CN205805540U - Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane - Google Patents

Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane Download PDF

Info

Publication number
CN205805540U
CN205805540U CN201620687273.2U CN201620687273U CN205805540U CN 205805540 U CN205805540 U CN 205805540U CN 201620687273 U CN201620687273 U CN 201620687273U CN 205805540 U CN205805540 U CN 205805540U
Authority
CN
China
Prior art keywords
lane
head bracket
terminal head
function terminal
longwell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620687273.2U
Other languages
Chinese (zh)
Inventor
孙如钢
刘国柱
钱建钢
钱洋喜
张亚龙
唐家鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN201620687273.2U priority Critical patent/CN205805540U/en
Application granted granted Critical
Publication of CN205805540U publication Critical patent/CN205805540U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a kind of longwell protrusive working face of coal seam mechanization and exploit complete set of equipments without lane, adopt coaling rocking arm or small-sized digger including laneway molding, exploit multi-function terminal head bracket and waste edge chock without lane;Laneway molding is adopted and is coaling rocking arm or small-sized digger is fixed on scrapper conveyor tail;Include paving top net device, anchor shaft anchor cable construction device without lane exploitation multi-function terminal head bracket, cut apical pore constructing device, vertical net laying apparatus, suspension device, self-advancing Device, push away tail apparatus;Without formed between lane exploitation multi-function terminal head bracket and transition bracket one cut apical pore drill and the space on top is cut in explosion;It is connected with scrapper conveyor without lane exploitation multi-function terminal head bracket, elapses a little each other;Waste edge chock is arranged in the described rear without lane exploitation multi-function terminal head bracket, and the inward flange in tunnel is arranged along the newly formed.Can realize without lane exploit, roadway support equipment all reclaims, reduce the coal mining impact on environment, the environmental nuisance in exploitation reducig later stage with resume work.

Description

Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
Technical field
This utility model relates to a kind of coal mine fully-mechanized mining coal-mining technique, particularly relates to a kind of longwell protrusive working face of coal seam machine Xie Huawu lane exploitation complete set of equipments.
Background technology
At present, China's coal-mine is combined and is adopted in coal winning technology, and roadway workface is generally adopted by the method for driuing along goaf.Along empty Driving is exactly in low stress field roadway layout, it is simple to roadway maintenance, reduces deflection, and it is it is crucial that strictly control coal column width Degree, the purpose of future small coal pillar is to be isolated with goaf in tunnel, prevents the water in goaf and harmful gas from sealing in tunnel, jeopardizes peace Full production, but its maintenance situation in tunnel is played a decisive role by coal pillar width, if coal column is too small, owing to the coal column by mined out side is propped up The impact of load in moulding, easy unstability, wall caving is serious, if coal column is excessive, then layout of actual mining roadway is in pressure increases district, Tunnel Pressure will be made big, supporting difficulty.
The process of driuing along goaf also exists serious defect and deficiency:
Exploitation cannot be reclaimed due to fender, cause coal resources waste;Due to the difference of various geological conditions, coal The more difficult control of suitable size of post;Every work surface needs two tunnels of digging, and human and material resources consume huge;The standard in subsequent duty face Standby workload is big, the time is long, affects coal mining efficiency.
Coal resources are disposable resource, and the response rate of coal resources is all paid much attention to by countries in the world, without coal pillar mining The most therefore the research and development of edge air gallery technology arises at the historic moment.
Gob side entry retaining coal-mining technique is that former stope drift active workings are safeguarded at edge, coal-face tailing edge goaf.In order to reclaim tradition Mining mode is stayed the safety pillar set, simultaneously in order to preferably safeguard that next adopts the tunnel in face, uses certain technological means The crossheading supporting again of a upper section is left for next section use.This way staying lane is former along edge, goaf The reservation of crossheading position is known as gob side entry retaining.
Gob side entry retaining is the maximally effective mining way currently without coal pillar mining, and it is more advanced than driuing along goaf mining type, But the intrinsic deficiency that this technology is from principle design highlights day by day.Gob side entry retaining means to safeguard former back production lane along edge, goaf Road, its premise is that first digging goes out tunnel, and this technology is only capable of few tunnel tunneling half than driuing along goaf, that is each work One tunnel of face digging.
Utility model content
The purpose of this utility model be to provide a kind of efficient, economic and environment-friendly longwell protrusive working face of coal seam mechanization without Lane exploitation complete set of equipments.
The purpose of this utility model is achieved through the following technical solutions:
Longwell protrusive working face of coal seam mechanization of the present utility model exploits complete set of equipments without lane, it is characterised in that bag Include laneway molding to adopt coaling rocking arm or small-sized digger, exploit multi-function terminal head bracket and waste edge chock without lane;
Described laneway molding is adopted and is coaling rocking arm or small-sized digger is fixed on scrapper conveyor tail;
Described without lane exploitation multi-function terminal head bracket include paving top net device, anchor shaft anchor cable construction device, cut apical pore construction Device, vertical net laying apparatus, suspension device, self-advancing Device, push away tail apparatus;
Described without lane exploitation multi-function terminal head bracket and transition bracket between formed one cut apical pore drill and explosion is cut The space on top, the length direction in space is the propelling length of a driving class;
Described without lane exploitation multi-function terminal head bracket be connected with scrapper conveyor, elapse a little each other;
Described waste edge chock is arranged in the described rear without lane exploitation multi-function terminal head bracket, the inner edge in tunnel along the newly formed Edge is arranged.
The technical scheme provided by above-mentioned this utility model is it can be seen that the longwell that this utility model embodiment provides advances Formula working face of coal seam mechanization exploits complete set of equipments without lane, and the exploitation in exploiting field, each coal seam, except the crossheading lane up and down in digging exploiting field Outside road, each adopt face combine adopt automatic lane forming, it is achieved without lane exploit, roadway support equipment all reclaims, and coal all reclaims, prolongation Mine life, improves social benefit;Save roadway support material, reduced and stay lane workload;Lasting exploit, reduces coal mining Impact on environment, the environmental nuisance in exploitation reducig later stage with resume work.
Accompanying drawing explanation
Fig. 1 is the layout schematic diagram of longwell protrusive working face of coal seam in this utility model embodiment.
The longwell protrusive working face of coal seam mechanization that Fig. 2 provides for this utility model embodiment exploits complete set of equipments without lane Layout schematic diagram.
In Fig. 3 a, Fig. 3 b respectively this utility model embodiment, laneway molding adopts the different operating state signal of rocking arm of coalingging Figure.
Fig. 4 is the side structure schematic diagram of this utility model embodiment Zhong Wu lane exploitation multi-function terminal head bracket.
Fig. 5 a, Fig. 5 b are the end face structure schematic diagram of this utility model embodiment Zhong Wu lane exploitation multi-function terminal head bracket.
Fig. 6 is joint-cutting drilling machine and the scheme of installation of a Mini-anchor Method rig in this utility model embodiment.
Fig. 7 a, Fig. 7 b, Fig. 7 c, Fig. 7 d be respectively in this utility model embodiment the right side of joint-cutting drilling machine depending on, main regard, left Depending on, overlook scheme of installation.
Fig. 8 is the layout schematic diagram of waste edge chock in this utility model embodiment.
In figure:
1-coal-winning machine;2-small-sized fixed position rocker arm of coal mining machine;3-scrapper conveyor;Paving top, 4-tunnel net device;5-opens without lane Adopt multi-function terminal head bracket;Anchor shaft anchor cable rig between 6-frame internal frame;The tunnel that the 7-face of adopting automatically forms;8-founds net laying apparatus; 9-waste edge chock;10-joint-cutting rig;11-transition bracket;12-force piece.
41-scrapper conveyor tail;Net fixing seat in top between 42-frame;The fixing seat of 43-support top net;The basic stake body of 44-;45-bores Hole machine oil press pump;56-back timber net guide.
51-back joint-cutting hole;52-back anchor shaft anchor cable;Net fixing seat in top between 53-frame;54-support top net is solid Reservation;55-back timber net guide.
61-joint-cutting drilling machine;62-Mini-anchor Method rig (i.e. anchor shaft anchor cable rig between 6-frame internal frame).
Detailed description of the invention
This utility model embodiment will be described in further detail below.
Longwell protrusive working face of coal seam mechanization of the present utility model exploits complete set of equipments without lane, and it is preferably concrete real The mode of executing is:
Adopt coaling rocking arm or small-sized digger including laneway molding, exploit multi-function terminal head bracket and waste edge chock without lane;
Described laneway molding is adopted and is coaling rocking arm or small-sized digger is fixed on scrapper conveyor tail;
Described without lane exploitation multi-function terminal head bracket include paving top net device, anchor shaft anchor cable construction device, cut apical pore construction Device, vertical net laying apparatus, suspension device, self-advancing Device, push away tail apparatus;
Described without lane exploitation multi-function terminal head bracket and transition bracket between formed one cut apical pore drill and explosion is cut The space on top, the length direction in space is the propelling length of a driving class;
Described without lane exploitation multi-function terminal head bracket be connected with scrapper conveyor, elapse a little each other;
Described waste edge chock is arranged in the described rear without lane exploitation multi-function terminal head bracket, the inner edge in tunnel along the newly formed Edge is arranged.
The diameter of cylinder that described laneway molding adopts coaling rocking arm or small-sized digger is straight less than the cylinder of working surface coal mining machine Footpath, described laneway molding is adopted rocking arm of coalingging and is used the structure of two joints.
Described multi-function terminal head bracket uses unsplit bedplate and the structure of split left and right back timber, is scraped with described by pusher rod Trigger is connected, and reserves anchor shaft anchor cable construction space between split left and right back timber, and top net net volume is installed on fixed mount, passes through Net guide on back timber is walked around back timber front end overlap joint and is laid on top board.
Described apical pore constructing device of cutting includes joint-cutting drilling machine and a Mini-anchor Method rig, described joint-cutting drilling machine and institute The base stating multi-function terminal head bracket is hinged, and described joint-cutting drilling machine has joint-cutting hole drill and two drill booms of anchor shaft anchor cable hole drill, institute State Mini-anchor Method rig to be located at along the guide rail longitudinally laid along support in the middle part of base.
Described waste edge chock is with described multi-function terminal head bracket without being connected, and waste edge chock group postpones, before using, the structure drawn, Described waste edge chock uses the structure of split back timber.
Longwell protrusive working face of coal seam mechanization of the present utility model exploits complete set of equipments, multi-function terminal head bracket without lane Integrate supporting, anchor shaft anchor cable construction, joint-cutting is holed, net vertical net laying in top sets function, it is achieved mechanization Qie Dingcheng Xiang Wu opens in lane Adopt, mainly solve work surface and become the mechanization concentration of multiple function at heading tail to realize in order:
Driuing along goaf roadway workface and the anchor shaft anchor cable construction in gob side entry retaining tunnel, top net laying set combined supporting, all exist Carry out constructing operation when becoming lane, interfere with working face equipment and operation nothing;Qie Dingliu lane cut drilling and blast working of apical pore, All carry out in tunnel, work surface front, interfere with working face equipment and operation nothing.Use longwell protrusive working face of coal seam machine Xie Huawu lane exploitation time, anchor pole, anchor cable, top net combined supporting, cut apical pore drill and top is cut in explosion, will become at work surface Realize at heading tail.
During the mechanization supporting of Qie Dingliu lane, vertical net lay-up operation is at tail.Use longwell protrusive working face of coal seam machine Xie Huawu lane is exploited, and vertical net lay-up operation still needs to becoming realization at heading tail.
Use longwell protrusive working face of coal seam mechanization to exploit without lane, becoming, at heading tail, special equipment need to be set, To realize laneway molding and requirement of coalingging.
The supporting in working surface tail tunnel and the mechanization realization of function above, the supporting and layout of relevant device, operation Carry out in order and operating procedure, and meet the regulation of related specifications code.
Application this utility model, the upper gate road in exploiting field, digging coal seam and lower gate road, gate road along exploiting field Arranging work surface and carry out back production, under work surface, crossheading position is cut top pressure release, is automatically formed tunnel, and as subsequent work face Upper gate road, go round and begin again, until adopting complete exploiting field, coal seam, it is achieved coal seam, exploiting field without lane exploitation.
Specific embodiment:
1) general layout:
As shown in Figure 1 and Figure 2, rocking arm of coalingging is adopted including laneway molding, without lane exploitation multi-function terminal head bracket and waste edge chock Three parts.
Laneway molding is adopted rocking arm of coalingging and is fixed on scrapper conveyor tail.
Function without lane exploitation multi-function terminal head bracket includes: paving is pushed up net, anchor shaft anchor cable construction, cut apical pore construction, vertical net Laying, supporting, certainly move, push away the functions such as tail.
Between multi-function terminal head bracket and transition bracket, formed one cut apical pore drill and the space on top is cut in explosion, long Degree direction is the propelling length of a driving class.
Multi-function terminal head bracket is connected with scrapper conveyor, elapses a little each other.
Waste edge chock is arranged in the rear of multi-function terminal head bracket, and tunnel inward flange is arranged along the newly formed, according to adopting shadow Sound region, about 30~40 meters.
2) laneway molding adopts rocking arm of coalingging:
(1) small-sized rocker arm of coal mining machine is fixed on scrapper conveyor tail, and diameter of cylinder reduces, and cuts and deep cuts deep with working surface coal mining machine Identical.
(2) as shown in Fig. 3 a, 3b, small-sized rocker arm of coal mining machine uses the form of two joints, it is possible to is scraped mining and is transported to work Face coal-winning machine can be coaling in region, thus ensures that tail becomes lane coal all to be transported by scrapper conveyor.
(3) minor diameter cylinder can reduce tunnel and form arc angle, it is simple to equipment and walk in tunnel.
3) multi-function terminal head bracket:
(1) as shown in Figure 4, the function without lane exploitation multi-function terminal head bracket includes: paving is pushed up net, anchor shaft anchor cable construction, cut Apical pore construction, vertical net laying set, supporting, certainly move, push away the functions such as tail.
(2) support uses unsplit bedplate and the form of split left and right back timber, is connected with scrapper conveyor by pusher rod, it is achieved The supporting of support, certainly shifting and the function of passage tail.
(3) split left and right back timber reserves anchor shaft anchor cable construction space;
(4) as shown in Fig. 5 a, Fig. 5 b, top net net volume is installed on fixed mount, by the net guide on set cap, around Cross back timber front end overlap joint to be laid on top board.
(5) as shown in Figure 6, joint-cutting drilling machine is connected with bracket base in an articulated manner, and joint-cutting rig has two drill booms, Drilling slot apertures can bore again anchor shaft anchor cable hole.One Mini-anchor Method rig is fixed on base, between the back timber of left and right, can along Frame longitudinal direction slide anteroposterior, the roofbolt anchor cable between the back timber of construction bracket left and right.One Mini-anchor Method rig passes through water Two grades of hinge bars of flattened receipts are fixed on bracket base, the anchor shaft anchor cable of top board between scaffold.
(6) as shown in Fig. 7 a, 7b, 7c, 7d, joint-cutting rig is similar with stent length, two slide anteroposterior and left and right pendulum Dynamic.Joint-cutting rig afterbody is provided with vertical net mounting seat, couples, before support (joint-cutting rig) with top net after vertical net unfolding Moving, vertical net is automatically laid and is opened.
4) waste edge chock
As shown in Figure 8, waste edge chock is placed in the rear of multi-function terminal head bracket, with face end support without being connected.According to adopting The zone of influence, can arrange 30~40 meters, and waste edge chock group postpones, before using, the moving manner drawn.Waste edge chock is arranged and tunnel joint-cutting Edge, utilizes its support force and roof pressure to be disconnected along joint-cutting hole by top board, makes tunnel become the structure that short cantilever beam is more stable. Waste edge chock uses the form of split back timber, it is to avoid damage back anchor shaft anchor cable device.
The beneficial effects of the utility model:
1) application of the present utility model, the exploitation in exploiting field, each coal seam, in addition to the gate road up and down in digging exploiting field, each Face of adopting is combined and is adopted automatic lane forming, it is achieved exploiting without lane, the common driuing along goaf back production mode of ratio, each work surface tunnels 2 lanes less Road, reduces and puts into six to eight thousand ten thousand yuan, have good economic benefit.
2) application of the present utility model, it is achieved without coal pillar mining, roadway support equipment all reclaims, and making to adopt rear work surface can Bulk settling, will not cause damage to earth's surface building etc., also helps holding lithic drainage and is not destroyed.Of the present utility model should Low infringement lasting exploit is belonged to exploitation.
3) application of the present utility model, it is possible to coal supply mine belt carrys out substantive benefit.Reduce tunnelling amount, alleviate and continue tightly ?;Save driving expense, improve overall economic efficiency;Coal all reclaims, and extends mine life, improves social benefit;Save Roadway support material, reduces and stays lane workload;Lasting exploit, reduces the coal mining impact on environment, exploitation reducig later stage Environmental nuisance with resume work.
The above, only this utility model preferably detailed description of the invention, but protection domain of the present utility model is not Being confined to this, any those familiar with the art, in the technical scope that this utility model discloses, can readily occur in Change or replacement, all should contain within protection domain of the present utility model.Therefore, protection domain of the present utility model should It is as the criterion with the protection domain of claims.

Claims (5)

1. a longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane, it is characterised in that include laneway molding Adopt coaling rocking arm or small-sized digger, exploit multi-function terminal head bracket and waste edge chock without lane;
Described laneway molding is adopted and is coaling rocking arm or small-sized digger is fixed on scrapper conveyor tail;
Described without lane exploitation multi-function terminal head bracket include paving top net device, anchor shaft anchor cable construction device, cut apical pore constructing device, Found net laying apparatus, suspension device, self-advancing Device, push away tail apparatus;
Described without lane exploitation multi-function terminal head bracket and transition bracket between formed one cut apical pore drill and top is cut in explosion Space, the length direction in space is the propelling length of a driving class;
Described without lane exploitation multi-function terminal head bracket be connected with scrapper conveyor, elapse a little each other;
Described waste edge chock is arranged in the described rear without lane exploitation multi-function terminal head bracket, the inward flange cloth in tunnel along the newly formed Put.
Longwell protrusive working face of coal seam mechanization the most according to claim 1 exploits complete set of equipments without lane, and its feature exists In, described laneway molding adopts the diameter of cylinder diameter of cylinder less than working surface coal mining machine of coaling rocking arm or small-sized digger, institute State laneway molding and adopt the structures of rocking arm employing two joint of coalingging.
Longwell protrusive working face of coal seam mechanization the most according to claim 1 exploits complete set of equipments without lane, and its feature exists In, described multi-function terminal head bracket uses unsplit bedplate and the structure of split left and right back timber, by pusher rod and described scrapper conveyor Being connected, reserve anchor shaft anchor cable construction space between split left and right back timber, top net net volume is installed on fixed mount, passes through back timber On net guide walk around back timber front end overlap joint be laid on top board.
Longwell protrusive working face of coal seam mechanization the most according to claim 1 exploits complete set of equipments without lane, and its feature exists In, described in cut apical pore constructing device and include joint-cutting drilling machine and a Mini-anchor Method rig, described joint-cutting drilling machine is with described many The base of function end head bracket is hinged, and described joint-cutting drilling machine has joint-cutting hole drill and two drill booms of anchor shaft anchor cable hole drill, described little Type jumbolter is located at along the guide rail longitudinally laid along support in the middle part of base.
Longwell protrusive working face of coal seam mechanization the most according to claim 1 exploits complete set of equipments without lane, and its feature exists In, described waste edge chock with described multi-function terminal head bracket without being connected, waste edge chock group postpones, before using, the structure drawn, described in cut Ceiling hold uses the structure of split back timber.
CN201620687273.2U 2016-06-30 2016-06-30 Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane Active CN205805540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620687273.2U CN205805540U (en) 2016-06-30 2016-06-30 Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620687273.2U CN205805540U (en) 2016-06-30 2016-06-30 Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane

Publications (1)

Publication Number Publication Date
CN205805540U true CN205805540U (en) 2016-12-14

Family

ID=57513363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620687273.2U Active CN205805540U (en) 2016-06-30 2016-06-30 Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane

Country Status (1)

Country Link
CN (1) CN205805540U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952453A (en) * 2016-06-30 2016-09-21 中煤北京煤矿机械有限责任公司 Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN108049896A (en) * 2017-12-19 2018-05-18 河南力行科创矿山技术开发有限公司 A kind of fully mechanized coal face gob-side entry retaining method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952453A (en) * 2016-06-30 2016-09-21 中煤北京煤矿机械有限责任公司 Long wall advancing type mechanical non-roadway mining complete plant for coal seam face
CN108049896A (en) * 2017-12-19 2018-05-18 河南力行科创矿山技术开发有限公司 A kind of fully mechanized coal face gob-side entry retaining method

Similar Documents

Publication Publication Date Title
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN108222934B (en) Equipment system of roadway-free coal-pillar-free self-retained roadway mining method
CN100554642C (en) A kind of method of long-wall integrated-extraction reclaiming room-type coal column mining
CN101775991B (en) Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face
CN101749018B (en) Coal mining method with direct coal pillar recovery
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN105089668A (en) Longwall working face coal-pillar-free mining method
CN110259451A (en) A kind of efficient mining methods of gently inclined medium thick orebody Pre-control roof
CN103643979A (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN202500562U (en) Excavating, supporting and anchoring parallel operating system
CN102661144B (en) Method for determining anchoring depth of anchor cable along deep lane wall of empty crossheading entity coal side
CN107091091A (en) A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN103899342A (en) Gob-side entrydriving coal pillar anchor cable through reinforcing method
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
CN104074534B (en) A kind of combining adopts/the gob-side entry retaining method of fully mechanized coal face
CN107355223A (en) A kind of stope drift active workings gob-side entry retaining method suitable for easy inbreak top plate
CN109538224A (en) A kind of novel coal lane high-speed driving machine
CN105909284B (en) A kind of high working face coal wall caving prevents control method
CN114592909A (en) Downward layered access filling mining method for extremely-broken thick and large ore body
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN205805540U (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN104265294A (en) Coal pillar-free mining technology for blasting mining face of steeply dipping seam
CN107956481A (en) A kind of suspension device for superelevation tunnel gob side entry retaining
CN209494569U (en) A kind of novel coal lane high-speed driving machine
CN111828073A (en) Novel roadway support device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant