CN204754950U - It puts force piece to combine to adopt to combine - Google Patents
It puts force piece to combine to adopt to combine Download PDFInfo
- Publication number
- CN204754950U CN204754950U CN201520348691.4U CN201520348691U CN204754950U CN 204754950 U CN204754950 U CN 204754950U CN 201520348691 U CN201520348691 U CN 201520348691U CN 204754950 U CN204754950 U CN 204754950U
- Authority
- CN
- China
- Prior art keywords
- support
- grillage
- combine
- monomer
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 12
- 239000010959 steel Substances 0.000 claims abstract description 12
- 239000003245 coal Substances 0.000 claims description 15
- 241001669679 Eleotris Species 0.000 claims description 8
- 230000000153 supplemental effect Effects 0.000 claims description 2
- 239000000178 monomer Substances 0.000 abstract description 14
- 238000010276 construction Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 238000011084 recovery Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model provides an it puts force piece to combine to adopt to combine, this support include grillage and monomer pillar, and grillage and monomer pillar below are the bottom plate, the top is the roof, and the grillage props up and establishes on the bottom plate and support the roof, and the monomer pillar sets up on the bottom plate, sets up the girder steel on the monomer pillar, monomer pillar and girder steel auxiliary stay roof. The utility model discloses to originally utilize the monomer pillar to set up the mode of strutting that the roof was safeguarded to the capplce in fan -shaped area department, and change into and locate cogging, the supplementary mode of strutting of strutting of monomer pillar in fan -shaped area, increase the area of contact with the bottom plate to prevent a monomer cylindrical drill ground, and easily retrieve, and then reduced staff intensity of labour, guaranteed safe construction.
Description
Technical field
The utility model relates to a kind of combining and adopts fully mechanized coal face support.
Background technology
At present, carry out combining adopt fully mechanized coal face support reclaim time, often run into mud stone base plate, cause sector belt supporting monomer to bore ground, cause sector belt roof timbering insufficient strength thus, deflection is large, and support reclaims difficulty.Meanwhile, deflection is comparatively large, also causes supporting MONOMER RECOVERY comparatively difficult, and constructor's labour intensity is comparatively large, and safety factor reduces, thus danger is increased, and has a strong impact on construction speed.
Fig. 1 shows in prior art to combine and adopts the schematic diagram that hydraulic support of top-coal saving face withdraws sector belt supporting.As shown in Figure 1, in the prior art, often recall a support, that sets up " beam three post " in time at support original position moves towards canopy supporting roof.The canopy that moves towards of so-called " beam three post " refers to the frame construction being supported a crossbeam by three individual props.Usually, the post distance between individual prop is 0.5 meter, and the distance between adjacent canopy is 0.85 meter.Undertaken by frame from bottom to top during frame canopy.Above-mentioned girder steel can adopt π section steel beam.Unsupported back span between this π section steel beam front end and return channel, from time larger, install a post of attaching the names of pre-determined candidates and safeguards.Later often withdraw a support and safeguard top board according to the method described above, simultaneously in the end two framves move towards canopy prop up intercolumniation respectively install 1 in an opposite direction post (angle clashed by post is in an opposite direction 75 ° ~ 80 °) carry out strengthening supporting; Move towards canopy to reclaim by " seeing seven times two " or " seeing eight times two " principle.
As described above, the method shown in Fig. 1 of employing is carried out combining and is adopted hydraulic support of top-coal saving face and withdraw, and easily cause supporting monomer to bore ground, supporting intensity is inadequate, and deflection is large, and make support reclaim difficulty thus, increase labour intensity, also safety factor is lower.
Utility model content
The utility model provides a kind of combining and adopts fully mechanized coal face support, be intended to overcome that supporting monomer in prior art easily bores that ground, the amount of crushing are large, supporting intensity not and the defects such as MONOMER RECOVERY difficulty.
Specifically, the utility model provides a kind of combining to adopt fully mechanized coal face support, this support comprises grillage and individual prop, for base plate, top are top board below grillage and individual prop, grillage props up and is located on base plate and roof supporting, individual prop is erected on base plate, and individual prop sets up girder steel, individual prop and girder steel supplemental support top board.
Preferably, described grillage is sleeper.
More preferably, described sleeper quantity is 50.
More preferably, described sleeper is of a size of 1200mm × 150mm × 150mm or 1500mm × 150mm × 150mm.
More preferably, individual prop is up to 3.15 meters, and girder steel grows 0.8 meter-1.2 meters.
The utility model utilizes individual prop erection capplce to safeguard the support pattern of top board by original at sector belt place, change into the support pattern at sector belt place crib building, individual prop auxiliary shoring, add the contact area with base plate, thus prevent individual prop from boring ground, and be easy to reclaim, and then reduce staff labor intensity, ensure that safe construction.
Accompanying drawing explanation
Fig. 1 shows in prior art to combine and adopts the schematic diagram that hydraulic support of top-coal saving face withdraws sector belt supporting;
Fig. 2 illustrates and adopts hydraulic support of top-coal saving face withdraw sector belt supporting schematic diagram according to of the present utility model combining.
Detailed description of the invention
Generally, the utility model reclaims to combine on mud stone base plate adopts fully mechanized coal face support, support unit erection capplce is utilized to safeguard the support pattern of top board by original at sector belt place, change into the support pattern at sector belt place crib building, support unit auxiliary shoring, the supporting intensity of sector belt place top board can be increased thus.
Specifically, Fig. 2 illustrates and adopts hydraulic support of top-coal saving face withdraw sector belt supporting schematic diagram according to of the present utility model combining.As shown in Figure 2, basic support can be withdrawn from by round-link chain.Often withdraw from this support of stylobate, just a grillage is set in the origin-location of this this support of stylobate.Typically, grillage can adopt sleeper form, and its size can be 1200mm × 150mm × 150mm or 1500mm × 150mm × 150mm, and the quantity of sleeper is about 50.
The process that basic support is withdrawn from by round-link chain can be described below:
First, basic Bracket setting to be withdrawn has passing case, and the first shield support is also provided with passing case, employing is unloaded button and is coordinated round-link chain (such as, Φ 26 round-link chain) the passing case of the passing case and shield support waiting to withdraw basic support is linked together, then basic support to be withdrawn is dropped to suitable height, site operation human users support, adopt support to move forward from the mode of moving;
Subsequently, when the back timber of basic support to be withdrawn is moved to ad-hoc location (such as, apart from coal side specific range, especially, distance about 1m) time, site operation personnel install grillage (being such as " # " font grillage) under support original position, and install a post of attaching the names of pre-determined candidates (quantity and the position of propping up the post that sets up an office are determined according to field condition, and some post preferably forms certain angle in an opposite direction relative to direction, goaf) in grillage front;
Then, adjustment ceiling location, after top board has adjusted, basic support to be withdrawn has continued from moving to ad-hoc location (such as, till coal side 0.3m), adopt work plane tuning winch directly to connect the passing case of the basic support withdrawn, to this basic support tuning, holder orientation to be ajusted (in the case, can complete by individual prop, but necessary remote-controlled operation), haul support to point of loading with work plane tuning winch, entrucking is transported to ground.Thus, the process that withdraws of basic support will complete.Now, top board will be that a main pylon of attaching the names of pre-determined candidates is set to and auxiliaryly carries out roof timbering with grillage.
Basic support is withdrawn from by return channel, and return channel can be set to long 300 meters, wide 4.4 meters, high 4 meters.Generally, return channel can be arranged to enough large size, so that basic support can successfully be withdrawn from along round-link chain.
As described above, need to use shield support when basic rack restoring.Generally, shield support supports and safeguards return channel, prevents roof caving, and cooperation installs grillage and safeguards that sector withdraws hydraulic support.Three shield supports (first, second, third shield support) have been shown in Fig. 2.Hereinafter by the concrete operations mode of concrete analysis shield support.
As shown in Figure 2, three, the second, first shield support is taken a step slowly point to draw for three times and is moved on to position and (draw and move order: the three-the second-the first), the delayed first shield support certain distance of second shield support (such as, the distance of 1.75 meters), the 3rd shield support is concordant with the second shield support base;
Subsequently, before pulling shield support, first the winch gib head in return channel and the 3rd shield support are passed case to link together, be then drilled into operation in shield support by site operation personnel and fall frame, use winch draw the reach of this shield support or adopt support to move forward from the mode of moving; And pull the mode of other shield supports identical with pulling the mode of the 3rd shield support;
Then, the mode of loosing core can be adopted to withdraw support, in this case, often take out two framves and draw and move a cover frame; Also order can be adopted to withdraw support, and in this case, first, second shield support is often taken out two framves and is drawn and move once, and the 3rd shield support is often taken out a frame and drawn and move once.
As described above, often withdraw from a basic support, just can set up a grillage in the origin-location of basic support.Therefore, now supporting roof by crib protection.In the case, because grillage itself has relatively large floor space, therefore when running into mud stone base plate, grillage also can not bore ground, thus effectively increases the supporting intensity of supporting roof.
Certainly, the not pure grillage that adopts of the utility model supports supporting roof.While grillage supports, also adopt individual prop to carry out auxiliary shoring simultaneously.Such as, individual prop, up to 3.15 meters, also adopts " beam column " structure, and its crossbeam adopts the girder steel of long 0.8 meter-1.2 meters.But because grillage plays main support action, even if therefore when running into mud stone base plate, monomer supporting also can not bore ground.
Machine lane and air way is also shown in Fig. 2.Machine lane is also called Belt transport tunnel, is mainly used in carry coal, is also intake simultaneously.Air way is then return aircourse.Thus, machine lane air intake, air way return air, machine lane and air way, work plane form a system.
The utility model utilizes support unit erection capplce to safeguard the support pattern of top board by original at sector belt place, change into the support pattern at sector belt place crib building, individual prop auxiliary shoring, add the contact area with base plate, thus prevent individual prop from boring ground, and be easy to reclaim, and then reduce staff labor intensity, ensure that safe construction.
Those skilled in the art will also be appreciated that protection domain of the present utility model is not limited in above-described embodiment, allly all drop in scope of the present utility model equivalents of the present utility model.
Claims (5)
1. one kind combine adopt fully mechanized coal face support, it is characterized in that: this support comprises grillage and individual prop, for base plate, top are top board below grillage and individual prop, grillage props up to be located on base plate and roof supporting, individual prop is erected on base plate, individual prop sets up girder steel, individual prop and girder steel supplemental support top board.
2. support according to claim 1, is characterized in that: described grillage is sleeper.
3. support according to claim 2, is characterized in that: described sleeper quantity is 50.
4. support according to claim 3, is characterized in that: described sleeper is of a size of 1200mm × 150mm × 150mm or 1500mm × 150mm × 150mm.
5. support according to claim 1, is characterized in that: individual prop is up to 3.15 meters, and girder steel grows 0.8 meter-1.2 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520348691.4U CN204754950U (en) | 2015-05-26 | 2015-05-26 | It puts force piece to combine to adopt to combine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520348691.4U CN204754950U (en) | 2015-05-26 | 2015-05-26 | It puts force piece to combine to adopt to combine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204754950U true CN204754950U (en) | 2015-11-11 |
Family
ID=54469669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520348691.4U Active CN204754950U (en) | 2015-05-26 | 2015-05-26 | It puts force piece to combine to adopt to combine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204754950U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107654250A (en) * | 2017-11-09 | 2018-02-02 | 神华集团有限责任公司 | Fully mechanized mining withdraws working face fan section and withdraws method |
CN114033458A (en) * | 2021-10-22 | 2022-02-11 | 国家能源集团宁夏煤业有限责任公司 | Fully mechanized coal mining face withdrawing method |
-
2015
- 2015-05-26 CN CN201520348691.4U patent/CN204754950U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107654250A (en) * | 2017-11-09 | 2018-02-02 | 神华集团有限责任公司 | Fully mechanized mining withdraws working face fan section and withdraws method |
CN107654250B (en) * | 2017-11-09 | 2020-03-20 | 神华集团有限责任公司 | Fully mechanized mining withdrawing working face sector withdrawing method |
CN114033458A (en) * | 2021-10-22 | 2022-02-11 | 国家能源集团宁夏煤业有限责任公司 | Fully mechanized coal mining face withdrawing method |
CN114033458B (en) * | 2021-10-22 | 2023-10-20 | 国家能源集团宁夏煤业有限责任公司 | Fully mechanized mining face retracting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101775991B (en) | Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face | |
CN104895592A (en) | Fully-mechanized coal mining and caving face support retracement supporting method | |
CN101514633B (en) | Non-roadside supporting gob-side entry retaining process | |
CN101349159B (en) | Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face | |
CN105952453B (en) | Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane | |
CN101302931B (en) | Method for extracting rim angle coal and re-extracting after warehouse coal extracting | |
CN104033151A (en) | Safe mining method of ten million-ton mine under complicated conditions of dual-system coal seams | |
CN104500117B (en) | Without repeatedly supporting continuous supporting advanced hydraulic support | |
CN105736044A (en) | Rapid withdrawing method for fully mechanized coal mining face equipment of steep coal seam | |
CN106677813A (en) | Novel temporary supporting device for coal mine roadway comprehensive digging face | |
CN102392667B (en) | Fast installation method of ten-million-ton scale fully mechanized caving face equipment | |
CN102418525B (en) | Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method | |
CN105715289B (en) | Gob side entry retaining face end support | |
CN204754950U (en) | It puts force piece to combine to adopt to combine | |
CN104863599B (en) | Fully-mechanized mining working synchronously expands side installation method and support system | |
CN102322281B (en) | Tunnel quick-tunneling advance support integrated device | |
CN105736027A (en) | Support group for gob-side entry retaining | |
CN201560775U (en) | Temporary support device for coal mine tunneling | |
CN110130964A (en) | A kind of temporary supporting device of driving working face and construction method | |
CN204691807U (en) | Fully-mechanized mining working synchronously expands side and installs support system | |
CN208502820U (en) | A kind of constant pressure automatic moving type forepoling hydraulic support | |
CN203570351U (en) | Supporting device for low coal seam comprehensive mechanized remained gateway along goaf | |
CN205805540U (en) | Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane | |
CN205677652U (en) | A kind of gob side entry retaining advanced stand device | |
CN201650359U (en) | Filling bag for temporarily supporting filling space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |