CN109653773A - Fully-mechanized mining working expands peace integral process and method - Google Patents

Fully-mechanized mining working expands peace integral process and method Download PDF

Info

Publication number
CN109653773A
CN109653773A CN201910097905.8A CN201910097905A CN109653773A CN 109653773 A CN109653773 A CN 109653773A CN 201910097905 A CN201910097905 A CN 201910097905A CN 109653773 A CN109653773 A CN 109653773A
Authority
CN
China
Prior art keywords
brush
fully
expands
mechanized mining
expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910097905.8A
Other languages
Chinese (zh)
Inventor
方良才
聂政
程新明
王多春
戴习奎
吴凤鸣
张世泰
张�浩
谢传博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Group Co Ltd
Original Assignee
Huaibei Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Group Co Ltd filed Critical Huaibei Mining Group Co Ltd
Priority to CN201910097905.8A priority Critical patent/CN109653773A/en
Publication of CN109653773A publication Critical patent/CN109653773A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/14Telescopic props
    • E21D15/44Hydraulic, pneumatic, or hydraulic-pneumatic props
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of fully-mechanized mining workings of the invention to expand peace integral process, belong to coal mine mining technical field, the operation mode that lore brush expands, installs afterwards is cut in the traditional fully mechanized mining of the process reform, the expansion of eye brush is cut into fully mechanized mining and equipment installation is integrated, realize that two process collaboration construction operations, technique Core equipment are to expand to pacify integrated outfit and hydraulic support installation fork truck.The installation speed of fully-mechanized mining working is improved, and then promotes the efficiency of coal mining and the labor intensity of worker.

Description

Fully-mechanized mining working expands peace integral process and method
Technical field
The present invention relates to coal mine mining technical fields, pacify integrated chemical industry specifically, expanding the present invention relates to fully-mechanized mining working Skill and method.
Background technique
The coal resource in China is abundant, coalfield distribution is wide, is a coal mining big country, with the quick hair of China's economy Exhibition, society constantly increase the demand of coal resources, face current fast pace, efficient epoch, the exploitation of coal resources Efficiency is particularly important.Therefore, modern coal-mining technique has incorporated the production model of mechanization, and it is comprehensive that fully mechanized mining is also defined as coal mine Mechanical coal mining is closed, mechanization utility ratio is 95% or more.Due to the application of the high-power coal excavation apparatus of mine, stope is taken over frequently, The installation and removal of fully-mechanized mining working electromechanical equipment have become the weak link for restricting coal mining efficiency.Undeniably, mesh The installation of preceding China's mine down-hole combined mining working and dismounting technological level be not high, and the installation of electromechanical equipment and withdrawing technique technology are sent out It opens up unobvious.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of fully-mechanized mining workings to expand peace integral process and method, improves The installation speed of fully-mechanized mining working, and then promote the efficiency of coal mining and the labor intensity of worker.
In order to solve the above-mentioned technical problem, the technical scheme adopted by the invention is that: fully-mechanized mining working, which expands, pacifies integrated chemical industry Skill and method, include the following steps:
(1) using side installation Synchronos method is expanded, while brush expands and cuts, hydraulic support is installed, is selected according to different construction conditions Different cuts eye brush expansion mode, first is that carrying out cutting the expansion of eye brush, roof timbering using the integrated outfit of peace is expanded, one section of brush expands knot Shu Hou, sliding temporary support device slide forward, continue supporting roof, transport hydraulic support in place and rise, to top plate after It is continuous to carry out supporting;
(2) it carries out cutting the expansion of eye brush using comprehensive driving, supporting is carried out to the top plate of exposure using anchor net or frame canopy mode, to development machine Between formation tune is aerial after Forward, hydraulic support stand top plate is installed in time, cuts eye expansion brush a distance as a result, hydraulic support is pacified A distance is filled, time cost is saved, improves installation effectiveness.
Using technical solution of the present invention, can obtain it is below the utility model has the advantages that
Fully-mechanized mining working of the invention expands peace integral process, the traditional fully mechanized mining of the process reform cut lore brush expand, rear installation Operation mode, eye brush cut into fully mechanized mining expand and installed with equipment integrated, realize two processes collaboration construction operations, technique Core equipment It is to expand to pacify integrated outfit (or development machine) and hydraulic support installation fork truck.The installation speed of fully-mechanized mining working is improved, And then promote the efficiency of coal mining and the labor intensity of worker.
Detailed description of the invention
Brief description is made to content expressed by each attached drawing of this specification and the label in figure below:
Fig. 1 is present apparatus structural schematic diagram.
Specific embodiment
Below against attached drawing, by the description of the embodiment, to for example related each structure of a specific embodiment of the invention The works such as the shape of part, construction, the mutual alignment between each section and connection relationship, the effect of each section and working principle are further Detailed description.
As shown in Figure 1, installing elevating conveyor, belt feeder Deng Ji lane shipment system and Stady On The Auxiliary Transportation Systems first.In air way, work Make face, be laid with track in machine lane;2 meter-gages are laid with away from track in working face;In advance to cut an end carry out brush expand operation, working Expand in the tunnel of face and help out 10 meters * 3.5 meters of tunnel, expand section mounting slip formula temporary support device in brush, multifunctional excavator and Bridge conveyor starts brush using the method for multifunctional excavator and vibration big gun auxiliary and expands operation.When work, first loosen dynamic big gun into Coal is dug to scrapper conveyor tail and carries out shipment by row coal breakage, usage mining machine, and goods after rolling, carries out brush peace bracket and moves frame work.First Back segment column is risen, so that top beam is connect top, it is ensured that enough setting loads.Then leading portion column is dropped, leading portion top beam is made to be lower than back segment top beam, Operation, which is drawn, moves oil cylinder, by leading portion bracket, moves forward, then gets face guard.After leading portion bracket moves on to position, then top is connect, operated Shifting oil cylinder is drawn to move forward back segment bracket.Back segment bracket can not be such as pulled, or when mobile back segment bracket, leading portion bracket is also downward When sliding, winch gib head can be used to fasten to leading portion bracket base, tensioning winch, then back segment bracket is moved, then connect top;It such as brushes big When collateral mask is long-pending larger, extended extensible canopy gib, moving frame terminates to beat steel band wall supporting in time.
Hydraulic support is transported to assembling chamber and is completed, is transported with winch to an end is cut, is drawn using winch On transplanting installation fork truck, and it is rotated by 90 °.Designated place is transported to using installation fork truck.Then by sliding gib Device Forward will be elapsed directly using installation fork truck to designated place supporting.The technique can not have to beat anchor pole and anchor cable, when saving Between 2-3 hours, achieve the effect that expand that side installation is synchronous to be carried out.Excavator can be used when expanding side and expand side, in the lower part of excavator Bastard coal is transported with elevating conveyor.Bracket installs, and withdraws installation fork truck, and installation fork truck is removed job site.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way Limitation, as long as the improvement for the various unsubstantialities that the inventive concept and technical scheme of the present invention carry out is used, or without changing It is within the scope of the present invention into the conception and technical scheme of the invention are directly applied to other occasions.

Claims (1)

1. fully-mechanized mining working expands peace integral process and method, which comprises the steps of:
(1) using side installation Synchronos method is expanded, while brush expands and cuts, hydraulic support is installed, is selected according to different construction conditions Different cuts eye brush expansion mode, first is that carrying out cutting the expansion of eye brush, roof timbering using the integrated outfit of peace is expanded, one section of brush expands knot Shu Hou, sliding temporary support device slide forward, continue supporting roof, transport hydraulic support in place and rise, to top plate after It is continuous to carry out supporting;
(2) it carries out cutting the expansion of eye brush using comprehensive driving, supporting is carried out to the top plate of exposure using anchor net or frame canopy mode, to development machine Between formation tune is aerial after Forward, hydraulic support stand top plate is installed in time, cuts eye expansion brush a distance as a result, hydraulic support is pacified A distance is filled, time cost is saved, improves installation effectiveness.
CN201910097905.8A 2019-01-31 2019-01-31 Fully-mechanized mining working expands peace integral process and method Pending CN109653773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910097905.8A CN109653773A (en) 2019-01-31 2019-01-31 Fully-mechanized mining working expands peace integral process and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910097905.8A CN109653773A (en) 2019-01-31 2019-01-31 Fully-mechanized mining working expands peace integral process and method

Publications (1)

Publication Number Publication Date
CN109653773A true CN109653773A (en) 2019-04-19

Family

ID=66122580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910097905.8A Pending CN109653773A (en) 2019-01-31 2019-01-31 Fully-mechanized mining working expands peace integral process and method

Country Status (1)

Country Link
CN (1) CN109653773A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117868826A (en) * 2024-01-31 2024-04-12 宁夏王洼煤业有限公司 Fully-mechanized mining face safety-expanding parallel operation process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392667A (en) * 2011-10-19 2012-03-28 山东新巨龙能源有限责任公司 Fast installation method of ten-million-ton scale fully mechanized caving face equipment
CN102587962A (en) * 2012-04-13 2012-07-18 中国矿业大学 Methods for arranging and supporting wall-expanded gas extraction drill sites
CN104863599A (en) * 2015-05-15 2015-08-26 辽宁鑫丰矿业(集团)有限公司 Fully-mechanized mining face synchronous slope expansion and installation method and supporting system
CN204691807U (en) * 2015-05-15 2015-10-07 辽宁鑫丰矿业(集团)有限公司 Fully-mechanized mining working synchronously expands side and installs support system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392667A (en) * 2011-10-19 2012-03-28 山东新巨龙能源有限责任公司 Fast installation method of ten-million-ton scale fully mechanized caving face equipment
CN102587962A (en) * 2012-04-13 2012-07-18 中国矿业大学 Methods for arranging and supporting wall-expanded gas extraction drill sites
CN104863599A (en) * 2015-05-15 2015-08-26 辽宁鑫丰矿业(集团)有限公司 Fully-mechanized mining face synchronous slope expansion and installation method and supporting system
CN204691807U (en) * 2015-05-15 2015-10-07 辽宁鑫丰矿业(集团)有限公司 Fully-mechanized mining working synchronously expands side and installs support system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵海龙: "煤矿综采工作面切眼扩帮安装同步法工艺", 《陕西煤炭》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117868826A (en) * 2024-01-31 2024-04-12 宁夏王洼煤业有限公司 Fully-mechanized mining face safety-expanding parallel operation process

Similar Documents

Publication Publication Date Title
CN108194081B (en) Coal mining operation method
CN101349159B (en) Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN101769158B (en) Excavating, supporting and bolting integrated self-contained machine
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN201344032Y (en) Complete device integrating the tunneling, protection and anchoring
CN105240013A (en) Longwall mining N00 construction method
CN104234749B (en) A kind of fully-mechanized mining working big cross section return channel surrounding rock control method
CN202500562U (en) Excavating, supporting and anchoring parallel operating system
CN103195457A (en) Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN105019927A (en) Hydraulic support withdrawing system and method
CN102536229A (en) Tunneling, protecting and anchoring parallel work system and construction technology
CN102392667B (en) Fast installation method of ten-million-ton scale fully mechanized caving face equipment
CN103382844A (en) Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN102678151B (en) Fully-mechanized excavating self-moving type temporary support system and technological method thereof
CN104632233A (en) Mechanical repair technology of distortional roadway and roadway repair machine
CN102418525A (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN104863599B (en) Fully-mechanized mining working synchronously expands side installation method and support system
CN105134212A (en) Method for ensuring fully-mechanized top coal caving recovery rate of three-soft thick coal seam roadway tunneling along top
CN109653773A (en) Fully-mechanized mining working expands peace integral process and method
CN110985083A (en) Stoping roadway stack type support supporting system and method
CN110966005A (en) Novel medium-length hole ore-breaking stage chamber method
CN204691807U (en) Fully-mechanized mining working synchronously expands side and installs support system
CN211648172U (en) Ten-arm tunneling and tracing machine
CN104389605A (en) Cover retracement method of dense steel wire ropes of coal face
CN102536277A (en) Follower assorted supporting and anchoring system of cantilever type development machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419

RJ01 Rejection of invention patent application after publication