CN108729595A - A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction - Google Patents
A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction Download PDFInfo
- Publication number
- CN108729595A CN108729595A CN201810856783.1A CN201810856783A CN108729595A CN 108729595 A CN108729595 A CN 108729595A CN 201810856783 A CN201810856783 A CN 201810856783A CN 108729595 A CN108729595 A CN 108729595A
- Authority
- CN
- China
- Prior art keywords
- roofing
- tile
- joist
- eaves gutter
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 238000000034 method Methods 0.000 title claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 7
- 239000011083 cement mortar Substances 0.000 claims description 13
- 239000004567 concrete Substances 0.000 claims description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 230000001681 protective effect Effects 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000009415 formwork Methods 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000009413 insulation Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000003796 beauty Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000001351 cycling effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D11/00—Roof covering, as far as not restricted to features covered by only one of groups E04D1/00 - E04D9/00; Roof covering in ways not provided for by groups E04D1/00 - E04D9/00, e.g. built-up roofs, elevated load-supporting roof coverings
- E04D11/02—Build-up roofs, i.e. consisting of two or more layers bonded together in situ, at least one of the layers being of watertight composition
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B3/00—Methods or installations for obtaining or collecting drinking water or tap water
- E03B3/02—Methods or installations for obtaining or collecting drinking water or tap water from rain-water
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/064—Gutters
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/08—Down pipes; Special clamping means therefor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Abstract
A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction, the pitched roof includes reinforced concrete roof (1), the light steel keel support that is layed in roofing, the roofing tile being laid on lightgage steel joist frame;Light steel keel support includes main joist (2), the secondary joist vertical with main joist (3), is spaced the fixed block (4) being welded on every secondary joist;The roofing tile includes the cover tile (6) of under tile (5), laying buckle closure on adjacent two-way under tile and fixed block between riding upon two fixed blocks;Recessed hidden eaves gutter (1a) is poured close at root edge in roofing, is located at main joist in roofing and secondary joist junction is embedded with the steel bar end (7) welded with main joist and/or secondary joist;Scupper (5a) is offered on the upward slope under tile close to eaves gutter, the pipe that rains (9) communicated with eaves gutter is provided at both ends in eaves gutter.Sloping roof structure that the present invention is built is firm, attractive and durable, good heat-insulation effect and can converge rainwater and recycles.
Description
Technical field
The invention belongs to construction engineering technical fields, relate generally to building sloping roof structure and its method of construction.
Background technology
The roofing in house is roughly divided into two class of pitched roof and flat roof deck.In China's conventional house building, pitched roof building
Very favored by people always.Traditional pitched roof building is first to set up house beam, then sets up roof slope roof truss, then in room
Under tile and cover tile are laid on upper frame.This traditional roof structure is very easy to be impaired, and tile is easy to be started by strong wind or by hard object
It smashes, wind resistance anti-disaster ability is poor, once tile damages or falls, house will fill wind roof leaking, need often to repair.In addition its
Poor sealing, heat-resisting and winter resistance are all poor.Into the modern times, people start directly to pour into a mould pitched roof using armored concrete,
Although wind resistance anti-disaster ability and leakproofness are improved, the aesthetic feeling on traditional tile top is lost completely, and its is heat-resisting and anti-
Cold still poor, summer is sultry within doors, and winter is cold.More major problem is that, since cement mortar is not corrosion-resistant and antidetonation
, often there is the problems such as roofing splits, falls off, leaking, it is often necessary to repair in use in the characteristics such as property is poor.In addition, raining
When, rainwater leaves along pitched roof, completely sinuous flow, brings inconvenience to people.Although someone, which takes to set up in eaves, connects rain slot, by rain
Water introduces downpipe, but this exposed beauty for connecing rain slot and seriously affecting building by connecing rain slot, also often due to sealing
It is not in place to lead to leak, often to repair.
Invention content
It is an object of the present invention to solve the deficiency of the existing technology and provide a kind of stabilized structure, attractive and durable, heat-insulated effects
Fruit is good and can effectively converge house pitched roof and its method of construction that rainwater recycles.
The purpose of the present invention is achieved through the following technical solutions:
A kind of structurally stable heat-isolating antiseepage pitched roof is included the sloping roof poured using armored concrete, is layed in
The light steel keel support of roofing, the roofing tile being laid on lightgage steel joist frame;The light steel keel support includes along the slope of roof
Be spaced installation the main joist being mutually parallel, arranged for interval be welded on main joist and with the orthogonal secondary joist of main joist,
It is mutually aligned the fixed block that interval is welded on every secondary joist;The roofing tile includes between riding upon two fixed blocks from room
Eaves bottom sequence is laid with to the under tile at the top of roofing, sequence and is laid with cover tile of the buckle closure on adjacent two-way under tile and fixed block;?
The roofing pours recessed hidden eaves gutter close at root edge, is located at main joist in roofing and secondary joist junction is embedded with
Steel bar end, the main joist and/or secondary joist are welded with steel bar end, and the under tile is installed on by connecting bolt on secondary joist;
Scupper is offered on the upward slope under tile close to hidden eaves gutter, falling of being communicated with eaves gutter is provided at both ends in hidden eaves gutter
Rain pipe.
Roofing of the present invention include armored concrete pouring layer and the cement mortar screeding layer being successively laid with, waterproof layer,
Waterproof roll layer, insulating layer, cement mortar protective course.
Steps are as follows for the method for construction of structurally stable heat-isolating antiseepage pitched roof of the present invention:
Being poured Step 1: completing sloping roof using armored concrete, when pouring under roofing eaves and building masonry wall
Intersection formwork pours hidden eaves gutter, and embedded bar head is arranged in a matrix in roofing;
Step 2: being laid with light steel keel support in roofing;It first is laid with main joist along the slope of roof, then on main joist laterally
Secondary joist is welded, then interval is welded and fixed block on every secondary joist, and the fixed block on every secondary joist is mutually aligned to be formed
Multichannel fixed block;Finally main joist and steel bar end are welded, light steel keel support is fixed;
Mat formation Step 3: carrying out tiling, under tile is sequentially laid between two fixed blocks along longitudinal direction by column, using connection
Bolt passes through under tile and secondary joist, and under tile is installed and is fixed, and cover tile sequence is then laid with buckle closure in adjacent two-way under tile and solid
Determine on block;Close to hidden eaves when opening up scupper under tile at the upward slope close to hidden eaves gutter, or being laid under tile
It is laid at the upward slope of ditch to have opened up the under tile of scupper;
Step 4:The pipe that rains communicated with eaves gutter is set at hidden eaves gutter both ends, or in hidden eaves gutter both ends ditch
Bottom opens up water falling hole, and the pipe that rains is set up under water falling hole.
After the completion of the reinforced concrete roof of above-mentioned steps one pours, successively in roofing topping laying cement mortar screeding
Layer, waterproof layer, waterproof roll layer, insulating layer, cement mortar protective course.
The present invention is fixed on light steel by the way that light steel keel support is firm on roofing, by under tile by connecting bolt
On keel bracket, the firm installation of under tile is realized, will not loosen and be scattered.By in reinforced concrete roof close at root edge structure
Hidden eaves gutter is built, and opens up scupper on the upward slope under tile close to hidden eaves gutter, the rainwater that retention roofing flows down simultaneously draws
Enter eaves gutter, rainwater enters the pre-buried pipe that rains in eaves gutter end by hidden eaves gutter, through rainwater down pipe in-line arrangement to rain water collecting system
It is interior, it realizes rainwater cycling and reutilization, avoids and cause a large amount of ponding of roofing on most of rainwater catchment to roof boarding and drip to wear
The case where stone damage roofing, occurs.In addition, being played very there are certain overhead space between reinforced concrete roof and tiling
Good heat-blocking action, can make house indoor more comfortable.The eaves gutter of hidden, which designs, makes row's rain system hidden under tiling, right
Facade does not influence completely.
Sloping roof structure that the present invention is built is light and handy and firm stable, is unlikely to deform, will not fall off, and has anti-high wind, anti-
Shake ability is strong, the outstanding features such as heat-insulated, good seepage-proof property.The method of construction simple process of pitched roof of the present invention, it is quick for installation, build
Make at low cost, construction safety.
Description of the drawings
Fig. 1 is the casting reinforced concrete roofing schematic diagram of the present invention;
Fig. 2 is the structural schematic diagram of light steel keel support;
Fig. 3 is that roofing tile is mated formation sectional schematic diagram;
Fig. 4 is the vertical view of Fig. 3;
Fig. 5 is the Section A-A figure of Fig. 1.
Specific implementation mode
As Figure 1-Figure 4, structurally stable heat-isolating antiseepage pitched roof of the invention, including poured using armored concrete
Sloping roof 1, the light steel keel support for being layed in roofing, the roofing tile that is laid on lightgage steel joist frame.The lightgage steel joist
Holder include the main joist 2 being mutually parallel installed along slope of roof interval, arranged for interval be welded on main joist and with main dragon
The orthogonal secondary joist 3 of bone is mutually aligned the fixed block 4 that interval is welded on every secondary joist.The roofing tile includes taking
It is located between two fixed blocks and is laid with buckle closure in adjacent two-way from eaves bottom sequence laying to the under tile 5 at the top of roofing, sequence
Cover tile 6 under tile and fixed block.Recessed hidden eaves gutter 1a is poured close at root edge in the roofing 1, in roofing position
Steel bar end 7, the main joist and/or secondary joist are embedded in main joist and secondary joist junction to weld with steel bar end, the bottom
Watts 5 are installed on by connecting bolt 8 on secondary joist.Scupper 5a is offered on the upward slope under tile close to hidden eaves gutter,
Hidden eaves gutter is provided at both ends with the pipe 9 that rains communicated with eaves gutter.
As shown in figure 5, the roofing 1 includes armored concrete pouring layer 1-1 and the cement mortar screeding layer being successively laid with
1-2, waterproof layer 1-3, waterproof roll layer 1-4, insulating layer 1-5, cement mortar protective course 1-6.
Steps are as follows for the method for construction of structurally stable heat-isolating antiseepage pitched roof of the present invention:
Being poured Step 1: completing sloping roof 1 using armored concrete, when pouring under roofing eaves and building masonry wall
Intersection formwork pours hidden eaves gutter 1a, and embedded bar head 7 is arranged in a matrix in roofing;
After the completion of reinforced concrete roof pours, successively the 1 of roofing topping laying 20mm thickness:3 cement mortar screeding layers
The cement mortar protective course 1-6 of 1-2, waterproof layer 1-3, waterproof roll layer 1-4, insulating layer 1-5,20mm thickness;
Step 2: being laid with light steel keel support in roofing;First main joist 2, then the cross on main joist are laid with along the slope of roof
To welding secondary joist 3, then interval is welded and fixed block 4 on every secondary joist, and the fixed block on every secondary joist is mutually aligned
Form multichannel fixed block;Finally main joist and steel bar end 7 are welded, light steel keel support is fixed;
Mat formation Step 3: carrying out tiling, under tile 5 is sequentially laid between two fixed blocks along longitudinal direction by column, using even
Connecting bolt 8 passes through under tile 5 and secondary joist, and under tile is installed and is fixed, then cover tile 6 is sequentially laid with to buckle closure in adjacent two-way under tile
And on fixed block;Close to hidden when opening up scupper 5a under tile at the upward slope close to hidden eaves gutter, or being laid under tile
It covers and is laid at the upward slope of formula eaves gutter to have opened up the under tile of scupper;
Step 4:The pipe 9 that rains communicated with eaves gutter is set at hidden eaves gutter both ends, or in hidden eaves gutter both ends ditch
Bottom opens up water falling hole, and the pipe 9 that rains is set up under water falling hole.Rain water on roof flows into hidden eaves gutter 1a by scupper 5a, enters back into
The rain pipe 9 pre-buried to eaves gutter end is drained into rain water collecting system through falling Guan Yu and is used.
Claims (4)
1. a kind of structurally stable heat-isolating antiseepage pitched roof, which is characterized in that include the domatic room poured using armored concrete
Face (1), the light steel keel support for being layed in roofing, the roofing tile being laid on lightgage steel joist frame;The light steel keel support packet
Include the main joist (2) being mutually parallel installed along slope of roof interval, arranged for interval is welded on main joist and with main joist phase
Mutual vertical secondary joist (3) is mutually aligned the fixed block (4) that interval is welded on every secondary joist;The roofing tile includes taking
It is located between two fixed blocks and is laid with buckle closure adjacent two from eaves bottom sequence laying to the under tile (5) at the top of roofing, sequence
Cover tile (6) on road under tile and fixed block;Recessed hidden eaves gutter (1a) is poured close at root edge in the roofing (1),
It is located at main joist in roofing and secondary joist junction is embedded with steel bar end (7), the main joist and/or secondary joist and is welded with steel bar end
It connects, the under tile (5) is installed on by connecting bolt (8) on secondary joist;It is opened up on the upward slope under tile close to hidden eaves gutter
There is scupper (5a), the pipe that rains (9) communicated with eaves gutter is provided at both ends in hidden eaves gutter.
2. a kind of structurally stable heat-isolating antiseepage pitched roof according to claim 1, which is characterized in that the roofing (1)
Including armored concrete pouring layer (1-1) and the cement mortar screeding layer (1-2) being successively laid with, waterproof layer (1-3), waterproof roll
Layer (1-4), insulating layer (1-5), cement mortar protective course (1-6).
3. a kind of method of construction of structurally stable heat-isolating antiseepage pitched roof as claimed in claim 1 or 2, which is characterized in that side
Steps are as follows for method:
Step 1: completing pouring for sloping roof (1) using armored concrete, eaves is handed over building masonry wall under roofing when pouring
Formwork at boundary pours hidden eaves gutter (1a), and embedded bar head (7) is arranged in a matrix in roofing;
Step 2: being laid with light steel keel support in roofing;It first is laid with main joist (2) along the slope of roof, then on main joist laterally
Secondary joist (3) is welded, then interval is welded and fixed block (4) on every secondary joist, and the fixed block on every secondary joist is mutually right
It is neat to form multichannel fixed block;Finally main joist and steel bar end (7) are welded, light steel keel support is fixed;
Mat formation Step 3: carrying out tiling, between under tile (5) is sequentially laid on two fixed blocks along longitudinal direction by column, using connection
Bolt (8) passes through under tile (5) and secondary joist, and under tile is installed and is fixed, and cover tile (6) sequence is then laid with buckle closure in adjacent two-way
On under tile and fixed block;When opening up scupper (5a) under tile at the upward slope close to hidden eaves gutter, or being laid under tile
It is laid at the upward slope of hidden eaves gutter to have opened up the under tile of scupper;
Step 4:The pipe that rains (9) communicated with eaves gutter is set at hidden eaves gutter both ends, or in hidden eaves gutter both ends bottom of trench
Water falling hole is opened up, the pipe (9) that rains is set up under water falling hole.
4. a kind of method of construction of structurally stable heat-isolating antiseepage pitched roof according to claim 3, which is characterized in that upper
State step 1 reinforced concrete roof pour after the completion of, successively in roofing topping laying cement mortar screeding layer (1-2), waterproof
Layer (1-3), waterproof roll layer (1-4), insulating layer (1-5), cement mortar protective course (1-6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810856783.1A CN108729595A (en) | 2018-07-31 | 2018-07-31 | A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810856783.1A CN108729595A (en) | 2018-07-31 | 2018-07-31 | A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108729595A true CN108729595A (en) | 2018-11-02 |
Family
ID=63942009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810856783.1A Withdrawn CN108729595A (en) | 2018-07-31 | 2018-07-31 | A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108729595A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629770A (en) * | 2018-12-28 | 2019-04-16 | 深圳宝家乡墅科技有限公司 | A kind of New Roof structure |
CN111456333A (en) * | 2020-04-22 | 2020-07-28 | 四川省商业建设有限责任公司 | Construction process of small green tile roof with wood base layer |
CN111927007A (en) * | 2020-08-04 | 2020-11-13 | 中冶建筑研究总院有限公司 | Mounting method for thatch eave |
CN113833191A (en) * | 2021-09-08 | 2021-12-24 | 中铁上海工程局集团有限公司 | Steel construction wind and rain building metal glazed tile roofing system structure |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1113195A (en) * | 1997-06-26 | 1999-01-19 | Hashimoto Kawarabuki Kogyo Kk | Roof execution method of building, and panel and tile for roof |
CN104790595A (en) * | 2015-05-15 | 2015-07-22 | 山西五建集团有限公司 | Construction method for adjustable tile hanging system of pitched roof |
CN204753940U (en) * | 2015-06-18 | 2015-11-11 | 徐永权 | A concrete structure for sloping open valley |
CN105298031A (en) * | 2015-09-08 | 2016-02-03 | 中建二局第三建筑工程有限公司 | Steep tiled roof structure of archaized building and its construction method |
CN205276714U (en) * | 2016-01-15 | 2016-06-01 | 湖州职业技术学院 | Prefabricated drainage eaves gutter structure of hidden prestressing force |
CN105839864A (en) * | 2016-05-20 | 2016-08-10 | 合肥国瑞集成建筑科技有限公司 | Quickly-built sloping roof based on cold-bent thin wall type steel structure |
CN107587660A (en) * | 2017-10-09 | 2018-01-16 | 华东建筑设计研究院有限公司 | A kind of sloping roof system of titanium roofing tile |
CN208748980U (en) * | 2018-07-31 | 2019-04-16 | 云南省城乡建设投资有限公司 | A kind of structurally stable heat-isolating antiseepage pitched roof |
-
2018
- 2018-07-31 CN CN201810856783.1A patent/CN108729595A/en not_active Withdrawn
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1113195A (en) * | 1997-06-26 | 1999-01-19 | Hashimoto Kawarabuki Kogyo Kk | Roof execution method of building, and panel and tile for roof |
CN104790595A (en) * | 2015-05-15 | 2015-07-22 | 山西五建集团有限公司 | Construction method for adjustable tile hanging system of pitched roof |
CN204753940U (en) * | 2015-06-18 | 2015-11-11 | 徐永权 | A concrete structure for sloping open valley |
CN105298031A (en) * | 2015-09-08 | 2016-02-03 | 中建二局第三建筑工程有限公司 | Steep tiled roof structure of archaized building and its construction method |
CN205276714U (en) * | 2016-01-15 | 2016-06-01 | 湖州职业技术学院 | Prefabricated drainage eaves gutter structure of hidden prestressing force |
CN105839864A (en) * | 2016-05-20 | 2016-08-10 | 合肥国瑞集成建筑科技有限公司 | Quickly-built sloping roof based on cold-bent thin wall type steel structure |
CN107587660A (en) * | 2017-10-09 | 2018-01-16 | 华东建筑设计研究院有限公司 | A kind of sloping roof system of titanium roofing tile |
CN208748980U (en) * | 2018-07-31 | 2019-04-16 | 云南省城乡建设投资有限公司 | A kind of structurally stable heat-isolating antiseepage pitched roof |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109629770A (en) * | 2018-12-28 | 2019-04-16 | 深圳宝家乡墅科技有限公司 | A kind of New Roof structure |
CN111456333A (en) * | 2020-04-22 | 2020-07-28 | 四川省商业建设有限责任公司 | Construction process of small green tile roof with wood base layer |
CN111927007A (en) * | 2020-08-04 | 2020-11-13 | 中冶建筑研究总院有限公司 | Mounting method for thatch eave |
CN113833191A (en) * | 2021-09-08 | 2021-12-24 | 中铁上海工程局集团有限公司 | Steel construction wind and rain building metal glazed tile roofing system structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108729595A (en) | A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction | |
CN205663117U (en) | Assembled slope tile roofing mounting structure | |
CN209163515U (en) | A kind of flat-changed-into-sloping roof with draining heat-insulation and heat-preservation | |
CN211313112U (en) | Large-area large-gradient integrated waterproof heat-preservation tile-hanging roof | |
CN103334554A (en) | Construction method of laid tiles of sloping roof | |
CN206337739U (en) | A kind of heat insulating and water proof structure of parapet root | |
CN206752862U (en) | Inverted roof waterproof construction based on durability | |
CN203174810U (en) | Bearing-and-leaning type installed assembly wall body | |
CN103615076B (en) | The oblique roofing concrete construction method of a kind of heavy grade | |
CN208748980U (en) | A kind of structurally stable heat-isolating antiseepage pitched roof | |
Brotrück | Basics roof construction | |
CN112695959A (en) | Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process | |
CN111350315A (en) | Waterproof closing-in pre-embedding method for roof parapet | |
CN107190919A (en) | A kind of multifunction imitated palaiotype roofing and its manufacture method | |
CN114645604B (en) | Construction method for waterproof treatment nodes of deformation joints of boarding and parking roofs | |
CN217128772U (en) | Inverted roof drainage structure | |
CN212336545U (en) | Oblique roofing tile hanging anti-leakage structure | |
CN210597802U (en) | Flat change slope roofing node structure | |
CN104196178B (en) | Hollow double structure layer water-proof roofing and construction method thereof | |
CN208502089U (en) | A kind of adjustable bark roofing of cornice | |
CN204001469U (en) | Hollow double structure layer water-proof roofing | |
CN220247404U (en) | Slope roof cornice waterproof structure | |
CN212336547U (en) | Gutter node structure of cement roof tile system | |
CN106854918B (en) | The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage | |
CN212053495U (en) | Roof waterproof structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181102 |
|
WW01 | Invention patent application withdrawn after publication |