CN205663117U - Assembled slope tile roofing mounting structure - Google Patents
Assembled slope tile roofing mounting structure Download PDFInfo
- Publication number
- CN205663117U CN205663117U CN201620490965.8U CN201620490965U CN205663117U CN 205663117 U CN205663117 U CN 205663117U CN 201620490965 U CN201620490965 U CN 201620490965U CN 205663117 U CN205663117 U CN 205663117U
- Authority
- CN
- China
- Prior art keywords
- tile
- roofing
- ridge
- nail
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The utility model discloses an assembled slope tile roofing mounting structure, including waterproofing membrane, the parallel ridge of waterproofing membrane is just up spread from the eaves mouth and is pasted on the roof surface, with lafarge counter batten nail or cement steel nail behind the counter batten preserved handle, and counter batten is parallel interval arranged, and the heated board is fixed to be set up between two counter batten's interval, the tile batten is fixed on counter batten with special nail or corrosion resistant nail, aluminium matter escape canal is fixed in tile hanging basic unit with supporting escape canal clip, the roofing tile passes through on special nail of roofing tile or the fixed roofing of anti -wind hasp, ridge tile pillow support is high fixed ridge tile pillow support and ridge tile strip according to the ridge tile, adopts the ridge tile hasp to bind the ridge tile on the ridge tile strip. All adopt the unit mount, this technology is advanced, and the construction convenience potential safety hazard is little, advanced easy grasp of this worker method simple process, the quality is guaranteed, the waterproof durability of this worker method is strong, especially the whole architectural energy consumption greatly reduced of the original messenger of internet technology.
Description
Technical field
This utility model relates to the installation Technology field of assembled slope tile roofing, is specially a kind of room, assembled slope watt
Face mounting structure.
Background technology
The slope tile roofing of villa and high-end residential needs are fast installed, because the duration is relatively tight and the construction time is commonly located at rain
Phase, use traditional wet trade tile hanging to install and certainly will cause a series of problems such as tiling pollution, poor, the heat insulation difference of waterproof effect,
Bigger hidden danger is caused, it is therefore necessary to take quick and that operation can be done tile roofing installation body to the effect of Deluxe villa
System.
Summary of the invention
The purpose of this utility model is to provide a kind of assembled slope tile roofing mounting structure, to solve above-mentioned background technology
The problem of middle proposition.
For achieving the above object, this utility model following technical scheme of offer: a kind of assembled slope tile roofing mounting structure,
Including waterproof roll, tile batten, counter battens, warming plate, aluminum matter gutter, wind resistance hasp, ridge tiles bolster support and roofing tile;Institute
State the parallel ridge of waterproof roll and at cornice up paving at roof surface;Use Lafarge suitable after described counter battens preservative treatment
Water bar nail or cement steel nail, be fixed on counter battens on roofing, and counter battens is parallel interval arrangement, and warming plate is fixedly installed on
Between the interval of two counter battens;Described tile batten is fixed on counter battens with special nail or corrosion resistant wire nail after preservative treatment;Institute
State aluminum matter gutter to be fixed in tile hanging basic unit with supporting gutter clip;Described roofing tile is by roofing tile special nail or anti-
Wind hasp is fixed on roofing;Described ridge tiles bolster support is fixed ridge tiles bolster support according to the height of ridge tiles with ridge tiles bar, adopts
With ridge tiles hasp, ridge tiles is bound on ridge tiles bar.
Further, adhesive bitument primer uniformly it is painted with between described waterproof roll and roof surface.
Further, described counter battens exceeds 5-10mm than warming plate.
Further, described warming plate posts aluminium foil layer, and aluminium foil surface is upward.
Further, described tile batten uses Masson Pine bar.
Further, by a section watt hasp, roofing tile is fixed at roofing hip and valley.
Compared with prior art, the beneficial effects of the utility model are: layer downstream, antiradiation that roofing heat-insulating layer is arranged are hot
Layer, cross-ventilation layer are energy-saving and environment-friendly;The creative use of roofing tile hanging material is more prolonged than traditional mortar mounting method;Roofing
The process antiseep the most attractive in appearance simple to operate of watt detail treatment;The use of coiled material is not only novel ventilative but also rainproof revolutionizes tradition
The deficiency of technique, makes tile roofing engineering more perfect.All using assembly to install, this technique is advanced, and easy construction potential safety hazard is little;
This engineering method technique is simply advanced easily to be grasped, and quality is guaranteed;The waterproof durability of this engineering method is strong, especially power-saving technology original make whole
Building energy consumption is substantially reduced, and reaches extraordinary social benefit.
Accompanying drawing explanation
Fig. 1 is waterproof roll structure schematic diagram of the present utility model;
Fig. 2 is that tile batten of the present utility model arranges structural representation;
Fig. 3 is gutter of the present utility model mounting structure schematic diagram;
Fig. 4 is ridge mounting structure schematic diagram of the present utility model;
Fig. 5 is wind resistance hasp side structure schematic diagram of the present utility model;
Fig. 6 is wind resistance hasp Facad structure schematic diagram of the present utility model;
Fig. 7 is of the present utility model section watt of hasp structure schematic diagram;
Fig. 8 is ridge tiles bolster supporting structure schematic diagram of the present utility model.
In figure: 1-waterproof roll, 2-tile batten, 21-tile hanging basic unit, 3-counter battens, 4-warming plate, 5-aluminum matter gutter,
6-wind resistance hasp, 7-cut a watt hasp, 8-ridge tiles bolster support, 9-ridge tiles hasp, 10-roofing tile, 11-ridge tiles.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Refer to Fig. 1-8, a kind of embodiment that this utility model provides: a kind of assembled slope tile roofing mounting structure, bag
Include waterproof roll 1, tile batten 2, counter battens 3, warming plate 4, aluminum matter gutter 5, wind resistance hasp 6, ridge tiles bolster support 8 and roofing
Watts 10;The described parallel ridge of waterproof roll 1 and at cornice up paving at roof surface;After the preservative treatment of described counter battens 3
With Lafarge counter battens nail or cement steel nail, counter battens 3 is fixed on roofing, and counter battens 3 arranges in parallel interval, insulation
Plate 4 is fixedly installed between the interval of two counter battens 3;Described tile batten 2 is solid with special nail or corrosion resistant wire nail after preservative treatment
It is scheduled on counter battens 3;Described aluminum matter gutter 5 is fixed in tile hanging basic unit 21 with supporting gutter clip;Described roofing tile
10 are fixed on roofing by roofing tile special nail or wind resistance hasp 6;Described ridge tiles bolster support 8 according to the height of ridge tiles ridge tiles
Bolster support 8 is fixed with ridge tiles bar, uses ridge tiles hasp 9 to be bound on ridge tiles bar by ridge tiles 11.
As optimisation technique scheme of the present utility model: be uniformly painted with cold between described waterproof roll 1 and roof surface
Bottom oil.
As optimisation technique scheme of the present utility model: described counter battens 3 exceeds 5-10mm than warming plate 4.
As optimisation technique scheme of the present utility model: post aluminium foil layer on described warming plate 4, and aluminium foil surface is upward.
As optimisation technique scheme of the present utility model: described tile batten 2 uses Masson Pine bar.
As optimisation technique scheme of the present utility model: by cutting watt hasp 7 by roofing tile 10 at roofing hip and valley
Fixing.
Operation principle:
Technological process, waterproof coiled material construction counter battens warming plate is installed and is covered easy coiled material and tile batten installation gutter
Construct roofing tile and node processing is installed.
1. waterproof coiled material construction
Base oil: waterproof roll 1 basal plane before construction must uniform brushing adhesive bitument primer, to ensure the good of coiled material and basal plane
In conjunction with.
Installation of membrane: waterproof roll 1 answers the up paving at cornice of parallel ridge, and two-way drain slope coiled material lapping acts in accordance with
Current direction, long limit and the lap width of termination, full bonding is 80mm, and termination meets stubble 50mm to be staggered.
Waterproof roll 1 should eject datum line paving by coiled material specification, and make the length of coiled material from the beginning of the descending of drain slope
Limit is vertical with flowing water slope aspect.Notice that coiled material preparation should reduce the joint at negative and positive angle.
The coiled material that paving plane is connected with facade, should be carried out from bottom to top, makes coiled material be close to negative and positive angle, to volume when sprawling
Material can not La get Tai tight, and must not have the phenomenon such as gauffer, hollowing.
2. counter battens 3 and warming plate 4 are installed
Position, gutter and the line setting of counter battens:
According to the contour line (i.e. centrage) of ditch of having a rest, it is parallel to the both sides 160mm of contour line, respectively puts a location line and make
The position in gutter is also the position installing additional counter battens.
The line setting of counter battens 3: first up measure 50mm from eaves, ejects one and is parallel to the parallel of cornice limit
Line, determines the top starting point of the pillow bar position counter battens 3 of eaves first row watt.Then hang down according to warming plate 4 width dimensions 600mm
Straight in the evenly distributed location of roofing eave.Counter battens 3 spacing is not preferably greater than 600mm.
The installation of counter battens 3: counter battens size preferably 40mm*40mm(thickness should determine according to warming plate thickness, it is ensured that
Counter battens 3 aspect ratio warming plate 4 exceeds 5-10mm flowing water gap) must follow closely or cement steel with Lafarge counter battens after preservative treatment
Nail, is fixed on counter battens 3 on roofing by line of ink marker position, location, and the nail largest interval of all fixing counter battens 3 is that 450mm is true
Protect the firm of counter battens.
The installation of warming plate 4: within the installation of warming plate 4 can directly be embedded in counter battens 3, and keep counter battens 3 guarantor
Temperature board is the most tight.
3. the installation of tile batten 2
Aluminium foil thermal insulating coiled material lays: between counter battens 3 and tile batten 2, coiled material rich degree < between any two counter battens 3
20mm;Aluminium foil surface upward, overlaps a size of laterally 100mm, longitudinal 150mm;Seam must use coiled material lapping sealing strip to paste.
Workmen installs suitable wear dark glasses in the sun and guarantees safety.
The installation of tile batten 2: must eject according to the size of roofing tile and lap of splice ink fountain before installing tile batten 2
The spread length of tile batten;Tile batten is preferably 30mm*30mm Masson Pine bar, after preservative treatment with Lafarge tile batten special nail or
The corrosion resistant wire nail of 50-60mm length is fixed on counter battens 3, and tile batten 2 must nail with every counter battens 3 intersection.
Cornice upwards 340mm fixes first row tile batten 2, after securing first row tile batten, arranges most to go up row's tile batten
2, going up most the upper edge of row's tile batten away from ridge center line 30mm. is that watt pawl going up most row's tile reserves position.
It is smooth that tile batten 2 should spread nail, and firmly, upper rib should be in line.Joint on counter battens 3, and should arrange it up and down
Between joint and mutually to stagger.Two tile battens 2 should be set, it is necessary to exceed 60mm with counter battens surface, it is ensured that roofing at eaves
Smooth straight after watt installation.
4. the installation in aluminum matter gutter 5 and constructing
Using 1600 × 500 × 0.7 special aluminum gutter about 5 lap of splice is 150mm, every gutter
It is fixed in tile hanging basic unit 21 with 6 supporting gutter clips.
Constructing of aluminum matter gutter 5: aluminum matter gutter 5 construct width should according to the size of gathering ground, gutter area and
Areal rainfall depth determines.The top place of joining in all gutters (as two valleys and the ridge on dormer window roof are joined place), Ying Cai
With gutter sealing strip sealing.
5. the installation of roofing tile 10
Roofing tile 10 installs front unwrapping wire: tile batten 2 is installed after fixing, and should eject the most directly so that cornice line is at a right angle before tiling
Line is that tile is parallel to this line as datum line, extrapolates arrangement modulus according to roofing tile width dimensions, makes same eaves kept man of a noblewoman's tail
Tile keeps consistent neat.
The laying of roofing tile 10: should be from the beginning of the eaves lower right corner during tiling, right-to-left, from bottom to top, every master's watt
Watt pawl must link closely tile batten 2, alignment watt seam.Align with line during tiling, make roofing tile be up to the standard, watt seam is vertical, diagonal
Three-dimensional mark is neat.
Fixing of roofing tile 10:
When the slope of roof be 17.5-22.5 spend time, the periphery cornice in all houses, chimney and protrude roofing structures
Deng, two rows watt of periphery must use roofing tile special nail or roofing tile wind resistance hasp 6 to fix.
When the slope of roof be 22.5-45 spend time, in addition to upper bar, the roofing tile of remainder and every upper next row watt or
Roofing tile special nail or roofing tile wind resistance must be used to take 6 buttons every a piece of tiling watt to fix.
When the slope of roof is for during more than 45 degree, and all of roofing tile must use roofing tile special nail or roofing tile wind resistance hasp
6 fix.
That cuts watt is fixing: when occurring hip and valley in roofing, main tile herein needs to cut off, should be according to hip when cutting off
Line parallel reservation 20mm, after a watt pawl for main watt of part is truncated, it is impossible to during tile hanging, can use section watt hasp 7 to fix.
The installation of accessory watt
Just, the ridge tiles 11 of hip is laid: first according to the height of ridge tiles 11, ridge tiles bolster should be propped up from the beginning of oblique ridge low side
Then frame 8 is fixing with ridge tiles bar pastes waterproof roll 1, uses ridge tiles hasp 9 by ridge tiles 11 by the lap of splice of regulation, should
Bind on ridge tiles bar, guarantee that horizontal smooth-going is straight.
The cornice of gable is laid: beginning in cornice Fengkai, lower end, eaves position, mountain, more directly spreads with eaves tile to eaves top, mountain and reserve
A piece of cornice top bedding.Process with flexible flashing, and fix Yushan Hill eaves position with the Lafarge screw special of 75mm length
Additional counter battens 3 on.
7. node processing
There will be tile in roofing with the position that body of wall or other structures are combined, the process at this position is roof waterproof
Key, may produce hydrops after heavy rain, must ponder deeply combination even earthing method and material during process, should do waterproof additional
Enhancement layer.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this practicality in other specific forms new
Type.Therefore, no matter from the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, this practicality is new
The scope of type is limited by claims rather than described above, it is intended that by the containing of equivalency in claim that fall
All changes in justice and scope are included in this utility model.Should not be considered as any reference in claim limiting
Involved claim.
Claims (6)
1. an assembled slope tile roofing mounting structure, including waterproof roll (1), tile batten (2), counter battens (3), warming plate
(4), aluminum matter gutter (5), wind resistance hasp (6), ridge tiles bolster support (8) and roofing tile (10);It is characterized in that: described waterproof volume
Material (1) parallel ridge and at cornice up paving at roof surface;After described counter battens (3) preservative treatment by Lafarge downstream
Bar nail or cement steel nail, be fixed on counter battens (3) on roofing, and counter battens (3) arrange in parallel interval, and warming plate (4) is solid
Surely it is arranged between the interval of two counter battens (3);Described tile batten (2) is fixed with special nail or corrosion resistant wire nail after preservative treatment
On counter battens (3);Described aluminum matter gutter (5) is fixed in tile hanging basic unit (21) with supporting gutter clip;Described room
Face watt (10) is by the fixing roofing of roofing tile special nail or wind resistance hasp (6);Described ridge tiles bolster support (8) is according to ridge tiles
Height is fixed ridge tiles bolster support (8) with ridge tiles bar, uses ridge tiles hasp (9) to be bound on ridge tiles bar by ridge tiles (11).
A kind of assembled slope the most according to claim 1 tile roofing mounting structure, is characterized in that: described waterproof roll (1)
And uniformly it is painted with adhesive bitument primer between roof surface.
A kind of assembled slope the most according to claim 1 tile roofing mounting structure, is characterized in that: described counter battens (3) compares
Warming plate (4) exceeds 5-10mm.
A kind of assembled slope the most according to claim 1 tile roofing mounting structure, is characterized in that: on described warming plate (4)
Post aluminium foil layer, and aluminium foil surface is upward.
A kind of assembled slope the most according to claim 1 tile roofing mounting structure, is characterized in that: described tile batten (2) is adopted
Use Masson Pine bar.
A kind of assembled slope the most according to claim 1 tile roofing mounting structure, is characterized in that: at roofing hip and valley
By cutting watt hasp (7), roofing tile (10) is fixed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620490965.8U CN205663117U (en) | 2016-05-25 | 2016-05-25 | Assembled slope tile roofing mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620490965.8U CN205663117U (en) | 2016-05-25 | 2016-05-25 | Assembled slope tile roofing mounting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205663117U true CN205663117U (en) | 2016-10-26 |
Family
ID=57161283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620490965.8U Expired - Fee Related CN205663117U (en) | 2016-05-25 | 2016-05-25 | Assembled slope tile roofing mounting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205663117U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107313558A (en) * | 2017-08-14 | 2017-11-03 | 中铁北京工程局集团有限公司 | Piece is constructed between a kind of disjunctor building pitched roof |
CN107338915A (en) * | 2017-06-02 | 2017-11-10 | 康博达节能科技有限公司 | A kind of fall arrest roofing tile installs integrated system construction method |
CN108130971A (en) * | 2016-12-01 | 2018-06-08 | 中航天建设工程有限公司 | Water-proof ventilation type Flat tile roof ridge structure |
CN108331268A (en) * | 2018-02-09 | 2018-07-27 | 乐居乐筑(北京)建筑材料有限公司 | A kind of pitched roof combined metal leveling tile batten, Roof system and its construction method |
CN108798061A (en) * | 2018-07-09 | 2018-11-13 | 四川农业大学 | One kind being suitable for traditional tile roofing anti-skid mesh bracing means suit |
CN110005148A (en) * | 2019-04-24 | 2019-07-12 | 中铁八局集团第四工程有限公司 | A kind of fluorine modeling resin tile roofing construction technique |
CN110219410A (en) * | 2019-05-21 | 2019-09-10 | 深圳市华阳国际工程设计股份有限公司 | Sloping roof structure |
CN110644689A (en) * | 2019-10-28 | 2020-01-03 | 苏州园林发展股份有限公司 | Structure for draining inclined ditch of cross ridge roof of palace type building and construction method thereof |
CN114016675A (en) * | 2021-11-18 | 2022-02-08 | 上海宝冶集团有限公司 | Construction method of asphalt waterproof board sloping roof system |
CN114293717A (en) * | 2022-01-12 | 2022-04-08 | 中核华辰建筑工程有限公司 | Dry construction process for pitched roof |
CN114658171A (en) * | 2022-03-31 | 2022-06-24 | 中国化学工程第十四建设有限公司 | Method for installing and reinforcing slope metal plate tiles of archaized building roof |
-
2016
- 2016-05-25 CN CN201620490965.8U patent/CN205663117U/en not_active Expired - Fee Related
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108130971A (en) * | 2016-12-01 | 2018-06-08 | 中航天建设工程有限公司 | Water-proof ventilation type Flat tile roof ridge structure |
CN107338915A (en) * | 2017-06-02 | 2017-11-10 | 康博达节能科技有限公司 | A kind of fall arrest roofing tile installs integrated system construction method |
CN107313558A (en) * | 2017-08-14 | 2017-11-03 | 中铁北京工程局集团有限公司 | Piece is constructed between a kind of disjunctor building pitched roof |
CN107313558B (en) * | 2017-08-14 | 2023-05-09 | 中铁北京工程局集团有限公司 | Joint structure between conjoined building sloping roof |
CN108331268B (en) * | 2018-02-09 | 2023-05-02 | 乐居乐筑(北京)建筑材料有限公司 | Combined metal leveling batten for sloping roof, roof system and construction method of roof system |
CN108331268A (en) * | 2018-02-09 | 2018-07-27 | 乐居乐筑(北京)建筑材料有限公司 | A kind of pitched roof combined metal leveling tile batten, Roof system and its construction method |
CN108798061A (en) * | 2018-07-09 | 2018-11-13 | 四川农业大学 | One kind being suitable for traditional tile roofing anti-skid mesh bracing means suit |
CN108798061B (en) * | 2018-07-09 | 2023-08-15 | 四川农业大学 | Reinforcing apparatus suit suitable for traditional tile roofing antiskid net |
CN110005148A (en) * | 2019-04-24 | 2019-07-12 | 中铁八局集团第四工程有限公司 | A kind of fluorine modeling resin tile roofing construction technique |
CN110219410A (en) * | 2019-05-21 | 2019-09-10 | 深圳市华阳国际工程设计股份有限公司 | Sloping roof structure |
CN110644689A (en) * | 2019-10-28 | 2020-01-03 | 苏州园林发展股份有限公司 | Structure for draining inclined ditch of cross ridge roof of palace type building and construction method thereof |
CN110644689B (en) * | 2019-10-28 | 2024-03-19 | 苏州园林发展股份有限公司 | Palace type structure for draining inclined ditch of cross ridge roof of building and construction method thereof |
CN114016675A (en) * | 2021-11-18 | 2022-02-08 | 上海宝冶集团有限公司 | Construction method of asphalt waterproof board sloping roof system |
CN114293717A (en) * | 2022-01-12 | 2022-04-08 | 中核华辰建筑工程有限公司 | Dry construction process for pitched roof |
CN114658171A (en) * | 2022-03-31 | 2022-06-24 | 中国化学工程第十四建设有限公司 | Method for installing and reinforcing slope metal plate tiles of archaized building roof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205663117U (en) | Assembled slope tile roofing mounting structure | |
CN211313112U (en) | Large-area large-gradient integrated waterproof heat-preservation tile-hanging roof | |
CN201047140Y (en) | Water proof heat preserving noise prevention decorative roof of steel construction roof truss | |
CN111980309A (en) | Sloping roof system adopting modular tile hanging downstream frame and construction method | |
CN108729595A (en) | A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction | |
CN214461659U (en) | Novel newly-built building roof waterproof node structure | |
CN102733553A (en) | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs | |
CN112695959A (en) | Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process | |
CN211313034U (en) | Slope roof structure | |
CN208748980U (en) | A kind of structurally stable heat-isolating antiseepage pitched roof | |
CN215406980U (en) | Pitched roof tile roofing eaves mouth structure | |
CN110725424B (en) | Passive steel structure house | |
CN205116573U (en) | Waterproof polyurethane roof boarding keeps warm | |
CN210738078U (en) | Slope roof formwork system for multiple slopes | |
CN203097135U (en) | Pitched roof eaves gutter | |
CN207829326U (en) | New type solar energy tile roof mounting structure | |
CN205531042U (en) | Upright lock stitches steel tile roofing system | |
CN220539041U (en) | Parapet flashing structure without reserved groove | |
CN212358795U (en) | Concrete tile roof ridge node structure | |
CN216157240U (en) | Slope roof eaves mouth is consolidated and is decorated device | |
CN114775880A (en) | Construction method for dry-hanging archaized small blue tile on slope roof with angle larger than 45 degrees | |
CN216007576U (en) | Block tile roof gable eave structure | |
CN220117607U (en) | Inclined roof heat-insulating waterproof structure | |
CN212866655U (en) | Plain roofing gutter node structure | |
CN216475928U (en) | Fireproof heat-preservation pitched roof structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161026 Termination date: 20170525 |