CN205743077U - Pin-connected panel sentry box - Google Patents

Pin-connected panel sentry box Download PDF

Info

Publication number
CN205743077U
CN205743077U CN201521023260.7U CN201521023260U CN205743077U CN 205743077 U CN205743077 U CN 205743077U CN 201521023260 U CN201521023260 U CN 201521023260U CN 205743077 U CN205743077 U CN 205743077U
Authority
CN
China
Prior art keywords
sentry box
plate
frame assembly
roof
header board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521023260.7U
Other languages
Chinese (zh)
Inventor
杨卓舒
马翠忠
张学良
李杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuoda New Material Technology Group Co Ltd
Original Assignee
Zhuoda New Material Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuoda New Material Technology Group Co Ltd filed Critical Zhuoda New Material Technology Group Co Ltd
Priority to CN201521023260.7U priority Critical patent/CN205743077U/en
Application granted granted Critical
Publication of CN205743077U publication Critical patent/CN205743077U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

This utility model relates to pin-connected panel sentry box, including sentry box main body and assembled roof, sentry box main body includes frame assembly and the multiple prefabricated panels being installed on frame assembly, frame assembly includes the multiple straight connection pipe fitting arranged along each of the edges of prefabricated panel, and prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly;At least three riser vertically disposed with base plate, including at least one pair of side plate;Header board, header board comprises a component, and the both sides of header board are adjacent with one of side plate respectively;Wherein assembled roof is the polygonal pyramid shape being overlapped to form by multiple prefabricated building shoe plate, and the recess between two adjacent projection of the edge that each roofing tile plate inserts, by the protuberance of respective edge, the roofing tile plate being positioned adjacent to completes being clasped thus realizing overlap joint of shape.This sentry box is suitable to utilize prefabrication sheet material etc. to overlap at the scene, can solve transport and assemble inconvenience, and strengthening structure and top load-bearing, simultaneously guarantee thermal-insulating waterproof sound insulation value than existing sentry box.

Description

Pin-connected panel sentry box
Technical field
This utility model relates to sentry box, especially with the field-installed sentry box of erection method.
Background technology
Along with the constantly propelling of urbanization process, sentry box, as a kind of work facility moved into for management personnel in public places and implement to manage, plays increasingly important effect maintaining public order in terms of combing social environment order.Along with increasing of sentry box pattern, sentry box is also applied to various occasion, such as parking lot, gateway, job site;Community, office building, the property point on duty of shopping square;Police service is on duty, landscape garden, highway, enterprises and institutions etc..
Current sentry box is primarily present following several form, and a kind of is relatively simple only to possess ceiling (or en-toutcas), the wide-open sentry box of surrounding, and affected by environment oneself is the most superseded because of the simplest and the crudest and easy in this sentry box.Another is then all-in-one-piece, it is possible to provide the inner space of relative closure, and the visual field of not appreciable impact personnel on duty, the most most common.It is divided into again permanent structure formula and integrated movable, and the common mode of building of current permanent structure formula still uses conventional concrete to construct, long construction period, human and material resources put into big, environmental disruption is serious, and later period maintenance frequency is higher, and this just brings the raising of cost.And; due to reinforced concrete construction; series of problems such as deformation and constraint itself; quality defect of concrete is made to have become modal engineering disease in building construction; the concrete of hardened forming also exists numerous microvoid, air pocket and microcracks; it is the most all band joint working just because of these first concrete; owing to existence and the development of defect would generally make the material generation corrosion such as the reinforcing bar within body of wall; reduce the bearing capacity of reinforced concrete floor, durability and impermeability, affect outward appearance and service life.It addition, the difficulty of construction such as waterproof, heat insulation, the sound insulation in house of building are relatively big, being also the construction being easiest to go wrong, the requirement to construction team is higher.Integrated movable the most generally uses light board to carry out all or main body pre-formed in factory, is then transported to on-the-spot general assembly in position, is to a certain degree overcoming the above-mentioned inherent shortcoming of permanent structure formula;Certain this monoblock type sentry box there is also obvious deficiency, first, this sentry box typically by manufacturer's integral manufacturing well after, it is transported to appointed place again, carry out installing and fix, after such as generally its position such as column or crossbeam is fixed by modes such as welding, sentry box processes assembled formation in factory then, transport, to in-site installation, needs hanging device to load and unload in shipment again, thus causes more greatly transport inconvenience because of sentry box volume;Secondly, in hoisting process, sentry box Integral levelling is relatively difficult, wastes time and energy;Additionally, fixed sentry box material therefor is mostly color steel, aluminium alloy, rustless steel, metallic carved plate etc., heat insulating ability, comfortableness are the best.For solving the problems referred to above, those skilled in the art propose some schemes, such as, the patent application of the application number CN201210415867.4 in entitled " the removable sentry box of one ", move roller for a pair by interpolation bottom booth railway carriage or compartment and move sentry box to solve overall sentry box to transport the problem to scene;The patent application of the application number CN201320295419.5 in entitled " moveable police sentry box " provides heat-insulation layer in mobile sentry box.But, in place of they equal Shortcomings, such as add movable pulley and can be only done short distance transport, and improve the indoor temperature under extreme weather conditions by interpolation heat-insulation layer and can dramatically increase weight and manufacturing cost.
Another is field assembled sentry box, connector is utilized prefabricated component such as sheet material or prefabricated bodies to be assembled at the scene, the patent application of the application number CN201510279475.3 of the most entitled " a kind of Assembled type movable sentry box and fast method for preparing thereof ", sentry box main body and Liftable roof are linked into an integrated entity by it by L-type connecting plate.It addition, the patent application of the application number CN201029216082.8 of entitled " detachable sentry box " utilizes inserting mode to connect plate members at the scene and assembles sentry box, it is not only convenient for transport and improves efficiency, cost-effective.But, in the patent application in field assembled sentry box as above, if the former is to utilize parts to assemble smooth top assembly at the scene to lift again, it is inevitably present structural stability and top weight capacity deficiency and the problem being difficult to tolerate sleety weather thus resulted in;The latter is the roof assembly of integral type of molding of being prefabricated in the factory, and still suffers from the problem that volume is not readily transportable.
Therefore, sentry box that need a kind of defect that can overcome state of the art as above badly, that the available sheet material of prefabrication, framework assemble at the scene with connector etc. in the way of similar overlap joint building blocks or concatenation module, it not only can simplify the precasting process of component sheet material, reduce manufacturing cost, and transport and the difficulty of Assembling inconvenience can be solved, and strengthening the structural integrity in described sentry box, stability and top weight capacity while, also ensure waterproof, heat insulation, the sound insulation value in sentry box compared to prior art.
Utility model content
The purpose of this utility model is intended to provide a kind of novel field-installed sentry box of employing erection method, it can substitute tradition sentry box the various drawbacks overcoming the latter to construct, as difficulty of construction is big, time-consumingly, consumption people, consumption thing, not insulation, the defect such as the most sturdy and durable, to be more suitable for people's requirement to house.
For realizing above-mentioned purpose, the utility model discloses a kind of employing field-installed sentry box of erection method, it includes sentry box main body and assembled roof, described sentry box main body includes frame assembly and the multiple prefabricated panels being installed on frame assembly, described frame assembly includes the multiple straight connection pipe fitting arranged along each of the edges of prefabricated panel, and described prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly;At least three riser vertically disposed with base plate, described riser includes: at least one pair of side plate;Header board, described header board comprises a component, and the both sides of described header board are adjacent with one of side plate respectively;
Wherein assembled roof is the polygonal pyramid shape being overlapped to form by multiple prefabricated building shoe plate, and each roofing tile plate inserts and snap fit onto the edge of neighbouring roofing tile plate recess between two adjacent projection by the protuberance of respective edge.
Preferably, it is provided with, inside the lower limb being clasped on described assembled roof, the roof plug-in unit extended straight down;And away from base plate at vertical direction and it is arranged on the multiple straight confluce being connected pipe fitting of each riser upper edge with base plate abreast plug-in unit hole is set, be used for receiving roof plug-in unit.
Preferably, described prefabricated panel includes at least one back plate, and it is oppositely arranged with header board.
Preferably, the number of the plurality of riser is n, and the angle adjoined each other between riser is (n-2) × 180 °/n.
Preferably, the cross sectional shape of described straight connection pipeline section is square tube.
Preferably, described straight connection pipeline section is steel beam column material.
Preferably, between each prefabricated panel, at least one in the group comprising following auxiliary supports is used: angle steel, floor, loose-leaf.
Preferably, the adjoiner of edge protuberance on assembled roof and the engagement of recess form from one another uses at least one in the group comprising following additional reinforcement part: connect liner, glued joint, weld, loose-leaf connection.
Preferably, cooperation between plug-in unit hole and corresponding roof plug-in unit that confluce between straight connection pipe fitting is arranged, is replaced by least one in the group comprising following fit system: be clasped, weld, sell-hole combines, screw connects, screw-and-nut connects.
Preferably, the combination between the roofing tile plate of splicing, it is replaced by least one in the group comprising following fit system: be clasped, weld, sell-hole combines, screw connects, screw-and-nut connects.
The beneficial effects of the utility model are, first, assemble the prefabricated panels that described pin-connected panel sentry box of the present utility model is used, including prefabricated panel and prefabricated building shoe plate, all can enrich according to the individual demand customization of the different consumer groups, moulding, the variation of color, texture.Secondly, pin-connected panel sentry box of the present utility model has fire protection flame retarding, waterproof resistance to leaching, energy-saving and emission-reduction, permanent releasing negative oxygen ion, multinomial characteristic that comprehensive physical performance is good, so, no matter from the price sold or in terms of construction speed, relative to other building constructions in occupation of the biggest advantage.Then, pin-connected panel sentry box of the present utility model is sturdy and durable, it is possible to resisting 9 grades of earthquake intensitys, the harmful substance such as release formaldehyde, ammonia, radon, not radiationless, can reach A level fitting space.
Accompanying drawing explanation
Fig. 1 illustrates the axonometric chart in pin-connected panel sentry box of the present utility model;
Wherein, reference is as follows:
1-sentry box main body;2-assembly roof;3-frame assembly;4-is straight connection pipeline section;5-header board;6-side plate;7-roofing tile plate;8-plug-in unit hole;9-roof plug-in unit.
Detailed description of the invention
For enabling above-mentioned purpose of the present utility model, feature and advantage to become apparent from, below in conjunction with the accompanying drawings the technology contents of this utility model preferred embodiment is elaborated.
Fig. 1 is the axonometric chart in pin-connected panel sentry box of the present utility model, wherein, as shown in the figure, in a preferred embodiment, the field-installed sentry box of employing erection method of the present utility model, comprising: sentry box main body 1 and assembled roof 2, described sentry box main body 1 includes frame assembly 3 and the multiple prefabricated panels being installed on frame assembly 3, described frame assembly 3 includes the multiple straight connection pipe fitting arranged along the edge of each prefabricated panel, and described prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly 3;Four risers vertically disposed with base plate, described riser includes: header board 5, and described header board 5 comprises a component;It is parallel to the back plate that header board 5 is arranged;Pair of side plates 6, described side plate 6 be arranged in parallel, and each side plate 6 adjoins respectively with header board 5 and back plate, and at least one side plate 6 comprises window member;
Wherein, assembled roof 2 is the rectangular pyramid shape being overlapped to form by multiple prefabricated building shoe plate 7, each roofing tile plate 7 inserts the recess between two adjacent projection of the edge of roofing tile plate 7 being positioned adjacent to and completes being clasped thus realizing overlap joint of shape by the protuberance of respective edge, is provided with, inside the lower limb being clasped on described assembled roof 2, the roof plug-in unit 9 extended straight down;
And wherein, at vertical direction, plug-in unit hole 8 is set away from base plate and four straight confluces being connected pipe fitting be arrangeding in parallel with base plate, for receiving the roof plug-in unit 9 extended straight down from the edge on described assembled roof 2.
Described straight connection pipeline section 4 can the pipeline section of for example, multiple section shape, it is therefore preferable to square tube.
Described side plate 6 adjoins at a certain angle with header board 5 and back plate, and interior angle the most adjacent one another are is complementary, is preferably right angle.
Preferably, the quantity of described roof plug-in unit 9 is at least one, more preferably such as four.
Preferably, the quantity of described plug-in unit hole 8 is at least one, more preferably such as four.
Similarly, in other embodiments, multiple amendment and modification can be realized based on above preferred embodiment.
In the second embodiment substituted, pin-connected panel sentry box includes: sentry box main body 1 and assembled roof 2, described sentry box main body 1 includes frame assembly 3 and the multiple prefabricated panels being installed on frame assembly 3, described frame assembly 3 includes the multiple straight connection pipe fitting arranged along the edge of each prefabricated panel, and described prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly 3;Three risers vertically disposed with base plate, described riser includes: header board 5, and described header board 5 comprises a component;A pair adjacent side plate 6, the side that the two side plate 6 does not adjoins is adjacent with header board 5 respectively, and at least one in described side plate 6 comprises window member;
Wherein, assembled roof 2 is the triangular pyramid being overlapped to form by multiple prefabricated building shoe plate 7, each roofing tile plate 7 inserts the recess between two adjacent projection of the edge of roofing tile plate 7 being positioned adjacent to and completes being clasped thus realizing overlap joint of shape by the protuberance of respective edge, is provided with, inside the lower limb being clasped on described assembled roof 2, the roof plug-in unit 9 extended straight down;
And wherein, at vertical direction, plug-in unit hole 8 is set away from base plate and three straight confluces being connected pipe fitting be arrangeding in parallel with base plate, for receiving the roof plug-in unit 9 extended straight down from the edge on described assembled roof 2.
Adjoining at a certain angle between described each plate, preferably interior angle is 60 degree.
Preferably, the quantity of described roof plug-in unit 9 is at least one, more preferably such as three.
Preferably, the quantity of described plug-in unit hole 8 is at least one, more preferably such as three.
Alternately, in the third embodiment, pin-connected panel sentry box includes: sentry box main body 1 and assembled roof 2, described sentry box main body 1 includes frame assembly 3 and the multiple prefabricated panels being installed on frame assembly 3, described frame assembly 3 includes the multiple straight connection pipe fitting arranged along the edge of each prefabricated panel, and described prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly 3;Five risers vertically disposed with base plate, described riser includes: header board 5, and described header board 5 comprises a component;A pair adjacent angularly in relation to one another back plate, spaced apart with header board 5;Pair of side plates 6, each side plate 6 adjoins one of back plate and header board 5 the most simultaneously, and at least one in described back plate and side plate 6 comprises window member;
Wherein, assembled roof 2 is the pentagonal pyramid shape being overlapped to form by multiple prefabricated building shoe plate 7, each roofing tile plate 7 inserts the recess between two adjacent projection of the edge of roofing tile plate 7 being positioned adjacent to and completes being clasped thus realizing overlap joint of shape by the protuberance of respective edge, is provided with, inside the lower limb being clasped on described assembled roof 2, the roof plug-in unit 9 extended straight down;
And wherein, at vertical direction, plug-in unit hole 8 is set away from base plate and five straight confluces being connected pipe fitting be arrangeding in parallel with base plate, for receiving the roof plug-in unit 9 extended straight down from the edge on described assembled roof 2.
Adjoining at a certain angle between described each plate, preferably interior angle is 108 degree.
Preferably, the quantity of described roof plug-in unit 9 is at least one, more preferably such as five.
Preferably, the quantity of described plug-in unit hole 8 is at least one, more preferably such as five.
Alternately, in the fourth embodiment, pin-connected panel sentry box includes: sentry box main body 1 and assembled roof 2, described sentry box main body 1 includes frame assembly 3 and the multiple prefabricated panels being installed on frame assembly 3, described frame assembly 3 includes the multiple straight connection pipe fitting arranged along the edge of each prefabricated panel, and described prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly 3;Six risers vertically disposed with base plate, described riser includes: header board 5, and described header board 5 comprises a component;Back plate, and header board 5 is parallel and interval is arranged;A pair rear flank plate, adjoins with back plate both sides respectively, and spaced apart with header board 5;At least one in pair of side plates 6, each side plate 6 one of adjacent sides back plate the most simultaneously and header board 5, and described back plate, rear flank plate and side plate 6 comprises window member;
Wherein, at vertical direction, plug-in unit hole 8 is set away from base plate and six straight confluces being connected pipe fitting be arrangeding in parallel with base plate, for receiving the roof plug-in unit 9 extended straight down from the edge on described assembled roof 2;
And wherein, assembled roof 2 is the hexagonal pyramid shape being overlapped to form by multiple prefabricated building shoe plate 7, and the recess between two adjacent projection of the edge that each roofing tile plate 7 inserts, by the protuberance of respective edge, the roofing tile plate 7 being positioned adjacent to completes being clasped thus realizing overlap joint of shape.
Adjoining at a certain angle between described each plate, preferably interior angle is 120 degree.
Preferably, the quantity of described roof plug-in unit 9 is at least one, more preferably such as six.
Preferably, the quantity of described plug-in unit hole 8 is at least one, more preferably such as six.
In a further embodiment, prefabricated panel can include the riser of other number n that be more than three vertically disposed with base plate, and correspondingly, assembled roof 2 is the polygonal pyramid shape being overlapped to form by multiple prefabricated building shoe plate 7, and its seamed edge number is equal to riser quantity n.
Adjoining at a certain angle between described each plate, preferably interior angle is (n-2) × 180 °/n, and wherein n is riser number.
Preferably, the quantity of described roof plug-in unit 9 is at least one, more preferably such as n.
Preferably, the quantity of described plug-in unit hole 8 is at least one, more preferably such as n.
As an alternative or supplement, for strengthening the stability that the angle between each plate connects, can use the support member of auxiliary such as, angle steel, floor or loose-leaf, for reinforcing angle.
As an alternative or supplement, for strengthening the overall structure steadiness on assembled roof 2, additional reinforcement part or additional reinforcement mode can be used at the adjoiner realized so that edge protuberance and recess form from one another engage, such as, but not limited to, connect liner, glued joint, weld, loose-leaf connection etc..
Additionally, the roof plug-in unit 9 that the plug-in unit hole 8 of the confluce setting between straight connection pipe fitting and the corresponding edge from described assembled roof 2 extend straight down, it is possible to be replaced by but be not limited to: be clasped, weld, sell-hole combination, screw connection, screw-and-nut connection etc..
Alternately, the combination between the roofing tile plate 7 of above-mentioned splicing is also substitutable for but is not limited to: is clasped, welds, sells-hole combination, screw connection, screw-and-nut connection etc..
In above-mentioned this utility model embodiment, it is contemplated that the mechanical performance of material, processing complexity and cost performance, the described straight connection pipeline section 4 in described pin-connected panel sentry box uses metal material, preferably steel beam column material.
Below in conjunction with specific embodiment, pin-connected panel sentry box of the present utility model is described, as it is shown in figure 1, its material used includes: prefabricated integrated wallboard, sliceable prefabricated building shoe plate 7, light steel, Dacroment nail, square tube etc..The manufacturing process steps in pin-connected panel sentry box includes as mentioned above: 1), confirm scheme according to customer demand;2), drawing joint examination determines package size;3), tool materials prepare;4), roof, sentry box assembles;5), square tube is fixed on roof;6), a weight external wall plate is installed with square tube;7), roof, sentry box square tube is inserted in body of wall square tube;8), fix square tube, be completed.
This utility model is owing to using the frame assembly of column structure as the skeleton laying prefabricated panel, constrain each to degree of freedom of wall body keel framework, make sentry box cylinder become strong black box, strengthen sentry box body structural robustness the most in the horizontal direction;And the form fit utilizing jog achieves the roof of polygonal pyramid shape, strengthen the structural integrity on roof and stability and weight capacity;And then coordinate by means of the plug connector being vertically arranged between roof and the sentry box bodies top of assembling and achieve complete sentry box, and ensure that the overall structure stability on vertical direction.And owing to using the component on site construction method of plate splicing, thus facilitate assembled in situ, reduce difficulty of construction, decrease the time that manual site constructs;Make integration body of wall product disclosure satisfy that user individual customization, prefabricated production by means of this utility model simultaneously, the most also make precast wall body product possess higher plasticity.
Each embodiment in this specification all uses the mode gone forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, and between each embodiment, identical similar part sees mutually.
Above a kind of pin-connected panel sentry box provided by the utility model is described in detail, preferred implementation of the present utility model is illustrated by specific case used herein, the explanation of above example is only intended to help to understand method of the present utility model and core concept thereof, and is not intended to be defined scope of the present utility model;Simultaneously; without departing under this utility model design spirit premise; deformation in terms of various detailed description of the invention that technical solutions of the utility model are made by this area ordinary skill technical staff and range of application and improvement, all should fall in the protection domain that claims of the present utility model determine.

Claims (8)

1. a pin-connected panel sentry box, it includes sentry box main body and assembled roof, described sentry box main body includes frame assembly and the multiple prefabricated panels being installed on frame assembly, described frame assembly includes the multiple straight connection pipe fitting arranged along each of the edges of prefabricated panel, and described prefabricated panel includes: base plate, it is used for being installed in bottom frame assembly;At least three riser vertically disposed with base plate, described riser includes: at least one pair of side plate;Header board, described header board comprises a component, and the both sides of described header board are adjacent with one of side plate respectively;
It is characterized in that,
Assembled roof is the polygonal pyramid shape being overlapped to form by multiple prefabricated building shoe plate, and each roofing tile plate inserts and snap fit onto the edge of neighbouring roofing tile plate recess between two adjacent projection by the protuberance of respective edge.
Sentry box the most according to claim 1, it is characterised in that be provided with, inside the lower limb being clasped on described assembled roof, the roof plug-in unit extended straight down;And away from base plate at vertical direction and it is arranged on the multiple straight confluce being connected pipe fitting of each riser upper edge with base plate abreast plug-in unit hole is set, be used for receiving roof plug-in unit.
Sentry box the most according to claim 1, it is characterised in that described prefabricated panel includes at least one back plate, it is oppositely arranged with header board.
Sentry box the most according to claim 1, it is characterised in that the number of the plurality of riser is n, the angle adjoined each other between riser is (n-2) × 180 °/n.
Sentry box the most according to claim 1, it is characterised in that the cross sectional shape of described straight connection pipeline section is square tube.
Sentry box the most according to claim 1, it is characterised in that described straight connection pipeline section is steel beam column material.
Sentry box the most according to claim 1, it is characterised in that at least one during employing comprises the group of following auxiliary supports between each prefabricated panel: angle steel, floor, loose-leaf.
Sentry box the most according to claim 2, it is characterised in that edge protuberance on assembled roof and recess form the adjoiner of engagement each other and use at least one in the group comprising following additional reinforcement part: connect liner, glued joint, weld, loose-leaf connection.
CN201521023260.7U 2015-12-11 2015-12-11 Pin-connected panel sentry box Active CN205743077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521023260.7U CN205743077U (en) 2015-12-11 2015-12-11 Pin-connected panel sentry box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521023260.7U CN205743077U (en) 2015-12-11 2015-12-11 Pin-connected panel sentry box

Publications (1)

Publication Number Publication Date
CN205743077U true CN205743077U (en) 2016-11-30

Family

ID=57389122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521023260.7U Active CN205743077U (en) 2015-12-11 2015-12-11 Pin-connected panel sentry box

Country Status (1)

Country Link
CN (1) CN205743077U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988464A (en) * 2017-04-20 2017-07-28 贵州蓝图新材料股份有限公司 A kind of ardealite is combined flat floor
CN109577686A (en) * 2018-12-03 2019-04-05 惠州市三力实业有限公司 A kind of modularization security pavilion on duty
CN110009949A (en) * 2019-04-28 2019-07-12 周丹若 A kind of autonomous learning device being built in campus
CN110670913A (en) * 2019-11-07 2020-01-10 佛山市南海长远金属制品有限公司 Arc four-corner pavilion
CN110714634A (en) * 2019-11-07 2020-01-21 佛山市南海长远金属制品有限公司 Cylindrical hexagonal pavilion
CN111677339A (en) * 2020-05-06 2020-09-18 海宏技术有限公司 Assembling method of zero-carbon attendance sentry box for construction site
CN112796418A (en) * 2020-12-25 2021-05-14 清华大学 Splicing and inserting pivot component for building structure, splicing and inserting pivot component and furniture
CN113775206A (en) * 2021-09-09 2021-12-10 江苏协和装饰工程有限公司 Method for constructing assembled pavilion

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988464A (en) * 2017-04-20 2017-07-28 贵州蓝图新材料股份有限公司 A kind of ardealite is combined flat floor
CN109577686A (en) * 2018-12-03 2019-04-05 惠州市三力实业有限公司 A kind of modularization security pavilion on duty
CN110009949A (en) * 2019-04-28 2019-07-12 周丹若 A kind of autonomous learning device being built in campus
CN110009949B (en) * 2019-04-28 2021-03-12 周丹若 Autonomous learning device established in campus
CN110670913A (en) * 2019-11-07 2020-01-10 佛山市南海长远金属制品有限公司 Arc four-corner pavilion
CN110714634A (en) * 2019-11-07 2020-01-21 佛山市南海长远金属制品有限公司 Cylindrical hexagonal pavilion
CN111677339A (en) * 2020-05-06 2020-09-18 海宏技术有限公司 Assembling method of zero-carbon attendance sentry box for construction site
CN112796418A (en) * 2020-12-25 2021-05-14 清华大学 Splicing and inserting pivot component for building structure, splicing and inserting pivot component and furniture
CN113775206A (en) * 2021-09-09 2021-12-10 江苏协和装饰工程有限公司 Method for constructing assembled pavilion

Similar Documents

Publication Publication Date Title
CN205743077U (en) Pin-connected panel sentry box
JP3218530U (en) Central assembly steel structure
CN205444458U (en) Integrated assembled steel construction building
CN205444984U (en) Pin -connected panel sanitation room
CN203924344U (en) Building block and the modular architectural on the middle and senior level with this building block
CN207260319U (en) Integrated module assembled arthitecutral structure
CN103216115A (en) Modular integrally-movable house
CN204826348U (en) Compound floor board of three -dimensional light steel frame structure
CN103669574A (en) Building frame system and assembly method thereof
CN109881773A (en) A kind of box-type module room and method of construction
CN203008410U (en) Modularized overall moving house
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN108360682A (en) A kind of construction process of three-dimensional building module and three-dimensional building module
CN104863392B (en) A kind of Assembled type movable sentry box and its fast method for preparing
CN203270775U (en) House assembled by light steel composite construction modules
CN104405039B (en) Modular made intelligent (MMI) building and construction method
CN205276639U (en) Pin -connected panel roof module and assemble roof
CN202730953U (en) Modular steel unit structure
CN106351466A (en) Housing assembled by light steel space framework structure composite plate module and construction method thereof
CN205387749U (en) Box house of removable assecmbly formula thin -walled cold -formed steel frame -type
CN212026607U (en) Assembled steel structure house that can build additional
CN211286002U (en) Assembled folding type box room
CN211285988U (en) Steel-concrete frame structure, wall structure and passive room
CN210713208U (en) Transformer substation's assembled integration guard room
CN201835540U (en) Mobile house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20190613

Granted publication date: 20161130

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20220613

Granted publication date: 20161130

PD01 Discharge of preservation of patent