CN206337739U - A kind of heat insulating and water proof structure of parapet root - Google Patents

A kind of heat insulating and water proof structure of parapet root Download PDF

Info

Publication number
CN206337739U
CN206337739U CN201621088766.0U CN201621088766U CN206337739U CN 206337739 U CN206337739 U CN 206337739U CN 201621088766 U CN201621088766 U CN 201621088766U CN 206337739 U CN206337739 U CN 206337739U
Authority
CN
China
Prior art keywords
layer
parapet
waterproof layer
insulation layer
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621088766.0U
Other languages
Chinese (zh)
Inventor
汪静
李�杰
刘宇
路则耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Green Building Polytron Technologies Inc
Original Assignee
Shanghai Green Building Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Green Building Polytron Technologies Inc filed Critical Shanghai Green Building Polytron Technologies Inc
Priority to CN201621088766.0U priority Critical patent/CN206337739U/en
Application granted granted Critical
Publication of CN206337739U publication Critical patent/CN206337739U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

本实用新型提供了一种女儿墙根部的保温防水结构,包括混凝土楼板和女儿墙;混凝土楼板的上表面设有第一防水层,女儿墙的内侧设有第二防水层,第二防水层由第一防水层沿女儿墙的设置方向延伸得到;第一防水层的上表面设有第一保温层,第一保温层的上方设有第三防水层;导流管,导流管一端穿过第一防水层设置在第一保温层的下方,另一端穿过女儿墙;排水管,排水管靠近第二防水层的一端为进水端,另一端为排水端;进水端贯穿第二防水层位于所述女儿墙的根部,排水端穿过所述女儿墙。本实用新型采用双层防水层与保温层的设计,达到防水保温的效果;同时通过设置的排水管和导流管,达到双道排水,有效防止保温层和防水层下方的施工积水渗入室内。

The utility model provides a thermal insulation and waterproof structure at the root of a parapet, which includes a concrete floor and a parapet; the upper surface of the concrete floor is provided with a first waterproof layer, and the inner side of the parapet is provided with a second waterproof layer. The second waterproof layer consists of The first waterproof layer is obtained by extending along the setting direction of the parapet; the upper surface of the first waterproof layer is provided with a first thermal insulation layer, and a third waterproof layer is provided above the first thermal insulation layer; the diversion pipe, one end of the diversion pipe passes through The first waterproof layer is set under the first insulation layer, and the other end passes through the parapet; the drain pipe, the end of the drain pipe close to the second waterproof layer is the water inlet end, and the other end is the drain end; the water inlet end runs through the second waterproof The layer is located at the root of the parapet, and the drainage end passes through the parapet. The utility model adopts the design of the double-layer waterproof layer and the thermal insulation layer to achieve the effect of waterproof and thermal insulation; at the same time, the drainage pipe and the diversion pipe are provided to achieve double drainage, effectively preventing the construction water under the thermal insulation layer and the waterproof layer from seeping into the room .

Description

一种女儿墙根部的保温防水结构A thermal insulation and waterproof structure at the root of a parapet wall

技术领域technical field

本实用新型涉及建筑结构设计领域,尤指一种女儿墙根部的保温防水结构。The utility model relates to the field of building structure design, in particular to a thermal insulation and waterproof structure at the root of a parapet wall.

背景技术Background technique

现有的屋面保温防水设计中的两大类:倒置式屋面和正置式屋面。正置式屋面防水设计,则是由于防水层没有保温层的保护作用,在常年接受太阳辐射和雨雪循环冻融破坏之后容易发生变质腐化,导致防水效果降低。There are two types of existing roof insulation and waterproof designs: inverted roofs and positive roofs. The waterproof design of the vertical roof is because the waterproof layer has no protective effect of the insulation layer, and it is prone to deterioration and corrosion after being damaged by solar radiation and rain and snow cycle freeze-thaw all year round, resulting in reduced waterproof effect.

而倒置式屋面则有效的解决了防水这个问题,但是在工程实践中仍然有缺陷,由于这种设计的保温层是在女儿墙根部落水管处(即女儿墙与屋面找坡层连接处)进行断开处理,形成了热桥。这样就会导致下方顶层房屋在冬季出现内壁面结露发霉的现象,且施工过程中有水分进入屋面保温防水层以下难以排出,导致工程出现渗水。The inverted roof effectively solves the problem of waterproofing, but there are still defects in engineering practice, because the insulation layer of this design is broken at the water pipe at the root of the parapet (that is, the connection between the parapet and the roof slope). Open processing, forming a thermal bridge. This will lead to condensation and mold on the inner wall of the top floor of the house in winter, and during the construction process, water will enter the roof insulation and waterproof layer and be difficult to discharge, resulting in water seepage in the project.

因此,既要解决正置式屋面的防水层得不到保温层的保护问题,还要解决倒置式屋面施工过程雨水及房屋使用过程中的冷凝水渗入室内的问题,是本申请急需解决的问题。Therefore, it is necessary to solve the problem that the waterproof layer of the vertical roof cannot be protected by the thermal insulation layer, and also solve the problem that the rainwater in the construction process of the inverted roof and the condensed water in the house use process infiltrate into the room, which is an urgent problem to be solved in this application.

实用新型内容Utility model content

本实用新型的目的是提供一种女儿墙根部的保温防水结构,采用双层防水层与保温层的设计,达到防水保温的效果;通过在女儿墙根部设置排水管,以及在保温防水层下侧设置的导流管,满足双道排水管同时进行排水,防止导流保温层和防水层下方的施工积水渗入室内。The purpose of this utility model is to provide a thermal insulation and waterproof structure at the root of the parapet, which adopts the design of double-layer waterproof layer and thermal insulation layer to achieve the effect of waterproof and thermal insulation; The diversion pipe is set to meet the requirements of dual drainage pipes to drain water at the same time, preventing the construction water under the diversion insulation layer and the waterproof layer from seeping into the room.

本实用新型提供的技术方案如下:The technical scheme provided by the utility model is as follows:

混凝土楼板,以及与所述混凝土楼板连接的女儿墙;a concrete floor, and a parapet connected to said concrete floor;

所述混凝土楼板的上表面设有第一防水层,所述女儿墙的内侧设有第二防水层,所述第二防水层由所述第一防水层沿所述女儿墙的设置方向延伸得到;The upper surface of the concrete floor is provided with a first waterproof layer, and the inner side of the parapet is provided with a second waterproof layer, and the second waterproof layer is obtained by extending the first waterproof layer along the installation direction of the parapet ;

所述第一防水层的上表面设有第一保温层,所述第一保温层的上方设有第三防水层;A first insulation layer is provided on the upper surface of the first waterproof layer, and a third waterproof layer is provided above the first insulation layer;

导流管,所述导流管一端穿过所述第一防水层设置在所述第一保温层的下方,另一端穿过所述女儿墙,用于将积聚的冷凝水排出;A guide tube, one end of the guide tube passes through the first waterproof layer and is arranged under the first heat insulation layer, and the other end passes through the parapet to discharge accumulated condensed water;

排水管,所述排水管靠近所述第二防水层的一端为进水端,另一端为排水端;所述进水端贯穿所述第二防水层位于所述女儿墙的根部,所述排水端穿过所述女儿墙,用于将所述混凝土楼板上的雨水排出。A drainage pipe, one end of the drainage pipe close to the second waterproof layer is the water inlet end, and the other end is the water discharge end; the water inlet end runs through the second waterproof layer and is located at the root of the parapet, and the drainage pipe The end passes through the parapet for draining rainwater from the concrete floor.

本技术方案中,通过在混凝土楼板上方设置的第一保温层,以及在第一保温层上下表面设置的第一防水层和第三防水层,进而达到对混凝土楼板的防水保温效果,同时通过设置的排水管,能够将混凝土楼板上的雨水,以及通过设置的导流管,能够将隐藏在屋面保温防水层中少数冷凝水分排出去,有效地防止导流保温层和防水层下方的施工积水渗入室内。In this technical solution, through the first insulation layer arranged above the concrete floor, and the first waterproof layer and the third waterproof layer arranged on the upper and lower surfaces of the first insulation layer, the waterproof and heat preservation effect on the concrete floor is achieved. At the same time, by setting The drainage pipe can drain the rainwater on the concrete floor, and through the set diversion pipe, it can discharge a small amount of condensed water hidden in the roof insulation and waterproof layer, effectively preventing construction water under the diversion insulation layer and waterproof layer Penetrates indoors.

优选地,所述第二防水层的外侧设有第二保温层,所述第二保温层由所述第一保温层沿所述女儿墙的设置方向延伸得到。Preferably, a second thermal insulation layer is provided on the outer side of the second waterproof layer, and the second thermal insulation layer is obtained by extending the first thermal insulation layer along the installation direction of the parapet.

本技术方案中,在第二防水层的外侧设置第二保温层,进而实现对女儿墙的防水保温处理。同时将第二保温层是有第一保温层的延伸得到,使得两者的一体成型,简化安装程序,提高保温效果。In the technical solution, the second heat preservation layer is arranged outside the second waterproof layer, thereby realizing the waterproof and heat preservation treatment of the parapet wall. At the same time, the second insulation layer is obtained by extending the first insulation layer, so that the two are integrally formed, the installation procedure is simplified, and the insulation effect is improved.

优选地,所述第二保温层包括设置在所述第二防水层上段表面的上保温层,以及设置在所述第二防水层下段表面的下保温层;Preferably, the second thermal insulation layer includes an upper thermal insulation layer disposed on the upper surface of the second waterproof layer, and a lower thermal insulation layer disposed on the lower surface of the second waterproof layer;

所述下保温层的外侧设有第四防水层,所述第四防水层由所述第三防水层沿所述第二保温层铺设方向延伸得到;A fourth waterproof layer is provided on the outer side of the lower thermal insulation layer, and the fourth waterproof layer is obtained by extending the third waterproof layer along the laying direction of the second thermal insulation layer;

所述下保温层与所述第一保温层一体成型,且均为聚氨酯屋面保温层。The lower insulation layer and the first insulation layer are integrally formed, and both are polyurethane roof insulation layers.

本技术方案中,将第二保温层由上保温层和下保温层连接构成,由于下保温层位于女儿墙的根部,而女儿墙的根部是设置排水管的位置,设置排水管时容易形成热桥,导致下方顶层房屋在冬季出现内壁面结露发霉,因此,将下保温层与第一保温层一体成型,能够提高保温效果,同时通过下保温层的外侧设置的第四防水层,且第四防水层与第三防水层为一体成型,满足对女儿墙根部的双层防水,提高防水效果。In this technical solution, the second insulation layer is formed by connecting the upper insulation layer and the lower insulation layer. Since the lower insulation layer is located at the root of the parapet wall, and the root of the parapet wall is the position where the drain pipe is installed, it is easy to form heat when the drain pipe is installed. bridge, resulting in condensation and mildew on the inner wall of the house on the top floor below in winter. Therefore, the lower insulation layer and the first insulation layer are integrally formed to improve the insulation effect. The fourth waterproof layer and the third waterproof layer are integrally formed to meet the double-layer waterproofing of the root of the parapet wall and improve the waterproof effect.

优选地,所述上保温层和所述下保温层之间连接一第五防水层,所述第五防水层由所述第四防水层朝向所述女儿墙方向延伸得到,且与所述第二防水层连接。Preferably, a fifth waterproof layer is connected between the upper thermal insulation layer and the lower thermal insulation layer, and the fifth waterproof layer is obtained by extending from the fourth waterproof layer toward the parapet, and is connected with the first waterproof layer. Two waterproof layers are connected.

本技术方案中,在设置的上保温层和下保温层之间通过第五防水层进行连接,且第五防水层和第四防水层为一体,且五防水层与第二防水层连接,这样可以进一步的提高对女儿墙根部的防水效果,避免雨水沿上保温层和下保温层的连接处下方进入下保温层中。In this technical solution, the fifth waterproof layer is connected between the set upper heat insulation layer and the lower heat insulation layer, and the fifth waterproof layer and the fourth waterproof layer are integrated, and the fifth waterproof layer is connected with the second waterproof layer, so that The waterproof effect to the root of the parapet wall can be further improved, and rainwater can be prevented from entering the lower insulation layer along the joint below the upper insulation layer and the lower insulation layer.

优选地,所述女儿墙的外侧设有第三保温层。Preferably, the outer side of the parapet is provided with a third thermal insulation layer.

本技术方案中,在女儿墙的外侧设置第三保温层,通过设置的第三保温层,实现对女儿墙外侧的保温,进一步提高保温效果。In the technical solution, a third heat insulation layer is arranged on the outside of the parapet wall, and the heat insulation effect on the outside of the parapet wall is realized through the provided third heat insulation layer, thereby further improving the heat insulation effect.

优选地,所述第一防水层与所述混凝土楼板之间还设置一屋面找坡层。Preferably, a roof slope is further arranged between the first waterproof layer and the concrete floor.

本技术方案中,设置的找坡层能够使得铺设的第一防水层形成一定的坡度,满足将混凝土楼板上的冷凝水快速的流入导流管,避免冷凝水在第一防水层上产生积水现象,影响防水效果。In this technical solution, the slope-finding layer can make the laid first waterproof layer form a certain slope, satisfying the need to quickly flow the condensed water on the concrete floor into the diversion pipe, and avoid the accumulation of condensed water on the first waterproof layer Phenomenon, affect the waterproof effect.

优选地,所述第一保温层与所述第三防水层之间还设置一水泥砂浆找平层。Preferably, a cement mortar leveling layer is further arranged between the first thermal insulation layer and the third waterproof layer.

本技术方案中,找平层的作用是找平,就是避免由于第一保温层的上表面高低不平,产生积水现象,影响防水层的防水效果,和第一保温层的保温效果。In this technical solution, the function of the leveling layer is leveling, which is to avoid water accumulation due to the unevenness of the upper surface of the first thermal insulation layer, which affects the waterproof effect of the waterproof layer and the thermal insulation effect of the first thermal insulation layer.

优选地,所述第三防水层的上表面还设有一防护层。Preferably, a protective layer is further provided on the upper surface of the third waterproof layer.

本技术方案中,通过设置的防护层,实现对第三防水层的保护,延长第三防水层的使用寿命,增加第三防水层的防水效果。In the technical solution, the protection of the third waterproof layer is realized through the provided protective layer, the service life of the third waterproof layer is prolonged, and the waterproof effect of the third waterproof layer is increased.

在上述结构的基础上进一步的优选,所述导流管的一端穿过所述第一防水层位于所述第一保温层和所述第二保温层的连接处的下方,所述导流管的另一端与雨水斗连通,所述雨水斗设置在所述女儿墙的外侧,用于将接收的雨水排入下水道中;On the basis of the above structure, it is further preferred that one end of the flow guide tube passes through the first waterproof layer and is located below the junction of the first heat insulation layer and the second heat insulation layer, and the flow guide tube The other end of the rainwater bucket is connected with the rainwater bucket, and the rainwater bucket is arranged on the outside of the parapet, and is used to discharge the received rainwater into the sewer;

所述导流管的一端高于所述导流管的另一端。One end of the draft tube is higher than the other end of the draft tube.

本技术方案中,通过导流管的设置,避免第一保温层和第二保温层下方有冷凝水的积聚,满足将积聚的水分快速排出。同时通过设置的雨水斗,实现将水快速排至设定的位置,避免影响整个建筑的外墙的美观度。In the technical solution, through the setting of the guide pipe, the accumulation of condensed water under the first insulation layer and the second insulation layer is avoided, and the accumulated water can be quickly discharged. At the same time, through the set rainwater bucket, the water can be quickly drained to the set position, so as to avoid affecting the aesthetics of the outer wall of the entire building.

在上述结构的基础上进一步的优选,所述排水管的进水端的管壁与所述第二防水层密封连接,所述排水管的排水端穿过所述女儿墙与所述雨水斗连通;On the basis of the above structure, it is further preferred that the pipe wall of the water inlet end of the drain pipe is sealed and connected with the second waterproof layer, and the drain end of the drain pipe communicates with the rainwater bucket through the parapet;

和/或;and / or;

所述排水管的直径大于所述导流管的直径。The diameter of the drain pipe is larger than that of the draft pipe.

本技术方案中,将排水管的进水端的管壁与第二防水层密封连接,可以避免水沿排水管的管壁流入与女儿墙的连接处之间,导致漏水现象发生。同时另一端与雨水斗连通,同样的实现将水快速排至设定的位置,避免影响整个建筑的外墙的美观度。In this technical solution, the pipe wall of the water inlet end of the drainage pipe is sealed and connected with the second waterproof layer, which can prevent water from flowing into the joint with the parapet wall along the pipe wall of the drainage pipe, resulting in water leakage. At the same time, the other end is connected to the rainwater bucket, and the water can be quickly discharged to the set position in the same way, so as to avoid affecting the aesthetics of the outer wall of the entire building.

本实用新型提供的一种女儿墙根部的保温防水结构,能够带来以下一种有益效果:The utility model provides a thermal insulation and waterproof structure at the root of a parapet wall, which can bring the following beneficial effects:

1、本实用新型采用双层防水层与保温层的设计,满足对混凝土楼板的防水保温的效果;通过在女儿墙根部落水管处设置排水管,以及在混凝土楼板上方设置的保温防水层下侧设置导流管,满足双道排水管同时进行排水,防止导流保温层和防水层下方的施工积水渗入室内。1. The utility model adopts the design of double-layer waterproof layer and thermal insulation layer to meet the effect of waterproof and thermal insulation on the concrete floor; by setting the drainage pipe at the water pipe at the root of the parapet wall, and the lower side of the thermal insulation and waterproof layer set above the concrete floor The diversion pipe satisfies the simultaneous drainage of the dual drainage pipes to prevent the construction water under the diversion insulation layer and the waterproof layer from seeping into the room.

2、本实用新型通过设置的第一保温层,以及由第二保温层延伸得到的第二保温层,以及设置在女儿墙外侧的第三保温层,实现对混凝土楼板和女儿墙的保温,且保温效果较佳。2. The utility model realizes the insulation of the concrete floor and the parapet through the first thermal insulation layer provided, the second thermal insulation layer extended from the second thermal insulation layer, and the third thermal insulation layer arranged outside the parapet wall, and Better heat preservation effect.

3、本实用新型中将第二保温层由上保温层和下保温层构成,且对下保温层进行内外双层防水,由于下保温层位于女儿墙的根部,而女儿墙的根部是设置排水管的位置,设置排水管时容易形成热桥,导致下方顶层房屋在冬季出现内壁面结露发霉,进而通过双层防水层满足对女儿墙根部的双层防水,提高防水效果。3. In the utility model, the second thermal insulation layer is composed of an upper thermal insulation layer and a lower thermal insulation layer, and the lower thermal insulation layer is waterproofed inside and outside, because the lower thermal insulation layer is located at the root of the parapet, and the root of the parapet is provided with drainage The position of the pipe, when the drain pipe is installed, it is easy to form a thermal bridge, which will cause condensation and mold on the inner wall of the top floor of the house in winter, and then use the double-layer waterproof layer to meet the double-layer waterproofing of the root of the parapet and improve the waterproof effect.

4、本实用新型通过设置在上保温层和下保温层之间的第五防水层,避免水沿上保温层进入下保温层中,使得整个下保温层处于一个无水的空间中,避免女儿墙的根部出现发霉、漏水等现象。4. The utility model prevents water from entering the lower insulation layer along the upper insulation layer through the fifth waterproof layer arranged between the upper insulation layer and the lower insulation layer, so that the entire lower insulation layer is in a water-free space, preventing daughter The root of the wall has mildew and water leakage.

5、本实用新型通过设置的找坡层,满足积聚冷凝水从导流管中快速排出;通过设置的找平层,满足避免由于第一保温层的上表面高低不平,影响第一防水层的防水和第一保温层的保温效果。5. The utility model satisfies the rapid discharge of accumulated condensed water from the diversion pipe through the setting of the slope layer; through the setting of the leveling layer, it meets the requirements of avoiding the unevenness of the upper surface of the first insulation layer, which affects the waterproofing of the first waterproof layer And the insulation effect of the first insulation layer.

6、本实用新型将导流管和排水管均与雨水斗连通,实现将水快速排至设定的位置,避免影响整个建筑的外墙的美观度。6. In the utility model, both the diversion pipe and the drain pipe are connected with the rainwater bucket, so that the water can be quickly discharged to the set position, and the aesthetics of the outer wall of the entire building can be avoided.

7、本实用新型结构简单,加工程序简单,防水保温效果较佳,通过双层防水层和双道排水管结合,保证屋面部位不产生积水、混凝土楼板不发生渗水的功效。7. The utility model has the advantages of simple structure, simple processing procedure and better waterproof and heat preservation effect. The combination of double-layer waterproof layer and double-channel drainage pipe can ensure the effect of no water accumulation on the roof and no water seepage on the concrete floor.

附图说明Description of drawings

下面将以明确易懂的方式,结合附图说明优选实施方式,对一种女儿墙根部的保温防水结构的上述特性、技术特征、优点及其实现方式予以进一步说明。In the following, the preferred embodiment will be described in a clear and easy-to-understand manner with reference to the accompanying drawings, and the above-mentioned characteristics, technical features, advantages and implementation methods of a thermal insulation and waterproof structure at the root of a parapet wall will be further described.

图1是本实用新型女儿墙根部的保温防水结构中剖面结构示意图。Fig. 1 is the schematic diagram of the sectional structure in the thermal insulation and waterproof structure of the parapet root of the utility model.

附图标号说明:Explanation of reference numbers:

混凝土楼板1;女儿墙2;concrete floor 1; parapet 2;

第一保温层31;第二保温层32;上保温层321;下保温层322;第三保温层33;The first insulation layer 31; the second insulation layer 32; the upper insulation layer 321; the lower insulation layer 322; the third insulation layer 33;

第一防水层41;第二防水层42;第三防水层43;第四防水层44;第五防水层45;The first waterproof layer 41; the second waterproof layer 42; the third waterproof layer 43; the fourth waterproof layer 44; the fifth waterproof layer 45;

导流管5;排水管6;屋面找坡层7;水泥砂浆找平层8;防护层9;雨水斗10。Drain pipe 5; drain pipe 6; roof slope layer 7; cement mortar leveling layer 8; protective layer 9; rain bucket 10.

具体实施方式detailed description

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对照附图说明本实用新型的具体实施方式。显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图,并获得其他的实施方式。In order to more clearly illustrate the embodiment of the utility model or the technical solutions in the prior art, the specific implementation of the utility model will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings in the following description are only some embodiments of the present utility model, and those skilled in the art can also obtain other accompanying drawings according to these drawings without creative work, and Get other implementations.

在本实用新型的实施例一中,参看图1所示,一种女儿墙根部的保温防水结构,包括混凝土楼板1,以及与混凝土楼板1连接的女儿墙2,其中,混凝土楼板1的上表面设有第一防水层41,而女儿墙2的内侧设有第二防水层42,具体的第二防水层42是由第一防水层41沿女儿墙2的设置方向延伸得到,即第一防水层41和第二防水层42一体成型,并铺设在混凝土楼板1上表面和女儿墙2的内侧表面。进一步的在第一防水层41的上表面设有第一保温层31,且在第一保温层31的上方设有第三防水层43,利用第一防水层41和第三防水层43实现对第一保温层31的双层防水设计,提高第一保温层31的保温效果。In Embodiment 1 of the present utility model, referring to Fig. 1, a thermal insulation and waterproof structure at the root of a parapet includes a concrete floor 1 and a parapet 2 connected to the concrete floor 1, wherein the upper surface of the concrete floor 1 A first waterproof layer 41 is provided, and a second waterproof layer 42 is provided on the inner side of the parapet 2. Specifically, the second waterproof layer 42 is obtained by extending the first waterproof layer 41 along the installation direction of the parapet 2, that is, the first waterproof layer The layer 41 and the second waterproof layer 42 are integrally formed, and are laid on the upper surface of the concrete floor 1 and the inner surface of the parapet 2 . Further, the upper surface of the first waterproof layer 41 is provided with the first insulation layer 31, and the third waterproof layer 43 is provided above the first insulation layer 31, and the first waterproof layer 41 and the third waterproof layer 43 are used to realize the The double-layer waterproof design of the first thermal insulation layer 31 improves the thermal insulation effect of the first thermal insulation layer 31 .

具体运用时,由于施工过程的雨水及房屋使用过程中的冷凝水会在第一保温层31与第二保温处的连接处下方聚集,所以进一步的设置一导流管5,且将导流管5的一端穿过第一防水层41设置在第一保温层31的下方,而另一端穿过女儿墙2将积聚的冷凝水排出,避免聚集的冷凝水渗入室内。同时由于女儿墙2 的根部与混凝土楼板1连接处下方是雨水积聚之处,因此,通过设置的排水管6将其雨水排出,将排水管6靠近第二防水层42的一端为进水端,另一端为排水端;实际安装时,将进水端贯穿第二防水层42位于女儿墙2的根部,而排水端穿过女儿墙2,实现将混凝土楼板1上的雨水排出。其中应说明的是,导流管5和排水管6可以在建筑时预埋在女儿墙中,具体的设置方式不做一一赘述,根据实际施工需求做合理的设置即可。During specific use, since the rainwater in the construction process and the condensed water in the use of the house will gather below the junction of the first insulation layer 31 and the second insulation, so a diversion pipe 5 is further provided, and the diversion pipe One end of 5 passes through the first waterproof layer 41 and is arranged under the first insulation layer 31, while the other end passes through the parapet 2 to discharge the accumulated condensed water, so as to prevent the accumulated condensed water from seeping into the room. Simultaneously because the bottom of the root of parapet wall 2 and concrete floor slab 1 is the place where rainwater accumulates, therefore, its rainwater is discharged through the drain pipe 6 provided, and the end of drain pipe 6 near the second waterproof layer 42 is the water inlet end, The other end is the drainage end; during actual installation, the water inlet end penetrates the second waterproof layer 42 at the root of the parapet 2, and the drainage end passes through the parapet 2 to discharge the rainwater on the concrete floor 1. It should be noted that the diversion pipe 5 and the drain pipe 6 can be pre-buried in the parapet during construction, and the specific setting methods will not be described one by one, and reasonable setting can be made according to actual construction requirements.

在本实用新型的实施例二中,与实施例一相比改进之处在于:进一步的在第二防水层42的外侧设置第二保温层32,且第二保温层32由第一保温层31沿女儿墙2的设置方向延伸得到,这样可以通过设置的第二保温层32实现对女儿墙2内侧的保温。In the second embodiment of the present utility model, compared with the first embodiment, the improvement is that: the second thermal insulation layer 32 is further arranged on the outside of the second waterproof layer 42, and the second thermal insulation layer 32 is formed by the first thermal insulation layer 31 It is obtained by extending along the installation direction of the parapet wall 2, so that the inner side of the parapet wall 2 can be insulated through the second thermal insulation layer 32 provided.

在本实施例二中,进一步优选地,将设置的保温层由设置在第二防水层42上段表面的上保温层321和设置在第二防水层42下端表面的下保温层322连接构成。由于下保温层322位于女儿墙2的根部,因此,进一步的在下保温层322的外侧设置第四防水层44,具体的第四防水层44是由设在第一保温层31上的第三防水层43沿第二保温层32铺设方向延伸得到,即下保温层322和第一保温层31一体成型,可以有效地提高防水层的防水效果和保温效果。In the second embodiment, it is further preferred that the insulation layer is composed of an upper insulation layer 321 arranged on the upper surface of the second waterproof layer 42 and a lower insulation layer 322 arranged on the lower surface of the second waterproof layer 42 . Since the lower thermal insulation layer 322 is located at the root of the parapet 2, the fourth waterproof layer 44 is further arranged on the outside of the lower thermal insulation layer 322. The layer 43 is obtained by extending along the laying direction of the second thermal insulation layer 32, that is, the lower thermal insulation layer 322 and the first thermal insulation layer 31 are integrally formed, which can effectively improve the waterproof effect and thermal insulation effect of the waterproof layer.

在本实施例二中,优选地,在上保温层321和下保温层322之间连接一第五防水层45,设置的第五防水层45主要是由设置在下保温层322外侧的第四防水层44朝向女儿墙2的方向延伸得到的,即第五防水层45和第四防水层44为一体成型。同时为提高防水性能,将第五防水层45与所述第二防水层42连接,实现下保温层322整个在防水层内,有效地避免水沿上保温层321流入下保温层322,进一步提高女儿墙2根部的防水性能。In the second embodiment, preferably, a fifth waterproof layer 45 is connected between the upper insulation layer 321 and the lower insulation layer 322, and the fifth waterproof layer 45 is mainly composed of the fourth waterproof layer arranged on the outside of the lower insulation layer 322. The layer 44 is obtained by extending toward the direction of the parapet 2, that is, the fifth waterproof layer 45 and the fourth waterproof layer 44 are integrally formed. Simultaneously in order to improve the waterproof performance, the fifth waterproof layer 45 is connected with the second waterproof layer 42 to realize that the lower thermal insulation layer 322 is entirely in the waterproof layer, effectively preventing water from flowing into the lower thermal insulation layer 322 along the upper thermal insulation layer 321, and further improving the waterproof performance. The waterproof performance of the 2 roots of the parapet.

当然在其他实施例中,上保温层321和下保温层322可以是一体成型,具体的根据实际需要做设计,本申请中主要是通过不同的保温材料提高不同位置的保温效果才由此设计。Of course, in other embodiments, the upper insulation layer 321 and the lower insulation layer 322 can be integrally formed, and the specific design is made according to actual needs. In this application, different insulation materials are used to improve the insulation effect of different positions.

在本实用新型实施例三中,与上述实施例的改进之处在于:进一步的在女儿墙2的外侧设有第三保温层33。其中,应说明的是,第三保温层33和第二保温层32的上保温层321采用的是常规的外墙保温层,而第二保温层32的下保温层322和第一保温层31采用的是聚氨酯屋面保温层。In the third embodiment of the present utility model, the improvement compared with the above-mentioned embodiments lies in that a third thermal insulation layer 33 is further provided on the outside of the parapet 2 . Wherein, it should be noted that what the third thermal insulation layer 33 and the upper thermal insulation layer 321 of the second thermal insulation layer 32 adopted is a conventional outer wall thermal insulation layer, while the lower thermal insulation layer 322 of the second thermal insulation layer 32 and the first thermal insulation layer 31 Polyurethane roof insulation is used.

在本实用新型实施例四中,与上述实施例的改进之处在于:进一步的在第一防水层41与混凝土楼板1之间设置一屋面找坡层7,设置的屋面找坡层7是将排水方向垒出一定的缓坡来,以将屋面雨水有组织的疏导到建筑物和城市的雨水排放系统中去,即具体的由导流管5排出。可以有效地加快雨水的排放速度,避免凝聚的冷凝水聚集在第一防水层41上,影响第一防水层41的防水效果。In Embodiment 4 of the present utility model, the improvement with the above-mentioned embodiment is: a roof slope finding layer 7 is further set between the first waterproof layer 41 and the concrete floor 1, and the roof slope finding layer 7 is set to A certain gentle slope is built in the direction of drainage, so that roof rainwater can be channeled into the rainwater drainage system of buildings and cities in an organized manner, that is, it is specifically discharged by the diversion pipe 5 . The discharge speed of rainwater can be effectively accelerated, and the condensed water can be prevented from accumulating on the first waterproof layer 41 and affecting the waterproof effect of the first waterproof layer 41 .

在本实用新型实施例五中,与上述实施例的改进之处在于:进一步的在第一保温层31与第三防水层43之间还设置一水泥砂浆找平层8。设置的水泥砂浆找平层8主要是将第一保温层31的上表面找平,避免表面高低不平,产生积水现象,影响防水和保温的效果。In Embodiment 5 of the present utility model, the improvement from the above embodiments is that a cement mortar leveling layer 8 is further provided between the first thermal insulation layer 31 and the third waterproof layer 43 . The cement mortar leveling layer 8 provided is mainly to level the upper surface of the first thermal insulation layer 31, so as to avoid surface unevenness and water accumulation, which will affect the effect of waterproofing and thermal insulation.

在本实用新型实施例六中,与上述实施例的改进之处在于:进一步的在第三防水层43的上表面上设置一防护层9,设置防护层9的目的是对第三防水层43进行保护,避免第三防水层43长期在阳光和雨水中缩短使用寿命。In Embodiment 6 of the present utility model, the improvement with the above-mentioned embodiment is that a protective layer 9 is further set on the upper surface of the third waterproof layer 43, and the purpose of setting the protective layer 9 is to protect the third waterproof layer 43. Carry out protection, avoid that the third waterproof layer 43 shortens the service life in sunshine and rainwater for a long time.

应说明的是,本申请中第三防水层43、第四防水层44以及第五防水层45均为卷材防水层,而第一防水层41和第二防水层42为聚氨酯防水涂膜层。It should be noted that in the present application, the third waterproof layer 43, the fourth waterproof layer 44 and the fifth waterproof layer 45 are all membrane waterproof layers, while the first waterproof layer 41 and the second waterproof layer 42 are polyurethane waterproof coating layers .

上述实施例作为一个具体实施例一使用时,将设置的导流管5的一端穿过第一防水层41位于第一保温层31和第二保温层32的连接处的下方,而导流管5的另一端与雨水斗10连通,且雨水斗10设置在女儿墙2的外侧,用于将接收的雨水排入下水道中。具体的将导流管5的一端设置的高于导流管5的另一端,可以进一步的加快排水速度。When above-mentioned embodiment is used as a specific embodiment one, one end of the guide tube 5 that will be provided passes through the first waterproof layer 41 and is positioned at the below of the junction of the first heat-insulating layer 31 and the second heat-insulating layer 32, and the guide tube The other end of 5 communicates with the rainwater bucket 10, and the rainwater bucket 10 is arranged on the outside of the parapet 2, and is used for discharging the received rainwater into the sewer. Specifically, setting one end of the draft tube 5 higher than the other end of the draft tube 5 can further accelerate the drainage speed.

上述实施例作为一个具体实施例二使用时,将排水管6的进水端的管壁与第二防水层42密封连接,排水管6的排水端穿过女儿墙2与雨水斗10连通。其中,进水端的管壁与第二防水层42的密封连接方式有多种,本申请中不再一一赘述。When the above-mentioned embodiment is used as a specific embodiment 2, the pipe wall of the water inlet end of the drain pipe 6 is sealed and connected with the second waterproof layer 42 , and the drain end of the drain pipe 6 communicates with the rainwater bucket 10 through the parapet 2 . Among them, there are many ways to seal the connection between the pipe wall at the water inlet end and the second waterproof layer 42 , which will not be repeated in this application.

当然在其他具体实施例中使用时,导流管5和排水管6可以在建筑时预先埋设在女儿墙2中。且优选地将,排水管6的直径设置的大于导流管5的直径,主要是排水管6是将屋面上部自然雨水排出去,水量较大,因此直径则较宽,由于要断开女儿墙2根部保温层,必然存在热桥形成冷凝,而导气管则是将隐藏在屋面保温防水层中少数冷凝水分排出去,水量较小,因此将导流管5的直径设置的较小,优选为φ10mm的PVC管,使得形成冷凝的概率交低。Of course, when used in other specific embodiments, the guide pipe 5 and the drain pipe 6 can be pre-embedded in the parapet 2 during construction. And preferably, the diameter of the drainpipe 6 is set greater than the diameter of the guide pipe 5, mainly because the drainpipe 6 discharges the natural rainwater on the top of the roof, and the water volume is relatively large, so the diameter is wider. 2. In the thermal insulation layer at the root, there must be a thermal bridge to form condensation, and the air duct is to discharge a small amount of condensed water hidden in the roof thermal insulation and waterproof layer. The φ10mm PVC pipe reduces the probability of condensation.

应当说明的是,上述实施例均可根据需要自由组合。以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。It should be noted that the above embodiments can be freely combined as required. The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made. Retouching should also be regarded as the scope of protection of the present utility model.

Claims (10)

1. a kind of heat insulating and water proof structure of parapet root, it is characterised in that including:
Concrete floor, and the parapet being connected with the concrete floor;
The upper surface of the concrete floor is provided with the first waterproof layer, and the inner side of the parapet is provided with the second waterproof layer, described Setting direction extension of second waterproof layer by first waterproof layer along the parapet is obtained;
The upper surface of first waterproof layer is provided with the first heat-insulation layer, and the top of first heat-insulation layer is provided with the 3rd waterproof layer;
Mozzle, described mozzle one end is arranged on the lower section of first heat-insulation layer, the other end through first waterproof layer Through the parapet, for the condensed water of accumulation to be discharged;
Drainpipe, the drainpipe is water inlet end close to one end of second waterproof layer, and the other end is discharge ends;The water inlet The root for being located at the parapet through second waterproof layer is held, the discharge ends pass through the parapet, for by described in Rainwater discharge on concrete floor.
2. the heat insulating and water proof structure of parapet root according to claim 1, it is characterised in that:
The outside of second waterproof layer is provided with the second heat-insulation layer, and second heat-insulation layer is by first heat-insulation layer along the female The setting direction extension of youngster's wall is obtained.
3. the heat insulating and water proof structure of parapet root according to claim 2, it is characterised in that:
Second heat-insulation layer includes being arranged on the upper heat-insulation layer of section surface on second waterproof layer, and is arranged on described the The lower heat-insulation layer of section surface under two waterproof layers;
The outside of the lower heat-insulation layer is provided with the 4th waterproof layer, and the 4th waterproof layer is by the 3rd waterproof layer along described second Heat-insulation layer laying direction extension is obtained;
The lower heat-insulation layer is integrally formed with first heat-insulation layer, and is polyurethane roofing heat-insulating layer.
4. the heat insulating and water proof structure of parapet root according to claim 3, it is characterised in that:
One the 5th waterproof layer is connected between the upper heat-insulation layer and the lower heat-insulation layer, the 5th waterproof layer is prevented by the described 4th Water layer is obtained towards parapet direction extension, and is connected with second waterproof layer.
5. the heat insulating and water proof structure of parapet root according to claim 2, it is characterised in that:
The outside of the parapet is provided with the 3rd heat-insulation layer.
6. the heat insulating and water proof structure of parapet root according to claim 2, it is characterised in that:
Roof slope making layer is also set up between first waterproof layer and the concrete floor.
7. the heat insulating and water proof structure of parapet root according to claim 2, it is characterised in that:
Cement mortar screeding layer is also set up between first heat-insulation layer and the 3rd waterproof layer.
8. the heat insulating and water proof structure of parapet root according to claim 2, it is characterised in that:
The upper surface of 3rd waterproof layer is additionally provided with an overcoat.
9. the heat insulating and water proof structure of the parapet root according to claim any one of 2-8, it is characterised in that:
One end of the mozzle is located at the company of first heat-insulation layer and second heat-insulation layer through first waterproof layer The lower section at place is connect, the other end of the mozzle is connected with roof drain, the roof drain is arranged on the outside of the parapet, used It is discharged into by the rainwater of reception in sewer;
One end of the mozzle is higher than the other end of the mozzle.
10. the heat insulating and water proof structure of parapet root according to claim 9, it is characterised in that:
The tube wall of the water inlet end of the drainpipe is tightly connected with second waterproof layer, and the discharge ends of the drainpipe pass through institute Parapet is stated to connect with the roof drain;
And/or;
The diameter with diameter greater than the mozzle of the drainpipe.
CN201621088766.0U 2016-09-28 2016-09-28 A kind of heat insulating and water proof structure of parapet root Expired - Fee Related CN206337739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621088766.0U CN206337739U (en) 2016-09-28 2016-09-28 A kind of heat insulating and water proof structure of parapet root

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621088766.0U CN206337739U (en) 2016-09-28 2016-09-28 A kind of heat insulating and water proof structure of parapet root

Publications (1)

Publication Number Publication Date
CN206337739U true CN206337739U (en) 2017-07-18

Family

ID=59298980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621088766.0U Expired - Fee Related CN206337739U (en) 2016-09-28 2016-09-28 A kind of heat insulating and water proof structure of parapet root

Country Status (1)

Country Link
CN (1) CN206337739U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979020A (en) * 2018-07-26 2018-12-11 浙江广辉建设有限公司 A kind of the flashing constructing device and construction method of parapet of roofing
CN110984485A (en) * 2019-10-18 2020-04-10 宋冠群 Roof waterproof heat insulation new construction
CN113404170A (en) * 2021-06-18 2021-09-17 中国建筑第八工程局有限公司 Waterproof structure at joint of prefabricated outer wall and cast-in-place floor slab and construction method thereof
CN113882600A (en) * 2021-11-08 2022-01-04 利坚美(北京)科技发展有限公司 Roof parapet concrete roof-pressing heat-insulating waterproof construction method
CN115045447A (en) * 2022-06-02 2022-09-13 大同泰瑞集团建设有限公司 Passive house roofing is with disconnected heat bridge comprehensive drainage device
WO2023000568A1 (en) * 2021-07-21 2023-01-26 山东京博控股集团有限公司 Drainage system for planting in soil covering top of hazardous chemical storage tank

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979020A (en) * 2018-07-26 2018-12-11 浙江广辉建设有限公司 A kind of the flashing constructing device and construction method of parapet of roofing
CN110984485A (en) * 2019-10-18 2020-04-10 宋冠群 Roof waterproof heat insulation new construction
CN113404170A (en) * 2021-06-18 2021-09-17 中国建筑第八工程局有限公司 Waterproof structure at joint of prefabricated outer wall and cast-in-place floor slab and construction method thereof
WO2023000568A1 (en) * 2021-07-21 2023-01-26 山东京博控股集团有限公司 Drainage system for planting in soil covering top of hazardous chemical storage tank
CN113882600A (en) * 2021-11-08 2022-01-04 利坚美(北京)科技发展有限公司 Roof parapet concrete roof-pressing heat-insulating waterproof construction method
CN115045447A (en) * 2022-06-02 2022-09-13 大同泰瑞集团建设有限公司 Passive house roofing is with disconnected heat bridge comprehensive drainage device

Similar Documents

Publication Publication Date Title
CN209025252U (en) An exterior wall waterproof structure of a prefabricated building
CN208363452U (en) A kind of double-layer drainage structure of heat-insulating roof
CN204715638U (en) A kind of roof covering water-proof structure
CN205712797U (en) A kind of drainage system on building roof
CN206371225U (en) Rain water on roof is detained double-arch structure and Green Roof Intelligent irrigation system
CN208347160U (en) A kind of intensive pipeline of casing cluster type goes out the hoistway anti-leakage structure of roofing
CN210164152U (en) A green energy-saving roof structure
CN209339468U (en) A kind of strong waterproof roof structure for building to prevent water seepage
CN219298619U (en) Steel structure roof cornice
CN207776290U (en) A kind of horizontal type water for flat roof waterproof system falls mouth structure
CN205503183U (en) Formula of covering delivery port structure in tunnel heat preservation escape canal
CN215563905U (en) Node structure that cornices on block tile roofing
CN211396308U (en) Waterproof structure of pitched roof eaves gutter
CN116575603A (en) Anti-leakage systems for building facades
CN212201049U (en) Roof parapet inlet for stom water cold bridge prevention structure
CN115874769A (en) roof exhaust system
CN212336557U (en) A kind of roof parapet waterproof structure
CN202787726U (en) Anti-leakage roof drainage gutter
CN203834824U (en) Waterproof device for joint hole of pipeline and water separator/collector of Tabs system
CN209855082U (en) Water retaining joint of ventilation pipeline
CN223018009U (en) A building high-impermeability roof drainage structure
CN202324408U (en) System for arranging rainwater down pipe capable of reducing temperature of outer wall in summer
CN224032025U (en) Double-guide drainage structure for roof external drainage
CN220336274U (en) A kind of guide channel for metal roof
CN207277712U (en) Waterproof thermal-insulated roof structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170718