CN104863347A - Building scaffold wall connecting structure and construction process - Google Patents

Building scaffold wall connecting structure and construction process Download PDF

Info

Publication number
CN104863347A
CN104863347A CN201510349291.XA CN201510349291A CN104863347A CN 104863347 A CN104863347 A CN 104863347A CN 201510349291 A CN201510349291 A CN 201510349291A CN 104863347 A CN104863347 A CN 104863347A
Authority
CN
China
Prior art keywords
main body
concrete structure
wall
body concrete
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510349291.XA
Other languages
Chinese (zh)
Inventor
吕成
柳志军
朱淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201510349291.XA priority Critical patent/CN104863347A/en
Publication of CN104863347A publication Critical patent/CN104863347A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a building scaffold wall connecting structure. A main body concrete structure is fixedly connected with a scaffold by use of a wall connecting piece and a wall connecting steel pipe, wherein the wall connecting piece is an L-shaped metal strip; the horizontal part of the wall connecting piece is buried in the main body concrete structure; the lower half section of the vertical part of the wall connecting piece is arranged in the main body concrete structure, while the upper half section of the vertical part extends out of the surface of the main body concrete structure and is bent; the bottom surface of the bent part is closely fitted with the surface of the main body concrete structure, and two bolt holes are formed in the part, extending out of the main body concrete structure, of the front end of the bent part in the horizontal direction; the wall connecting steel pipe is fixed on the lower surface of the part, extending out of the main body concrete structure, of the wall connecting piece by use of a wall connecting fastener; one end of the wall connecting steel pipe is tightly jacked up with the outer vertical surface of the main body concrete structure, while the other end of the wall connecting steel pipe is fixedly connected with the scaffold by use of a fastener. The building scaffold wall connecting structure is capable of effectively resisting the horizontal deformation of the scaffold body; no hole needs to be reserved while the safety performance is improved; the safety construction is ensured, and the construction efficiency is improved.

Description

A kind of building scaffold connects wall construction and construction technology
Technical field
The present invention relates to a kind of wall-connecting device of scaffold, specifically a kind of building scaffold connects wall construction and construction technology, belongs to building trade technical field of auxiliary equipment.
Background technology
In existing building site, the connection between scaffold and construction wall is one of important step in building safety facility always.The structure of wall attaching parts many employings built-in pipe of present most scaffold, and must reserved opening when building a wall, inserts vertical tube and tube connector, and is fixed by snaply connected with scaffold.Said structure has following shortcoming:
1. above-mentioned connected mode manufactures difficulty to other operations of construction, and in practice, workman's usually not embedded steel tube or arbitrarily remove on request, brings potential safety hazard to scaffold.2. above-mentioned connected mode palpus reserved opening when building a wall, the later stage shutoff cost in wall hole is higher, and effect is bad, even causes wall leakage.
3. hinder integral construction, reduce efficiency of construction, and structure must be assigned at ad-hoc location, increase the difficulty of construction of constructor.
Summary of the invention
For above-mentioned prior art Problems existing, the invention provides a kind of building scaffold and connect wall construction and using method, effectively opposing support body horizontal distortion, while improving security performance, without the need to reserved opening, guarantees main body construction, and improves the efficiency of construction.
To achieve these goals, the present invention includes main body concrete structure and scaffold, be fixedly connected with by connecting wall sheet and connecting wall steel pipe between main body concrete structure and scaffold.
Wherein, connecting wall sheet is L-type bonding jumper, the horizontal component connecting wall sheet is embedded in main body concrete structure, the lower semisection of vertical portion is arranged in main body concrete structure, upper semisection stretches out the surface also bending of main body concrete structure, the bottom surface of dogleg section and the surface of main body concrete structure are close to, and the part that main body concrete structure is stretched out in front end has two bolt hole bolts hole in the horizontal direction; Connect wall steel pipe to be fixed on and to connect by connecting wall fastener the soffit that wall sheet level stretches out the part of main body concrete structure, connect wall steel pipe one end and main body concrete structure alien invasion holds out against in fact, the other end is fixedly connected with scaffold by buckle.
Further, connect wall fastener to be made up of bolt and pipe clamp, wherein, bolt arranges two in the horizontal direction, be fixed on the upper surface of pipe clamp by the mode of welding or be threaded, and with the bolt hole threaded engagement connecting part that wall sheet level stretches out main body concrete structure and have.
Further, pipe clamp inner surface has anti-slip veins.
Further, the inner surface of buckle has anti-slip veins.
Further, the thickness connecting wall sheet is 5mm, and width is 50mm, and the length of horizontal component is 100mm, and the length of vertical portion is 400mm, and wherein, the bending part of vertical portion is apart from top 200mm, and the centre distance top 100mm of the bolt hole had, diameter is 12mm.
Further, connecting wall sheet is iron, steel.
Further, connect wall sheet to be made up of the plain bar of more than a diameter 10mm.
Using method of the present invention is as follows:
1) be first embedded in main body concrete structure in advance by the latter half of the horizontal component and vertical portion that connect wall sheet, leveling is also fixing;
2) pre-buried complete after, will wall sheet be connected stretch out the vertical portion bending of main body concrete structural surface, and the bottom surface of vertical portion is contacted with concrete structural surface, not interspace;
3), after bending, by connecting the below of wall steel pipe by the connection official folder company of being fixed on wall sheet dogleg section, the vertical plane of wall steel pipe one end dieback at main body concrete structure will be connected simultaneously; After guaranteeing that dieback can not rock, the other end connecting wall steel pipe is connected with scaffold by buckle;
4) after being used to complete, taken off respectively by company's wall steel pipe from scaffold and company's wall sheet, subsequently, construction personnel uses instrument to pound curved by the part that company's wall sheet stretches out main body concrete structure, and the part making it stretch out touch the vertical plane of main body concrete structure; Continuing directly by smearing of surface, it to be wrapped in main body concrete structure completely in work progress subsequently.
Compared with existing structure, the present invention has following feature: 1. can effectively avoid workman to be removed by wall-connecting piece when the later stage builds a wall and kitchen toilet water-stopping platform is constructed, and ensure the overall wall-connecting piece quantity of scaffold, and distribution rationally.2. this connects that wall construction does not need reserved opening, avoiding that traditional wall-connecting piece is configured in when building a wall must reserved opening, and the later stage shutoff cost in wall hole is higher, and effect is bad, even causes the generation of the situation of wall leakage.3. do not hinder main body construction, and increase work efficiency.Even also can arrange at wall, post horizontal construction joint place, and simple.Abundant guarantee wall-connecting piece distribution rationally.4. be close to wall face after connecting the bending of wall sheet, directly can carry out external rendering and other subsequent jobs.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation connecting wall sheet;
Fig. 3 is the structural representation connecting wall fastener.
In figure: 1, main body concrete structure, 2, connect wall sheet, 3, connect wall fastener, 4, connect wall steel pipe, 5 scaffolds, 6, pipe clamp, 7, bolt.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1, one can utilize formula building scaffold wall attaching parts, comprises main body concrete structure 1 and scaffold 5, it is characterized in that, is fixedly connected with between main body concrete structure 1 and scaffold 5 by connecting wall sheet 2 and connecting wall steel pipe 4; As shown in Figure 2, connecting wall sheet 2 is L-type bonding jumper, the horizontal component connecting wall sheet 2 is embedded in main body concrete structure 1, the lower semisection of vertical portion is arranged in main body concrete structure 1, upper semisection stretches out the surface also bending of main body concrete structure 1, the bottom surface of dogleg section and the surface of main body concrete structure 1 are close to, and the part that main body concrete structure 1 is stretched out in front end has two bolts hole in the horizontal direction.Connect wall steel pipe 4 stretches out the part of main body concrete structure 1 soffit by connecting wall fastener 3 company of being fixed on wall sheet 2 level, even wall steel pipe 4 one end and main body concrete structure 1 alien invasion hold out against real, and the other end is fixedly connected with scaffold 5 by buckle.
As shown in Figure 3, connect wall fastener 3 to be made up of bolt 7 and pipe clamp 6, wherein, bolt 7 has setting in the horizontal direction, be fixed on the upper surface of pipe clamp 6 by the mode of welding or be threaded, and with the bolt hole threaded engagement connecting part that wall sheet 2 level stretches out main body concrete structure 1 and have.
Further improve as the present invention, pipe clamp 6 inner surface has anti-slip veins, guarantees the dynamics of pipe clamp.
Further improve as the present invention, the inner surface of buckle has anti-slip veins, plays anti-skidding effect.
Further improve as the present invention, the thickness connecting wall sheet 2 is 5mm, and width is 50mm, the length of horizontal component is 100mm, and the length of vertical portion is 400mm, wherein, the bending part of vertical portion is apart from top 200mm, and the centre distance top 100mm of the bolt hole had, diameter is 12mm.
Further improve as the present invention, connecting wall sheet 2 is iron, steel.Prevent corrosion when constructing, improve application life.
Further improve as the present invention, connecting wall sheet 2 can be made up of the plain bar of more than a diameter 10mm.
In the course of work, 1) first the latter half of the horizontal component and vertical portion that connect wall sheet is embedded in main body concrete structure 1 in advance, leveling is also fixing;
2) pre-buried complete after, will wall sheet 2 be connected stretch out the vertical portion bending on main body concrete structure 1 surface, and make bottom surface and concrete structure 1 surface contact of vertical portion, not interspace;
3), after bending, by connecting the below of wall steel pipe 4 by the connection official folder company of being fixed on wall sheet 2 dogleg section, the vertical plane of one end dieback at main body concrete structure 1 of wall steel pipe 4 will be connected simultaneously; After guaranteeing that dieback can not rock, the other end connecting wall steel pipe 4 is connected with scaffold by buckle;
4) after being used to complete, taken off respectively by company's wall steel pipe from scaffold 5 and company's wall sheet, subsequently, construction personnel uses instrument to pound curved by the part that even wall sheet 2 stretches out main body concrete structure 1, and the part making it stretch out touch the vertical plane of main body concrete structure 1; Continuing directly by smearing of surface, it to be wrapped in main body concrete structure 1 completely in work progress subsequently.
In sum, the present invention can effectively avoid workman to be removed by wall-connecting piece when the later stage builds a wall and kitchen toilet water-stopping platform is constructed, and ensure the overall wall-connecting piece quantity of scaffold, and distribution rationally; 6 simultaneously, and this connects, and wall construction does not need reserved opening, avoiding that traditional wall-connecting piece is configured in when building a wall must reserved opening, and the later stage shutoff cost in wall hole is higher, and effect is bad, even causes the generation of the situation of wall leakage.Secondly, do not hinder main body construction, and increase work efficiency.Even also can arrange at wall, post horizontal construction joint place, and simple.Abundant guarantee wall-connecting piece distribution rationally.
In conjunction with the course of work and feature, the present invention has market value and commercial promise widely, can large batch of production and use in building trade.

Claims (8)

1. a building scaffold connects wall construction, it is characterized in that, comprise main body concrete structure (1) and scaffold (5), it is characterized in that, be fixedly connected with by connecting wall sheet (2) and connecting wall steel pipe (4) between described main body concrete structure (1) and scaffold (5);
Wherein, described company's wall sheet (2) is L-type bonding jumper, the horizontal component connecting wall sheet (2) is embedded in main body concrete structure (1), the lower semisection of vertical portion is arranged in main body concrete structure (1), upper semisection stretches out the surface also bending of main body concrete structure (1), the bottom surface of dogleg section and the surface of main body concrete structure (1) are close to, and the part that main body concrete structure (1) is stretched out in front end has two bolts hole in the horizontal direction;
The soffit of the part of main body concrete structure (1) stretches out in described company's wall steel pipe (4) by connecting wall fastener (3) company of being fixed on wall sheet (2) level, even wall steel pipe (4) one end and main body concrete structure (1) alien invasion hold out against real, and one end is fixedly connected with scaffold (5) by buckle.
2. a kind of building scaffold according to claim 1 connects wall construction and using method, it is characterized in that, described company's wall fastener (3) is made up of bolt (7) and pipe clamp (6), wherein, described bolt (7) arranges two in the horizontal direction, be fixed on the upper surface of pipe clamp (6) by the mode of welding or be threaded, and with the bolt hole threaded engagement connecting part that wall sheet (2) level stretches out main body concrete structure (1) and have.
3. a kind of building scaffold according to claim 2 connects wall construction and using method, it is characterized in that, described pipe clamp (6) inner surface has anti-slip veins.
4. a kind of building scaffold according to claim 1 and 2 connects wall construction, it is characterized in that, the inner surface of described buckle has anti-slip veins.
5. a kind of building scaffold according to claim 1 and 2 connects wall construction, it is characterized in that, the thickness of described company's wall sheet (2) is 5mm, width is 50mm, and the length of horizontal component is 100mm, and the length of vertical portion is 400mm, wherein, the bending part of vertical portion is apart from top 200mm, and the centre distance top 100mm of the bolt hole had, diameter is 12mm.
6. a kind of building scaffold according to claim 1 and 2 connects wall construction, it is characterized in that, described company's wall sheet (2) is iron, steel.
7. a kind of building scaffold according to claim 1 and 2 connects wall construction, it is characterized in that, described company's wall sheet (2) can be made up of the plain bar of more than a diameter 10mm.
8. a kind of building scaffold according to claim 1 connects wall construction, and concrete construction technology is as follows:
1) be first embedded in main body concrete structure (1) in advance by the latter half of the horizontal component and vertical portion that connect wall sheet, leveling is also fixing;
2) pre-buried complete after, the vertical portion bending that wall sheet (2) stretches out main body concrete structure (1) surface will be connected, and make bottom surface and concrete structure (1) surface contact of vertical portion, do not interspace;
3), after bending, the below of wall steel pipe (4) by the connection official folder company of being fixed on wall sheet (2) dogleg section will be connected, the vertical plane of one end dieback in main body concrete structure (1) of wall steel pipe (4) will be connected simultaneously; After guaranteeing that dieback can not rock, the other end that will connect wall steel pipe (4) is connected with scaffold by buckle;
4) after being used to complete, wall steel pipe will be connected take off from scaffold (5) and company's wall sheet respectively, subsequently, construction personnel uses instrument to pound curved by the part connecting wall sheet (2) and stretch out main body concrete structure (1), and the part making it stretch out touch the vertical plane of main body concrete structure (1); Continuing directly by smearing of surface, it to be wrapped in main body concrete structure (1) completely in work progress subsequently.
CN201510349291.XA 2015-06-24 2015-06-24 Building scaffold wall connecting structure and construction process Pending CN104863347A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510349291.XA CN104863347A (en) 2015-06-24 2015-06-24 Building scaffold wall connecting structure and construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510349291.XA CN104863347A (en) 2015-06-24 2015-06-24 Building scaffold wall connecting structure and construction process

Publications (1)

Publication Number Publication Date
CN104863347A true CN104863347A (en) 2015-08-26

Family

ID=53909478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510349291.XA Pending CN104863347A (en) 2015-06-24 2015-06-24 Building scaffold wall connecting structure and construction process

Country Status (1)

Country Link
CN (1) CN104863347A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105937299A (en) * 2016-06-08 2016-09-14 中国十七冶集团有限公司 Scaffold for building construction
CN106677518A (en) * 2017-03-13 2017-05-17 唐山曹妃甸二十二冶工程技术有限公司 Internally-inserted construction hanging basket and scaffold fixing device and application method thereof
CN107636238A (en) * 2015-05-27 2018-01-26 Peri有限公司 The application of scaffold and aperture in scaffolding pole with scaffold wall connecting piece receiving portion

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107636238A (en) * 2015-05-27 2018-01-26 Peri有限公司 The application of scaffold and aperture in scaffolding pole with scaffold wall connecting piece receiving portion
CN107636238B (en) * 2015-05-27 2019-05-03 Peri有限公司 The application of scaffold and aperture in scaffolding pole with scaffold wall connecting piece receiving portion
CN105937299A (en) * 2016-06-08 2016-09-14 中国十七冶集团有限公司 Scaffold for building construction
CN106677518A (en) * 2017-03-13 2017-05-17 唐山曹妃甸二十二冶工程技术有限公司 Internally-inserted construction hanging basket and scaffold fixing device and application method thereof

Similar Documents

Publication Publication Date Title
CN101892738B (en) Embedded scaffold connecting tube and construction method thereof
CN104196222B (en) The suspension scaffold of tools type section steel builder's jack
CN207228607U (en) A kind of external wall scaffold wall connecting piece
CN104863347A (en) Building scaffold wall connecting structure and construction process
CN202925898U (en) Template joint connecting structure
CN102251582B (en) Barrier-free decoration structure of high and low incorporated buildings and construction method thereof
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN210273410U (en) Pre-buried fixing device of block terminal
CN205036077U (en) Shear force wall formwork support suitable for narrow and small space usage
CN206769350U (en) Outer on large-sized station boiler Steel Structure chooses net scaffold
CN206707255U (en) Combined type wall attaching parts for external scaffolding
CN103321410A (en) Overhang diagonal form at exposed corner and method for erecting form
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN205976447U (en) Scaffold frame of connecting with straight screw sleeve links wall spare
CN206571135U (en) It is a kind of not influence the outer scaffold wall connector of construction
CN206385794U (en) A kind of wall-connecting piece and its connection system
CN206220467U (en) It is a kind of it is non-it is embedding can turnover type outer scaffold wall connector
CN204238443U (en) A kind of detachable suspension column fastening devices
CN103726575B (en) A kind of prefabricated balcony slab and balcony support and connection structure
CN204386140U (en) A kind of recoverable suspension scaffold shaped steel anchor device
CN204402004U (en) A kind of Simple general type outer scaffold wall connector
CN202081512U (en) Barrier-free decoration structure of high-low connected building
CN203856207U (en) Building floor concrete horizontal pump pipe supporting and fixing tool
CN203082365U (en) Matched pipe mounting bracket of civil architecture
CN210152266U (en) Wall pre-embedding fixing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150826

WD01 Invention patent application deemed withdrawn after publication