CN205840142U - 一种超高层核心筒内不落地钢骨柱 - Google Patents
一种超高层核心筒内不落地钢骨柱 Download PDFInfo
- Publication number
- CN205840142U CN205840142U CN201620672758.4U CN201620672758U CN205840142U CN 205840142 U CN205840142 U CN 205840142U CN 201620672758 U CN201620672758 U CN 201620672758U CN 205840142 U CN205840142 U CN 205840142U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- column
- concrete column
- steel column
- temporary support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
本实用新型涉及一种不落地钢骨柱,尤其涉及一种超高层核心筒内不落地钢骨柱,属于钢结构领域。包括不落地钢骨柱,所述的不落地钢骨柱底部的两端分别设有钢柱组件。一种超高层核心筒内不落地钢骨柱结构紧凑,保障操作精度,降低施工成本。
Description
技术领域
本实用新型涉及一种不落地钢骨柱,尤其涉及一种超高层核心筒内不落地钢骨柱及其施工方法,属于钢结构领域。
背景技术
常规的超高层核心筒内钢骨梁与落地的钢骨柱连接,钢骨梁待钢骨柱安装好后施工。本实用新型涉及的钢骨梁为核心筒内与不落地钢骨柱相连的钢骨梁,钢骨梁与钢骨柱车间焊,形成整体。对于这种梁柱一体的超高层核心筒内不落地钢骨柱施工方法,传统的施工方法是先在柱底搭设施工临时支撑,再安装钢骨柱,然后绑扎钢筋,安装模板,最后浇筑混凝土。这种缺点明显,主要体现在以下几个方面:
1.临时支撑浇筑在混凝土内,无法拆卸,一次性消耗,成本较高。
2.占用空间大,临时支撑影响钢筋混凝土柱施工操作空间。为获得良好的支撑效果,通常将临时支撑放置在钢骨柱下方,这样势必会影响钢筋混凝土柱绑扎钢筋及混凝土振捣,产生诸多不安全因素,增加施工难度。
3.临时支撑与钢筋绑扎有交叉作业,安装速度慢,施工周期长。
实用新型内容
本实用新型主要是解决现有技术中存在的不足,提供一种结构紧凑,能够有效的解决临时支撑的一次性使用问题,使得“节材”的理念在施工中充分体现的一种超高层核心筒内不落地钢骨柱。
本实用新型的上述技术问题主要是通过下述技术方案得以解决的:
一种超高层核心筒内不落地钢骨柱,包括不落地钢骨柱,所述的不落地钢骨柱底部的两端分别设有钢柱组件;
所述的钢柱组件包括临时支撑钢柱,所述的临时支撑钢柱的两侧端分别设有延伸至地面的平面外钢管支撑;
钢柱组件间通过交叉分布的圆管架定位。
作为优选,所述的平面外钢管支撑的上部设有插板,所述的插板与临时支撑钢柱间、圆管架的两侧端与临时支撑钢柱间分别通过支撑连接板连接,所述的平面外钢管支撑呈倾斜状分布;
所述的临时支撑钢柱的底部设有柱底板,所述的圆管架通过花蓝螺栓调节定位,所述的临时支撑钢柱的上部与不落地钢骨柱间设有连梁连接板,所述的平面外钢管支撑的底部设有支撑底板。
所述的圆管架由圆管拼装而成。
具有以下优点:
1.在全寿命周期内可多次重复循环利用,节约用钢量,减少了资源浪费,符合绿色施工理念。
2.结构安全可靠,传力明确,平面内采用十字支撑,平面外采用斜撑,使其成为一个稳定的结构体系。
3.支撑均采用螺栓连接,便于组装、运输,可降低转运储存成本。
4.无论是施工时间还是在操作空间上均避免与钢筋混凝土工程交叉作业,有效保证了各工种工作的有序开展。
5.十字支撑、斜撑与柱在地面组装成为一个整体单元,减少了吊装次数,提高了施工机械效率,大大的减少冬施高空带来的影响。
本实用新型提供一种超高层核心筒内不落地钢骨柱,结构紧凑,保障操作精度,降低施工成本。
附图说明
图1是本实用新型的结构示意图;
图2是本实用新型的正视结构示意图;
图3是本实用新型的侧视结构示意图。
具体实施方式
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明。
实施例1:如图1、图2和图3所示,一种超高层核心筒内不落地钢骨柱,包括不落地钢骨柱1,所述的不落地钢骨柱1底部的两端分别设有钢柱组件;
所述的钢柱组件包括临时支撑钢柱2,所述的临时支撑钢柱2的两侧端分别设有延伸至地面的平面外钢管支撑3;
钢柱组件间通过交叉分布的圆管架4定位。
所述的平面外钢管支撑3的上部设有插板5,所述的插板5与临时支撑钢柱2间、圆管架4的两侧端与临时支撑钢柱2间分别通过支撑连接板6连接,所述的平面外钢管支撑3呈倾斜状分布;
所述的临时支撑钢柱2的底部设有柱底板7,所述的圆管架4通过花蓝螺栓8调节定位,所述的临时支撑钢柱2的上部与不落地钢骨柱1间设有连梁连接板9,所述的平面外钢管支撑3的底部设有支撑底板10;
所述的圆管架4由圆管拼装而成。
Claims (2)
1.一种超高层核心筒内不落地钢骨柱,其特征在于:包括不落地钢骨柱(1),所述的不落地钢骨柱(1)底部的两端分别设有钢柱组件;
所述的钢柱组件包括临时支撑钢柱(2),所述的临时支撑钢柱(2)的两侧端分别设有延伸至地面的平面外钢管支撑(3);
钢柱组件间通过交叉分布的圆管架(4)定位。
2.根据权利要求1所述的一种超高层核心筒内不落地钢骨柱,其特征在于:所述的平面外钢管支撑(3)的上部设有插板(5),所述的插板(5)与临时支撑钢柱(2)间、圆管架(4)的两侧端与临时支撑钢柱(2)间分别通过支撑连接板(6)连接,所述的平面外钢管支撑(3)呈倾斜状分布;
所述的临时支撑钢柱(2)的底部设有柱底板(7),所述的圆管架(4)通过花蓝螺栓(8)调节定位,所述的临时支撑钢柱(2)的上部与不落地钢骨柱(1)间设有连梁连接板(9),所述的平面外钢管支撑(3)的底部设有支撑底板(10);
所述的圆管架(4)由圆管拼装而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620672758.4U CN205840142U (zh) | 2016-06-30 | 2016-06-30 | 一种超高层核心筒内不落地钢骨柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620672758.4U CN205840142U (zh) | 2016-06-30 | 2016-06-30 | 一种超高层核心筒内不落地钢骨柱 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205840142U true CN205840142U (zh) | 2016-12-28 |
Family
ID=57621636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620672758.4U Expired - Fee Related CN205840142U (zh) | 2016-06-30 | 2016-06-30 | 一种超高层核心筒内不落地钢骨柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205840142U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926855A (zh) * | 2016-06-30 | 2016-09-07 | 浙江东南网架股份有限公司 | 一种超高层核心筒内不落地钢骨柱及其施工方法 |
-
2016
- 2016-06-30 CN CN201620672758.4U patent/CN205840142U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926855A (zh) * | 2016-06-30 | 2016-09-07 | 浙江东南网架股份有限公司 | 一种超高层核心筒内不落地钢骨柱及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103290952B (zh) | 装配整体式混凝土框架-剪力墙连接结构及其施工方法 | |
CN202248298U (zh) | 型钢混凝土框架节点 | |
CN102747796A (zh) | 钢筋混凝土叠合剪力墙的预制墙体外壳结构及其拼接方法 | |
CN112523347A (zh) | 一种承插式梁柱连接节点 | |
CN205840142U (zh) | 一种超高层核心筒内不落地钢骨柱 | |
CN203373751U (zh) | 一种用于基坑支护内支撑系统的三角形围檩 | |
CN203429551U (zh) | 现浇式倒t型盖梁及桥墩 | |
CN209685126U (zh) | 一种钢连廊整体提升吊耳装置 | |
CN203096729U (zh) | 储罐桩帽组装式浇筑平台 | |
CN203420270U (zh) | 基坑支护内支撑系统的鱼腹梁部件 | |
CN203393721U (zh) | 内支撑主围檩部件 | |
CN203373857U (zh) | 一种装配式梁-柱连接装置 | |
CN203569482U (zh) | 整体装配式高墩墩身钢筋操作平台 | |
CN203420271U (zh) | 围檩部件 | |
CN203420275U (zh) | 一种围檩部件 | |
CN206476671U (zh) | 塔吊附着装置 | |
CN205654083U (zh) | 一种可周转使用的销接式格构柱 | |
CN203420273U (zh) | 鱼腹梁围檩的支撑基座 | |
CN219281198U (zh) | 一种便于组装的脚手架 | |
CN204282684U (zh) | 一种混凝土楼梯 | |
CN203334290U (zh) | 一种支撑杆 | |
CN203420276U (zh) | 一种基坑支护内支撑系统的鱼腹梁部件 | |
CN215406529U (zh) | 一种承插式梁柱连接节点 | |
CN203420272U (zh) | 基坑支护内支撑系统的钢绞线支撑部件 | |
CN103437365B (zh) | 基坑支护内支撑系统的钢绞线支撑部件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161228 Termination date: 20180630 |