CN204691807U - Fully-mechanized mining working synchronously expands side and installs support system - Google Patents

Fully-mechanized mining working synchronously expands side and installs support system Download PDF

Info

Publication number
CN204691807U
CN204691807U CN201520316793.8U CN201520316793U CN204691807U CN 204691807 U CN204691807 U CN 204691807U CN 201520316793 U CN201520316793 U CN 201520316793U CN 204691807 U CN204691807 U CN 204691807U
Authority
CN
China
Prior art keywords
base
back timber
rear portion
support system
anterior
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520316793.8U
Other languages
Chinese (zh)
Inventor
张希望
薛庆生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Xinfeng Mining (group) Co Ltd
Original Assignee
Liaoning Xinfeng Mining (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Xinfeng Mining (group) Co Ltd filed Critical Liaoning Xinfeng Mining (group) Co Ltd
Priority to CN201520316793.8U priority Critical patent/CN204691807U/en
Application granted granted Critical
Publication of CN204691807U publication Critical patent/CN204691807U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of fully-mechanized mining working and synchronously expands side installation support system, comprises front and rear two parts: anterior is brettis; This support has a base, 4 telescopic columns, one group of anterior back timber, advancing jack; Back timber adopts tower structure, and three block frames connect into a rigid unitary structure by folding; There is extensible canopy anterior back timber inside, and when pedestal forward lead, extensible canopy stretches out simultaneously, and its lapping ends is above the back timber of rear portion; Rear portion is brettis; This support is made up of base, telescopic column, rear portion back timber; Rear portion back timber adopts frame type overall structure; Front and rear is connected by advancing jack.The utility model has the advantages that: utilize and cut eye portion expansion side, support technology, by the method for caving, the coal seam of side upper is expanded in exploitation, has saved resource, has adopted support system simultaneously, avoids sky top operation, improves safety.

Description

Fully-mechanized mining working synchronously expands side and installs support system
Technical field
The utility model relates to coal mining apparatus field, is a kind of driving support system specifically.
Background technology
Present Domestic colliery driving method mainly contains two kinds: one uses development machine to excavate; A kind ofly still use the old-fashioned tunneling method of drilling and blasting.During two kinds of method drivings, support pattern majority is bolt support, also has part to adopt the support pattern of metal hinge top beam and hydraulic prop.
Use development machine tunnels, and adopting bolt support, is the method that current National emphasis colliery generally adopts.Prior art is when the hydraulic support carrying out cutting a position is installed, adopt once to tunnel and wholely cut a width, and do not adopt suspension device, the method not only emits the danger of empty top operation when operating, and due to the installation of hydraulic support, whole coal seam of cutting above eye cannot be exploited, cause the huge wasting of resources.
Utility model content
For solving the problems of the technologies described above, the purpose of this utility model is to provide a kind of fully-mechanized mining working (cutting eye) and synchronously expands side mounting method and support system, utilization is cut eye portion and is expanded side technology (expanding along cutting a width by original passage), by the method for caving, the coal seam of side upper is expanded in exploitation, has saved resource, has adopted support system simultaneously, avoid empty top operation, improve safety.Concrete technical scheme is as follows:
Fully-mechanized mining working synchronously expands side and installs support system, it is characterized in that: support system comprises front and rear two parts:
Front portion is brettis; This support has a base, 4 telescopic columns, one group of anterior back timber, advancing jack;
Wherein base is made up of three pieces of base plates, and three pieces of base plates connect into an entirety by folding, and in three pieces of base plates, middle is case structure, and the top of the base plate of both sides turn increases the casing of an elongate in shape, and length is identical with base plate; All advancing jack is housed in these two casings;
4 telescopic columns are arranged on the casing of the elongate in shape of base, and telescopic column is connected with the casing of the elongate in shape of base and adopts double pin axle pattern, and column is kept and base perpendicular positioning;
Back timber adopts tower structure, and three block frames connect into a rigid unitary structure by folding; There is extensible canopy anterior back timber inside, and when pedestal forward lead, extensible canopy stretches out simultaneously, and its lapping ends is above the back timber of rear portion;
Rear portion is brettis; This support is made up of base, telescopic column, rear portion back timber;
Wherein base is overall structure, and all there is square chest at the two ends of base, and telescopic column is equipped with in square chest top;
4 telescopic columns are arranged on the casing of the elongate in shape of base, and telescopic column is connected with the casing of the elongate in shape of base and adopts double pin axle pattern, and column is kept and base perpendicular positioning;
Rear portion back timber adopts frame type overall structure;
Front and rear is connected by advancing jack.
Anterior back timber all adopts connecting rod double pin axle mode to be connected with the top of telescopic column with rear portion back timber; To ensure when 4 columns stretch out differing heights, back timber reaches inclination job requirements.
The utility model has the advantages that: utilize and cut eye portion expansion side technology (expanding along cutting a width by original passage), by the method for caving, the coal seam of side upper is expanded in exploitation, save resource, adopt support system simultaneously, avoid empty top operation, improve safety.
Accompanying drawing explanation
Fig. 1 is construction schematic diagram of the present utility model;
Fig. 2 is support system structural representation;
Fig. 3 connecting rod double pin axle mode connection diagram;
In figure, 1 is support system, and 2 is development machine, and 3 is hydraulic support, 4 is passage, and 5 for expanding side position, and 6 is hydraulic support installation fork truck, and 7 is hydraulic support to be installed, 8 is crane, and 9 is scrapper conveyor, and 10 is elevating conveyor, and 11 is haulage drift, 12 is stope, and 101 is anterior, and 102 is rear portion, 103 is base, and 104 is advancing jack, and 105 is extensible canopy, 106 is anterior back timber, and 107 is telescopic column, and 108 is rear portion back timber.
Detailed description of the invention
The utility model is illustrated below in conjunction with accompanying drawing, as shown in Figure 1, the utility model fully-mechanized mining working (cutting eye) synchronously expands side mounting method, first excavates a passage 4 along cutting a length direction, then, in the passage 4 after excavation, expansion side is carried out along cutting a width; When expanding side, development machine 2 enters the below of support system and carries out excavation operation; After development machine 2 tunnels 2 two meters forward, development machine 2 stops operation;
Support system front portion 101 moves forward 2m by push unit; Simultaneous retractable beam 105 stretches out; Extensible canopy 105 end keeps the state be overlapped on above support system rear portion back timber 108; After extensible canopy 105 puts in place, anterior back timber 106 connects top;
Hydraulic support 3 is installed to the below of support system extensible canopy 105;
Support system rear portion back timber 108 unloads top, and anterior back timber 106 connects top, and after extensible canopy 105 is retracted, the hydraulic support 3 originally below extensible canopy 105 connects top;
Support system rear portion back timber 108 unloads top, by the contraction of advancing jack 104, makes rear portion back timber 108 be advanced to below hydraulic support 3;
Rise support system rear portion back timber 108, while connecing top with hydraulic support 3, hold up the end of extensible canopy 105 in the anterior back timber 106 of support system;
Repetition like this, constantly carries out the work of expanding side installation.
Point of cutting of coal face synchronously expands side and installs support system, it is characterized in that: comprise anterior 101 and 102 two, rear portion part:
Anterior 101 is brettis; This support has a base 103,4 telescopic columns 107, a group anterior back timber 106, advancing jack 104;
Wherein base 3 is made up of three pieces of base plates, and three pieces of base plates connect into an entirety by folding, and in three pieces of base plates, middle is case structure, and the top of the base plate of both sides turn increases the casing of an elongate in shape, and length is identical with base plate; In these two casings, advancing jack 104 is all housed;
4 telescopic columns 107 are arranged on the casing of the elongate in shape of base, and telescopic column 107 is connected with the casing of the elongate in shape of base 103 and adopts double pin axle pattern, and column is kept and base perpendicular positioning;
Anterior back timber 106 adopts tower structure, and three block frames connect into a rigid unitary structure by folding; There is extensible canopy 105 anterior back timber 106 inside, and when pedestal forward lead, extensible canopy 105 stretches out simultaneously, and its lapping ends is above rear portion back timber 108;
Rear portion is brettis; This support is made up of base 103, telescopic column 107, rear portion back timber 108;
Wherein base 3 is overall structure, and all there is square chest at the two ends of base 3, and telescopic column 107 is equipped with in square chest top;
4 telescopic columns 107 are arranged on the casing of the elongate in shape of base, and telescopic column 107 is connected with the casing of the elongate in shape of base 3 and adopts double pin axle pattern, and column is kept and base perpendicular positioning;
Rear portion back timber 108 adopts frame type overall structure;
Anterior 101 are connected by advancing jack 104 with rear portion 102.
As shown in Figure 3, the back timber 106 of front and rear and the top of telescopic column 107 adopt connecting rod double pin axle mode to be connected, that is: back timber 106 is coupling by bearing pin 109 and connecting rod 108, and connecting rod 108 is coupling by bearing pin 109 and telescopic column 107; To ensure when 4 columns stretch out differing heights, back timber reaches inclination job requirements.
Embodiment 1
In tunnel of rolling back and rationalizing, work plane, fortune along in tunnel lay 600 or 900 gauge tracks; 2 meter-gages are laid apart from track at work plane.
In fortune along in tunnel, use crane that conveyor tail is installed; Installation frame head of reloading machine, elevating conveyor play bridge portion; Breaker mounting; Elevating conveyor intermediate channel, aircraft tail shelf are installed.
At buttock installation end head bracket.
Use crane that rear portion scrapper conveyor head and lead-over groove are installed, forward scraper machine head and lead-over groove are installed.
Crane is transplanted on return air triangulation point place.
Assemble mobile crane with crane, install rear portion scraper conveyor middle groove with mobile crane afterwards, installation, withdraws from mobile crane.
With crane, road, corner is installed; Lifting hydraulic support installs fork truck, launches hydraulic pressure support installing fork truck, installs fork truck in place.
Hydraulic support on flat car is drawn to and installs on fork truck, be transported to infield in advance and wait for installation in position.
In the roadway workface of 5.5 meters wide, first time expands side 3 meters of x4.5 rice, uses bolt and cable anchor supporting.Second time expands side 4 meters of x4.5 rice again, uses bolt and cable anchor supporting.
To the hydraulic support of infield be transported to, 90-degree rotation on installation fork truck, and (note: hydraulic support anterior when entrucking toward the front) the first pack support is installed to the place that first time expands side.
Support system is arranged on second time to expand in the tunnel after helping.Anterior back timber rises to below top board and connects top.
Rear portion back timber is arranged on below first hydraulic support, connects top with hydraulic support front-axle beam simultaneously.And keep the rear portion back timber of support system and the extensible canopy of anterior back timber to be in overlap joint state (extensible canopy is overlapped on anterior back timber).
Development machine enters the below of support system, and proceeds excavation operation.After tunneling 2 meters forward, development machine stops operation.
Support system front portion moves forward 2m by push unit.Simultaneous retractable beam stretches out (operate extensible canopy simultaneously and pass cylinder jack).Require that extensible canopy front portion keeps the state be overlapped on the back timber of support system rear portion.After putting in place, anterior back timber connects top.
Fork truck is installed and gets back to return air triangulation point place, group hydraulic support of second on flat car is drawn to and installs on fork truck, be transported to infield, 90-degree rotation on installation fork truck.
Second group of hydraulic support is installed to the below of support system extensible canopy, keeps the gap of 50mm with extensible canopy.
Support system rear portion back timber unloads top, and anterior back timber unloads top, and extensible canopy retracts 2 meters, afterwards, and the hydraulic supporting bridge joint top originally below extensible canopy.
Support system rear portion back timber unloads top, by passing the contraction of cylinder, rear portion back timber is advanced to below hydraulic support.
Rise support system rear portion back timber, with hydraulic supporting bridge joint top while, hold up the front end of extensible canopy in the anterior back timber of support system.
After third time expansion side 2mx4.5m, so repeat the operating process of the second frame hydraulic support, can play anchor pole and anchor cable, save time 2-3 hour, reaches to expand to help to install the effect of synchronously carrying out.
Development machine can be used when expanding side to expand side, at the rear portion elevating conveyor of development machine, slag is transported.
The mode that big gun can also be adopted to dig when expanding side, below rib, install a scrapper conveyor, slag can install on scrapper conveyor by excavator for coal mines by slag, is transported by slag by scrapper conveyor.Support installing is complete, regains and installs fork truck, installation fork truck is shifted out job site.
With crane, the conveyor in development machine, work plane is removed, and lay 2 meter-gages apart from track in the conveyor position of removing.
With crane, mobile crane is lifted into 2 meter-gages on track.Use mobile crane that forward scraper machine intermediate channel is installed and be transported to infield enforcement installation.Intermediate channel installs 4-6 block at every turn.
With crane, coal-winning machine is installed.Then forward scraper machine lead-over groove, tail are installed.

Claims (2)

1. fully-mechanized mining working synchronously expands side installation support system, it is characterized in that: support system comprises front and rear two parts:
Front portion is brettis; This support has a base, 4 telescopic columns, one group of anterior back timber, advancing jack;
Wherein base is made up of three pieces of base plates, and three pieces of base plates connect into an entirety by folding, and in three pieces of base plates, middle is case structure, and the top of the base plate of both sides turn increases the casing of an elongate in shape, and length is identical with base plate; All advancing jack is housed in these two casings;
4 telescopic columns are arranged on the casing of the elongate in shape of base, and telescopic column is connected with the casing of the elongate in shape of base and adopts double pin axle pattern, and column is kept and base perpendicular positioning;
Back timber adopts tower structure, and three block frames connect into a rigid unitary structure by folding; There is extensible canopy anterior back timber inside, and when pedestal forward lead, extensible canopy stretches out simultaneously, and its lapping ends is above the back timber of rear portion;
Rear portion is brettis; This support is made up of base, telescopic column, rear portion back timber;
Wherein base is overall structure, and all there is square chest at the two ends of base, and telescopic column is equipped with in square chest top;
4 telescopic columns are arranged on the casing of the elongate in shape of base, and telescopic column is connected with the casing of the elongate in shape of base and adopts double pin axle pattern, and column is kept and base perpendicular positioning;
Rear portion back timber adopts frame type overall structure;
Front and rear is connected by advancing jack.
2. fully-mechanized mining working according to claim 1 synchronously expands side installation support system, it is characterized in that: anterior back timber and rear portion back timber all adopt connecting rod double pin axle mode to be connected with the top of telescopic column.
CN201520316793.8U 2015-05-15 2015-05-15 Fully-mechanized mining working synchronously expands side and installs support system Active CN204691807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520316793.8U CN204691807U (en) 2015-05-15 2015-05-15 Fully-mechanized mining working synchronously expands side and installs support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520316793.8U CN204691807U (en) 2015-05-15 2015-05-15 Fully-mechanized mining working synchronously expands side and installs support system

Publications (1)

Publication Number Publication Date
CN204691807U true CN204691807U (en) 2015-10-07

Family

ID=54232110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520316793.8U Active CN204691807U (en) 2015-05-15 2015-05-15 Fully-mechanized mining working synchronously expands side and installs support system

Country Status (1)

Country Link
CN (1) CN204691807U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863599A (en) * 2015-05-15 2015-08-26 辽宁鑫丰矿业(集团)有限公司 Fully-mechanized mining face synchronous slope expansion and installation method and supporting system
CN109653773A (en) * 2019-01-31 2019-04-19 淮北矿业(集团)有限责任公司 Fully-mechanized mining working expands peace integral process and method
CN113482635A (en) * 2021-07-08 2021-10-08 淮北矿业股份有限公司 Parallel construction method for installing and expanding cutting brush based on stack type support reinforced long-span top plate

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863599A (en) * 2015-05-15 2015-08-26 辽宁鑫丰矿业(集团)有限公司 Fully-mechanized mining face synchronous slope expansion and installation method and supporting system
CN109653773A (en) * 2019-01-31 2019-04-19 淮北矿业(集团)有限责任公司 Fully-mechanized mining working expands peace integral process and method
CN113482635A (en) * 2021-07-08 2021-10-08 淮北矿业股份有限公司 Parallel construction method for installing and expanding cutting brush based on stack type support reinforced long-span top plate

Similar Documents

Publication Publication Date Title
CN108194081B (en) Coal mining operation method
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN106837392A (en) Tunnel gantry type multifunctional supporting chassis
CN101775991B (en) Method for significant reduction of bracket support of gob-side roadway of fully-mechanized mining face
CN103277107B (en) Shield type roadway heading machine
CN202500562U (en) Excavating, supporting and anchoring parallel operating system
CN103643979A (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN103382844A (en) Temporary support and permanent support parallel operation excavating technology and equipment for tracked hydraulic combined support
CN104790997A (en) Self-moving advance temporary supporting hydraulic bracket used for fully-mechanized excavation
CN204691807U (en) Fully-mechanized mining working synchronously expands side and installs support system
CN102536229A (en) Tunneling, protecting and anchoring parallel work system and construction technology
CN104895592A (en) Fully-mechanized coal mining and caving face support retracement supporting method
CN206419048U (en) Tunnel gantry type multifunctional supporting chassis
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN104863599B (en) Fully-mechanized mining working synchronously expands side installation method and support system
CN102392667A (en) Fast installation method of ten-million-ton scale fully mechanized caving face equipment
CN113605837A (en) Single track hydraulic anchor rod drill carriage of advance support
CN201513191U (en) Roadway temporary support self-advancing hydraulic support
CN203097920U (en) Track-type fully hydraulic leading shoring equipment
CN102536277B (en) Follower assorted supporting and anchoring system of cantilever type development machine
CN111828073A (en) Novel roadway support device
CN104912554B (en) Under-pressure self-moving excavation and support unit and under-pressure self-moving method
CN203905988U (en) Slip type temporary supporting bracket
CN203570351U (en) Supporting device for low coal seam comprehensive mechanized remained gateway along goaf
CN203257446U (en) Coal harbor arched supporting shield structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant