CN106854918B - The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage - Google Patents

The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage Download PDF

Info

Publication number
CN106854918B
CN106854918B CN201510889991.8A CN201510889991A CN106854918B CN 106854918 B CN106854918 B CN 106854918B CN 201510889991 A CN201510889991 A CN 201510889991A CN 106854918 B CN106854918 B CN 106854918B
Authority
CN
China
Prior art keywords
pan tile
watt
waterproof
general pre
stress hollow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510889991.8A
Other languages
Chinese (zh)
Other versions
CN106854918A (en
Inventor
陈明东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510889991.8A priority Critical patent/CN106854918B/en
Publication of CN106854918A publication Critical patent/CN106854918A/en
Application granted granted Critical
Publication of CN106854918B publication Critical patent/CN106854918B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/24Roofing elements with cavities, e.g. hollow tiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/30Special roof-covering elements, e.g. ridge tiles, gutter tiles, gable tiles, ventilation tiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/064Gutters
    • E04D13/0646Gutters made of concrete or stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D1/00Roof covering by making use of tiles, slates, shingles, or other small roofing elements
    • E04D1/30Special roof-covering elements, e.g. ridge tiles, gutter tiles, gable tiles, ventilation tiles
    • E04D2001/301Special roof-covering elements, e.g. ridge tiles, gutter tiles, gable tiles, ventilation tiles at roof edges, e.g. intersections with walls
    • E04D2001/303Eave tiles

Abstract

The general pre-stress hollow pan tile of the flat roof superstructure of the ne-leakage constructs self waterproofing system for structure.Component production specification meets size coordination principle, is generally applicable in roof waterproof field.The primary anti-row's rainwater of roofing, the corresponding construction of waterproof layer spells whip stitch, self adaptive cracking, reform of nature rule, it expands with heat and contract with cold, moisture expansion and drying shrinkage seeps water through general pre-stress hollow pan tile constructional waterproofing, and secondary anti-row leads infiltration, it is accepted again through concave waterproof water guide collar tie beam groove, cross over pipe lower part is introduced by water guide pipe network having opened leakage drain gully, having cross over pipe principle effect to act on, is discharged outside room, roofing cracking leakage problems are solved with this.The waterproof layer surface once anti-bright water of row's roofing is formed, general pre-stress hollow pan tile constructional waterproofing is hidden to lead infiltration at secondary anti-row, and combines roof concave waterproof water guide collar tie beam groove pipe network, and guidance percolating water drains, the waterproof technique effect of overall coordination system.

Description

The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage
Technical field
This technology belongs to building roof waterproof field.
Background technique
Flat roof building cover structure layer, typically reinforced concrete roof, i.e. cast-in-situ steel reinforced concrete roofing and assembled Armoured concrete slab roofing.
Cast-in-situ steel reinforced concrete roofing, it obeys the rule that crack occurs from middle part again and again, and there is also randomness cracks point Cloth generates the complexity fractue spacing that the two haves both at the same time.
In multi-storey building, in small high-rise and skyscraper, cast-in-situ steel reinforced concrete roof construction layer usually will appear 0.1mm-0.2mm different degrees of construction crack, or even will appear the connectivity crack greater than 0.2mm, if crack allows width It is reduced to 0.2mm from 0.3mm, about needs to increase by 30% arrangement of reinforcement, the effect of the economy of waterproof technique and control critical eigenvalue is not It is good.
With prefabricated concrete hollow slab component, the roofing building cover structure of assembly, rigid waterproof layer (or screed-coat) with Between structured base layer cored slab piece, end seam, connectivity crack is formed.
Currently, reinforced concrete roof, is all made of totally-enclosed waterproof material technology covering roofing, splits to solve roof structure Infiltration problem, but has a problem in that each layer of material constructional waterproofing also relates to, the linear expansion coefficient between waterproof material is different, and heat expansion is cold Compression deformation value is also just different, makes material combination of rigidity and flexibility to each other, it is compatible with match, constructing operation is not easy, material aging, uncoordinated Etc. brings leakage problems.
Summary of the invention
Systematically analyzing roof waterproof now, the problem of generally existing leakage, we provide Technical Economy conjunctions Reason, with prestressed concrete technology and the cementitious capillary waterproofing material for mutually melting armored concrete, is integrated collaboration The technological means of roof collar tie beam, optimization solve roof superstructure leakage, form rigid roofing water barrier surface, once anti-row's rainwater, Infiltration is split through base layer structure constructional waterproofing, and secondary anti-row leads infiltration, then combined roof, the concave waterproof water guide collar tie beam ditch being integrally formed Barrel net is accepted, and guidance percolating water drains, the systematic waterproofing technical solution of overall coordination, schematic diagram 1.It is 1. 2. 3. 4. pre- in figure 5. prestressed concrete structure constructional waterproofing component, the flat roof superstructure assemblied seep to integrate the anti-gear of concave of roof formation Water is entered the room, the concave waterproof water guide collar tie beam that drains of guidance percolating water, there is water guide pipe network in section, groove center, is equipped with and pipe network It is connected between each setting nozzle, with the polywater ditch for encircleing arc, the pipe network in groove and beam on beam forms cross over pipe principle effect It should act on, opened the openning of overboard row's infiltration below, each nozzle lower part of setting is coupled pipe network and makees gradient water conservancy diversion installation process.
Fig. 2 is Z-shaped plate watt used in roofing superstructure in technical solution, and T-type pan tile (positive T-type, inverted T shaped), side plate watt (is opened Head plate watt receives head plate watt), five kinds of structure constructional waterproofing components, schematic illustration and member section schematic diagram, component are suitble to work Factory, standardized production, structural system meet the requirement of size coordination principle, we are called general prestressed cored slab Watt, abbreviation pan tile.
2. 3. description of symbols: 1. Shang watt mouth, 2. pan tile is worked as, and sees Fig. 1,3. water blocking, 4. lower watt of mouth, has row to seep slope, 5. wear Muscle button binding reinforcement wears snap fit muscle with pan tile section angle at 45 ° with benefit, 6. water proof wire casing in length and breadth,Water proof wire casing ring moulds tool, Internal diameter d is corresponding with mold tube core outer diameter D to match, and 7. drips, 8. the simultaneous muscle of wearing of hanging ring is buckled, and 9. side plate watt, which encloses, works as, and sees Fig. 1 1. 4..
Fig. 3, Fig. 4, Fig. 5, Fig. 7, Fig. 8 are that pan tile assembly spells and takes mode, with a thickness of 120mm, 160mm, 180mm, 240mm, 1. five kinds of specifications such as 320mm, Fig. 7 are to spell whip stitch thin portion enlarged drawing.
Pan tile length specification size is divided into: 2.4m, 3.0m ... 7.5m etc. is a variety of.
Pan tile width specifications size is divided into: 600mm, 900mm, 1200mm etc. are several.
Pan tile thickness specification size is divided into: 120mm, 160mm, 180mm, 240mm, 320mm etc. are several.
Lower watt of mouth ramp height respectively corresponds pan tile thickness are as follows: 10mm, 30mm, 50mm, 110mm, 170mm etc. are several.
It is seeped to improve lower watt of mouth gradient acceleration drainage row of pan tile, it can or Demand Design selection pan tile how many according to regional rainfall Thickness selects the standard width of a room in an old-style house to collapse long needs, the i.e. short use of slab, not necessarily with the row's of raising infiltration slope ratio.Collapsing for Fig. 7 is grown within 3m, is done Drought area short of rain uses.
Fig. 9 is that roof superstructure need to set internal drainage, and to the practice and requirement of pan tile body aperture mode, no special situation is not adopted Use internal discharging type.
1. the section size position of pan tile aperture, opening diameter d is less than pan tile hollow pipe cavity diameter D, is not allowed to injure pre- answer Power reinforcing bar.2. aperture needed for pan tile longitudinal profile or the position for opening second hole, two hole back gauges should be greater than being equal to 80mm, and aperture is answered It is dug at pan tile hollow pipe cavity in pan tile end away from the region pan tile length 250mm-600mm, aperture discharge capacity is small, Just can be as needed, longitudinal to dig second hole, pan tile body must not be dug in other regions.3. threading water guide pipe fitting and set Position applies cementitious capillary crystalline waterproofing agent, makees plugging watertight processing before sealing.4. sealing nut, 5. sealing ring.⑥ The vertical view and side view of discharge outlet, nozzle top should fill grate.
The beneficial effect of the technology is: wearing muscle button binding reinforcement above general prestressed cored slab tile structure component, indulges Snap fit muscle string knot roofing steel mesh is crossed, and is securely linked with the binding reinforcement on roof surrounding concave waterproof water guide collar tie beam, is worn Button connection arrangement of reinforcement is convenient, and after roofing pea gravel concreten waterproof layer pours, assembly globality structure enhancing, shockproof erosion-resisting characteristics is mentioned It is high.
The corresponding construction of roof waterproof layer spells whip stitch and adaptively cracks, the secondary anti-row's percolating water of constructional waterproofing, house indoor without Leakage, because being integrated with structural elements, constructional waterproofing is consistent durable using durable years with the Concrete Structure Design for constructional waterproofing Effectively, component assembles, and laying is mounted on concave waterproof water guide collar tie beam, and construction is simple, and installation effectiveness is high, save artificial, template, Bracket, waterproof are built economical.
Concave waterproof water guide collar tie beam accepts the entire secondary anti-row's percolating water of roofing, and the anti-gear infiltration of groove is entered the room, polywater ditch Diversion enters each nozzle, is drained to leakage drain gully through slope connection pipe network, is discharged outside room, roof structure constructional waterproofing system peace Dress, waterproof quality are easily guaranteed that.
The ramp height of secondary anti-row's percolating water, can be according to regional rainfall size selected member thickness specification.
Detailed description of the invention
Fig. 1 is to solve the problems, such as background technique, provided technical solution schematic diagram.
Fig. 2 to Fig. 9 is the schematically illustrate and corresponding section signal of five kinds of components of constructional waterproofing used in technical solution, Have including upper watt mouth water proof wire casing ring moulds, schematic diagram 2, assembly spells and takes mode, marks five kinds of specification Fig. 3, Fig. 4, Fig. 5, figures 7, Fig. 8, roofing internal drainage osseotomy site installation signal (no special situation does not use internal discharging type) Fig. 9, Fig. 6 is Fig. 5 specification Another construction spell and take mode.
Figure 10 to Figure 14, is technical solution, in specific embodiment, produces mold schematic diagram 10 used in pan tile, template, Production site schematic diagram 11, the template mold schematic diagram 12 of the built concave waterproof water guide collar tie beam in erecting bed roof, lower watt of mouth are oblique Slope water conservancy diversion illustrates schematic diagram 13, pan tile structure constructional waterproofing reinforced component schematic diagram 14.
Figure 15 is technical solution, flat roof superstructure waterproof system, partial schematic diagram explanation.
Figure 16 is flat roof superstructure, and assembly is laid with pan tile schematic diagram, is painted with respective markers position 1. to thin portion installation 7. Structure structure cutaway view and corresponding position roofing pan tile spell whip stitch, end seam diagramPart, roofing wear snap fit muscle diagram in length and breadth ③④Part, the adaptive crack diagram of roofingPart.
Figure 17 is technical solution, is implemented required roofing eave (ditch), 1. 2. 3. 4. totally four kinds of constructional waterproofing schematic diagram.
Specific embodiment
Figure 10 is the Shang Wakou and lower watt of mouth partial illustrations when pan tile component is produced, and is labeled with section watt mouth ruler It is very little.Oblique line area portions are molds.1. lower watt of mouth upper mold, 2. mold (being painted with enlarged drawing) under Shang watt mouth.
Production method: oblique line area portions make mold, prefabricated extraction tube core mold, after form removal, need secondary demoulding (tiltedly Line area portions mold), after the concrete set strength after waiting the type of building reaches requirement, can demoulding, do not hurt a watt mouth, the mould on lower watt of mouth Tool finally can carefully remove after a form removal, not hurt a watt mouth.
In this explanatory diagram 2The use of water proof wire casing ring moulds tool: when production pan tile, wire casing ring moulds tool is inserted in Shang Wakou Mold tube core, each one of both ends, away from the position between end head formwork 15mm-20mm, after building type extraction tube core, wire casing ring moulds Tool can be left on position set by watt mouth, after demoulding, after waiting concrete strengths to reach requirement, can take out wire casing ring moulds and have, thereon watt Mold (oblique line area portions) below mouthful should do the isosceles of corresponding wire casing ring moulds tool in the corresponding position of two ends mold The small trough of ladder type.
The pan tile produced, at the scene lift before, need to use cement based penetration crystallization type water proofing paint, to pan tile upper watt Mouth, which drips, around to be brushed or sprays secondary, and to being brushed or sprayed three times in lower watt of mouth, thickness should be not less than 1.0mm, brush Or when spraying, answer thickness uniform every time, in case lifting after final set.
Figure 11 is that Z-shaped plate watt used in production pan tile builds two side template of type and two ends template and production site shows It is intended to.
Description of symbols: being 1. that 2. mold forms superposition mould under Shang watt mouth by Shang watt mouth Side shuttering and Figure 10,It is corresponding Pan tile side eaves tile template with 1. overlap, in addition, also reply Shang watt mouth oblique line area mold lower section Figure 10, eaves tile 2. polishing at position Template.2. it is lower watt of mouth Side shuttering and Figure 10 1. lower watt of mouth upper mold composition superposition mould,It is corresponding pan tile side eaves tile Template with 2. overlap.
3. it is pan tile two ends engaging template,- 1,3. -1 with- 2,3. -2, mould is crossed according to presstressed reinforcing steel distribution Place, is provided with the card slot of joinery and its construction, and- 1 withConvex head (being painted with side view and top view) is reserved on -2 template tenons. After bolster engaging is held together, it is formed the square via hole of presstressed reinforcing steel, is 4. convex head via size.
It is 6. the side view production landform of Z (T) template watt, 7. landform is raised, is 5. being the vertical view production landform of side plate watt To replace saving bottom abdomen template, 8. long line platform presstressed reinforcing steel, 9. starts pan tile signal, 10. receives head plate watt signal,Pan tile has been taken, Collapsible form and position are removed,The swollen loose device of side plate watt and position are taken.
Figure 12 is concave waterproof water guide ring beam template: 1. gable (beam), the template on outer vertical wall (beam), and with Figure 16's Detail drawing 7. corresponds to and arrangement of reinforcement, 2. cross wall (beam), the template on interior vertical wall (beam), and 6. corresponding with the detail drawing of Figure 16, And arrangement of reinforcement, 3. it is that figure is cutd open in the longitudinal direction of corresponding templates 2. female mold tool, is 4. the polywater ditch mold section diagram with arch arc.
In the concrete for pouring concave waterproof water guide collar tie beam, mixes cementitious capillary crystalline waterproofing agent or concave waterproof is led It in the groove of hydrosphere beam, brushes or sprays, thickness is uniform, and thickness should be not less than 1.0mm, cement-base infiltration crystallization type water-proof Coating.
Figure 13 is that the type mode of building of the slope Wa Kou water conservancy diversion under pan tile illustrates: 1. lower watt of mouth macropore Side Template, 2. lower watt of mouth is small Hole Side Template, 3. for 1. with 2. template, size hole horizontal sighting distance be overlapped inscribe (or size hole horizontal sighting distance overlapping intersection, such as scheme 3, Fig. 4, Fig. 5, Fig. 6), it is 4. 7. cone mold tube core passes through the side view of template 1., 2., the water conservancy diversion for 5. building type formation is oblique 6. the latch aperture and rod bolt of tube core are fixed in slope.
Figure 14 is Z (T) template watt, side plate watt reinforcement bar arrangement figure: 1. pan tile section presstressed reinforcing steel, 2. in the middle part of upper and lower watt of mouth Bar spacing, 3. pan tile end bar spacing, 4. pan tile is when with muscle is taken off, 5. side plate watt, which encloses, works as arrangement of reinforcement, 6. upper and lower watt of mouth arrangement of reinforcement, 7. wearing muscle snap fit muscle, 8. pan tile end stirrup.
Figure 15 be in order to install flat roof superstructure waterproof system, detail sections and the overboard local specification of alien invasion: 1. rigid waterproof layer corresponds to pan tile and spells whip stitch, adaptive to crack, 2. roofing drain port, 3. roofing pea gravel concreten rigid waterproofing Layer, 4. backing, sealing material, 5. cavity, 6. band encircles the polywater ditch of arc, 7. leaks drain gully, 8. percolating water water conservancy diversion pipe network, 9. Concave waterproof water guide collar tie beam, 10. roofing drain port and leakage drain gully alien invasion bucket and master, manifold docking assembly,Housing Corrugated tube, at 1 meter or more, waveform nozzle should be closed length.
Figure 16 is that assembly is taken in flat roof superstructure roofing spelling, and installation is equipped with longitudinal direction and has lateral pan tile schematic diagram, marks 1. to sectional detail figure when being 7. painted with installation respectively.
1. enlarged drawing in is the closure node diagram at pan tile laterally and longitudinally right-angled intersection,- 1 is " several " font Backing blocks the seam signal of pan tile end,- 2 be pan tile longitudinally spell whip stitch block, see Fig. 7 1. amplify spell whip stitch, the seam using mixed with The sticky more dry mortar of asbestos is made into a joint filling and blocks, and mortar must not be fallen into Xia Wakou, in order to avoid infiltration flowing, row is hindered to seep not Freely.In 2.- 1 is to wear snap fit muscle amplification diagram in length and breadth.In 4.- 1 is that the simultaneous muscle of wearing of hanging ring buckles specification, and- 2 wear muscle button, and height is for the ease of pile, transport, hidden keeps away rear waterproof layer matcoveredn on it.In 7.It is concave The binding reinforcement of gable (beam) and outer vertical wall (beam) and roof waterproof layer on waterproof water guide collar tie beam.
The above installation is completed, blocks and spells whip stitch and end seam, and wear snap fit muscle in length and breadth, on inspection after no problem, will be poured thin Stone concrete waterproof layer should mix cementitious capillary crystalline waterproofing agent, and one-time-concreting by waterproofing design requirement in concrete It completes.Through Troweling press finishing three times before beginning, initial set, final set.It should be paid attention to, after receiving water, second of press polish is to guarantee waterproof Layer surface compactness closes pore, improves impermeability, and an extremely important procedure must carry out 14d maintenance after final set.
After this, roofing pea gravel concreten rigid waterproof layer can be deformed because of base, building sedimentation, ambient air temperature Change, solar radiation, under the action of rain, snow and house heat source etc., rigid waterproof layer adaptively generates crack, some cracks Meeting very little, what is had will not even crack, this will see the size of its stressing influence.Whip stitch is spelled in gap and pan tile usually after cracking, End seam communicates up and down, corresponds to the size distribution of base's pan tile regularly.Such as the roofing of Figure 16 5.Partial illustrations.
It must refer to the waterproof maintaining management of roofing later period, reason has three:
One, the gradient of accessible roof generally in 2%-3%, construction it is levelling be difficult to accomplish it is accurate, waterproof layer surface just The place for having several places or many places indentation, influences roof drainage, therefore pan tile, it is larger should to scratch obstruction based on waterproof row's infiltration Gap, allowing rainwater, from roofing, once bright water drainage is gone out to greatest extent, and a small amount of percolating water is from the pan tile ditch and concave under crack It is secondary in waterproof water guide collar tie beam pipe network to drain.
Two, it repairs and safeguards that biggish crack is also the comfort level improved on people's fracture visual sensory, if had ready conditions, Tapestry brick decoration can be used, impact of the crack to vision is weakened.
Three, roof waterproof maintenance management should also develop simultaneously with prevention and treatment dust dirt, be that can go up the movable roofing of people fortunately, Usually roof drainage obstacle dirt is removed, it is easy to keep hygienically clean, this is also the preferably maintenance dust-proof to roof waterproof.
To keep the constructional waterproofing system of flat roof superstructure permanent effective as the durable years of concrete structure member, institute With maintenance management, blade coating is stopped cracking and is also necessary in the gap of 0.4mm or more.

Claims (5)

1. the general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage, comprising: the general pre-stress hollow pan tile of Z-type, T-type are general pre- Stress hollow pan tile contains positive T-type and inverted T shaped, side plate watt, i.e., covering roof longitudinally in each or the lateral standard width of a room in an old-style house, initial arrangement it is general Pre-stress hollow pan tile, the general pre-stress hollow pan tile of beginning pan tile and covering arrangement ending, receives head plate watt, concave waterproof is led Mold, the template of type, concave waterproof water guide collar tie beam and the master for wherein leading the pipe network and peripheral hardware that seep row's leakage are built in hydrosphere beam, and production Discrimination water falling pipe, it is characterized in that: the beginning pan tile through side plate watt, the general pre-stress hollow pan tile of Z-type T-type, to the receipts of side plate watt Head plate watt, installation spell and take laying, cover on the concave waterproof water guide collar tie beam on building roof, cover entire roof flooring, and close Whip stitch and end seam are spelled between general pre-stress hollow pan tile, and wears button string knot arrangement of reinforcement in length and breadth on it, pour pea gravel concreten waterproof After layer, the flat roof superstructure of complete one is formed, once anti-row's rainwater, general pre-stress hollow pan tile construction are anti-for waterproof layer surface Water, secondary anti-row lead infiltration, are accepted by concave waterproof water guide collar tie beam, through its groove pipe network, are guided to leakage drain gully, flow into peripheral hardware Main discrimination water falling pipe discharge room outside.
2. the general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage as described in claim 1, it is characterized in that: Z-type T-type is general Pre-stress hollow pan tile wears muscle button binding reinforcement in plate face, upper watt mouth of pan tile two sides and the Xia Wakou for having a gradient water conservancy diversion, And the eaves tile that two ends are sagging, the water proof wire casing at both ends, includes the arrangement of reinforcement in its upper and lower watt of mouth, eaves tile in Shang watt mouth.
3. the general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage as described in claim 1, it is characterized in that: beginning pan tile and Head plate watt to be received, wears muscle button binding reinforcement in plate face, there is Shang watt mouth in beginning pan tile side or has the Xia Wakou of a gradient water conservancy diversion, and two End and three side of the other side, then have continuous sagging enclosing to work as, and the water proof wire casing at both ends, receipts head plate watt also have phase in Shang watt mouth Mutually correspond to upper watt mouth of beginning pan tile or have a gradient water conservancy diversion Xia Wakou and two ends and three side of the other side it is continuously sagging Enclose and work as, the water proof wire casing at both ends, includes its upper and lower watt of mouth in Shang watt mouth, enclose in arrangement of reinforcement.
4. the general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage as described in claim 1, it is characterized in that: whole building building room Waterproof water guide collar tie beam structure on top is with whole made of gable beam, outer vertical wall beam, interior cross wall beam, interior vertical wall beam in length and breadth connection Body is a waterproof water guide groove continuously penetrated through above collar tie beam, and section is entered the room at concave, anti-gear infiltration, and gable beam and outer vertical For concave waterproof water guide collar tie beam on wall beam at abnormal shape, top is asymmetric, and outside is both higher and wide than inside, highly thick with laying pan tile Degree flushes, and outside top is equipped with the binding reinforcement overlapped with roof waterproof layer, the inbuilt pipe in concave waterproof water guide collar tie beam Net is then to communicate with concave groove, and is then to be equipped with gradient connection for water conservancy diversion infiltration to gang up below pipe network, and the main discrimination with peripheral hardware Water falling pipe communicates.
5. the general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage as described in claim 1, it is characterized in that: roof superstructure needs Aperture if internal drainage, to pan tile body.
CN201510889991.8A 2015-12-08 2015-12-08 The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage Active CN106854918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510889991.8A CN106854918B (en) 2015-12-08 2015-12-08 The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510889991.8A CN106854918B (en) 2015-12-08 2015-12-08 The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage

Publications (2)

Publication Number Publication Date
CN106854918A CN106854918A (en) 2017-06-16
CN106854918B true CN106854918B (en) 2019-06-25

Family

ID=59131321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510889991.8A Active CN106854918B (en) 2015-12-08 2015-12-08 The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage

Country Status (1)

Country Link
CN (1) CN106854918B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144767A (en) * 2019-12-05 2020-12-29 怀化沃普环保科技有限公司 Pressure release type waterproof system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331308A (en) * 1997-06-04 1998-12-15 Shinko Kenzai Kogyo Kk Floor structure
CN2346855Y (en) * 1998-08-21 1999-11-03 余贤禹 Anti-leakage heat isolating hollow precast slab used as roof
NZ534402A (en) * 2004-07-30 2006-10-27 Glen Adrian Harley Floor mounted drainage channel to prevent flooding spreading between rooms
CN103669742B (en) * 2013-04-12 2016-03-30 龙宏元 Diversion waterproof thermal-insulation system
CN203654620U (en) * 2013-09-03 2014-06-18 沈阳理工大学 Assembly type roof waterproof and heat-insulation structure

Also Published As

Publication number Publication date
CN106854918A (en) 2017-06-16

Similar Documents

Publication Publication Date Title
CN101831985B (en) Precast concrete wallboard and preparation method thereof
CN101818539B (en) Assembled integral building and construction method thereof
CN102116061B (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN101818541B (en) Precast composite wallboard with door/window holes and manufacturing method thereof
CN106906962B (en) A kind of building roof parapet flashing construction technology
CN205653820U (en) Basement post -cast strip advances plugging device
CN209723052U (en) The prefabricated plate advanced water-stopping of poured band of outer wall of basement backfills structure
CN101644079B (en) Construction method of reinforced concrete shear wall body
CN201738494U (en) Prefabricated composite wall slab with door/window opening
CN106978823A (en) Outer wall of basement advanced water-stop post-pouring zone construction method
CN208981531U (en) A kind of prefabricated assembled parapet connection structure
CN104674998B (en) 45-degree slope roof cast-in-place concrete construction method
CN212613903U (en) Brick-concrete structure old building body composite reinforcement structure
CN108729595A (en) A kind of structurally stable heat-isolating antiseepage pitched roof and its method of construction
CN106854918B (en) The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage
CN113585351A (en) Soil covering plane settlement post-cast strip prefabrication advanced reverse order closed construction method
CN101260726A (en) Prestressed concrete wide goose plate construction method
CN115030556B (en) Repairing and reinforcing method for exposed wall old building of brick
KR20140139217A (en) Concrete protection wall with linear drainage functions and construction method thereof
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN109339355A (en) The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN103510699B (en) It is easy to the construction method of the close rib building roof of rainwater utilization
CN113123215B (en) Construction method of platform wall and platform wall
CN101215938A (en) Ring aeration tank integral formwork support process
CN103572783B (en) Comprehensive method for preventing crack and water of basement project

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant