CN102678151B - Fully-mechanized excavating self-moving type temporary support system and technological method thereof - Google Patents

Fully-mechanized excavating self-moving type temporary support system and technological method thereof Download PDF

Info

Publication number
CN102678151B
CN102678151B CN201210111221.7A CN201210111221A CN102678151B CN 102678151 B CN102678151 B CN 102678151B CN 201210111221 A CN201210111221 A CN 201210111221A CN 102678151 B CN102678151 B CN 102678151B
Authority
CN
China
Prior art keywords
fully
moving type
tunneling
falsework
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210111221.7A
Other languages
Chinese (zh)
Other versions
CN102678151A (en
Inventor
邢存恩
宋毅
杨新华
加麦生
韩传廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201210111221.7A priority Critical patent/CN102678151B/en
Publication of CN102678151A publication Critical patent/CN102678151A/en
Application granted granted Critical
Publication of CN102678151B publication Critical patent/CN102678151B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a fully-mechanized excavating self-moving type temporary support system and a technological method thereof, belongs to the field of large-scale, centralized and automatic fully-mechanized mining and fully-mechanized excavating technology for coal mines and particularly relates to a quick tunneling fully-mechanized excavating system and a technological method. By the aid of the self-moving type temporary support system, a position for performing a tunneling procedure and a position for performing a permanent support procedure in a fully-mechanized excavating process are separated by a certain distance on a tunneling face of a roadway, so that the tunneling procedure and the permanent support procedure are performed in parallel instead of being performed sequentially. The fully-mechanized excavating self-moving type temporary support system and the technological method are mainly characterized in that the tunneling procedure and the permanent support procedure in the fully-mechanized excavating process are carried out separately by the certain distance at the same location of the roadway, so that the tunneling procedures and the permanent support procedure are performed in parallel instead of being performed sequentially, and the system realizes quick fully-mechanized excavating. By the aid of the system, duration of influences of permanent support to tunneling is shortened, the fully-mechanized tunneling speed is multiplied, efficacy of a fully-mechanized tunneling road-header is greatly realized, and production efficiency of a mine is improved.

Description

Combine pick automatic moving type temporary support system and process thereof
Technical field
The present invention combines pick automatic moving type temporary support system and process thereof, belongs to the maximization of coal mine fully-mechanized mining experimentation, centralization, automatic field.Be specifically related to, by increasing a kind of automatic moving type temporary support system and tradition combined driving in tunneling process and permanent support two master operations separating certain distance from tunnelling face, make driving and permanent support two operations change into parallel operations by sequential analysis, realize system and the process of combining pick speedy drivage.
Background technology
Along with combining the development of adopting experimentation, coal production just strides forward towards high-yield and high-efficiency maximization, centralization, automation direction.To tunnel experimentation, extensively adopt the pick fortune system of fully-mechanized digging machine+rubber conveyer (or drag conveyor), and supporting employing anchor pole (or shotcrete) support system.Piercing technique process is as follows: combine pick driving system activities: first use fully-mechanized digging machine driving rib (or crag), uses development machine and rubber conveyer shipment coal petrography simultaneously, shuts down, cleaning driving place after tunneling a segment distance; Then use the equipment such as roof-bolter and pulp shooting machine to carry out tunnel permanent support to the nude tunnel part excavated and complete a P. drechsleri.Repeat P. drechsleri to realize combining pick driving.Because driving and supporting two-step are substantially all in tunnelling face, therefore, sequential analysis can only be adopted.Thus cause anchor pole (or shotcrete) support speed slow, driving speed is very restricted, constrains and combine the pick performance of capacity of equipment and the raising of comprehensive pick speed.
Summary of the invention
The present invention combines pick automatic moving type temporary support system and process thereof, the problems such as the above-mentioned speed that its object is to exist for comprehensive pick is slow, disclose and a kind ofly by automatic moving type temporary support system, the driving in comprehensive tunneling process and permanent support operation are separated 8-15m distance from tunnelling face, make driving and permanent support two operations change into parallel operations by sequential analysis, realize the temporary lining equipment and process scheme combining pick speedy drivage.
The present invention combines pick automatic moving type temporary support system, it is characterized in that increasing automatic moving type temporary support system in former comprehensive pick driving transportation system and support system, former support system is become permanent support system, delayed driving operation 8-15m distance, and within the scope of the 20-30m of driving face tunnel, use automatic moving type temporary support system to carry out supporting, automatic moving type temporary support system is primarily of falsework, falsework transport vehicle and frame move track composition, automatic moving type temporary support system moves orbital position according to frame and component devices is divided into: shop fixtures automatic moving type temporary support system, hanging automatic moving type temporary support system or the semifixed automatic moving type temporary support system of frame.
Above-mentioned comprehensive pick automatic moving type temporary support system, is characterized in that described shop fixtures automatic moving type temporary support system, exactly frame is moved track section and be arranged in roadway floor, moves unwheeling and moves track by frame and transport and fall the system of the falsework after frame to development end place to use.
Above-mentioned comprehensive pick automatic moving type temporary support system, it is characterized in that described hanging automatic moving type temporary support system, exactly frame is moved track section hanging and be arranged in provisional chock for galleries back timber bottom, move unwheeling and move track by frame and transport and fall the system of the falsework after frame to development end place to use.
Above-mentioned comprehensive pick automatic moving type temporary support system, it is characterized in that the semifixed automatic moving type temporary support system of described frame, to move mounted track is exactly fixed on development machine and transporter by rail bracket, dragged by development machine and move mounted track reach, fall the falsework after frame to be directly placed on conveying track, move unwheeling and move track by frame and transport and fall the system of the falsework after frame to development end place to use.
The present invention combines the process of pick automatic moving type temporary support system, it is characterized in that a kind of after fully mechanized workface development machine completes driving, uses automatic moving type temporary lining equipment fast to the temporary lining that the roadway surrounding rock just tunneled out carries out; Tunnel permanent support is carried out with rear portion in the middle part of temporary lining equipment, by temporary support system, the driving in comprehensive tunneling process and permanent support are separated certain distance from tunnelling face, driving and permanent support two operations are made to change into parallel operations by sequential analysis, realize the method combining pick speedy drivage, its concrete technology step is:
, first, use fully-mechanized digging machine driving rib or crag, use development machine and rubber conveyer shipment coal petrography simultaneously, shut down after tunneling a segment distance, cleaning driving place 0-10min;
, then, use automatic moving type temporary lining equipment to carry out linked network+supporting falsework fast to the nude tunnel part just excavated, complete temporary lining; Again, under the support of temporary lining, be positioned at development machine rear portion and use roof-bolter and pulp shooting machine to carry out tunnel permanent support, after permanent support operation is generally positioned at development end 7-15m, before 20-30m, permanent support operation and pick operate industry and temporary lining operation is carried out simultaneously;
, last, the position of distance development end 20-30m, tunnel permanent support completes, reclaim falsework, and use falsework to move unwheeling falsework to be transported to development end in order to reusing, complete a P. drechsleri, repeat P. drechsleri and realize combining pick speedy drivage, speedy drivage temporary support system
The advantage that the present invention combines pick automatic moving type temporary support system and process thereof is: combine the roadway surrounding rock that pick uses automatic moving type temporary lining equipment quick supporting just to tunnel, carry out tunnel permanent support at temporary lining equipment postmedian, thus shorten the influence time of supporting to driving.By automatic moving type temporary support system, the driving in comprehensive tunneling process and permanent support are separated 8-15m distance from tunnelling face, make driving and permanent support two operations change into parallel operations by sequential analysis, realize combining pick speedy drivage.Adopt after combining pick automatic moving type temporary support system, combine pick system driving speed to decide (automatic moving type temporary lining holding time is very short) primarily of fully-mechanized digging machine, thus comprehensive pick speed several times can be improved, play the usefulness of fully-mechanized digging machine greatly, improve shaft production efficiency.
Accompanying drawing explanation
Fig. 1. shop fixtures automatic moving type temporary support system figure
Fig. 2. hanging automatic moving type temporary support system figure
Fig. 3. the semifixed automatic moving type temporary support system figure of frame
Number in the figure is: 1. falsework back timber 2. falsework pillar 3. falsework side leg 4. moves mounted track support 5. and moves mounted track 6. and move unwheeling 7. and move unwheeling scaffold bracket 8. fully-mechanized digging machine.
Detailed description of the invention
embodiment 1:
Shop fixtures automatic moving type temporary support system moves the comprehensive pick automatic moving type temporary support system of mounted track step-by-step arrangement at roadway floor, and its temporary lining equipment mainly comprises: falsework, move mounted track and move unwheeling.This mode may be used for big cross section driving.This automatic moving type temporary support system technology characteristics is (Fig. 1):
1). use fully-mechanized digging machine 8 to tunnel rib or crag, use fully-mechanized digging machine 8 and rubber conveyer shipment coal petrography simultaneously, shut down after driving 3.0m, cleaning driving place 3min
2). lay and move mounted track support 4 and move mounted track 5, to rib (or crag) and top board linked network, then launch falsework back timber 1, rise falsework pillar 2, prop up falsework side leg 3, install falsework complete;
3). carry out roadway bolt (shotcrete) supporting in stage casing, falsework supporting region and back segment (distance development end 15m), complete tunnel permanent support;
4). after completing tunnel permanent support (position of distance development end 30m), regain falsework wall supporting leg 3, reduce pillar 2, retraction back timber 1, reduce falsework;
5). the falsework of reduction being held up by the unwheeling scaffold bracket 7 that moves moving unwheeling 6, transporting driving face front end assigned address to by moving unwheeling 6;
6). repeat the operation of above-mentioned five steps, complete and combine pick temporary lining work.
embodiment 2:
Hanging automatic moving type temporary support system moves the comprehensive pick automatic moving type temporary support system that mounted track segmentation hanging is arranged in provisional chock for galleries back timber bottom, and its temporary lining equipment mainly comprises: falsework, move mounted track and move unwheeling.This mode may be used for light section driving.In the main distinction of mode one, this automatic moving type temporary support system is that moving mounted track is suspension type, its technology characteristics is (Fig. 2):
1). use fully-mechanized digging machine 8 to tunnel rib or crag, use fully-mechanized digging machine 8 and rubber conveyer shipment coal petrography simultaneously, shut down after driving 0.8m, cleaning driving place 1min
2). install on falsework and move mounted track frame and move mounted track, to rib (or crag) and top board linked network, then launch falsework back timber 1, rise falsework pillar 2, prop up falsework side leg 3, install falsework complete;
3). carry out roadway bolt (shotcrete) supporting in falsework stage casing and back segment (distance development end 7m), complete tunnel permanent support;
4). after completing tunnel permanent support (position of distance development end 20m), regain falsework wall supporting leg 3, reduce falsework pillar 2, retraction falsework back timber 1, remove and move mounted track frame and move mounted track, reduce falsework;
5). utilization is risen frame machine and is sling by the unwheeling scaffold bracket 7 that moves moving unwheeling 6 by the falsework of reduction, transports driving face front end assigned address to by moving unwheeling 6;
6). repeat the operation of above-mentioned five steps, complete and combine pick temporary lining work.
embodiment 3:
The semifixed automatic moving type temporary support system of frame, move mounted track and be fixed on comprehensive pick automatic moving type temporary support system on development machine and transporter by rail bracket, its temporary lining equipment mainly comprises: falsework, move mounted track and move unwheeling, and this mode may be used for large, medium and small section driving.The main distinction of this automatic moving type temporary support system and embodiment one and embodiment two is that moving mounted track is semi-fixed type, and moving mounted track does not need to lay and install, but needs to drag (as Fig. 3), and its technology characteristics is with embodiment 1.

Claims (1)

1. combining the process of pick automatic moving type temporary support system, is increase automatic moving type temporary lining equipment in former comprehensive pick driving system, and this equipment moves track composition primarily of falsework, falsework transport vehicle and frame; This process it is characterized in that a kind of after fully mechanized workface development machine completes driving operation, uses automatic moving type temporary lining equipment fast to the temporary lining that the roadway surrounding rock just tunneled out carries out; Tunnel permanent support is carried out with rear portion in the middle part of temporary lining equipment, by temporary support system, the driving in comprehensive tunneling process and permanent support are separated certain distance from tunnelling face, driving and permanent support two operations are made to change into parallel operations by sequential analysis, realize the method combining pick speedy drivage, its concrete technology step is:
, first, use fully-mechanized digging machine driving rib or crag, use development machine and rubber conveyer shipment coal petrography simultaneously, shut down after tunneling a segment distance, cleaning driving place 0-10min;
, then, use automatic moving type temporary lining equipment to carry out linked network+supporting falsework fast to the nude tunnel part just excavated, complete temporary lining; Again, under the support of temporary lining, be positioned at development machine rear portion and use roof-bolter and pulp shooting machine to carry out tunnel permanent support, after permanent support operation is generally positioned at development end 7-15m, before 20-30m, permanent support operation and pick operate industry and temporary lining operation is carried out simultaneously;
, last, the position of distance development end 20-30m, tunnel permanent support completes, reclaim falsework, and use falsework to move unwheeling falsework to be transported to development end in order to reusing, complete a P. drechsleri, repeat P. drechsleri and realize combining pick speedy drivage, speedy drivage temporary support system.
CN201210111221.7A 2012-04-17 2012-04-17 Fully-mechanized excavating self-moving type temporary support system and technological method thereof Expired - Fee Related CN102678151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210111221.7A CN102678151B (en) 2012-04-17 2012-04-17 Fully-mechanized excavating self-moving type temporary support system and technological method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210111221.7A CN102678151B (en) 2012-04-17 2012-04-17 Fully-mechanized excavating self-moving type temporary support system and technological method thereof

Publications (2)

Publication Number Publication Date
CN102678151A CN102678151A (en) 2012-09-19
CN102678151B true CN102678151B (en) 2015-01-14

Family

ID=46810652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210111221.7A Expired - Fee Related CN102678151B (en) 2012-04-17 2012-04-17 Fully-mechanized excavating self-moving type temporary support system and technological method thereof

Country Status (1)

Country Link
CN (1) CN102678151B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103382844B (en) * 2013-07-15 2015-09-30 郑东风 A kind of tracked hydraulic sectional shelf-unit temporary lining and permanent support parallel operations piercing technique and equipment
CN103397888B (en) * 2013-08-21 2015-07-01 郑东风 Frame device for lifting and transporting tunneling head-on temporary bracket, and operation method
CN104179517B (en) * 2014-09-03 2017-03-15 兖矿集团有限公司 A kind of driving support system and laneway support method
CN104314596B (en) * 2014-10-30 2017-02-15 北京双泰气动设备有限公司 Pneumatic movable support of roadway
CN106050284A (en) * 2016-07-15 2016-10-26 山东兖煤黑豹矿业装备有限公司 Parallel operation type quick tunneling support system and construction method
CN112593961A (en) * 2020-12-04 2021-04-02 煤炭科学研究总院 Roadway driving method
CN112576301B (en) * 2020-12-15 2022-08-16 郑州煤矿机械集团股份有限公司 Fully-mechanized mining face transportation crossheading unit support carrying system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4406166A1 (en) * 1994-02-25 1995-08-31 Hermann Meyer Temporary, advancing gallery support frame for mine gallery stair
CN101251022A (en) * 2008-03-26 2008-08-27 曹树祥 Immediate support device for digging machine
CN201215023Y (en) * 2008-06-25 2009-04-01 山西潞安环保能源开发股份有限公司王庄煤矿 Temporary support for drivage face
CN101457652A (en) * 2008-05-13 2009-06-17 天地科技股份有限公司 Overlarge mining height hydraulic support
CN201513191U (en) * 2009-09-14 2010-06-23 包新 Roadway temporary support self-advancing hydraulic support
CN101769158A (en) * 2008-12-30 2010-07-07 三一重型装备有限公司 Excavating, supporting and bolting integrated self-contained machine
CN202031619U (en) * 2011-04-15 2011-11-09 山西大同大学 Suspended mobile temporary supporting device of excavation roadway
CN102322281A (en) * 2011-06-18 2012-01-18 张春生 Tunnel quick-tunneling advance support integrated device
CN102383815A (en) * 2011-07-22 2012-03-21 安徽理工大学 Suspension type driftage temporary supporting device and use method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4406166A1 (en) * 1994-02-25 1995-08-31 Hermann Meyer Temporary, advancing gallery support frame for mine gallery stair
CN101251022A (en) * 2008-03-26 2008-08-27 曹树祥 Immediate support device for digging machine
CN101457652A (en) * 2008-05-13 2009-06-17 天地科技股份有限公司 Overlarge mining height hydraulic support
CN201215023Y (en) * 2008-06-25 2009-04-01 山西潞安环保能源开发股份有限公司王庄煤矿 Temporary support for drivage face
CN101769158A (en) * 2008-12-30 2010-07-07 三一重型装备有限公司 Excavating, supporting and bolting integrated self-contained machine
CN201513191U (en) * 2009-09-14 2010-06-23 包新 Roadway temporary support self-advancing hydraulic support
CN202031619U (en) * 2011-04-15 2011-11-09 山西大同大学 Suspended mobile temporary supporting device of excavation roadway
CN102322281A (en) * 2011-06-18 2012-01-18 张春生 Tunnel quick-tunneling advance support integrated device
CN102383815A (en) * 2011-07-22 2012-03-21 安徽理工大学 Suspension type driftage temporary supporting device and use method thereof

Also Published As

Publication number Publication date
CN102678151A (en) 2012-09-19

Similar Documents

Publication Publication Date Title
CN102678151B (en) Fully-mechanized excavating self-moving type temporary support system and technological method thereof
CN104564050B (en) Equipment for heading and anchoring parallel operation construction
CN101769158B (en) Excavating, supporting and bolting integrated self-contained machine
CN104675422B (en) The hydraulic means of coal mine roadway temporary support for drivage face
CN105386771A (en) Shield type digging and anchoring machine
CN105697013A (en) Contractible temporary support for tunneling tunnel
CN104747201A (en) Rapid drivage-anchoring integrated equipment for coal road under instable surrounding rock condition
CN103195457A (en) Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
AU2015281641A1 (en) Method for removing hydraulic support for solid filling coal mining
CN104653182B (en) A kind of coal-mining method that the bastard coal of coal seam containing thick dirt band point is adopted
CN104481547B (en) A kind of shed ding support tunnel speedy drivage method
CN102865082B (en) Rectangular bend quick construction method of T-shaped laneway of mine
CN103382844A (en) Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN205578001U (en) Advance support formula integral unit suitable for soft rock tunnelling
CN103174448A (en) In-time supporting method for roadway fully-mechanized excavating operation
CN104500069A (en) Continuous coal mining machine top-coal mining process for extremely-thick coal seam bound coal
CN105041357A (en) Monorail hoisting tail-to-head-type advance support system
CN108131140A (en) A kind of cantilevered longitudinal axis anchor driving machine with distant control function
CN205225262U (en) Shield constructs formula tunneling and anchoring machine
CN205277431U (en) Coal road tunnelling apparatus
CN104863599B (en) Fully-mechanized mining working synchronously expands side installation method and support system
CN102536312B (en) Anchor rod transloading set
CN103821530A (en) Continuous excavating equipment and process for roadways
CN211648172U (en) Ten-arm tunneling and tracing machine
CN204691807U (en) Fully-mechanized mining working synchronously expands side and installs support system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20160417