CN102392667B - Fast installation method of ten-million-ton scale fully mechanized caving face equipment - Google Patents

Fast installation method of ten-million-ton scale fully mechanized caving face equipment Download PDF

Info

Publication number
CN102392667B
CN102392667B CN 201110317732 CN201110317732A CN102392667B CN 102392667 B CN102392667 B CN 102392667B CN 201110317732 CN201110317732 CN 201110317732 CN 201110317732 A CN201110317732 A CN 201110317732A CN 102392667 B CN102392667 B CN 102392667B
Authority
CN
China
Prior art keywords
hydraulic support
wide
eye
cutting
array pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110317732
Other languages
Chinese (zh)
Other versions
CN102392667A (en
Inventor
辛恒奇
王乃国
董兆科
李志深
陈培国
张治高
李加春
李先锋
郑志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XINJULONG ENERGY CO Ltd
Original Assignee
SHANDONG XINJULONG ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XINJULONG ENERGY CO Ltd filed Critical SHANDONG XINJULONG ENERGY CO Ltd
Priority to CN 201110317732 priority Critical patent/CN102392667B/en
Publication of CN102392667A publication Critical patent/CN102392667A/en
Application granted granted Critical
Publication of CN102392667B publication Critical patent/CN102392667B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a fast installation method of ten-million-ton scale fully mechanized caving face equipment and belongs to sinking and driving engineering of mines. The method is innovatively characterized in that open-off cuts on a working surface are widen to improve the transportation mode and installation method of a hydraulic support and the supporting mode of the open-off cuts. By virtue of the improvements, the installation time of the ten-million-ton scale fully mechanized caving face equipment is realized, the construction period is shortened and the installation progress of the working surface is accelerated.

Description

Ten-million-ton scale fully mechanized coal face equipment method for rapidly mounting
Technical field
The present invention relates to mine tunnel engineering, be mainly used in fully mechanized coal face and cut the expansion of eye brush and equipment installation project.
Background technology
At present, the colliery ten-million-ton scale is combined and to be adopted, when fully mechanized coal face equipment is installed, and at first the construction working face is cut eye, because equipment is huge, cut a span generally at 8-10m, cut the eye construction back that finishes and adopt the individual prop align reaming to connect back timber it is added strong supporting, and then carry out the working face equipment installation work.Remove individual prop again when equipment is installed, be changed to fully mechanized mining supporter.
Brought the problem of following three aspects thus:
(1) work plane cut the eye fully the construction finish the back span bigger, workload is big when adopting individual prop to add strong supporting, need set more than 1000 of individual prop, and installation period is grown the difficulty height, and the operating space that hydraulic support is installed is little, causes potential safety hazard to roof control.
(2) cut equipment such as carrying out hydraulic support after the eye construction finishes again at work plane and install, cause the work plane set-up time longer, influence the operation progress.
(3) because the hydraulic support transit route is longer, adopt the monorail crane travelling speed slower, adopt bracket carrier to harden to the transit route base plate separately, workload is big, and the duration is longer.Resistance is bigger when using winch haul support, and is more serious to roadway floor destruction, and transportation safety is caused big hidden danger.
Summary of the invention:
The present invention provides a kind of ten-million-ton scale fully mechanized coal face equipment method for rapidly mounting for addressing the above problem.
Mounting method of the present invention is as follows:
After the upper and lower gallery developing in exploiting field, at wide 4.5 meters, high 3.7 meters common eye of cutting of pre-mining face developing, form ventilation circulation system; It is characterized in that,
(1) the hydraulic support transportation resources is:
(1) hydraulic support is split aboveground, after the shaft station re-assemblies, transport to and change the outfit a little, adopt directly hydraulic support to be transported to after the bracket carrier entrucking and cut a upper end.Three is one group during unwheeling carrying hydraulic support, the safety when guaranteeing the transportation of upper and lower slope;
When (2) bracket carrier is carried, lay hinged viaduct at gate top, hinged viaduct adopts i iron and checkered plates to be welded into a piece bed board, and is hinged again, is layered on the gate top road surface, and the viaduct surface increases rubbing surface and props up a unwheeling climbing capacity to improve;
(3) upper end of autotomying is laid slide plate downwards along work plane, to reduce the friction of hydraulic support and base plate; After hydraulic support arrives upper end, utilize winch to adjust the direction of hydraulic support, guarantee that the hydraulic support direction is parallel with work plane, and hydraulic support is adjusted to the slide plate center; Reduce the hydraulic support height, its center of gravity is descended, occur the phenomenon that skews when avoiding with winch pull-down hydraulic support; Cutting winch of tip placement now, hydraulic support is pulled down to the installation site along slide plate;
(2) cut the wide and hydraulic support installation construction synchronously of eye brush
(1) cut now the termination from work plane and begin its brush widely, brushing wide degree is 5.3m, forms the width spaces that is easy to install hydraulic support of 9.8 meters of width;
(2) after cutting the wide 30 meters length of eye brush, begin to install hydraulic support; Earlier advance timbering is moved to new position, vacates the position of hydraulic support, with hydraulic support is drop-down put in place after, utilize that tail boom and plate cooperate winch that the hydraulic support direction is adjusted to and the work plane upright position behind the hydraulic support.All this group hydraulic support is carried out fluid injection behind one group of hydraulic support of every installation, guarantee that the hydraulic support setting load reaches 24Mpa, opens hydraulic support extensible canopy and face guard simultaneously; The limit is installed the hydraulic support limit and is brushed the wide eye of cutting, the limit secondary supporting, and advance timbering is removed on the limit, and order is carried out, and installs until entire working surface equipment;
(3) cut the eye supporting method be:
(1) at first driving is cut a top board and is selected for use the left-handed high strength anchor bar of KMG500 Φ 22 * 2500mm to join the supporting of W steel band compressed steel muscle weldering net, and array pitch is 850 * 1000mm between the left-handed high strength anchor bar of KMG500 Φ 22 * 2500mm; Two help to adopt Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength to join the W steel band presses two anti-net supportings, and array pitch is 750 * 1000mm between Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength; First anchor cable is arranged in the top board place between the steel band of tunnel, the construction of jacking coal, and an array pitch is 2250 * 2000mm; The first anchor cable length 10.3m;
(2) the wide top board of cutting of secondary brush selects for use the left-handed high strength anchor bar of Φ 22 * 2500mm to join the supporting of W steel band compressed steel muscle weldering net, and array pitch is 900 * 1000mm between the left-handed high strength anchor bar of Φ 22 * 2500mm; The group's face after wide brushed adopts Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength to join the W steel band and presses two anti-net supportings, array pitch 850 * 1000mm between Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength anchor pole; When running into breaking roof, top board adopts second anchor cable to add strong supporting, and the second anchor cable specification is Φ 18.9 * 10.3m, and an array pitch is 2250 * 1000mm; Immediately following driving face, install row's individual prop and add strong supporting along a former center line of cutting, up along with the brush width position, along arranging in the lane that two row's advance timberings carry out supporting, an array pitch is 1m at the rear portion.
Beneficial effect of the present invention:
(1) optimizes the roof timbering scheme of cutting of the nearly 10 meters big sections of width, cancelled top board anchor cable truss and added strong supporting and hydraulic pressure monomer reinforce support, reduced site operation labour intensity, reduced the supporting expense.Realize the support installation simultaneously and cut the parallel operations that the eye brush expands, guaranteed to install every day 4-5 frame support, shortened construction period, accelerated the work plane installation progress.
(2) if transport according to original method, need harden to roadway floor, the required duration has relatively high expectations than long and hardening strength, and the later stage need keep in repair.And after adopting bracket carrier to cooperate this mode of the hinged viaduct of steel plate, hinged viaduct intensity can satisfy movement requirement, has both improved travelling speed, has saved the time, can avoid waste of material again.
(3) slide plate cooperates the application of the means of transportation of winch, has also improved and has cut a safety of position support transportation, has avoided " eating the end " phenomenon in the transportation, has reduced the destruction to the tunnel.
Description of drawings
Fig. 1 is work plane layout plan of the present invention;
Fig. 2 is the face timbering profile.
Among the figure: 1-cuts a upper end, the common eye of cutting of 2-, and the 3-slide plate, the 4-hydraulic support, the 5-lower end, the 6-advance timbering, 7-brushes the wide eye of cutting, the 8-individual prop, 9-reinforcing bar weldering net, the left-handed high strength anchor bar of 10-, 11-first anchor cable, 12-second anchor cable, the 13-Bolt with Full Screw Threads and Equal Strength,
The specific embodiment
As depicted in figs. 1 and 2, after the upper and lower gallery developing in exploiting field, at wide 4.5 meters, high 3.7 meters common eye 2 of cutting of pre-mining face developing, form ventilation circulation system; Wherein:
(1) the hydraulic support transportation resources is:
(1) hydraulic support 4 is split aboveground, after the shaft station re-assemblies, transport to and change the outfit a little, adopt directly hydraulic support 4 to be transported to after the bracket carrier entrucking and cut a upper end 1, three is one group during unwheeling transporting supports, the safety when guaranteeing the transportation of upper and lower slope.
When (2) bracket carrier is carried, lay hinged viaduct at gate top, hinged viaduct adopts i iron and checkered plates 3 to be welded into a piece bed board, and is hinged again, is layered on the gate top road surface, and the viaduct surface increases rubbing surface and props up a unwheeling climbing capacity to improve.
(3) upper end 1 of autotomying is laid slide plate 3 downwards along work plane, to reduce the friction of support and base plate; Support utilizes winch to adjust the direction of support behind Dutch eye upper end 1, guarantees that holder orientation is parallel with work plane, and support is adjusted to slide plate 3 centers; Reduce support height, its center of gravity is descended, occur the phenomenon that skews when avoiding with the drop-down support of winch; Cutting winch of termination 5 layouts now, hydraulic support 4 is pulled down to the installation site along slide plate 3.
(2) cut the wide and hydraulic support installation construction synchronously of eye brush
(1) cut now termination 5 from work plane and begin its brush widely, brushing wide degree is 5.3m, forms the width spaces that is easy to install hydraulic support of 9.8 meters of width;
(2) after cutting the wide 30 meters length of eye brush, begin to install hydraulic support 4; Earlier advance timbering 6 is moved to new position, vacate the position of hydraulic support 4, after hydraulic support 4 drop-down putting in place, utilize hydraulic support 4 back tail booms and plate to cooperate winch that hydraulic support 4 directions are adjusted to and the work plane upright position.All this group hydraulic support 4 is carried out fluid injection behind one group of hydraulic support 4 of every installation, guarantee that hydraulic support 4 setting loads reach 24Mpa, open hydraulic support 4 extensible canopies and face guard simultaneously; The limit is installed hydraulic support 4 limits and is brushed the wide eye 7 of cutting, the limit secondary supporting, and advance timbering 6 is removed on the limit, and order is carried out, and installs until entire working surface equipment;
(3) cut the eye supporting method be:
(1) common eye 2 top boards of cutting select for use the left-handed high strength anchor bar 10 of KMG500 Φ 22 * 2500mm to join 9 supportings of W steel band compressed steel muscle weldering net, and 10 array pitch of the left-handed high strength anchor bar of KMG500 Φ 22 * 2500mm are 850 * 1000mm; Two help to adopt Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength 13 to join the W steel band presses two anti-net supportings, and array pitch is 750 * 1000mm between Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength; First anchor cable 11 is arranged in the top board place between the steel band of tunnel, the construction of jacking coal, and an array pitch is 2250 * 2000mm; First anchor cable, 11 length 10.3m.
(2) wide eye 7 top boards of cutting of secondary brush select for use the left-handed high strength anchor bar 10 of Φ 22 * 2500mm to join 9 supportings of W steel band compressed steel muscle weldering net, and 10 array pitch of the left-handed high strength anchor bar of Φ 22 * 2500mm are 900 * 1000mm; The group's face after wide brushed adopts Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength 13 to join the W steel band and presses two anti-net supportings, 13 array pitch 850 * 1000mm of Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength; When running into breaking roof, top board adopts second anchor cable 13 to add strong supporting, and second anchor cable, 13 specifications are Φ 18.9 * 10.3m, and an array pitch is 2250 * 1000mm; Immediately following driving face, install row's individual prop 8 and add strong supporting along a former center line of cutting, up along with the brush width position, along arranging in the lane that two row's advance timberings 6 carry out supporting, an array pitch is 1m at the rear portion;

Claims (1)

1. ten-million-ton scale fully mechanized coal face equipment method for rapidly mounting, it is after the upper and lower gallery developing in exploiting field, at wide 4.5 meters, high 3.7 meters common eye of cutting of pre-mining face developing, forms ventilation circulation system; It is characterized in that,
(1) the hydraulic support transportation resources is:
(1) hydraulic support is split aboveground, after the shaft station re-assemblies, transport to and change the outfit a little, adopt directly hydraulic support to be transported to after the bracket carrier entrucking and cut a upper end; Three is one group during bracket carrier carrying hydraulic support, the safety when guaranteeing the transportation of upper and lower slope;
When (2) bracket carrier is carried, lay hinged viaduct at gate top, hinged viaduct adopts i iron and checkered plates to be welded into a piece bed board, and is hinged again, is layered on the gate top road surface, and the viaduct surface increases rubbing surface and props up a unwheeling climbing capacity to improve;
(3) upper end of autotomying is laid slide plate downwards along work plane, to reduce the friction of hydraulic support and base plate; Hydraulic support utilizes winch to adjust the direction of hydraulic support behind Dutch eye upper end, guarantees that the hydraulic support direction is parallel with work plane, and hydraulic support is adjusted to the slide plate center; Reduce the hydraulic support height, its center of gravity is descended, occur the phenomenon that skews when avoiding with winch pull-down hydraulic support; Cutting winch of tip placement now, hydraulic support is pulled down to the installation site along slide plate;
(2) cut the wide and hydraulic support installation construction synchronously of eye brush
(1) cut now the termination from work plane and begin its brush widely, brushing wide degree is 5.3m, forms the width spaces that is easy to install hydraulic support of 9.8 meters of width;
(2) after cutting the wide 30 meters length of eye brush, begin to install hydraulic support; Earlier advance timbering is moved to new position, vacates the position of hydraulic support, with hydraulic support is drop-down put in place after, utilize that tail boom and plate cooperate winch that the hydraulic support direction is adjusted to and the work plane upright position behind the hydraulic support; All this group hydraulic support is carried out fluid injection behind one group of hydraulic support of every installation, guarantee that the hydraulic support setting load reaches 24Mpa, opens hydraulic support extensible canopy and face guard simultaneously; The limit is installed the hydraulic support limit and is brushed the wide eye of cutting, the limit secondary supporting, and advance timbering is removed on the limit, and order is carried out, and installs until entire working surface equipment;
(3) cut the eye supporting method be:
(1) at first driving is cut a top board and is selected for use the left-handed high strength anchor bar of KMG500 Φ 22 * 2500mm to join the supporting of W steel band compressed steel muscle weldering net, and array pitch is 850 * 1000mm between the left-handed high strength anchor bar of KMG500 Φ 22 * 2500mm; Two help to adopt Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength to join the W steel band presses two anti-net supportings, and array pitch is 750 * 1000mm between Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength; First anchor cable is arranged in the top board place between the steel band of tunnel, the construction of jacking coal, and an array pitch is 2250 * 2000mm; The first anchor cable length 10.3m;
(2) the wide top board of cutting of secondary brush selects for use the left-handed high strength anchor bar of Φ 22 * 2500mm to join the supporting of W steel band compressed steel muscle weldering net, and array pitch is 900 * 1000mm between the left-handed high strength anchor bar of Φ 22 * 2500mm; The group's face after wide brushed adopts Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength to join the W steel band and presses two anti-net supportings, array pitch 850 * 1000mm between Φ 22 * 2500mm Bolt with Full Screw Threads and Equal Strength anchor pole; When running into breaking roof, top board adopts second anchor cable to add strong supporting, and the second anchor cable specification is Φ 18.9 * 10.3m, and an array pitch is 2250 * 1000mm; Immediately following driving face, install row's individual prop and add strong supporting along a former center line of cutting, up along with the brush width position, along arranging in the lane that two row's advance timberings carry out supporting, an array pitch is 1m at the rear portion.
CN 201110317732 2011-10-19 2011-10-19 Fast installation method of ten-million-ton scale fully mechanized caving face equipment Expired - Fee Related CN102392667B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110317732 CN102392667B (en) 2011-10-19 2011-10-19 Fast installation method of ten-million-ton scale fully mechanized caving face equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110317732 CN102392667B (en) 2011-10-19 2011-10-19 Fast installation method of ten-million-ton scale fully mechanized caving face equipment

Publications (2)

Publication Number Publication Date
CN102392667A CN102392667A (en) 2012-03-28
CN102392667B true CN102392667B (en) 2013-07-03

Family

ID=45860035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110317732 Expired - Fee Related CN102392667B (en) 2011-10-19 2011-10-19 Fast installation method of ten-million-ton scale fully mechanized caving face equipment

Country Status (1)

Country Link
CN (1) CN102392667B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817626B (en) * 2012-05-07 2014-09-17 淮南矿业(集团)有限责任公司 Hydraulic support roping rigging and roping system
CN103061771B (en) * 2012-12-20 2015-10-21 大同煤矿集团有限责任公司 Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN105041359A (en) * 2015-05-29 2015-11-11 苏州贝多环保技术有限公司 Mounting method of hydraulic support of fully mechanized coal mining face
CN107152307B (en) * 2017-06-19 2019-04-23 徐州工程学院 Coal face hydraulic support transport and installation method
CN109653773A (en) * 2019-01-31 2019-04-19 淮北矿业(集团)有限责任公司 Fully-mechanized mining working expands peace integral process and method
CN110242307B (en) * 2019-06-28 2020-11-10 山东新巨龙能源有限责任公司 Method for hole cutting, digging, supporting and brushing expansion of fully mechanized caving face of high-stress water-rich roof
CN113586137B (en) * 2021-09-03 2022-06-17 淮南矿业(集团)有限责任公司 Hydraulic support transportation and reloading system and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB395754A (en) * 1932-01-22 1933-07-24 Stanley Walton Brown Improvements in or relating to loading or conveying systems for use in mines or the like
DE3522840C1 (en) * 1985-06-26 1986-04-24 Maschinenfabrik Glückauf Beukenberg GmbH & Co, 4650 Gelsenkirchen Device for the longitudinal displacement of a short gate conveyor relative to an abutment
CN101349159A (en) * 2008-08-23 2009-01-21 山西焦煤集团有限责任公司 Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN102094675A (en) * 2010-12-31 2011-06-15 大同煤矿集团有限责任公司 Safe moving and withdrawing method of complex-structured thick coal seam fully mechanized heavy equipment
CN102102526A (en) * 2010-12-30 2011-06-22 枣庄矿业集团新安煤业有限公司 Coal mine roadway supporting method and working face hole-cutting anchor mesh ladder and individual supporting device used by same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB395754A (en) * 1932-01-22 1933-07-24 Stanley Walton Brown Improvements in or relating to loading or conveying systems for use in mines or the like
DE3522840C1 (en) * 1985-06-26 1986-04-24 Maschinenfabrik Glückauf Beukenberg GmbH & Co, 4650 Gelsenkirchen Device for the longitudinal displacement of a short gate conveyor relative to an abutment
CN101349159A (en) * 2008-08-23 2009-01-21 山西焦煤集团有限责任公司 Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN102102526A (en) * 2010-12-30 2011-06-22 枣庄矿业集团新安煤业有限公司 Coal mine roadway supporting method and working face hole-cutting anchor mesh ladder and individual supporting device used by same
CN102094675A (en) * 2010-12-31 2011-06-15 大同煤矿集团有限责任公司 Safe moving and withdrawing method of complex-structured thick coal seam fully mechanized heavy equipment

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴征亮等.综采工作面"边刷边安"安装工艺在新集矿区的实际应用.《科技视野决策管理》.2008,59.
李强.综采边开帮边安装支架工艺的实践.《煤炭技术》.2009,第28卷(第8期),60-62.
综采工作面"边刷边安"安装工艺在新集矿区的实际应用;吴征亮等;《科技视野决策管理》;20080410;59 *
综采边开帮边安装支架工艺的实践;李强;《煤炭技术》;20090831;第28卷(第8期);60-62 *

Also Published As

Publication number Publication date
CN102392667A (en) 2012-03-28

Similar Documents

Publication Publication Date Title
CN102392667B (en) Fast installation method of ten-million-ton scale fully mechanized caving face equipment
CN101349159B (en) Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN101775991B (en) Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN102337904B (en) Method for retaining gob-side tunnel
CN101372891B (en) Strip filling integral backstopping coal mining method
CN101514633B (en) Non-roadside supporting gob-side entry retaining process
EA037982B1 (en) Method for pillarless mining with self-preserving development without roadway development at mining area
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN103670425B (en) Formula lifting migration rack mechanical hand is carried in an a kind of pick integral method and development machine holder
CN110455140B (en) Cutting construction method for high-strength rock stratum mountain tunnel
CN103410545A (en) Hydraulic support capable of realizing top coal caving and filling operation
CN102536229A (en) Tunneling, protecting and anchoring parallel work system and construction technology
CN104895592A (en) Fully-mechanized coal mining and caving face support retracement supporting method
CN203362198U (en) Track walking type immediate support device of fully-mechanized drivage roadway
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN105134212A (en) Method for ensuring fully-mechanized top coal caving recovery rate of three-soft thick coal seam roadway tunneling along top
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN104863599A (en) Fully-mechanized mining face synchronous slope expansion and installation method and supporting system
CN102536277B (en) Follower assorted supporting and anchoring system of cantilever type development machine
CN204691807U (en) Fully-mechanized mining working synchronously expands side and installs support system
CN204716236U (en) An a kind of automatic moving type pick unit with pressure
CN106761873A (en) It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone
CN102425417A (en) Anchor cable and rough wall combined method for gob-side entry retaining stage under collapsible roof
CN202659267U (en) Integral graded spanning-type walking bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20151019

EXPY Termination of patent right or utility model