CN205677652U - A kind of gob side entry retaining advanced stand device - Google Patents

A kind of gob side entry retaining advanced stand device Download PDF

Info

Publication number
CN205677652U
CN205677652U CN201620586839.2U CN201620586839U CN205677652U CN 205677652 U CN205677652 U CN 205677652U CN 201620586839 U CN201620586839 U CN 201620586839U CN 205677652 U CN205677652 U CN 205677652U
Authority
CN
China
Prior art keywords
hydraulic support
entry retaining
side entry
hydraulic
gob side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620586839.2U
Other languages
Chinese (zh)
Inventor
宋艳鹏
王嵩
郭志林
赵垒
张永平
刘忠平
张智强
魏朝
赵腾飞
李安洪
李良兵
刘冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD
Xian University of Science and Technology
Shanxi Luan Environmental Energy Development Co Ltd
Original Assignee
SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD
Xian University of Science and Technology
Shanxi Luan Environmental Energy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD, Xian University of Science and Technology, Shanxi Luan Environmental Energy Development Co Ltd filed Critical SHAANXI PIONEERING ARCHITECTURAL TECHNOLOGY CO LTD
Priority to CN201620586839.2U priority Critical patent/CN205677652U/en
Application granted granted Critical
Publication of CN205677652U publication Critical patent/CN205677652U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a kind of gob side entry retaining advanced stand device, including the first hydraulic support and the second hydraulic support, first hydraulic support and the second hydraulic support be arranged in parallel, first hydraulic support is positioned at side, gob side entry retaining tunnel, being provided with multiple wood point post between first hydraulic support and the second hydraulic support, the top of the first hydraulic support and the second hydraulic support is provided with wire netting.A kind of gob side entry retaining advanced stand device, workman need not enter goaf operation, operation in the gap of the first hydraulic support and the second hydraulic support, work safer, after first hydraulic support and the second hydraulic moving stand, wood point post is made supporting more firm by roof and floor extruding, wood point post low cost, does not reclaims.

Description

A kind of gob side entry retaining advanced stand device
Technical field
This utility model belongs to coal mining support technology field, relates to a kind of gob side entry retaining advanced stand device.
Background technology
Gob-side entry retaining support technology is, during coal-face is mined, to be protected in this work surface (or two) tunnel Stay, service for subsequent work face.By factors such as geological conditions, recovery method and costs, gob-side entry retaining support technology is not yet Obtain development in an all-round way, gob side entry retaining advance support more lack maturation Technology, use more waste pack, hydraulic single prop and Anchor cable carries out advance support, and during the workman's operation of these support patterns, safety is low, and cost is high, and effect is undesirable, narrow application range.
Utility model content
The purpose of this utility model is to provide a kind of gob side entry retaining advanced stand device, and the method can improve workman's operation Safety.
This utility model be employed technical scheme comprise that, a kind of gob side entry retaining advanced stand device, props up including the first hydraulic pressure Frame and the second hydraulic support, the first hydraulic support and the second hydraulic support be arranged in parallel, and the first hydraulic support is positioned at gob side entry retaining Side, tunnel, is provided with multiple wood point post, the first hydraulic support and the second hydraulic pressure between the first hydraulic support and the second hydraulic support The top of support is provided with wire netting.
Feature of the present utility model also resides in,
Multiple wood point posts are uniformly arranged.
Gap between first hydraulic support and the second hydraulic support is 0.5 ± 0.2m.
The beneficial effects of the utility model are: a kind of gob side entry retaining advanced stand device by arrange the first hydraulic support and Wood point post, the first hydraulic support and the second hydraulic pressure are set between the second hydraulic support, the first hydraulic support and the second hydraulic support Cradle top is respectively provided with wire netting, and wood point post forms supporting and shelves cash isolation structure with top metal net, under this structural defence Carry out the construction of roadside support body.Workman need not enter goaf operation, in the first hydraulic support and the gap of the second hydraulic support Interior operation, works safer, and after the first hydraulic support and the second hydraulic moving stand, wood point post is made supporting more by roof and floor extruding Firmly, wood point post low cost, does not reclaims.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model a kind of gob side entry retaining advanced stand device;
Fig. 2 is the view of this utility model a kind of gob side entry retaining advanced stand device.
In figure, 1. the first hydraulic support, 2. the second hydraulic support, 3. wood point post, 4. wire netting, 5. roadside support body, 6. Gob side entry retaining tunnel, 7. goaf.
Detailed description of the invention
With detailed description of the invention, this utility model is described in detail below in conjunction with the accompanying drawings.
This utility model provides a kind of gob side entry retaining advanced stand device, as it is shown in figure 1, include the first hydraulic support 1 With the second hydraulic support 2, the first hydraulic support 1 and the second hydraulic support 2 be arranged in parallel, and the first hydraulic support 1 is located along sky and stays Side, tunnel, lane 6, is provided with multiple wood point post 3, the first hydraulic support 1 and the between the first hydraulic support 1 and the second hydraulic support 2 Top and the front of two hydraulic supports 2 are provided with wire netting 4;
Multiple wood point posts 3 are uniformly arranged;
Gap between first hydraulic support 1 and the second hydraulic support 2 is 0.5 ± 0.2m.
The using method of this utility model a kind of gob side entry retaining advanced stand device is: as in figure 2 it is shown, gob side entry retaining is initial Position sets 0.5 ± 0.2m gap by staying between side, gob side entry retaining tunnel 6 first hydraulic support 1 and the second hydraulic support 2, and ensures This gap is kept to be basically unchanged when the most mobile first hydraulic support 1 is with the second hydraulic support 2;Then in gob side entry retaining tunnel 6 First hydraulic support 1 of side and the top of the second hydraulic support 2 and front all lay a grade cash wire netting 4;At the first hydraulic support 1 Wood point post 3 is set in staying, with the second hydraulic support 2, the gap set;Along with the first hydraulic support 1 and the second hydraulic support 2 move forward, Wood point post 3 forms supporting and shelves cash isolation structure with top metal net 4, carries out executing of roadside support body 5 under this structural defence Work.
Workman does not enter goaf 7, completes to set wood point post 3 in the first hydraulic support 1 and the second hydraulic support 2 gap, Working safer, after the first hydraulic support 1 and the reach of the second hydraulic support 2, wood point post 3 is integral with top metal net form, Side, goaf 7 wire netting naturally droops and lands, and forms gear cash divider wall with wood point post 3, and wood point post 3 is extruded by roof and floor simultaneously, Advance support is more firm, gives the construction slot milling of roadside support body subsequently and enough intensity.
Wood point post 3 low cost, does not reclaims, solves hydraulic single prop construction loaded down with trivial details, and cost is high, reclaims asking of difficulty Topic.
This utility model one gob side entry retaining advanced stand device is by arranging the first hydraulic support 1 and the second hydraulic support 2, wood point post 3 is set between first hydraulic support 1 and the second hydraulic support 2, the first hydraulic support 1 and the second hydraulic support 2 push up Portion is respectively provided with wire netting 4, and wood point post 3 forms supporting and shelves cash isolation structure with top metal net 4, carries out under this structural defence The construction of roadside support body 5.Workman need not enter goaf 7 operation, in the first hydraulic support 1 and gap of the second hydraulic support 2 Interior operation, works safer, and after the first hydraulic support 1 and the second hydraulic support 2 move frame, wood point post 3 is made supporting by roof and floor extruding More firm, wood point post 3 low cost, does not reclaims.

Claims (3)

1. a gob side entry retaining advanced stand device, it is characterised in that include the first hydraulic support (1) and the second hydraulic support (2), the first hydraulic support (1) and the second hydraulic support (2) be arranged in parallel, and the first hydraulic support (1) is positioned at gob side entry retaining tunnel (6) side, is provided with multiple wood point post (3), the first hydraulic support (1) between the first hydraulic support (1) and the second hydraulic support (2) It is provided with wire netting (4) with the top of the second hydraulic support (2).
A kind of gob side entry retaining advanced stand device the most according to claim 1, it is characterised in that: the plurality of wood point post (3) it is uniformly arranged.
A kind of gob side entry retaining advanced stand device the most according to claim 1 and 2, it is characterised in that: described first hydraulic pressure Gap between support (1) and the second hydraulic support (2) is 0.5 ± 0.2m.
CN201620586839.2U 2016-06-16 2016-06-16 A kind of gob side entry retaining advanced stand device Expired - Fee Related CN205677652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620586839.2U CN205677652U (en) 2016-06-16 2016-06-16 A kind of gob side entry retaining advanced stand device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620586839.2U CN205677652U (en) 2016-06-16 2016-06-16 A kind of gob side entry retaining advanced stand device

Publications (1)

Publication Number Publication Date
CN205677652U true CN205677652U (en) 2016-11-09

Family

ID=57432753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620586839.2U Expired - Fee Related CN205677652U (en) 2016-06-16 2016-06-16 A kind of gob side entry retaining advanced stand device

Country Status (1)

Country Link
CN (1) CN205677652U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676094A (en) * 2017-10-25 2018-02-09 贵州理工学院 Half-edge coal seam efficiently discharges the recovery method of production capacity
CN110847941A (en) * 2019-10-28 2020-02-28 西安科技大学 Flexible advanced combined hydraulic support protecting net device for deep dynamic pressure tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107676094A (en) * 2017-10-25 2018-02-09 贵州理工学院 Half-edge coal seam efficiently discharges the recovery method of production capacity
CN107676094B (en) * 2017-10-25 2020-02-14 贵州理工学院 Mining method for efficiently releasing productivity of steeply inclined coal seam
CN110847941A (en) * 2019-10-28 2020-02-28 西安科技大学 Flexible advanced combined hydraulic support protecting net device for deep dynamic pressure tunnel

Similar Documents

Publication Publication Date Title
CN201687497U (en) Quick wire mesh laying device for shield supports in last cutting stope of fully mechanized mining face
CN105697013A (en) Contractible temporary support for tunneling tunnel
CN205047241U (en) Tunnel quick travel formula advance support support
CN105019927A (en) Hydraulic support withdrawing system and method
CN205743901U (en) Digging laneway telescopic type falsework
CN203321561U (en) Gob-side entry retaining hydraulic support with top net paved on support tail
CN103775117A (en) Waste-rock-blocking top-cutting mold-hanging gob-side entry retaining hydraulic bracket for mining working face
CN203717005U (en) Cyclically moving advanced supporting hydraulic bracket for two roadways of fully mechanized coal mining face
CN205677652U (en) A kind of gob side entry retaining advanced stand device
CN201090231Y (en) Coal face support combined hydraulic support
CN203717008U (en) Gangue blocking top cutting deviation correcting self moving gob-side entry retaining hydraulic support frame
CN104389605B (en) A kind of coal-face intensive steel cord shielding withdraws method
CN203239375U (en) Low sublevel caving coal support
CN105715289A (en) Gob-side retained roadway end bracket
CN205297613U (en) Formula temporary support support is moved certainly in colliery headwork face in pit
CN105736027A (en) Support group for gob-side entry retaining
CN204984453U (en) Hydraulic support withdrawing system
CN203114338U (en) Supporting equipment for filling
CN201982125U (en) End head and tail advance support bracket for fully-mechanized caving face
CN106761874A (en) A kind of automatic moving type forepoling hydraulic support with side guard plate
CN203717006U (en) Rock-blocking, top-cutting and mold-hanging gob-side entryretaining hydraulic support for mining working face
CN203756209U (en) Longitudinal-girder staggered temporary support for heading face
CN203570351U (en) Supporting device for low coal seam comprehensive mechanized remained gateway along goaf
CN204754950U (en) It puts force piece to combine to adopt to combine
CN104863584B (en) Coal-face non-notch feed coal mining complete equipment and tool feeding method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161109

Termination date: 20170616

CF01 Termination of patent right due to non-payment of annual fee