CN205775897U - A kind of bridge operation suspension platform - Google Patents

A kind of bridge operation suspension platform Download PDF

Info

Publication number
CN205775897U
CN205775897U CN201620555177.2U CN201620555177U CN205775897U CN 205775897 U CN205775897 U CN 205775897U CN 201620555177 U CN201620555177 U CN 201620555177U CN 205775897 U CN205775897 U CN 205775897U
Authority
CN
China
Prior art keywords
operation post
hanging ladder
bridge
hanging
suspension platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620555177.2U
Other languages
Chinese (zh)
Inventor
解建飞
胡衷栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI HONGNING RAILWAY Co Ltd
Original Assignee
SHAANXI HONGNING RAILWAY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI HONGNING RAILWAY Co Ltd filed Critical SHAANXI HONGNING RAILWAY Co Ltd
Priority to CN201620555177.2U priority Critical patent/CN205775897U/en
Application granted granted Critical
Publication of CN205775897U publication Critical patent/CN205775897U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of bridge operation suspension platform, including operation post, operation post is the rectangular-shaped of inner hollow and upper opening, one lateral surface of operation post is connected with hanging ladder, the top of hanging ladder is connected with hook, the lateral surface bottom of the affixed hanging ladder of operation post is connected with lagging, and top, a side adjacent with hanging ladder on operation post is connected with articles holding table, and the upper surface of articles holding table is provided with glove groove.A kind of bridge operation suspension platform of the present utility model, simple in construction, easily fabricated, with low cost, easy to operate, work flow can not only be simplified, improve work efficiency, and job safety coefficient can be effectively improved.

Description

A kind of bridge operation suspension platform
Technical field
This utility model belongs to equipment for bridge construction technical field, is specifically related to a kind of bridge operation suspension platform.
Background technology
The days such as beam body inspection, the support bracket bolt oiling of footpath steel angle and the paint brushing of bridge steel structure bracket at bridge Often in inspection, maintenance activity, railway bridge tunnel work generally uses hanging basket to carry out construction operation.This operating type there is problems in that 1. boom hoist cable must keep vertical with ground, it is impossible to oblique pull;2., if hanging basket needs lateral suspension, hanging basket should be transferred to ground Face or withdrawal bridge floor, loosen boom hoist cable, after change Cantilever Beams position is fixing, then hoists or decline hanging basket, and cage lifting Putting in place and can go up people's operation after must confirming to fix anchorage with building, hanging basket not should be greater than with building horizontal range (gap) 20cm;3. easily causing hanging basket to rock in operation, potential safety hazard is bigger.Therefore, use hanging basket to carry out during construction operation and there is behaviour Make complicated and that safety coefficient is the highest problem.
Utility model content
The purpose of this utility model is to provide a kind of bridge operation suspension platform, solves to use hanging basket to enter in prior art The problem of the operation complexity existed during row bridge construction operation.
This utility model be the technical scheme is that a kind of bridge operation suspension platform, and including operation post, operation post is Inner hollow and upper opening rectangular-shaped, one lateral surface of operation post is connected with hanging ladder, and the top of hanging ladder is connected with hook, The lateral surface bottom of the affixed hanging ladder of operation post is connected with lagging, and top, a side adjacent with hanging ladder on operation post is connected with Articles holding table, the upper surface of articles holding table is provided with glove groove.
Feature of the present utility model also resides in:
Hook is at least provided with two.
The beneficial effects of the utility model are: a kind of bridge operation suspension platform of the present utility model, simple in construction, are prone to Manufacture, with low cost, easy to operate, work flow can not only be simplified, improve work efficiency, and operation can be effectively improved Safety coefficient.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model a kind of bridge operation suspension platform.
In figure, 1. operation post, 2. hanging ladder, 3. hook, 4. lagging, 5. articles holding table, 6. glove groove.
Detailed description of the invention
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings:
This utility model one bridge operation suspension platform, as it is shown in figure 1, include operation post 1, operation post 1 is in inside Empty and upper opening rectangular-shaped, 1 one lateral surface of operation post are connected with hanging ladder 2, and the top of hanging ladder 2 is connected with at least two Hook 3, the lateral surface bottom of the affixed hanging ladder of operation post 12 is connected with lagging 4, a side adjacent with hanging ladder 2 on operation post 1 Top, face is connected with articles holding table 5, and the upper surface of articles holding table 5 is provided with glove groove 6.
Using method of the present utility model is as follows:
Step 1. checks hanging work platform: check hanging work platform connecting portion (hook 3) the most firmly, reliably, State is the best;
Step 2. transfers hanging work platform: hung over by job platform on bridge railing, it is desirable to operating personnel handles with care, Avoid bridge equipment is caused trauma;
Step 3: operating personnel, during lower hanging work platform, must carry out security protection work;
Step 4: carry out operation;
Step 5: at one after operation, laterally urges transfer hanging work platform, carries out the operation of lower place, iterative method, Till operation is the most complete.In transfer process, operating personnel and the bridge floor cooperation personnel of hanging work platform carry out call and answer Answering, cooperate work;
Step 6: hanging work platform operating personnel returns bridge floor;
Step 7: regain hanging work platform;
In work progress, relevant power tool can be placed in the glove groove 6 that articles holding table 5 upper surface is arranged, Convenient working.Lagging 4 is prevented from material in operation process, facility accidental falling.
Utilize hanging work platform of the present utility model to carry out operation to have the advantage that
1. construction technology is simple, has effectively simplified work flow, has improve work efficiency.Efficiently solve use to hang simultaneously Because of the operation difficulty caused outstanding outside the support of walking slab angle in basket operation process.
2. strengthen the stability of job platform, improve maintenance activity quality, ensured the people of operating personnel further Body safety.
3. suspension operational is simple, saves the time.
4. change in the past shifting again the operation routine of vertical lift with the vertical lift of hanging basket method operation Horizontally suspend operation, time saving and energy saving, improve work efficiency.
5. belonging to hanging operation due to beam body inspection and the support bracket bolt oiling of footpath steel angle, hanging basket is to take rope to connect, and belongs to Software connects, and easily causes hanging basket to rock, causes job safety hidden danger coefficient to strengthen, and uses bridge hanging work platform operation, Software is connected and changes hardware connection into, it is thus possible to effectively reduce potential safety hazard.

Claims (2)

1. a bridge operation suspension platform, it is characterised in that include that operation post (1), operation post (1) are inner hollow and top Opening rectangular-shaped, (1) lateral surface of operation post is connected with hanging ladder (2), and the top of hanging ladder (2) is connected with hook (3), makees The lateral surface bottom of industry platform (1) affixed hanging ladder (2) is connected with lagging (4), that operation post (1) is the most adjacent with hanging ladder (2) Top, side is connected with articles holding table (5), and the upper surface of articles holding table (5) is provided with glove groove (6).
A kind of bridge operation suspension platform the most according to claim 1, it is characterised in that described hook (3) at least provided with Two.
CN201620555177.2U 2016-06-08 2016-06-08 A kind of bridge operation suspension platform Expired - Fee Related CN205775897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620555177.2U CN205775897U (en) 2016-06-08 2016-06-08 A kind of bridge operation suspension platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620555177.2U CN205775897U (en) 2016-06-08 2016-06-08 A kind of bridge operation suspension platform

Publications (1)

Publication Number Publication Date
CN205775897U true CN205775897U (en) 2016-12-07

Family

ID=58133797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620555177.2U Expired - Fee Related CN205775897U (en) 2016-06-08 2016-06-08 A kind of bridge operation suspension platform

Country Status (1)

Country Link
CN (1) CN205775897U (en)

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
CN103663142B (en) Tailing mechanism and translation tailing hoisting method
CN201826542U (en) Self-climbing protective screening
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN204081436U (en) A kind of climbing frame and template integrated system
CN108946542A (en) A kind of small gun carriage and its construction method
CN202441045U (en) Rail-type electric attached lifting scaffold
CN205777428U (en) Elevator is from climbing platforms
CN205775897U (en) A kind of bridge operation suspension platform
CN203767802U (en) Special device for elevator installation
CN110056176A (en) A kind of elevator mobile platform and application method
CN205662256U (en) High rises pergola side and hangs a semi -portal bridge crane
CN213653209U (en) Integrated construction movable platform for bridge flange plate
CN206769351U (en) A kind of regularization hoistway operation platform hoisting frame
CN202481984U (en) Electric block transferring device for lifting scaffolds
CN108915237A (en) A kind of scouring platform for building construction exterior wall glass
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN203499232U (en) Attached lifting scaffold
CN211006334U (en) Maintenance equipment for inner side surface of inverted Y-shaped tower column of three-way movable cable-stayed bridge
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN204357138U (en) Simple steel structure lifting upending frame
CN209884776U (en) Hanging basket type medicine moistening device
CN209957241U (en) Steel hanger
CN204126237U (en) A kind of elevator hoistway construction platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20190608