CN205778910U - A kind of outer mould trolley of cut-and-cover tunnel lining cutting - Google Patents

A kind of outer mould trolley of cut-and-cover tunnel lining cutting Download PDF

Info

Publication number
CN205778910U
CN205778910U CN201620380720.XU CN201620380720U CN205778910U CN 205778910 U CN205778910 U CN 205778910U CN 201620380720 U CN201620380720 U CN 201620380720U CN 205778910 U CN205778910 U CN 205778910U
Authority
CN
China
Prior art keywords
arc bar
template
cut
pattern plate
lining cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620380720.XU
Other languages
Chinese (zh)
Inventor
王清江
王悦
张意
李志强
周瑜
陈果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Chongqing Technology and Business Institute
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd, Chongqing Technology and Business Institute filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN201620380720.XU priority Critical patent/CN205778910U/en
Application granted granted Critical
Publication of CN205778910U publication Critical patent/CN205778910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of outer mould trolley of cut-and-cover tunnel lining cutting, including bearing supporting frame, template system and running gear, described bearing supporting frame is belfast truss, including outer arc bar, inner arc bar and connection strut, outer arc bar is arranged on the upside of inner arc bar, connect strut between outer arc bar and arc bar, and two ends are welded with outer arc bar and inner arc bar respectively, described template system includes pattern plate strutting beam, template and positioning jack, positioning jack is arranged on the downside of arc bar, top is fixed on inner arc bar, bottom is fixed on pattern plate strutting beam, arc is connected and composed by pattern plate strutting beam by multiple connecting shafts, it is connected with template on the downside of pattern plate strutting beam, template is made up of the arc shape board of multiple interruptions, described running gear is arranged at the bottom of the column at bearing supporting frame two ends.This device simple structure, easy to use, use this device when cut-and-cover tunnel is constructed, can effectively improve construction speed and tunnel-liner quality.

Description

A kind of outer mould trolley of cut-and-cover tunnel lining cutting
Technical field
This utility model relates to constructing tunnel device field, is specifically related to a kind of outer mould trolley of cut-and-cover tunnel lining cutting.
Background technology
Working jumbo for tunnel lining is the special construction equipment of one in lining concrete in tunnel construction, is widely used in highway, railway and water conservancy and hydropower constructing tunnel.Use working jumbo for tunnel lining, construction quality and mechanization of building operation degree, the accelerating construction progress of lining concrete in tunnel can be greatly improved, but, at present in cut-and-cover tunnel section is constructed, inner membrance many employings lining trolley, and adventitia carrys out spelling frequently with the interim forms such as little template of installing, during construction, external mold pours synchronization with coagulation and installs, and needs workman more, and overall lining concrete speed of application is slower, and open cut tunnel lining concrete outer surface is irregular, affect construction speed and tunnel-liner quality.Therefore, need to develop a kind of removable with turning use, the outer die device of rapid construction has seemed the most necessary and urgent.
Utility model content
For the deficiency in the presence of prior art, this utility model provides a kind of removable with turning use, the outer mould trolley of cut-and-cover tunnel lining cutting of rapid construction.
nullFor achieving the above object,This utility model have employed following technical scheme: a kind of outer mould trolley of cut-and-cover tunnel lining cutting,Including bearing supporting frame、Template system and running gear,Described bearing supporting frame is belfast truss,Including outer arc bar、Inner arc bar and connection strut,Outer arc bar is arranged on the upside of inner arc bar,Connect strut between outer arc bar and arc bar,And two ends are welded with outer arc bar and inner arc bar respectively,Described template system includes pattern plate strutting beam、Template and positioning jack,Positioning jack is arranged on the downside of arc bar,Top is fixed on inner arc bar,Bottom is fixed on pattern plate strutting beam,Arc is connected and composed by pattern plate strutting beam by multiple connecting shafts,It is connected with template on the downside of pattern plate strutting beam,Template is made up of the arc shape board of multiple interruptions,Described running gear is arranged at the bottom of the column at bearing supporting frame two ends.
Further, described positioning jack has fluid pressure type and mechanical type two kinds, alternately.
Further, described template offers concreting hole vertical, longitudinal at interval of 2-3m respectively.
Further, described running gear is wheel-track type or rubber-tyred.
Further, the material of described truss rod is channel-section steel or I-steel.
Compared to existing technology, this utility model has the advantages that this device simple structure, easy to use, uses this device when cut-and-cover tunnel is constructed, can effectively improve construction speed and tunnel-liner quality.
Accompanying drawing explanation
Fig. 1 is the section structure schematic diagram of the outer mould trolley of cut-and-cover tunnel lining cutting of the present utility model;
Fig. 2 is the formwork structure schematic diagram of the outer mould trolley of cut-and-cover tunnel lining cutting of the present utility model.
Detailed description of the invention
nullAs shown in Figure 1-2,A kind of outer mould trolley of cut-and-cover tunnel lining cutting,Including bearing supporting frame 1、Template system 2 and running gear 3,Described bearing supporting frame 1 is belfast truss,Including outer arc bar 6、Inner arc bar 7 and connection strut 8,Outer arc bar 6 is arranged on the upside of inner arc bar 7,Connect strut 8 between outer arc bar 6 and arc bar 7,And two ends are welded with outer arc bar 6 and inner arc bar 7 respectively,Described template system 2 includes pattern plate strutting beam 9、Template 10 and positioning jack 5,Positioning jack 5 is arranged on the downside of arc bar 7,Top is fixed on inner arc bar 7,Bottom is fixed on pattern plate strutting beam 9,Arc is connected and composed by pattern plate strutting beam 9 by multiple connecting shafts,It is connected with template on the downside of pattern plate strutting beam 9,Template 10 is made up of the arc shape board of multiple interruptions,Described running gear 3 is arranged at the bottom of the column at bearing supporting frame 1 two ends.
Described positioning jack 5 has fluid pressure type and mechanical type two kinds, alternately.When template adjusts position, use hydraulic jack, after Template Location, use mechanic jacks to fix its position.Described template 10 is offered concreting hole 11 at interval of 2-3m (be uniformly arranged some concreting holes in template in vertical, longitudinal direction respectively, the spacing of two adjacent concreting holes is 2-3m), template is not set, to facilitate uniform casting concrete at chassis vault.Described running gear 3 is wheel-track type or rubber-tyred, makes outer mould trolley automatically can walk under electric drive, makes outer film device reach removable with turning the purpose used.The material of described truss rod is channel-section steel or I-steel so that it is stressed effect is more preferable.
Wherein, this cut-and-cover tunnel lining cutting both can be located in same level with internal mold lining trolley by outer mould trolley, can be located at again Different Plane, during construction, in lining cutting mould be can the hydraulic lining trolley of self-propelled, first move into place, adjusted after fixing, colligation lining cutting section reinforcing bar.Then mobile external mold chassis under the driving of running gear 3, trolley traveling portion is locked on the ground, with fixed station facing position, simultaneously by the anchor pole 4 of employing afterwards in place, it is to avoid during lining construction, chassis floats.Then mechanic jacks fixed form 2 position is used.Inspection template and reinforcing bar qualified after, self-template (adventitia chassis) upper reserving hole layering symmetry pours lining concrete.
Finally illustrate is, above example is only in order to illustrate the technical solution of the utility model and unrestricted, although this utility model being described in detail with reference to preferred embodiment, it will be understood by those within the art that, the technical solution of the utility model can be modified or equivalent, without deviating from objective and the scope of technical solutions of the utility model, it all should be contained in the middle of right of the present utility model.

Claims (5)

  1. null1. the outer mould trolley of cut-and-cover tunnel lining cutting,Including bearing supporting frame (1)、Template system (2) and running gear (3),It is characterized in that,Described bearing supporting frame (1) is belfast truss,Including outer arc bar (6)、Inner arc bar (7) and connection strut (8),Outer arc bar (6) is arranged on the upside of inner arc bar (7),Connect strut (8) to be positioned between outer arc bar (6) and arc bar (7),And two ends are welded with outer arc bar (6) and inner arc bar (7) respectively,Described template system (2) includes pattern plate strutting beam (9)、Template (10) and positioning jack (5),Positioning jack (5) is arranged on the downside of arc bar,Top is fixed on inner arc bar (7),Bottom is fixed on pattern plate strutting beam (9),Arc is connected and composed by pattern plate strutting beam (9) by multiple connecting shafts,Pattern plate strutting beam (9) downside is connected with template,Template (10) is made up of the arc shape board of multiple interruptions,Described running gear (3) is arranged at the bottom of the column at bearing supporting frame (1) two ends.
  2. A kind of outer mould trolley of cut-and-cover tunnel lining cutting, it is characterised in that described positioning jack (5) has fluid pressure type and mechanical type two kinds, alternately.
  3. A kind of outer mould trolley of cut-and-cover tunnel lining cutting the most according to claim 1, it is characterised in that described template (10) offers concreting hole (11) vertical, longitudinal at interval of 2-3m respectively.
  4. A kind of outer mould trolley of cut-and-cover tunnel lining cutting the most according to claim 1, it is characterised in that described running gear (3) is wheel-track type or rubber-tyred.
  5. A kind of outer mould trolley of cut-and-cover tunnel lining cutting the most according to claim 1, it is characterised in that the material of described truss rod is channel-section steel or I-steel.
CN201620380720.XU 2016-04-29 2016-04-29 A kind of outer mould trolley of cut-and-cover tunnel lining cutting Expired - Fee Related CN205778910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620380720.XU CN205778910U (en) 2016-04-29 2016-04-29 A kind of outer mould trolley of cut-and-cover tunnel lining cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620380720.XU CN205778910U (en) 2016-04-29 2016-04-29 A kind of outer mould trolley of cut-and-cover tunnel lining cutting

Publications (1)

Publication Number Publication Date
CN205778910U true CN205778910U (en) 2016-12-07

Family

ID=57411988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620380720.XU Expired - Fee Related CN205778910U (en) 2016-04-29 2016-04-29 A kind of outer mould trolley of cut-and-cover tunnel lining cutting

Country Status (1)

Country Link
CN (1) CN205778910U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869164A (en) * 2019-03-29 2019-06-11 中铁七局集团有限公司 Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel
CN111472811A (en) * 2020-04-17 2020-07-31 中国人民解放军63921部队 Assembled integral GFRP-framework concrete mouth lining structure for rapid repair of tunnel mouth and rapid repair method
CN112576282A (en) * 2019-09-30 2021-03-30 中交第二航务工程局有限公司 Horizontal splicing device for circular steel lining and construction method thereof
CN113027503A (en) * 2021-03-24 2021-06-25 三峡大学 Movable device for filling non-Newtonian fluid to resist impact force and construction method
CN113338165A (en) * 2021-06-11 2021-09-03 中建二局土木工程集团有限公司 Cast-in-place arch bridge combined support structure and construction method thereof
CN114592889A (en) * 2022-05-11 2022-06-07 河北东风世景轨道有限公司 Arch self-bearing type formwork for tunnel concrete construction pouring

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109869164A (en) * 2019-03-29 2019-06-11 中铁七局集团有限公司 Combination hydraulic formwork jumbo pours the construction method of porous separate tunnel
CN112576282A (en) * 2019-09-30 2021-03-30 中交第二航务工程局有限公司 Horizontal splicing device for circular steel lining and construction method thereof
CN111472811A (en) * 2020-04-17 2020-07-31 中国人民解放军63921部队 Assembled integral GFRP-framework concrete mouth lining structure for rapid repair of tunnel mouth and rapid repair method
CN113027503A (en) * 2021-03-24 2021-06-25 三峡大学 Movable device for filling non-Newtonian fluid to resist impact force and construction method
CN113027503B (en) * 2021-03-24 2023-09-19 三峡大学 Device for movably filling non-Newtonian fluid to resist impact force and construction method
CN113338165A (en) * 2021-06-11 2021-09-03 中建二局土木工程集团有限公司 Cast-in-place arch bridge combined support structure and construction method thereof
CN113338165B (en) * 2021-06-11 2023-01-10 中建二局土木工程集团有限公司 Cast-in-place arch bridge combined support structure and construction method thereof
CN114592889A (en) * 2022-05-11 2022-06-07 河北东风世景轨道有限公司 Arch self-bearing type formwork for tunnel concrete construction pouring
CN114592889B (en) * 2022-05-11 2022-07-08 河北东风世景轨道有限公司 Arch-shaped self-bearing type formwork for tunnel concrete construction pouring

Similar Documents

Publication Publication Date Title
CN205778910U (en) A kind of outer mould trolley of cut-and-cover tunnel lining cutting
CN203080705U (en) Concrete post-cast strip supporting top
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN205604088U (en) But bent cap quick adjustment support
CN104763446B (en) The multi-functional chassis of metro station construction
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN105952148B (en) Easy-dismount aluminum alloy pattern plate support system and construction method in narrow movement joint
CN107806019A (en) Large-span suspension bridge gate Sarasota construction method
CN107476341A (en) Using cast in place and precast construction subway station prefabricated board assembling method
CN105220619A (en) A kind of method of quick manufacture two-wire nose circle solid pier
CN104480867A (en) Replacement and maintenance method of bridge foundation support padstone
CN110145341A (en) A kind of gang form system for circular tunnel concreting
CN205223976U (en) Irrigation gallery concrete slipform device
CN106836286A (en) Underground engineering assembly concrete air channel and its construction method
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN206646549U (en) Underground engineering assembly concrete air channel
CN107630463A (en) A kind of construction technology of underground pipe gallery construction mobile jumbo device
CN206189607U (en) Rag bolt location structure
CN110883920B (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN205704660U (en) Demoulding tunnel, self-propelled hydraulic location immersed tube tube coupling prefab-form
CN215760498U (en) Machine is demolishd to building engineering concrete form
CN206205429U (en) Easy-dismount aluminum alloy pattern plate support system in narrow movement joint
CN205876345U (en) Platform truck system that transports of template is pour to tunnel lateral sulcus cable duct

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20180429

CF01 Termination of patent right due to non-payment of annual fee