CN106761873A - It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone - Google Patents

It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone Download PDF

Info

Publication number
CN106761873A
CN106761873A CN201710029030.9A CN201710029030A CN106761873A CN 106761873 A CN106761873 A CN 106761873A CN 201710029030 A CN201710029030 A CN 201710029030A CN 106761873 A CN106761873 A CN 106761873A
Authority
CN
China
Prior art keywords
zone
arch support
track
crushed
collapsed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710029030.9A
Other languages
Chinese (zh)
Other versions
CN106761873B (en
Inventor
李兵磊
黄萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao pengte Electromechanical Equipment Co., Ltd
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201710029030.9A priority Critical patent/CN106761873B/en
Publication of CN106761873A publication Critical patent/CN106761873A/en
Application granted granted Critical
Publication of CN106761873B publication Critical patent/CN106761873B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/08Advancing mechanisms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, in the ground both sides mounting bracket track in tunnel, and the first arch support is installed;According to Collapsed zone or the length of crushed zone, guide post is respectively mounted in the both sides of the first arch support;The second prefabricated arch support to the n-th arch support is separately mounted on bracket track, the second arch support to the n-th arch support is moved respectively to specified location by drive mechanism;Retaining-plate is installed on the inverted U track of the first arch support to the n-th arch support successively;The grout pipe installed and penetrate in Collapsed zone or crushed zone is spaced on retaining-plate, and the anchor pole in the rock stratum stretched into above Collapsed zone or crushed zone is worn in grout pipe;To perfusion mortar in Collapsed zone or crushed zone, after the supporting that Collapsed zone or crushed zone are completed after mortar hardening.Underground Metallic Mines tunnel Collapsed zone and crushed zone support issues are solved, security and efficiency of construction are high.

Description

It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone
Technical field
The present invention relates to a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone.
Background technology
At present, the supporting of non-coal underground mine tunnel Collapsed zone and crushed zone, when tunnel occurs inbreak, is usually taken Measure is that with steel arch-shelf plus concrete support, inbreak region, come bashing, or fills inbreak using slip casting method with sleeper Area, when roadway construction runs into crushed zone, generally with grouting rock bolt, or passes through crushed zone with slip casting method.No matter which kind of is constructed Scheme, during construction, workman and equipment are often exposed to danger zone, and inbreak region can occur secondary inbreak at any time, Crushed zone can occur stone and drop at any time, can be caused casualties when serious or equipment damage.And in Bracing Process, machine Tool degree is not high, and the installation of steel arch-shelf and the placement of top sleeper are mainly carried out by artificial mode, and labour intensity is big, Low construction efficiency.
The content of the invention
It is an object of the invention to provide a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, Underground Metallic Mines tunnel Collapsed zone and crushed zone support issues are solved, security and efficiency of construction are high.
Technical program of the present invention lies in:It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the supporting side of crushed zone Method, comprises the following steps:
1)According to Collapsed zone or the length of crushed zone, in advance in the ground both sides mounting bracket track in tunnel, and in tunnel one end Safety zone install the first arch support that inverted U track is provided with along its profile;
2)According to Collapsed zone or the length of crushed zone, guide post is respectively mounted in the both sides of the first arch support;
3)The second prefabricated arch support to the n-th arch support is separately mounted on bracket track, and makes the second arch branch Frame to the fairlead of the n-th arch support both sides is nested with the guide bar respectively, second arch support to the n-th arch support It is upper that its profile is provided with inverted U track respectively, and two side lever bottoms of the second arch support to the n-th arch support are respectively provided with There is the roller driven by drive mechanism;
4)The second arch support to the n-th arch support is set to be moved respectively to specified location, and the n-th arch support by drive mechanism Move to the safety zone of the tunnel other end;
5)Retaining-plate is installed on the inverted U track of the first arch support to the n-th arch support successively, and makes adjacent two arches branch The retaining-plate of frame is end to end;
6)The grout pipe penetrated in Collapsed zone or crushed zone is installed at the interval on the retaining-plate on the downside of Collapsed zone or crushed zone, And the anchor pole in the rock stratum for stretching into above Collapsed zone or crushed zone is worn in grout pipe;
7)By grout pipe to perfusion mortar in Collapsed zone or crushed zone, after completing Collapsed zone or crushed zone after mortar hardening Supporting.
Further, the retaining-plate is made up of some pieces of template splicings respectively, and the template is longitudinally through inverted U track And middle part is stuck in inverted U track, the both sides of template be respectively arranged with articulated section and through the bearing pin longitudinally through articulated section with Adjacent forms are realized being hinged.
Further, the front and back end of the template is respectively arranged with the connection being connected with the template on adjacent retaining-plate Portion, below Collapsed zone or crushed zone on be additionally provided with the set hole passed through for grout pipe.
Further, the Single port on first arch support to the n-th arch support positioned at inverted U track is provided with and leads Draw motor, the output end of the traction electric machine is provided with the pull rope stretched into inverted U track;Template when mounted, will draw Rope it is packaged with first enter inverted U track in template be connected, by ordering about the peace of retaining-plate that traction electric machine completion is assembled Dress.
Further, the Single port of the inverted U track is provided with template limiting plate, and the another port of inverted U track sets Arc introduction part is equipped with, the upper and lower side in inverted U track is respectively arranged with auxiliary ball.
Further, first arch support to the top of the n-th arch support is respectively arranged with crossbeam, on the crossbeam Translot is provided with, the fixed pillar being connected with the template of retaining-plate, the both sides of translot are vertically provided with the middle part of the translot Portion is respectively separated the tilting portable stanchion for having and being connected with the template of retaining-plate;First arch support is to the n-th arch support Downside be also vertically provided with hydraulic prop, the expansion link of the hydraulic prop is supported in crossbeam middle part.
Further, the template middle part above fixed pillar is provided with cross draw-in groove, and the fixed pillar is in peace Its upper end is inserted in cross draw-in groove during dress, then the lower end of fixed pillar is hinged by bearing pin with translot.
Further, cross draw-in groove is respectively arranged with for the template middle part being connected with portable stanchion upper end, it is described Portable stanchion is when mounted sideling inserted in cross draw-in groove its upper end, then the lower end of portable stanchion is cut and by bearing pin It is set to be hinged with the pin shaft hole being arranged on translot.
Further, the drive mechanism includes being respectively arranged at two side levers of the second arch support to the n-th arch support The motor of bottom, the motor drives through driving chain and is connected with roller;It is arranged at intervals with the grout pipe Plum blossom-shaped grout hole, the bottom of grout pipe is provided with grouting valve.
Further, second arch support to the n-th arch support is moved and is directed to set by clamping screw afterwards in place It is locked through with guide post, the both sides of first arch support are additionally provided with and are connected and are in the n-th arch support phase two The bracing piece of cross-like.
Compared with prior art, the present invention has advantages below:
During by Collapsed zone, personnel can be in time allowed to be in the construction environment of safety;And the template for using, solves inbreak Area's slip casting problem;By the assembling of template, the support issues in inbreak region are solved;When by crushed zone, the template of design Have and specially leave the drilling for carrying out supporting construction, workman is constructed in the case of arching plate, the operations such as anchor pole are installed, Solve the problems, such as workman's job safety.The arch support of arching plate shifts to an earlier date on mounted track, by manual remote control Mode is walked, and solves labour intensity greatly, and the problem of low construction efficiency, the work for usually needing 5-6 people to complete is existing Can just be solved 2 people are only needed to.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is left side view of the invention;
Fig. 3 is the attachment structure schematic diagram of template of the invention;
Fig. 4 is the partial schematic diagram of inverted U track of the invention;
Fig. 5 is the A-A sectional views of Fig. 4 of the invention;
Fig. 6 is the structural representation of drive mechanism of the invention;
Fig. 7 is the local overlooking view of crossbeam of the invention;
Fig. 8 is the scheme of installation of arch support of the invention;
In figure:1- roads Collapsed zone and crushed zone 2- bracket tracks 10- the first arch support 11- inverted U tracks 12- lead Encircle to bar 13- traction electric machine 14- arc introduction part 15- ball 16- hydraulic prop 17- bracing pieces 20- second Shape support is to the n-th arch support 21- fairlead 22- roller 23- motor 24- driving chain 30- retaining-plates The 31- template 32- articulated sections 33- bearing pin 34- connecting portions 35- set cross draw-in groove 40- grout pipes of hole 36- 41- grout holes 42- grouting valve 50- anchor pole 60- mortar 70- crossbeam 71- translots 72- fixes pillar 73- Portable stanchion 74- bearing pins.
Specific embodiment
It is that features described above of the invention and advantage can be become apparent, special embodiment below, and coordinate accompanying drawing, make detailed Carefully it is described as follows, but the present invention is not limited thereto.
Referring to figs. 1 to Fig. 8
It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, comprise the following steps:
1)It is to consider equipment in advance in the ground both sides mounting brackets track 2 in tunnel according to Collapsed zone or the length of crushed zone 1 Transportation problem, track length is designed as 1-1.5m, can be extended by bolt between track;And in the safety of tunnel one end Region installs the first arch support 10 that inverted U track 11 is provided with along its profile;
2)According to Collapsed zone or the length of crushed zone, guide post 12 is respectively mounted in the both sides of the first arch support, to supply Two arch supports are walked to the n-th arch support 20 and are oriented to;
3)The second prefabricated arch support to the n-th arch support is separately mounted on bracket track, and makes the second arch branch Frame to the fairlead 21 of the n-th arch support both sides is nested with guide post 11 respectively, second arch support to the n-th arch Its profile is provided with inverted U track respectively on support, and two side lever bottoms of the second arch support to the n-th arch support are distinguished The roller 22 driven by drive mechanism is provided with, so as to the second arch support to the movement of the n-th arch support;
4)The second arch support to the n-th arch support is set to be moved respectively to specified location, and the n-th arch support by drive mechanism Move to the safety zone of the tunnel other end, so as to after whole arch support installations can from Collapsed zone or crushed zone across Cross;
5)Retaining-plate 30 is installed on the inverted U track of the first arch support, the retaining-plate installation of the first arch support is treated The retaining-plate of the second arch support is installed again afterwards, and so on, until the retaining-plate of the n-th arch support completes to install, install When make adjacent two arch support retaining-plate head and the tail connect, so as to improve the security of construction;
6)The grout pipe penetrated in Collapsed zone or crushed zone is installed at the interval on the retaining-plate on the downside of Collapsed zone or crushed zone 40, and the anchor pole 50 in the rock stratum stretched into above Collapsed zone or crushed zone is worn in grout pipe;
7)By grout pipe to perfusion mortar 60 in Collapsed zone or crushed zone, after completing Collapsed zone or crushed zone after mortar hardening Supporting.
In the present embodiment, the retaining-plate is made up of some pieces of splicings of template 31 respectively, and the template is longitudinally through inverted U Track and middle part is stuck in inverted U track, the both sides of template are respectively arranged with articulated section and through longitudinally through articulated section 32 Bearing pin 33 is realized being hinged with adjacent forms.Template is that, from pallet, width is 20cm, 1.2 ~ 1.5m of length.
In the present embodiment, the front and back end of the template is respectively arranged with the connection being connected with the template on adjacent retaining-plate Portion 34, below Collapsed zone or crushed zone on be additionally provided with the set hole 35 passed through for grout pipe, so that grout pipe is passed through.
In the present embodiment, the Single port on first arch support to the n-th arch support positioned at inverted U track is provided with Traction electric machine 13, the output end of the traction electric machine is provided with the pull rope stretched into inverted U track;Template when mounted, will Pull rope it is packaged with first enter inverted U track in template be connected, driven by ordering about traction electric machine and complete the branch that assembles The installation of backplate, makes template be automatically mounted into design attitude.Under secure conditions, then the template that carries out on next arch support Install, so as to improve efficiency of assembling.
In the present embodiment, the Single port of the inverted U track is provided with template limiting plate, will pass through first piece of template The spacing positioning for completing follow-up template.The another port of inverted U track is provided with arc introduction part 14, in inverted U track it is upper, Downside is respectively arranged with the ball 15 of auxiliary template slip, so that template is preferably imported.
In the present embodiment, first arch support to the top of the n-th arch support is respectively arranged with crossbeam 70, the horizontal stroke Translot 71 is provided with beam, the fixed pillar 72 being connected with the template of retaining-plate is vertically provided with the middle part of the translot, it is horizontal The both sides of groove are respectively separated the tilting portable stanchion 73 for having and being connected with the template of retaining-plate;First arch support is to The downside of n arch supports is also vertically provided with hydraulic prop 16, and the expansion link of the hydraulic prop is supported in crossbeam middle part or liquid Longitudinal plate or bar are provided with the expansion link for pressing pillar, are connected with crossbeam by the two ends of longitudinal plate or bar.Hydraulic prop pair One support force of template and arch support, it is ensured that the intensity of template and arch support.
In the present embodiment, the template middle part above fixed pillar is provided with cross draw-in groove 36, the fixed pillar Its upper end is inserted in cross draw-in groove when mounted, then the lower end of fixed pillar is hinged by bearing pin 74 and translot.
In the present embodiment, the template middle part for being connected with portable stanchion upper end is respectively arranged with cross draw-in groove, institute State portable stanchion when mounted sideling to insert in cross draw-in groove its upper end, then the lower end of portable stanchion is cut and by pin Axle 74 makes it be hinged with the pin shaft hole being arranged on translot, and the length of portable stanchion is adjusted so as to the situation according to scene.
In the present embodiment, the drive mechanism includes being respectively arranged at the second arch support to the both sides of the n-th arch support The motor 23 of bar bottom, the motor drives through driving chain 24 and is connected with roller.Set on the motor Remote-control facilities is equipped with, will pass through remote-control facilities, makes the second arch support to the n-th arch support automatic moving to design attitude.
In the present embodiment, plum blossom-shaped grout hole 41 is arranged at intervals with the grout pipe, the bottom of grout pipe is provided with filling Slurry valve 42, so as to the valve closing that will be in the milk after the completion of being in the milk.Grout pipe is mainly used to gib Collapsed zone and construction anchor pole Protection device during hole, prevents Collapsed zone from inbreak occurring again, while by direct on anchor pole after the completion of grout pipe slip casting Pallet is installed, grout pipe also functions to an effect for anchor pole.
In the present embodiment, second arch support to the n-th arch support motion is directed to by clamping screw afterwards in place Through being locked with guide post, the both sides of first arch support are additionally provided with and are connected simultaneously with the n-th arch support phase two set Cross-shaped bracing piece 17, so as to improve overall intensity.
Presently preferred embodiments of the present invention is the foregoing is only, for the ordinary skill in the art, according to this hair Bright teaching, design multi-form for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, and be not required to Want performing creative labour, it is all without departing from the principles and spirit of the present invention to be done according to scope of the present invention patent Impartial change, modification, replacement and modification, should all belong to covering scope of the invention.

Claims (10)

1. it is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, it is characterised in that including following step Suddenly:
1)According to Collapsed zone or the length of crushed zone, in advance in the ground both sides mounting bracket track in tunnel, and in tunnel one end Safety zone install the first arch support that inverted U track is provided with along its profile;
2)According to Collapsed zone or the length of crushed zone, guide post is respectively mounted in the both sides of the first arch support;
3)The second prefabricated arch support to the n-th arch support is separately mounted on bracket track, and makes the second arch branch Frame to the fairlead of the n-th arch support both sides is nested with the guide bar respectively, second arch support to the n-th arch support It is upper that its profile is provided with inverted U track respectively, and two side lever bottoms of the second arch support to the n-th arch support are respectively provided with There is the roller driven by drive mechanism;
4)The second arch support to the n-th arch support is set to be moved respectively to specified location, and the n-th arch support by drive mechanism Move to the safety zone of the tunnel other end;
5)Retaining-plate is installed on the inverted U track of the first arch support to the n-th arch support successively, and makes adjacent two arches branch The retaining-plate of frame is end to end;
6)The grout pipe penetrated in Collapsed zone or crushed zone is installed at the interval on the retaining-plate on the downside of Collapsed zone or crushed zone, And the anchor pole in the rock stratum for stretching into above Collapsed zone or crushed zone is worn in grout pipe;
7)By grout pipe to perfusion mortar in Collapsed zone or crushed zone, after completing Collapsed zone or crushed zone after mortar hardening Supporting.
2. according to claim 1 a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, its It is characterised by, the retaining-plate is made up of some pieces of template splicings respectively, and the template is longitudinally through inverted U track and middle part card In in inverted U track, the both sides of template are respectively arranged with articulated section and through the bearing pin and adjacent forms longitudinally through articulated section Realization is hinged.
3. according to claim 2 a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone, its It is characterised by, the front and back end of the template is respectively arranged with the connecting portion being connected with the template on adjacent retaining-plate, positioned at emitting Settle in an area or crushed zone below on be additionally provided with the set hole passed through for grout pipe.
4. a kind of according to Claims 2 or 3 be for Underground Metallic Mines tunnel Collapsed zone and the method for crushed zone supporting, Characterized in that, the Single port on first arch support to the n-th arch support positioned at inverted U track is provided with traction electricity Machine, the output end of the traction electric machine is provided with the pull rope stretched into inverted U track;Template when mounted, by pull rope with First it is packaged enter inverted U track in template be connected, the installation of retaining-plate assembled by ordering about traction electric machine to complete.
5. according to claim 4 a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for crushed zone supporting, its It is characterised by, the Single port of the inverted U track is provided with template limiting plate, and the another port of inverted U track is provided with arc Introduction part, the upper and lower side in inverted U track is respectively arranged with auxiliary ball.
6. a kind of according to claim 2,3 or 5 is for Underground Metallic Mines tunnel Collapsed zone and the side of crushed zone supporting Method, it is characterised in that first arch support to the top of the n-th arch support is respectively arranged with crossbeam, is set on the crossbeam Translot is equipped with, the fixed pillar being connected with the template of retaining-plate, the both sides of translot are vertically provided with the middle part of the translot It is respectively separated the tilting portable stanchion for having and being connected with the template of retaining-plate;First arch support is to the n-th arch support Downside is also vertically provided with hydraulic prop, and the expansion link of the hydraulic prop is supported in crossbeam middle part.
7. according to claim 6 a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for crushed zone supporting, its It is characterised by, the template middle part above fixed pillar is provided with cross draw-in groove, and the fixed pillar is when mounted by it Upper end is inserted in cross draw-in groove, then the lower end of fixed pillar is hinged by bearing pin with translot.
8. according to claim 6 a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for crushed zone supporting, its It is characterised by, the template middle part for being connected with portable stanchion upper end is respectively arranged with cross draw-in groove, the portable stanchion Its upper end is sideling inserted in cross draw-in groove when mounted, then the lower end of portable stanchion is cut and is made it and is set by bearing pin The pin shaft hole being placed on translot is hinged.
9. according to claim 1 a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for crushed zone supporting, its It is characterised by, the drive mechanism includes the drive of the two side lever bottoms for being respectively arranged at the second arch support to the n-th arch support Dynamic motor, the motor drives through driving chain and is connected with roller;Plum blossom-shaped filling is arranged at intervals with the grout pipe Slurry hole, the bottom of grout pipe is provided with grouting valve.
10. a kind of according to claim 1 or 9 is for Underground Metallic Mines tunnel Collapsed zone and the side of crushed zone supporting Method, it is characterised in that second arch support to the n-th arch support move in place afterwards by clamping screw be directed to set through with Guide post is locked, and the both sides of first arch support are additionally provided with and be connected with the n-th arch support phase two and in intersecting The bracing piece of shape.
CN201710029030.9A 2017-01-16 2017-01-16 It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone Active CN106761873B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710029030.9A CN106761873B (en) 2017-01-16 2017-01-16 It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710029030.9A CN106761873B (en) 2017-01-16 2017-01-16 It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone

Publications (2)

Publication Number Publication Date
CN106761873A true CN106761873A (en) 2017-05-31
CN106761873B CN106761873B (en) 2018-11-27

Family

ID=58945683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710029030.9A Active CN106761873B (en) 2017-01-16 2017-01-16 It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone

Country Status (1)

Country Link
CN (1) CN106761873B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448226A (en) * 2017-09-25 2017-12-08 张莲莲 One kind mining support fender bracket
CN108661664A (en) * 2018-04-04 2018-10-16 中交第三公路工程局有限公司 A kind of tunnel crushed zone construction method and combination supporting device
CN109444377A (en) * 2018-12-11 2019-03-08 河南理工大学 Similar material simulation experiment tunnel reservation device and its laneway molding method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2017196A (en) * 1978-03-24 1979-10-03 Ts Osrodek P K Maszyn Gorn An Arched Roof-Lining
CN203783620U (en) * 2014-04-18 2014-08-20 李明 Self-moving type arch-shield-support and anchor-net spraying and dust-preventing all-in-one machine
CN104196546A (en) * 2014-08-06 2014-12-10 山东大学 Treatment method for fault fracture zone collapse in tunnel construction process
CN104879136A (en) * 2015-04-17 2015-09-02 山东大学 Supporting and protecting system for tunnel penetrating weak and broken formations of karst cave and mounting method of supporting and protecting system
CN105781582A (en) * 2016-04-11 2016-07-20 长安大学 Novel shallow-buried tunnel support structure applicable to urban sensitive areas and construction method of novel shallow-buried tunnel support structure applicable to urban sensitive areas
CN106089240A (en) * 2016-06-14 2016-11-09 重庆工商职业学院 Support System in Soft Rock Tunnels segments in a circular shape excavation supporting system and method for protecting support thereof
CN205743941U (en) * 2016-05-16 2016-11-30 六盘水师范学院 A kind of colliery tunnel support plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2017196A (en) * 1978-03-24 1979-10-03 Ts Osrodek P K Maszyn Gorn An Arched Roof-Lining
CN203783620U (en) * 2014-04-18 2014-08-20 李明 Self-moving type arch-shield-support and anchor-net spraying and dust-preventing all-in-one machine
CN104196546A (en) * 2014-08-06 2014-12-10 山东大学 Treatment method for fault fracture zone collapse in tunnel construction process
CN104879136A (en) * 2015-04-17 2015-09-02 山东大学 Supporting and protecting system for tunnel penetrating weak and broken formations of karst cave and mounting method of supporting and protecting system
CN105781582A (en) * 2016-04-11 2016-07-20 长安大学 Novel shallow-buried tunnel support structure applicable to urban sensitive areas and construction method of novel shallow-buried tunnel support structure applicable to urban sensitive areas
CN205743941U (en) * 2016-05-16 2016-11-30 六盘水师范学院 A kind of colliery tunnel support plate
CN106089240A (en) * 2016-06-14 2016-11-09 重庆工商职业学院 Support System in Soft Rock Tunnels segments in a circular shape excavation supporting system and method for protecting support thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448226A (en) * 2017-09-25 2017-12-08 张莲莲 One kind mining support fender bracket
CN108661664A (en) * 2018-04-04 2018-10-16 中交第三公路工程局有限公司 A kind of tunnel crushed zone construction method and combination supporting device
CN109444377A (en) * 2018-12-11 2019-03-08 河南理工大学 Similar material simulation experiment tunnel reservation device and its laneway molding method

Also Published As

Publication number Publication date
CN106761873B (en) 2018-11-27

Similar Documents

Publication Publication Date Title
CN101251022B (en) Immediate support device for digging machine
CN102654060B (en) Tunnel excavation staggered type supporting device
AU2014292699A1 (en) Temporary supporting and permanent supporting parallel operation excavating technology for crawler-type hydraulic combination bracket and equipment using same
CN106703856A (en) Shed-style step forward combination support with multi-drill
CN106761873A (en) It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the method for protecting support of crushed zone
CN102392667B (en) Fast installation method of ten-million-ton scale fully mechanized caving face equipment
CN202391424U (en) Supporting type comprehensive bolter miner
CN102121390B (en) Telescopic tunneling immediate support device
CN201170107Y (en) Immediate support device for digging machine
CN110331996A (en) The purely mechanic semi-automatic mobile laneway temporary support device of one kind and working method
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN206608198U (en) A kind of canopy formula with gang drill is taken a step sectional shelf-unit
CN202578740U (en) Drivage staggered type support device
CN106593500B (en) It is a kind of for Underground Metallic Mines tunnel Collapsed zone and the device of crushed zone supporting
CN113622982B (en) Supporting device for coal mine composite roof and application method thereof
CN103628903B (en) Roadway full-fracture-surface anchoring-rod and anchoring-rope integrated parallel installation method and device
CN115288701B (en) Tunneling method for long-tunneling long-branch roadway
CN206448809U (en) Pick, branch, anchor, drill integrated fully-mechanized digging machine
CN102633086A (en) Clamping device for rubber belt
CN206458491U (en) A kind of support bracket structure for Underground Metallic Mines tunnel Collapsed zone and crushed zone
CN202125305U (en) Hydraulic bracket for roadway support
CN105937401B (en) The method for protecting support in Liu Sheshuan lanes is once tunneled in a kind of U-shaped ventilation
CN104153803B (en) Coal mine tunneling support device
CN105178992A (en) Temporary supporting method and apparatus for open-off cut excavation in fully-mechanized coal face of steep coal seam
CN104533493B (en) It is a kind of to be used to tunnel the shield support with back production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200330

Address after: No.4 village, Xuejiadao office, Huangdao District, Qingdao City, Shandong Province

Patentee after: Qingdao qiankunxing Intelligent Technology Co., Ltd

Address before: Minhou County of Fuzhou City, Fujian province 350108 Street Town Road No. 2 University City School District of Fuzhou University

Patentee before: FUZHOU University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200422

Address after: 350108 No. 2 College Road, University New District, Fuzhou, Fujian, Fuzhou

Patentee after: FUZHOU University

Address before: No.4 village, Xuejiadao office, Huangdao District, Qingdao City, Shandong Province

Patentee before: Qingdao qiankunxing Intelligent Technology Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200512

Address after: 266555 No.6 Huilongshan Road, Huangdao District, Qingdao, Shandong Province

Patentee after: Qingdao pengte Electromechanical Equipment Co., Ltd

Address before: 350108 No. 2 College Road, University New District, Fuzhou, Fujian, Fuzhou

Patentee before: FUZHOU University

TR01 Transfer of patent right