CN205708378U - Facilitate implementation the Wall or floor tile warehousing system of automatization's access - Google Patents

Facilitate implementation the Wall or floor tile warehousing system of automatization's access Download PDF

Info

Publication number
CN205708378U
CN205708378U CN201620256992.9U CN201620256992U CN205708378U CN 205708378 U CN205708378 U CN 205708378U CN 201620256992 U CN201620256992 U CN 201620256992U CN 205708378 U CN205708378 U CN 205708378U
Authority
CN
China
Prior art keywords
tunnel
adobe
automatization
access
lifting platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620256992.9U
Other languages
Chinese (zh)
Inventor
冯竞浩
张晓明
尹优伟
郑景业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Eding Industrial Co Ltd
Original Assignee
Guangdong Eding Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Eding Industrial Co Ltd filed Critical Guangdong Eding Industrial Co Ltd
Priority to CN201620256992.9U priority Critical patent/CN205708378U/en
Application granted granted Critical
Publication of CN205708378U publication Critical patent/CN205708378U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

Facilitate implementation the Wall or floor tile warehousing system of automatization's access, it is provided with the tunnel for depositing adobe, the top in tunnel is opened wide, by the top support adobe of two side, tunnel, it is provided with the fortune brick dolly along tunnel walking, fortune brick dolly is provided with the lifting platform of carrying adobe, and lifting platform both can be increased above the height of tunnel top, and can decrease below again the height of tunnel top.This Wall or floor tile warehousing system, by the lifting action of the lifting platform on fortune brick dolly, just can complete to be placed into adobe tunnel top, and take off the action of adobe from tunnel top.Utilize this system can realize automatization's access of adobe easily, as long as controlling fortune the sailing of brick dolly, stopping, and control to transport the lifting of the lifting platform on brick dolly, can be achieved with automatization's access of adobe, provide precondition for realizing the automated storing of adobe.

Description

Facilitate implementation the Wall or floor tile warehousing system of automatization's access
Technical field
This utility model relates to the storage technique of Wall or floor tile, particularly relates to the storage technique of Wall or floor tile adobe after kiln brick output, before post-production.
Background technology
In the production process of Wall or floor tile, the adobe needs exported from kiln are cooled, after storage a period of time, just can carry out the rubbing down in later stage, packaging processing.In the prior art, use the mode of pilot steering fork truck the adobe that kiln export to be removed to storehouse storage, after a period of time is deposited in adobe, then by pilot steering fork truck adobe taken out from storehouse and transport following process line to.This operation wastes time and energy, and labor cost is high, and is difficult to automatization.
Utility model content
The purpose of this utility model is to provide a kind of Wall or floor tile warehousing system facilitating implementation automatization's access, creates conditions for realizing the automated storing of adobe.
This utility model is achieved in that the Wall or floor tile warehousing system facilitating implementation automatization's access, it is provided with the tunnel for depositing adobe, the top in tunnel is opened wide, and deposits in the adobe in tunnel across the open-mouth at tunnel top, by the top support adobe of two side, tunnel;In tunnel or outside tunnel, being provided with the fortune brick dolly along tunnel walking, fortune brick dolly is provided with the lifting platform of carrying adobe, and lifting platform both can be increased above the height of tunnel top, and can decrease below again the height of tunnel top.
As improving further or preferred forms, this utility model also can use following attached technical scheme.
Being provided with track in described tunnel, described fortune brick dolly is along track travel.
The one end in described tunnel is provided with piler and the transmission line plugged into kiln, and the other end in described tunnel is provided with unstacker and the transmission line plugged into upstream device.
Using the above-mentioned system being provided with piler, unstacker and transmission line as expanding element, being provided with multiple expanding element, the transmission line being positioned at two ends, described tunnel of all unit respectively and is received on a total transmission line.
The utility model has the advantages that, deposit in the adobe in tunnel across the open-mouth at tunnel top, by the lifting action of the lifting platform on fortune brick dolly, just can complete to be placed into adobe tunnel top, and take off the action of adobe from tunnel top.Utilize this system can realize automatization's access of adobe easily: as long as control fortune the sailing of brick dolly by a set of program control system, stop, and control to transport the lifting of the lifting platform on brick dolly, can be achieved with automatization's access of adobe, provide precondition for realizing the automated storing of adobe.
With embodiment, this utility model is described in further detail below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment one;
Fig. 2 is the A-A cutaway view Amplified image of Fig. 1;
Fig. 3 is the structural representation of the fortune brick dolly in Fig. 2;
Fig. 4 is the structural representation of this utility model embodiment two;
Fig. 5 shows the adobe of the various location being positioned at tunnel;
Fig. 6 is the structural representation of this utility model embodiment three;
Fig. 7 is the structural representation of this utility model embodiment four;
Fig. 8 is the structural representation of this utility model embodiment five;
Fig. 9 is the structural representation of this utility model embodiment six;
Figure 10 is the unilateral enlarged drawing of the fortune brick dolly in Fig. 9.
Detailed description of the invention
Embodiment one
See the top view that Fig. 1, Fig. 1 are the whole Wall or floor tile warehousing systems of the present embodiment.This warehousing system is provided with the tunnel 1 for placing adobe, is provided with the fortune brick dolly 2 along tunnel walking in tunnel 1.Referring also to Fig. 1, Fig. 2, tunnel 1 is fixed on bracing members frame 1a, the 1b on ground and constitutes by two rows, and the top in whole piece tunnel 1 is opened wide.As in figure 2 it is shown, deposit in the adobe 3 in tunnel 1 across the open-mouth at tunnel top, by the top of two side, tunnel, namely by the top support adobe 3 of two row bracing members frame 1a, 1b.The length in tunnel 1 according to needed for deposit the quantity of adobe depending on, tunnel is the longest, and the adobe quantity that can deposit is the most.
As in figure 2 it is shown, fortune brick dolly 2 is provided with the lifting platform 2a of carrying adobe.Lifting platform 2a can be increased to the mesa top height higher than the top in tunnel 1.After lifting platform 2a raises, the adobe 3 leaving tunnel top in is held up by lifting platform 2a, and adobe 3 just is transferred to transport brick dolly 2 from the top in tunnel 1, and now, the height keeping lifting platform 2a is constant, just can be walked together with adobe 3 by fortune brick dolly 2.Lifting platform 2a also can be reduced to the mesa top height less than the top in tunnel 1 as shown in Figure 2, and the adobe 3 now originally held up by lifting platform 2a is placed in the top in tunnel 1.Fortune brick dolly 2 can run to different positions along tunnel 1, thus the diverse location in tunnel 1 is placed or takes adobe away, until the top in whole piece tunnel 1 is all piled or takes sky adobe.So, as long as control fortune the sailing of brick dolly 2 by a set of program control system, stop, and control the lifting of lifting platform 2a on fortune brick dolly 2, can be achieved with automatization's access of adobe, create condition for realizing the automated storing of adobe.
Fig. 3 shows a kind of specific embodiment of fortune brick dolly.Fortune brick dolly 2 in Fig. 3 is simultaneously driven two Worm gear feed screw elevator 5 by the rotating shaft two ends of a motor 4, two Worm gear feed screw elevator 5 synchronize to drive lifting platform 2a lifting, makes top holding level during lifting of lifting platform 2a.
Embodiment two
Seeing Fig. 4, the present embodiment has made further improvement on the basis of embodiment one: be provided with piler 6 and the transmission line 7 plugged into kiln in the one end in tunnel 1, and the other end in tunnel 1 is provided with unstacker 8 and the transmission line 9 plugged into upstream device.Piler 6 and unstacker 8 can use existing same category of device.Owing to the structure of piler 6 and unstacker 8 is more complicated, and this utility model is not related to piler 6 and the concrete structure of unstacker 8, and for making view clear, Fig. 4 is only with a dotted line frame abstract representation piler 6 and unstacker 8.When depositing adobe, from kiln output adobe one piece then one piece be arranged in the transmission line 7 plugged into kiln, the adobe sent here successively by transmission line 7 by piler 6 ricks at the top of the one end in tunnel 1, can be such as that three pieces, four pieces or five pieces of bricks pile a buttress, then by fortune brick dolly 2, the adobe ricked be transported and is placed on the top of the position being used for depositing adobe in tunnel 1.When taking adobe, unstacker 8 is sent in the adobe ricked that be will be stored in top, tunnel 1 by fortune brick dolly 2, transferred to adobe block-by-block by unstacker 8 again, on the transmission line 9 plugged into upstream device, make the then one piece of arrangement of the adobe one piece on transmission line 9, be convenient to the processing of upstream device.See Fig. 5, Fig. 5 and show that buttress the adobe 3a, this buttress adobe 3a piled at the top of the one end in tunnel 1 by piler 6 is just waiting for being carried it the position for depositing adobe to tunnel 1 by fortune brick dolly 2.Fig. 5 also show many buttress adobe 3b, 3c of the position for depositing adobe in tunnel 1 ..., these adobes are transported by fortune brick dolly 2 and are placed on herein successively.Fig. 5 also show by fortune brick dolly 2 give unstacker one buttress adobe 3d, this buttress adobe 3d be placed on the top of one end of the close unstacker 8 in tunnel 1, just waiting for being transferred on transmission line 9 by its block-by-block by unstacker 8.The piler 6 of the present embodiment, unstacker 8 can be coordinated to control by same set of program control system with fortune brick dolly 2.The transmission line 7,9 of the present embodiment can use conventional use of all kinds of transmission lines in existing Wall or floor tile production line, such as roller bed type transmission line, belt-type transmission line etc..
Embodiment three
See Fig. 6, the present embodiment has been made to further expand on the basis of embodiment two: with embodiment two, i.e. the system shown in Fig. 4 is as expanding element, it is extended to two unit, the transmission line being positioned at two ends, tunnel of two unit respectively and is received on a total transmission line, wherein, it is positioned at two transmission lines 7 of the same one end in tunnel 1 and receives on a total transmission line 10, be positioned at two transmission lines 9 of the other end in tunnel 1 and receive on another total transmission line 11.So, available different transmission line sorts the adobe of different cultivars: from the adobe of the different cultivars of kiln output through total transmission line 10 and two transmission lines 7, two unit can be respectively sent to, the tunnel 1 in two unit is made to deposit the adobe of different cultivars respectively, in like manner, leave the adobe on the tunnel 1 in two unit respectively in, can be sent on total transmission line 11 by two transmission lines 9 respectively.With reference to the extended mode shown in Fig. 6, this utility model also can extend further to three unit, four unit ..., and so on, in theory can be with infinite expanding.Multiple unit of whole system can also be further divided into many groups, and often group is made up of several unit, and the unit of same group deposits the adobe of same breed, and the unit of different groups deposits the adobe of different cultivars.
Embodiment four
Seeing Fig. 7, the present embodiment is provided with track 12 in tunnel 1, and fortune brick dolly 2 is walked along track 12.Other structures composition of the present embodiment can refer to previous embodiment.The various improved structures of previous embodiment are equally applicable to the present embodiment.
Embodiment five
Seeing Fig. 8, the tunnel 1 of the present embodiment is the tunnel being opened in underground, is provided with track 12 in tunnel, and fortune brick dolly 2 is walked along track 12 in tunnel.Other structures composition of the present embodiment can refer to previous embodiment.The various improved structures of previous embodiment are equally applicable to the present embodiment.
Embodiment six
Seeing Fig. 9, the fortune brick dolly 13 of the present embodiment is gantry frame structure, and tunnel 1 passes from the centre of fortune brick dolly 13.Fortune brick dolly 13 is provided with two lifting platforms 13a, 13b, and two lifting platforms 13a, 13b lay respectively at the outside of two side 1a, the 1b in tunnel 1.Two lifting platform 13a, 13b synchronization actions, its function and effect, identical with the function of the lifting platform 2a of the fortune brick dolly 2 in previous embodiment and effect, also it is for carrying adobe 3, but the type of drive of two lifting platforms 13a, 13b is different from previous embodiment.As a example by the lifting platform 13a on the left side, see Figure 10, this lifting platform 13a is connected with Worm gear feed screw elevator 5 by movable pulley mechanism, and the movable pulley 15 in movable pulley mechanism is fixed on the elevating screw 16 of Worm gear feed screw elevator 5, and movable pulley 15 is with elevating screw 16 1 lifting.Movable pulley 15 can be sheave, sprocket wheel etc..The top of pull rope 17 follow-up pulley 15 in movable pulley mechanism is walked around.Pull rope 17 can be steel wire rope, plate chain etc..The two ends of pull rope 17 are respectively connecting to downwards transport car body and the lifting platform 13a of brick dolly 13.It is articulated and connected by pin 18 between pull rope 17 and car body.It is articulated and connected by pin 19 between pull rope 17 and lifting platform 13a.When the elevating screw 16 of Worm gear feed screw elevator 5 drives movable pulley 15 to lift, lifting platform 13a can be driven to lift.The lifting platform 13b on the right uses the type of drive identical with the lifting platform 13a on the left side.
Other structures composition of the present embodiment can refer to previous embodiment.The various improved structures of previous embodiment are equally applicable to the present embodiment.

Claims (4)

1. facilitate implementation the Wall or floor tile warehousing system of automatization's access, it is characterised in that:
Being provided with the tunnel for depositing adobe, the top in tunnel is opened wide, and deposits in the adobe in tunnel across the open-mouth at tunnel top, by the top support adobe of two side, tunnel;
In tunnel or outside tunnel, being provided with the fortune brick dolly along tunnel walking, fortune brick dolly is provided with the lifting platform of carrying adobe, and lifting platform both can be increased above the height of tunnel top, and can decrease below again the height of tunnel top.
Facilitate implementation the Wall or floor tile warehousing system of automatization's access the most as claimed in claim 1, it is characterized in that: being provided with track in described tunnel, described fortune brick dolly is along track travel.
Facilitate implementation the Wall or floor tile warehousing system of automatization's access the most as claimed in claim 1 or 2, it is characterized in that: the one end in described tunnel is provided with piler and the transmission line plugged into kiln, the other end in described tunnel is provided with unstacker and the transmission line plugged into upstream device.
Facilitate implementation the Wall or floor tile warehousing system of automatization's access the most as claimed in claim 3, it is characterized in that: using the system described in claim 3 as expanding element, being provided with multiple expanding element, the transmission line being positioned at two ends, described tunnel of all unit respectively and is received on a total transmission line.
CN201620256992.9U 2016-03-30 2016-03-30 Facilitate implementation the Wall or floor tile warehousing system of automatization's access Expired - Fee Related CN205708378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620256992.9U CN205708378U (en) 2016-03-30 2016-03-30 Facilitate implementation the Wall or floor tile warehousing system of automatization's access

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620256992.9U CN205708378U (en) 2016-03-30 2016-03-30 Facilitate implementation the Wall or floor tile warehousing system of automatization's access

Publications (1)

Publication Number Publication Date
CN205708378U true CN205708378U (en) 2016-11-23

Family

ID=57311220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620256992.9U Expired - Fee Related CN205708378U (en) 2016-03-30 2016-03-30 Facilitate implementation the Wall or floor tile warehousing system of automatization's access

Country Status (1)

Country Link
CN (1) CN205708378U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105712023A (en) * 2016-03-30 2016-06-29 广东一鼎科技有限公司 Wall and floor brick warehousing system convenient for realizing automatic storage and taking
CN109436643A (en) * 2018-11-02 2019-03-08 深圳市顺丰物业管理有限公司 Automatic handling device
CN110980097A (en) * 2019-11-08 2020-04-10 江西唯美陶瓷有限公司 Three-dimensional storage device for bare ceramic plates

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105712023A (en) * 2016-03-30 2016-06-29 广东一鼎科技有限公司 Wall and floor brick warehousing system convenient for realizing automatic storage and taking
CN109436643A (en) * 2018-11-02 2019-03-08 深圳市顺丰物业管理有限公司 Automatic handling device
CN110980097A (en) * 2019-11-08 2020-04-10 江西唯美陶瓷有限公司 Three-dimensional storage device for bare ceramic plates

Similar Documents

Publication Publication Date Title
CN105712023A (en) Wall and floor brick warehousing system convenient for realizing automatic storage and taking
CN205169571U (en) Lifting tray machine
CN106218948A (en) The full-automatic packaging system of autoclave aerated concrete building block
CN106241397A (en) Autoclave aerated concrete building block pallet-free stacking and stacking technology
CN205708378U (en) Facilitate implementation the Wall or floor tile warehousing system of automatization's access
US4298305A (en) Method and apparatus for transferring loads
CN209396575U (en) Hollow brick automatically unloads base machine
CN103407794A (en) Fully-automatic brick packing and unloading method for sintered bricks
CN105600490A (en) Explosive loading method and explosive loading device
CN109552890B (en) Brick dividing and grouping device and method for reserved forklift holes
CN104290954A (en) Brick automatically packing production line
CN105986690B (en) A kind of vehicle-carrying plate stacking machine and the intelligent three-dimensional garage using the vehicle-carrying plate stacking machine
CN203959126U (en) A kind of multi-mode gig
CN206013956U (en) A kind of automatic loading machine hoisting mechanism
CN106476131A (en) A kind of storage base streamline
CN103964144B (en) A kind of pallet Automatic-descending cyclic code stack machine
CN103171901B (en) Container goose neck tunnel is positive and negative is stacked discharge system
CN105217287A (en) A kind of tile load transfer device
CN214991724U (en) Automatic change annealing stove and fall material circulation frock
CN204457013U (en) A kind of vehicle-containing stacking machine and use the intelligent three-dimensional garage of this vehicle-containing stacking machine
CN106966099A (en) Automatic picking and the device of transport
CN107187875B (en) Vacuum glass produces conveyer method
CN105540233B (en) A kind of cross-platform part flow arrangement of material
CN105819140A (en) Facility agricultural cultivation frame automatic storing device
CN103341996B (en) Automatic charging device of tread trolley of tire forming machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Wall and floor brick warehousing system convenient for realizing automatic storage and taking

Effective date of registration: 20180112

Granted publication date: 20161123

Pledgee: Guangdong Nanhai Rural Commercial Bank branch branch of Limited by Share Ltd.

Pledgor: Guangdong Eding Industrial Co.,Ltd.

Registration number: 2018440000015

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200203

Granted publication date: 20161123

Pledgee: Guangdong Nanhai Rural Commercial Bank branch branch of Limited by Share Ltd.

Pledgor: Guangdong Eding Industrial Co.,Ltd.

Registration number: 2018440000015

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

CF01 Termination of patent right due to non-payment of annual fee