, it is necessary to which solid and reliable, welding finished product ensures nut brush oil;
Step 1.2, template processing and fabricating:
1) exterior wall or outer column template use: stitching inner side template thickness 10mm, remaining direction template thickness >=15mm, template specification For 1830*915mm plank sheathing;
2) splicing is preceding according to the long and high production template of column wall, the height of template lengthening 200mm higher than wall, and adding on template top Eminence is got into the cave reserved suspension hook lifting hole(eyelet);
3) template spliced by wall size remaining tripartite in addition to top surface is followed closely with 20mm thickness batten into frame;
4) ohm card and screw rod hole position are determined according to stencil design drawing ruler and ink fountain snap the line, wherein ohm card erects Histogram is to disposing 5, horizontal space 150mm, and screw rod hole spacing is 450*450mm, two side templates respectively 200 from board bottom, 250mm starts to arrange;
5) the two pieces of template ohm cards in left and right and screw rod hole position should misplace arrangement in seam;
6) inner side template ohm card and vertical stupefied quarter bend installation are stitched, bores screw rod hole, it is vertical to place Φ 20mm according to the positioning line of ink marker Vertical stupefied quarter bend is fixed in template by secondary stupefied quarter bend with Φ 22mm finished product ohm card;Φ 20mm are drilled according to position line The screw rod hole in bar hole, the two pieces of templates in left and right is staggered 70mm, and one piece of length and width 50*30mm of boat nail in the case where being close to screw rod hole up and down Trapezoidal wood particle can preferably guarantee that nut center and screw rod hole center are straight at one convenient for shelving dedicated lateral bi-steel back cord On line, convenient for later period screw rod through walls.
3. construction method according to claim 1, which is characterized in that reserved diagonal brace anchor ring and installation in the step 2 Die plate base spacer bar specifically:, should be in lower layer's expansion joint shear wall or shear column interior wall side before expansion joint of constructing Floor or flooring reserve diagonal brace anchor ring, and anchor ring should be using the reinforcing bar of >=Φ 16, and for ring width preferably in 100~150mm, reinforcing bar exposes knot Structure face 60mm;If not being first floor construction, also every spacing at the top of the shear wall body of expansion joint two sides need to be poured in lower layer 500mm cuts the sulculus of a 14*50*14 with cutting machine, places in the bar dowel embedded groove of 1 Φ 14 and be used to support exterior wall Template.
4. construction method according to claim 1, which is characterized in that the line setting in the step 3 specifically: template Discharging structure sideline and the template contral line wide apart from sideline 300 before installing.
5. construction method according to claim 1, which is characterized in that the binding column wall reinforcing bar in the step 4 specifically: Intersect intensively by the reinforcing bar at capital position, setting-out must be carried out before reinforcing bar is bound, determine that the reinforcing bar of crossover sites puts sequence, keep away Exempt from the overstocked influence reinforcing bar binding of reinforcing bar and the construction of lower step;Joist is bidirectional stress reinforcing bar, and all reinforcing bar crosspoints should be bound point by point, Its lap of splice and position will meet code requirement;Wall column cushion block of concrete bar protective layer, spacing 1m, quincuncial arrangement, by setting are installed Meter requires installation wall connecting lacing wire quincuncial arrangement, and reinforcing bar spacer ferrule is added at column, wall top, to guarantee that wall double steel bar is horizontal flat Vertically, spacing is uniformly correct;For the thickness for guaranteeing wall, increase short 14 reinforcing bar inner support of Φ at Screw arbor with nut at both-ends, bar dowel two is held level with both hands It is whole.
6. construction method according to claim 1, which is characterized in that the installation of inner, external wall template and peace in the step 5 Dress leads wall conduit specifically:
Step 5.1, outer wall template erection sequence:
First, the lifting positioning of exterior wall vertical formwork;Second, side end shuttering supporting is fixed;Third, dedicated transverse direction bi-steel back Stupefied placement is simultaneously supported on side end template horizontal reinforcing steel pipe;4th, it is through walls to the installation of wire drawing bar conduit, alignment;5th, It is through walls that wire drawing bar is connect with dedicated lateral bi-steel back cord, the 6th, internal model installation is fixed;
Step 5.2, template and conduit installation:
Step 5.2.1, after the completion of deformation joint wall steel bar is bound, just with two pieces of dedicated outer wall templates of deformation joint of tower crane handling Position, is fixed temporarily after leveling;
Step 5.2.2, side end template is fixed according to positioning line of ink marker splicing support, and vertically the wooden a tree, used in making timber for boats time is stupefied end, horizontal The installation of reinforcing bar back cord is fixed;
Step 5.2.3, dedicated lateral bi-steel back cord is supported on the trapezoidal wood particle and side that mouth is followed closely under outer wall template screw rod hole On the horizontal reinforcing steel pipe of face both ends template, two pieces of outer wall template conduit holes and the dedicated lateral bi-steel of lateral expansion seam are adjusted Φ 20PVC casing is placed after making its centering in back cord nut hole site;
Step 5.2.4, the main stupefied bone of setting exterior wall transverse direction: passing through PVC conduit using 14 wall-punching pair-pulling threaded spindle of Φ, double with dedicated transverse direction Reinforcing bar back cord nut tightens connection, at least exceeds nut 20mm to wire drawing head, makes to lead stupefied reinforcing bar and dedicated wall-punching pair-pulling threaded spindle Connection forms whole;Dedicated transverse direction bi-steel back cord length longer than wall should exceed 200mm, reinforce, remove, dedicated cross convenient for the later period It when being placed to bi-steel back cord, should place from bottom to top, convenient for construction;
Step 5.2.5, when every one of dedicated lateral bi-steel back cord of setting, just inside wall formwork has been spliced according to the positioning line of ink marker simultaneously And fixed, so that screw rod through walls passes through inside wall formwork hole.
7. construction method according to claim 1, which is characterized in that inner, external wall template and dedicated cross in the step 6 It is reinforced to bi-steel back cord, diagonal brace, correction specifically:
It after inner, external wall template is fixed by positioning line of ink marker molding support, then sets gradually that the wooden a tree, used in making timber for boats is time stupefied, steel pipe master is stupefied, uses Wire drawing bar and three type cards are reinforced;Adjustable steel pipe diagonal brace one end is set again and is fixed on the reserved anchor ring of flooring with fastener timber wedge On reinforcing bar;The other end is separately connected: being connected on the stupefied steel pipe of level master of inside wall formwork and is played a supportive role, it is dedicated to be connected to exterior wall Play drawknot on lateral bi-steel back cord, and is securely reinforced with fastener or three type clamping locks;Messenger wire is used after reinforcing Hammer or level carry out the inspection correction of template.
8. construction method according to claim 1, which is characterized in that the concreting in the step 7 specifically: mixed Solidifying soil ensures before pouring being sealed on formwork edge joint with adhesive tape;Form lateral pressure is excessive in order to prevent causes quick-fried mould, pours coagulation Expansion joint two side columns (wall) is synchronous layered when native pours, is layered and vibrates, and concreting height difference in two sides is no more than 1000mm, and shakes Puddling is real;Covering one layer of gummed paper when pouring at the top of expansion joint prevents concrete from trickling down in expansion joint, and pays attention at any time flexible Whether concrete is trickled down in stitching, is rinsed with water completely in time if any unrestrained, avoids later period demoulding difficult.
9. construction method according to claim 1, which is characterized in that the form removable in the step 8 specifically: mixed Solidifying soil intensity can guarantee that its surface and corner angle are not damaged because of form removal, at least 1 after the concreting of usual situation lower prop It removes its template, first tears wall-punching pair-pulling threaded spindle open, extracts dedicated lateral bi-steel back cord out, then be top-down dismounting interior wall mould Vertical stupefied, template of plate, exterior wall quarter bend, cuts off pedestal spacer bar, the template finally removed, accessory, and accomplish to clear up in time, It repairs and painting brushes interleaving agent and clears up after dedicated transverse direction bi-steel back cord is removed nut eyelet, brush at oily antirust Reason.
10. construction method according to claim 1, which is characterized in that the construction method is flexible suitable for building Slit width Du≤100mm range inner frame, the multilayer of shear wall structure, high-rise industry are applied with civil buildings expansion joint two sides concrete Work.
CN201910782419.XA 2019-08-23 2019-08-23 Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint Pending CN110439265A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910782419.XA CN110439265A (en) 2019-08-23 2019-08-23 Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910782419.XA CN110439265A (en) 2019-08-23 2019-08-23 Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint

Publications (1)

Publication Number Publication Date
CN110439265A true CN110439265A (en) 2019-11-12

Family

ID=68437285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910782419.XA Pending CN110439265A (en) 2019-08-23 2019-08-23 Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint

Country Status (1)

Country Link
CN (1) CN110439265A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847596A (en) * 2019-12-04 2020-02-28 成都建工第一建筑工程有限公司 High-rise concrete vertical decorative line composite formwork construction method
CN111042011A (en) * 2019-12-30 2020-04-21 中铁六局集团天津铁路建设有限公司 Side wall reinforcing method for construction of close-distance adjacent frame structure bridge
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN113737727A (en) * 2021-09-01 2021-12-03 湖北省水利水电规划勘测设计院 Expansion joint flat pressing structure and method for hydraulic building
CN114809591A (en) * 2022-06-14 2022-07-29 中国建筑第七工程局有限公司 Reinforcing construction method for aluminum alloy templates of wall bodies on two sides of long and narrow expansion joint
CN115288436A (en) * 2022-08-23 2022-11-04 中建三局集团有限公司 Double-column synchronous construction tool type template at large-section narrow deformation joint and construction method
CN116641549A (en) * 2023-07-04 2023-08-25 中国建筑第四工程局有限公司 Template supporting structure with light dead weight and strong plasticity and construction method thereof
CN117403872A (en) * 2023-10-19 2024-01-16 上海建工七建集团有限公司 A construction method for pouring large-curvature polygonal fair-faced concrete double-layer formwork
CN117468700A (en) * 2023-10-27 2024-01-30 中建七局西南建设有限责任公司 A construction method that combines hoistable shaped steel formwork and aluminum formwork at narrow deformation joints on the same floor
WO2026107881A1 (en) * 2024-11-19 2026-05-28 赵平路 Layout device for main building of thermal power plant

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178591A (en) * 2015-10-12 2015-12-23 江苏南通二建集团有限公司 Small-gap double-shear-wall deformation joint formwork and construction method thereof
CN205857693U (en) * 2016-08-10 2017-01-04 中建新疆建工集团第一建筑工程有限公司 A kind of canalization template being applied to movement joint both sides shear wall synchronous construction
CN205976476U (en) * 2016-07-22 2017-02-22 中国建筑第八工程局有限公司 Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof
CN206337819U (en) * 2016-12-28 2017-07-18 吴玉红 A kind of bracing means of concrete structure templates for expansion joints
US20180223533A1 (en) * 2017-02-08 2018-08-09 Michael G. RUSH Adjustable rebar positioning device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178591A (en) * 2015-10-12 2015-12-23 江苏南通二建集团有限公司 Small-gap double-shear-wall deformation joint formwork and construction method thereof
CN205976476U (en) * 2016-07-22 2017-02-22 中国建筑第八工程局有限公司 Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof
CN205857693U (en) * 2016-08-10 2017-01-04 中建新疆建工集团第一建筑工程有限公司 A kind of canalization template being applied to movement joint both sides shear wall synchronous construction
CN206337819U (en) * 2016-12-28 2017-07-18 吴玉红 A kind of bracing means of concrete structure templates for expansion joints
US20180223533A1 (en) * 2017-02-08 2018-08-09 Michael G. RUSH Adjustable rebar positioning device

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847596A (en) * 2019-12-04 2020-02-28 成都建工第一建筑工程有限公司 High-rise concrete vertical decorative line composite formwork construction method
CN111042011A (en) * 2019-12-30 2020-04-21 中铁六局集团天津铁路建设有限公司 Side wall reinforcing method for construction of close-distance adjacent frame structure bridge
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN112411772B (en) * 2020-10-24 2022-05-27 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN113737727A (en) * 2021-09-01 2021-12-03 湖北省水利水电规划勘测设计院 Expansion joint flat pressing structure and method for hydraulic building
CN114809591A (en) * 2022-06-14 2022-07-29 中国建筑第七工程局有限公司 Reinforcing construction method for aluminum alloy templates of wall bodies on two sides of long and narrow expansion joint
CN115288436A (en) * 2022-08-23 2022-11-04 中建三局集团有限公司 Double-column synchronous construction tool type template at large-section narrow deformation joint and construction method
CN116641549A (en) * 2023-07-04 2023-08-25 中国建筑第四工程局有限公司 Template supporting structure with light dead weight and strong plasticity and construction method thereof
CN117403872A (en) * 2023-10-19 2024-01-16 上海建工七建集团有限公司 A construction method for pouring large-curvature polygonal fair-faced concrete double-layer formwork
CN117468700A (en) * 2023-10-27 2024-01-30 中建七局西南建设有限责任公司 A construction method that combines hoistable shaped steel formwork and aluminum formwork at narrow deformation joints on the same floor
CN117468700B (en) * 2023-10-27 2026-08-07 中建七局西南建设有限责任公司 Method for constructing joint of shaping steel template and aluminum template in same layer at narrow deformation joint in lifting manner
WO2026107881A1 (en) * 2024-11-19 2026-05-28 赵平路 Layout device for main building of thermal power plant

Similar Documents

Publication Publication Date Title
CN101956458B (en) Construction method of overlong and superhigh single-side fair-faced concrete wall
CN109707090B (en) Pre-buried dislocation preventing structure under laminated plate reinforced band plate and construction method
CN108824220A (en) A kind of cast-in-place support and construction method of the rigid structure of cantilever T-type
CN106437142A (en) Construction method and double-layer formwork structure for cast-in-situ slope roof
CN110777983A (en) Synchronous construction structure and method for concrete filled wall and cast-in-place structure
CN110905523A (en) Subway vertical shaft construction method
CN103498425B (en) One completely knocks down multifunctional assembled bearing bracket structure and construction method thereof
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN102003069A (en) Construction method and pouring device for framework masonry infill wall structure
CN110952456A (en) Pile type bridge construction process
CN103243912B (en) Multilayer is without plate framework construction method
CN113202222A (en) Construction method for assembled type superposed beam slab
CN111894204A (en) Steel pipe concrete composite column construction method
CN110145124A (en) A reinforcement tool and its construction method for controlling the quality of horizontal stubble of shear walls
CN115366247B (en) Pretensioned prestressed concrete hollow slab tensioning construction method
CN111042569B (en) Construction method for additionally building linear accelerator machine room in limited space of hospital basement
CN103174095A (en) Box girder concrete pouring structure with rear-expanding flanges and construction method thereof
CN111663770B (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN104831932A (en) Construction technology for high-grade concrete column base
CN110439257A (en) A kind of high turnover rate fashioned iron of sectional-film coating plywood light-type template system construction method
CN110258890B (en) Construction method of concrete structure with connected broken line type outer wall and roof
CN211499326U (en) A synchronous construction structure of concrete infill wall and cast-in-place structure
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN201850773U (en) Pouring device for constructional column of frame masonry infilled wall
CN209585348U (en) Workshop section's shear wall sliding push mode peace tears formwork system open after deformation joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191112

RJ01 Rejection of invention patent application after publication