CN102733553A - Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs - Google Patents
Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs Download PDFInfo
- Publication number
- CN102733553A CN102733553A CN2012102301057A CN201210230105A CN102733553A CN 102733553 A CN102733553 A CN 102733553A CN 2012102301057 A CN2012102301057 A CN 2012102301057A CN 201210230105 A CN201210230105 A CN 201210230105A CN 102733553 A CN102733553 A CN 102733553A
- Authority
- CN
- China
- Prior art keywords
- watt
- layer
- tile
- roofing
- ridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention discloses a construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs, comprising the following steps: checking up slope roof foundation, painting asphalt mastics, playing a vertical/horizontal mark line, laying glass fiber asphalt shingles and finishing. The method provided by the invention has the advantages of simple construction, good work effect, good longitudinal and transverse tension resistance, good non-deformability, water resistance and aging resistance after glass fiber asphalt shingles are laid, and ensures long-term weather resistance and dustproof self-cleaning performances of surface colors. The method is suitable for waterproof roof engineering of reinforced concrete roof and wood roof with slope of 45-60 degrees in multi-layer and high-layer civil buildings, public buildings, and villa engineering.
Description
Technical field
The present invention relates to the job practices of a kind of steel concrete abrupt slope roofing light glass bituminized shingle.
Background technology
In the multistory building design; People to moulding, environmental protection and the facade effect of requirement of building and expect increasingly high, multilayer, highrise building, mostly the Roof Design of utilities building, high-grade villa is two slopes and three-dimensional pitched roof; Often the gradient is more than 20 degree, and the abrupt slope roofing reaches 45~60 degree.
Pitched roof common main material be generally cement encaustic tile, ceramic watt and colored glaze watt etc., when roof pitch is very steep, lay ordinary Portland cement encaustic tile, ceramic watt or colored glaze watt; From great; Fixing comparatively difficulty in long-term use, receives boisterous the influence; Landing easily exists bigger hidden danger.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the job practices of the steel concrete abrupt slope roofing light glass bituminized shingle of good working effect.
Technical solution of the present invention is:
The job practices of a kind of steel concrete abrupt slope roofing light glass bituminized shingle is characterized in that: comprise the following steps:
(1) pitched roof basic unit inspection: the leveling layer of construction thickness 30 ㎜ on the warming plate, surface finish is not more than 5 ㎜; In the junction of basic unit and outstanding roofing, and the corner of basic unit, arc chord angle all made;
(2) brushing pitch glue: brushing one deck pitch glue on leveling layer;
(3) play the vertical-horizontal marker line: eject horizontal control line along the pitched roof length direction, the difference of the width that exposes between layer and the layer during tiling is no more than ± 3 ㎜; Width along pitched roof ejects vertical control line, makes the Ornamental Stitching alignment of eaves between the ridge watt of mouth overlapping the slot or single layered tile mouth; Intersect the many pitched roofs that form hip for double-slope roof or two roofings, vertical line is divided equally toward both sides from the center of each side slope; Intersect the many pitched roofs that form gutter for two roofings, vertical line is divided equally to the gutter direction from the end that each side slope does not intersect; Each bar distance between centers of tracks of vertical direction is 167 ㎜, and article one horizon will eject the 184 ㎜ places, bottom apart from initial watt, is 143 ㎜ between other horizon, each layer watt the top will be same the horizon of bullet match;
(4) asphalt glass watt:
A) initiation layer is installed: initiation layer is directly to lay along the sloping bottom of difference roofing; Along gable cornice with the cornice initiation layer to stretch out cornice 10 ㎜; Initiation layer both sides end parts is 50 ㎜ and fix with a nail respectively apart from the place of side 25 ㎜ apart from the base, and along continuous straight runs evenly is provided with two nails between these two nails then;
B) first floor paving: also lay tile in order successively with whole watt of beginning; Guarantee to align along cornice with the edge of initiation layer watt; Two-layer watt closely links together, and the tile that nails, watt the limit end with the horizon alignment of bullet; Watt side with the vertical line alignment of bullet, to sew on the Ornamental Stitching and every layer watt be connected of guaranteeing single layered tile lower floor's dislocation;
C) second layer watt paving: the side of the side of the second layer watt and preceding one deck watt 167 ㎜ that stagger; Then with whole watt of down paving successively; The base of single layered tile should flush with the Ornamental Stitching top of first floor watt; The base of the second layer watt should flush with the double-deck operative tip of first floor watt, guarantee previous lay watt expose 143 ㎜, with nail tile is fixed;
D) three layer of watt of paving: the 3rd layer watt first cut whole watt 1/3; Make its side of first 167 ㎜ that stagger with the second layer watt; During the single layered tile paving, watt the base flush with the Ornamental Stitching top of the second layer watt, during double-deck watt of paving; Watt the base flush with the double-deck operative tip of the second layer watt, then with whole watt successively down paving fix; With nail tile is fixed
E) four layer of watt of paving: first tile of the 4th layer watt cut half of whole watt; Make it with side of first of three layer watt, 167 ㎜ that stagger; During the single layered tile paving, watt the base flush with three layer watt Ornamental Stitching top, during double-deck watt of paving; Watt the base flush with three layer watt double-deck operative tip, then with whole watt successively down paving fix; With nail tile is fixed
F) installation of layer 5 and later other layer repeats first to fourth layer paving step;
G) paving of gutter tile: intersect roofing on watt layer and on two roofings, lay or the separately construction separately of each roofing to the gutter direction simultaneously; All paving is to apart from gutter center line 300~700 ㎜ places, repaves the tile on the subsides gutter after having spread two tiles on the roofing, upwards lays first floor watt along the edge of one of them roofing; And stretched gutter; Make last watt of this layer reach adjacent roofing 300 ㎜, lay first floor watt along the eaves of adjacent roofing then, will stretch watt layer that gutter snaps into previous laying equally; And be woven together mutually, watt by tightly in gutter;
H) ridge tiles is installed: hip and ridge are before laying ridge tiles; Earlier each roofing on the roof watt to covering to another crossing roofing; And nail, each roofing watt cross ridge 100 ㎜, for the ease of closing up; The last watt of roof tile that will make when laying crest tile can cover top layer, and equate with the lap width of ridge both sides roofing;
When laying ridge tiles,, its distance in ridge or the extension of hip both sides is equated along every watt of center line total length doubling, and snap the line paving alignment, the preheating tile is answered in winter construction, till can freely bending;
Oblique ridge tiles is installed: fastening first watt at the eaves place, and cut out the first watt along the roofing edge; Be temporarily fixed at the peak of hip to an oblique ridge tiles with nail, to interim tiltedly line of side bullet of ridge tiles, interim tiltedly ridge tiles removed along the side of first oblique ridge tiles; From oblique ridge tiles bottom; Begin to install oblique ridge tiles, every tile is reserved the exposed parts of 143 ㎜, follows closely a nail on the both sides of every tile to fix; If the position of nail should be apart from side 25 ㎜, the place of adjacent self-adhesive; Cut out last ridge tiles on every hip, they are fitted in the confluce of roof central authorities naturally in first ridge, sever one section that grows 100 ㎜, and be fixed on its on the ridge; Two and half ridge tiles of bifurcated are placed on respectively on two crossing hips, and fixing; The nail that exposes is coated pitch glue;
Crest tile is installed: from the leeward end of ridge, on terminal fastening first watt of ridge; At the ridge other end interim crest tile that nails; Along line of two ridge tiles edge bullets; Remove interim watt; Follow closely a nail to fix at every watt of dual-side; Every ridge tiles is reserved the exposed face of 143 ㎜; Leeward end from ridge during laying begins, fixing every ridge tiles, and a nail is respectively established in both sides, and the position of nail is apart from the 175 ㎜ places, base of exposing the limit, apart from ridge tiles side 25 ㎜ places;
Roofing node tile is installed: comprise the following steps:
Eaves gutter cornices: cornice first floor watt is chosen into eaves gutter 10 ㎜ with initial watt, between cornice position tile and initial watt, and pitching glue;
The flashing of gable, outstanding roofing and wall, parapet: lay the wide modified asphalt waterproof coiled material extra play of 300 ㎜ at the inner corner trim place; Flat each 150 ㎜ of facade; Then tile is turned over the height to 150 ㎜ of portion, on plane 150 ㎜ and facade, tile uses pitch glue completely to be bonded in the basic unit;
During the tile paving, first full coat pitch glue at the tile back side, gluing thickness 3 ㎜ completely adhere to it in lower floor watt and the coiled material basic unit then;
Paving hot melten type polymer modified bituminous waterproof sheet material on the facade, laying highly is 250 ㎜, with the lap width of tile be 100 ㎜, modified bituminous pitch coiled material closing in place uses that steel nail is fixed, pitch glue seals steel nail spacing 200 ㎜; The thick ferro-cement topping of modified asphalt waterproof coiled material outside construction one deck 20 ㎜;
I) passing intersection's filled bitumen glue of roofing pipeline, permeability cell, rainwater pipe and roofing junction and bituminized shingle;
J) round-off work: all tile constructions finish, the scrappy material on the cleaning roofing, and inspection and cleaning roofing are checked whole roofing, the tile that replacement damages, correcting defect then.
Easy construction of the present invention, good working effect has vertical, horizontal resistance to tension, non-deformability and waterproof, ageing resistance preferably after mating formation, and guarantees the long-term weatherability and the dustproof self-cleaning property of surface color and polish.Be applicable to many, high-rise civil building, the water-proof roofing engineering of the reinforced concrete roof of utilities building and villa engineering, the wood shingle gradient 45~60 degree.
Below in conjunction with embodiment the present invention is described further.
The specific embodiment
The job practices of a kind of steel concrete abrupt slope roofing light glass bituminized shingle is characterized in that: comprise the following steps:
(1) pitched roof basic unit inspection: the leveling layer of construction thickness 30 ㎜ on the warming plate, surface finish is not more than 5 ㎜; In the junction of basic unit and outstanding roofing, and the corner of basic unit, arc chord angle all made;
(2) brushing pitch glue: brushing one deck pitch glue on leveling layer;
(3) play the vertical-horizontal marker line: eject horizontal control line along the pitched roof length direction, the difference of the width that exposes between layer and the layer during tiling is no more than ± 3 ㎜; Width along pitched roof ejects vertical control line, makes the Ornamental Stitching alignment of eaves between the ridge watt of mouth overlapping the slot or single layered tile mouth; Intersect the many pitched roofs that form hip for double-slope roof or two roofings, vertical line is divided equally toward both sides from the center of each side slope; Intersect the many pitched roofs that form gutter for two roofings, vertical line is divided equally to the gutter direction from the end that each side slope does not intersect; Each bar distance between centers of tracks of vertical direction is 167 ㎜, and article one horizon will eject the 184 ㎜ places, bottom apart from initial watt, is 143 ㎜ between other horizon, each layer watt the top will be same the horizon of bullet match;
(4) asphalt glass watt:
A) initiation layer is installed: initiation layer is directly to lay along the sloping bottom of difference roofing; Along gable cornice with the cornice initiation layer to stretch out cornice 10 ㎜; Initiation layer both sides end parts is 50 ㎜ and fix with a nail respectively apart from the place of side 25 ㎜ apart from the base, and along continuous straight runs evenly is provided with two nails between these two nails then;
B) first floor paving: also lay tile in order successively with whole watt of beginning; Guarantee to align along cornice with the edge of initiation layer watt; Two-layer watt closely links together, and the tile that nails, watt the limit end with the horizon alignment of bullet; Watt side with the vertical line alignment of bullet, to sew on the Ornamental Stitching and every layer watt be connected of guaranteeing single layered tile lower floor's dislocation;
C) second layer watt paving: the side of the side of the second layer watt and preceding one deck watt 167 ㎜ that stagger; Then with whole watt of down paving successively; The base of single layered tile should flush with the Ornamental Stitching top of first floor watt; The base of the second layer watt should flush with the double-deck operative tip of first floor watt, guarantee previous lay watt expose 143 ㎜, with nail tile is fixed;
D) three layer of watt of paving: the 3rd layer watt first cut whole watt 1/3; Make its side of first 167 ㎜ that stagger with the second layer watt; During the single layered tile paving, watt the base flush with the Ornamental Stitching top of the second layer watt, during double-deck watt of paving; Watt the base flush with the double-deck operative tip of the second layer watt, then with whole watt successively down paving fix; With nail tile is fixed
E) four layer of watt of paving: first tile of the 4th layer watt cut half of whole watt; Make it with side of first of three layer watt, 167 ㎜ that stagger; During the single layered tile paving, watt the base flush with three layer watt Ornamental Stitching top, during double-deck watt of paving; Watt the base flush with three layer watt double-deck operative tip, then with whole watt successively down paving fix; With nail tile is fixed
F) installation of layer 5 and later other layer repeats first to fourth layer paving step;
G) paving of gutter tile: intersect roofing on watt layer and on two roofings, lay or the separately construction separately of each roofing to the gutter direction simultaneously; All paving is to apart from gutter center line 300~700 ㎜ places, repaves the tile on the subsides gutter after having spread two tiles on the roofing, upwards lays first floor watt along the edge of one of them roofing; And stretched gutter; Make last watt of this layer reach adjacent roofing 300 ㎜, lay first floor watt along the eaves of adjacent roofing then, will stretch watt layer that gutter snaps into previous laying equally; And be woven together mutually, watt by tightly in gutter;
H) ridge tiles is installed: hip and ridge are before laying ridge tiles; Earlier each roofing on the roof watt to covering to another crossing roofing; And nail, each roofing watt cross ridge 100 ㎜, for the ease of closing up; The last watt of roof tile that will make when laying crest tile can cover top layer, and equate with the lap width of ridge both sides roofing;
When laying ridge tiles,, its distance in ridge or the extension of hip both sides is equated along every watt of center line total length doubling, and snap the line paving alignment, the preheating tile is answered in winter construction, till can freely bending;
Oblique ridge tiles is installed: fastening first watt at the eaves place, and cut out the first watt along the roofing edge; Be temporarily fixed at the peak of hip to an oblique ridge tiles with nail, to interim tiltedly line of side bullet of ridge tiles, interim tiltedly ridge tiles removed along the side of first oblique ridge tiles; From oblique ridge tiles bottom; Begin to install oblique ridge tiles, every tile is reserved the exposed parts of 143 ㎜, follows closely a nail on the both sides of every tile to fix; If the position of nail should be apart from side 25 ㎜, the place of adjacent self-adhesive; Cut out last ridge tiles on every hip, they are fitted in the confluce of roof central authorities naturally in first ridge, sever one section that grows 100 ㎜, and be fixed on its on the ridge; Two and half ridge tiles of bifurcated are placed on respectively on two crossing hips, and fixing; The nail that exposes is coated pitch glue;
Crest tile is installed: from the leeward end of ridge, on terminal fastening first watt of ridge; At the ridge other end interim crest tile that nails; Along line of two ridge tiles edge bullets; Remove interim watt; Follow closely a nail to fix at every watt of dual-side; Every ridge tiles is reserved the exposed face of 143 ㎜; Leeward end from ridge during laying begins, fixing every ridge tiles, and a nail is respectively established in both sides, and the position of nail is apart from the 175 ㎜ places, base of exposing the limit, apart from ridge tiles side 25 ㎜ places;
Roofing node tile is installed: comprise the following steps:
Eaves gutter cornices: cornice first floor watt is chosen into eaves gutter 10 ㎜ with initial watt, between cornice position tile and initial watt, and pitching glue;
The flashing of gable, outstanding roofing and wall, parapet: lay the wide modified asphalt waterproof coiled material extra play of 300 ㎜ at the inner corner trim place; Flat each 150 ㎜ of facade; Then tile is turned over the height to 150 ㎜ of portion, on plane 150 ㎜ and facade, tile uses pitch glue completely to be bonded in the basic unit;
During the tile paving, first full coat pitch glue at the tile back side, gluing thickness 3 ㎜ completely adhere to it in lower floor watt and the coiled material basic unit then;
Paving hot melten type polymer modified bituminous waterproof sheet material on the facade, laying highly is 250 ㎜, with the lap width of tile be 100 ㎜, modified bituminous pitch coiled material closing in place uses that steel nail is fixed, pitch glue seals steel nail spacing 200 ㎜; The thick ferro-cement topping of modified asphalt waterproof coiled material outside construction one deck 20 ㎜;
I) passing intersection's filled bitumen glue of roofing pipeline, permeability cell, rainwater pipe and roofing junction and bituminized shingle;
J) round-off work: all tile constructions finish, the scrappy material on the cleaning roofing, and inspection and cleaning roofing are checked whole roofing, the tile that replacement damages, correcting defect then.
Claims (1)
1. the job practices of a steel concrete abrupt slope roofing light glass bituminized shingle is characterized in that: comprise the following steps:
(1) pitched roof basic unit inspection: the leveling layer of construction thickness 30 ㎜ on the warming plate, surface finish is not more than 5 ㎜; In the junction of basic unit and outstanding roofing, and the corner of basic unit, arc chord angle all made;
(2) brushing pitch glue: brushing one deck pitch glue on leveling layer;
(3) play the vertical-horizontal marker line: eject horizontal control line along the pitched roof length direction, the difference of the width that exposes between layer and the layer during tiling is no more than ± 3 ㎜; Width along pitched roof ejects vertical control line, makes the Ornamental Stitching alignment of eaves between the ridge watt of mouth overlapping the slot or single layered tile mouth; Intersect the many pitched roofs that form hip for double-slope roof or two roofings, vertical line is divided equally toward both sides from the center of each side slope; Intersect the many pitched roofs that form gutter for two roofings, vertical line is divided equally to the gutter direction from the end that each side slope does not intersect; Each bar distance between centers of tracks of vertical direction is 167 ㎜, and article one horizon will eject the 184 ㎜ places, bottom apart from initial watt, is 143 ㎜ between other horizon, each layer watt the top will be same the horizon of bullet match;
(4) asphalt glass watt:
A) initiation layer is installed: initiation layer is directly to lay along the sloping bottom of difference roofing; Along gable cornice with the cornice initiation layer to stretch out cornice 10 ㎜; Initiation layer both sides end parts is 50 ㎜ and fix with a nail respectively apart from the place of side 25 ㎜ apart from the base, and along continuous straight runs evenly is provided with two nails between these two nails then;
B) first floor paving: also lay tile in order successively with whole watt of beginning; Guarantee to align along cornice with the edge of initiation layer watt; Two-layer watt closely links together, and the tile that nails, watt the limit end with the horizon alignment of bullet; Watt side with the vertical line alignment of bullet, to sew on the Ornamental Stitching and every layer watt be connected of guaranteeing single layered tile lower floor's dislocation;
C) second layer watt paving: the side of the side of the second layer watt and preceding one deck watt 167 ㎜ that stagger; Then with whole watt of down paving successively; The base of single layered tile should flush with the Ornamental Stitching top of first floor watt; The base of the second layer watt should flush with the double-deck operative tip of first floor watt, guarantee previous lay watt expose 143 ㎜, with nail tile is fixed;
D) three layer of watt of paving: the 3rd layer watt first cut whole watt 1/3; Make its side of first 167 ㎜ that stagger with the second layer watt; During the single layered tile paving, watt the base flush with the Ornamental Stitching top of the second layer watt, during double-deck watt of paving; Watt the base flush with the double-deck operative tip of the second layer watt, then with whole watt successively down paving fix; With nail tile is fixed
E) four layer of watt of paving: first tile of the 4th layer watt cut half of whole watt; Make it with side of first of three layer watt, 167 ㎜ that stagger; During the single layered tile paving, watt the base flush with three layer watt Ornamental Stitching top, during double-deck watt of paving; Watt the base flush with three layer watt double-deck operative tip, then with whole watt successively down paving fix; With nail tile is fixed
F) installation of layer 5 and later other layer repeats first to fourth layer paving step;
G) paving of gutter tile: intersect roofing on watt layer and on two roofings, lay or the separately construction separately of each roofing to the gutter direction simultaneously; All paving is to apart from gutter center line 300~700 ㎜ places, repaves the tile on the subsides gutter after having spread two tiles on the roofing, upwards lays first floor watt along the edge of one of them roofing; And stretched gutter; Make last watt of this layer reach adjacent roofing 300 ㎜, lay first floor watt along the eaves of adjacent roofing then, will stretch watt layer that gutter snaps into previous laying equally; And be woven together mutually, watt by tightly in gutter;
H) ridge tiles is installed: hip and ridge are before laying ridge tiles; Earlier each roofing on the roof watt to covering to another crossing roofing; And nail, each roofing watt cross ridge 100 ㎜, for the ease of closing up; The last watt of roof tile that will make when laying crest tile can cover top layer, and equate with the lap width of ridge both sides roofing;
When laying ridge tiles,, its distance in ridge or the extension of hip both sides is equated along every watt of center line total length doubling, and snap the line paving alignment, the preheating tile is answered in winter construction, till can freely bending;
Oblique ridge tiles is installed: fastening first watt at the eaves place, and cut out the first watt along the roofing edge; Be temporarily fixed at the peak of hip to an oblique ridge tiles with nail, to interim tiltedly line of side bullet of ridge tiles, interim tiltedly ridge tiles removed along the side of first oblique ridge tiles; From oblique ridge tiles bottom; Begin to install oblique ridge tiles, every tile is reserved the exposed parts of 143 ㎜, follows closely a nail on the both sides of every tile to fix; If the position of nail should be apart from side 25 ㎜, the place of adjacent self-adhesive; Cut out last ridge tiles on every hip, they are fitted in the confluce of roof central authorities naturally in first ridge, sever one section that grows 100 ㎜, and be fixed on its on the ridge; Two and half ridge tiles of bifurcated are placed on respectively on two crossing hips, and fixing; The nail that exposes is coated pitch glue;
Crest tile is installed: from the leeward end of ridge, on terminal fastening first watt of ridge; At the ridge other end interim crest tile that nails; Along line of two ridge tiles edge bullets; Remove interim watt; Follow closely a nail to fix at every watt of dual-side; Every ridge tiles is reserved the exposed face of 143 ㎜; Leeward end from ridge during laying begins, fixing every ridge tiles, and a nail is respectively established in both sides, and the position of nail is apart from the 175 ㎜ places, base of exposing the limit, apart from ridge tiles side 25 ㎜ places;
Roofing node tile is installed: comprise the following steps:
Eaves gutter cornices: cornice first floor watt is chosen into eaves gutter 10 ㎜ with initial watt, between cornice position tile and initial watt, and pitching glue;
The flashing of gable, outstanding roofing and wall, parapet: lay the wide modified asphalt waterproof coiled material extra play of 300 ㎜ at the inner corner trim place; Flat each 150 ㎜ of facade; Then tile is turned over the height to 150 ㎜ of portion, on plane 150 ㎜ and facade, tile uses pitch glue completely to be bonded in the basic unit;
During the tile paving, first full coat pitch glue at the tile back side, gluing thickness 3 ㎜ completely adhere to it in lower floor watt and the coiled material basic unit then;
Paving hot melten type polymer modified bituminous waterproof sheet material on the facade, laying highly is 250 ㎜, with the lap width of tile be 100 ㎜, modified bituminous pitch coiled material closing in place uses that steel nail is fixed, pitch glue seals steel nail spacing 200 ㎜; The thick ferro-cement topping of modified asphalt waterproof coiled material outside construction one deck 20 ㎜;
I) passing intersection's filled bitumen glue of roofing pipeline, permeability cell, rainwater pipe and roofing junction and bituminized shingle;
J) round-off work: all tile constructions finish, the scrappy material on the cleaning roofing, and inspection and cleaning roofing are checked whole roofing, the tile that replacement damages, correcting defect then.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102301057A CN102733553A (en) | 2012-07-05 | 2012-07-05 | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102301057A CN102733553A (en) | 2012-07-05 | 2012-07-05 | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102733553A true CN102733553A (en) | 2012-10-17 |
Family
ID=46989799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102301057A Pending CN102733553A (en) | 2012-07-05 | 2012-07-05 | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733553A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103122680A (en) * | 2013-02-05 | 2013-05-29 | 中天建设集团有限公司 | Circular arc double line roof flashing construction technology |
CN104264911A (en) * | 2014-09-30 | 2015-01-07 | 句容金猴机械研究所有限公司 | Laying method of asphalt tile |
CN106930476A (en) * | 2017-04-28 | 2017-07-07 | 昆明市建筑设计研究院集团有限公司 | A kind of Weng Ding Was old countries house is with natural couch grass tile laying method |
CN107355078A (en) * | 2016-05-09 | 2017-11-17 | 陈春来 | Fiberglass tile construction technology |
CN109184085A (en) * | 2018-08-22 | 2019-01-11 | 北京定荣家科技有限公司 | The bituminized shingle laying method of light steel villa |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11293864A (en) * | 1998-04-14 | 1999-10-26 | Taiheiyo Cement Corp | Waterproofing method for construction and waterproof panel |
CN101307635A (en) * | 2008-06-25 | 2008-11-19 | 曾绍宏 | Light flexible conjoined fiber glass brick and its construction method |
CN101532323A (en) * | 2009-04-01 | 2009-09-16 | 浙江省二建建设集团有限公司 | Method for paving asphalt tile |
KR101097482B1 (en) * | 2011-05-02 | 2011-12-22 | 선구산업(주) | Waterproof sheet with protective material in a body and method constructing the complex waterproof sheets |
-
2012
- 2012-07-05 CN CN2012102301057A patent/CN102733553A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11293864A (en) * | 1998-04-14 | 1999-10-26 | Taiheiyo Cement Corp | Waterproofing method for construction and waterproof panel |
CN101307635A (en) * | 2008-06-25 | 2008-11-19 | 曾绍宏 | Light flexible conjoined fiber glass brick and its construction method |
CN101532323A (en) * | 2009-04-01 | 2009-09-16 | 浙江省二建建设集团有限公司 | Method for paving asphalt tile |
KR101097482B1 (en) * | 2011-05-02 | 2011-12-22 | 선구산업(주) | Waterproof sheet with protective material in a body and method constructing the complex waterproof sheets |
Non-Patent Citations (6)
Title |
---|
不详: "坡屋面单层玻纤瓦(沥青瓦)施工方案", 《建筑防水保温(HTTP://WWW.JZSWW.NET/NEWS/7410031.HTML)》 * |
不详: "油毡瓦安装施工工艺", 《豆丁网(HTTP://WWW.DOCIN.COM/P-219865127.HTML)》 * |
不详: "油毡瓦铺贴做法", 《百度文库(HTTP://WENKU.BAIDU.COM/VIEW/8DC39F4E767F5ACFA1C7CDD3.HTML)》 * |
樊海琴: "油毡瓦施工工艺综述", 《山西建筑》 * |
江泽维等: "沥青油毡瓦施工技术", 《建筑技术》 * |
王勇等: "自粘玻纤沥青瓦在鄂尔多斯市住宅坡屋面工程中的应用", 《中国建筑防水》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103122680A (en) * | 2013-02-05 | 2013-05-29 | 中天建设集团有限公司 | Circular arc double line roof flashing construction technology |
CN104264911A (en) * | 2014-09-30 | 2015-01-07 | 句容金猴机械研究所有限公司 | Laying method of asphalt tile |
CN107355078A (en) * | 2016-05-09 | 2017-11-17 | 陈春来 | Fiberglass tile construction technology |
CN106930476A (en) * | 2017-04-28 | 2017-07-07 | 昆明市建筑设计研究院集团有限公司 | A kind of Weng Ding Was old countries house is with natural couch grass tile laying method |
CN106930476B (en) * | 2017-04-28 | 2019-03-15 | 昆明市建筑设计研究院集团有限公司 | A kind of natural couch grass tile laying method in Weng Ding Wa old countries house |
CN109184085A (en) * | 2018-08-22 | 2019-01-11 | 北京定荣家科技有限公司 | The bituminized shingle laying method of light steel villa |
CN109184085B (en) * | 2018-08-22 | 2020-05-05 | 北京定荣家科技有限公司 | Asphalt tile laying method for light steel villa |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2871053B1 (en) | Reinforced water-resistant board | |
KR20140013737A (en) | Waterproofing roof shingle structure and, repairing method for preventing the blowing of roof shingle | |
CN104153522A (en) | Asphalt shingle roof waterproof system of sloping roof high-rise building and construction method of asphalt shingle roof waterproof system | |
CN102733553A (en) | Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs | |
US11927017B2 (en) | Roofing system and method | |
US20170145695A1 (en) | Metal Roof Shingle System and Method of Installation | |
US11933051B2 (en) | Rolled roof standing seam system and method of construction | |
Hetreed | The damp House: A Guide to the causes and Treatment of Dampness | |
CN214739146U (en) | Arc roofing structure | |
CN220058598U (en) | Structure of Tang-style modern assembled eave | |
Brotrück | Basics roof construction | |
CN112695959A (en) | Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process | |
CN111350315A (en) | Waterproof closing-in pre-embedding method for roof parapet | |
CN104264911B (en) | A kind of laying method of bituminized shingle | |
CN212336545U (en) | Oblique roofing tile hanging anti-leakage structure | |
CN210597802U (en) | Flat change slope roofing node structure | |
US10344469B2 (en) | Reinforced water-resistant board with traffic coat | |
CN111042420A (en) | Roof construction process for light steel villa | |
CN204081297U (en) | A kind of Sloping roof highrise building asphalt shingle roofing water-proof system | |
US20040200174A1 (en) | Lightweight roofing slate | |
CN109184085B (en) | Asphalt tile laying method for light steel villa | |
Molloy | Roof Construction and Repair | |
EP3346070A1 (en) | Reinforced water-resistant board with traffic coat | |
JP2000064520A (en) | Plural-gutter roof plate device and plural-gutter roof plate | |
Siegemund | Basics Roof Construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121017 |