CN102733553A - Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs - Google Patents

Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs Download PDF

Info

Publication number
CN102733553A
CN102733553A CN2012102301057A CN201210230105A CN102733553A CN 102733553 A CN102733553 A CN 102733553A CN 2012102301057 A CN2012102301057 A CN 2012102301057A CN 201210230105 A CN201210230105 A CN 201210230105A CN 102733553 A CN102733553 A CN 102733553A
Authority
CN
China
Prior art keywords
watt
layer
tile
roofing
ridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102301057A
Other languages
Chinese (zh)
Inventor
曹旦
朱光华
徐立强
成军
张晓丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Wujin Construction & Installation Engineering Co Ltd
Original Assignee
Jiangsu Wujin Construction & Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Wujin Construction & Installation Engineering Co Ltd filed Critical Jiangsu Wujin Construction & Installation Engineering Co Ltd
Priority to CN2012102301057A priority Critical patent/CN102733553A/en
Publication of CN102733553A publication Critical patent/CN102733553A/en
Pending legal-status Critical Current

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs, comprising the following steps: checking up slope roof foundation, painting asphalt mastics, playing a vertical/horizontal mark line, laying glass fiber asphalt shingles and finishing. The method provided by the invention has the advantages of simple construction, good work effect, good longitudinal and transverse tension resistance, good non-deformability, water resistance and aging resistance after glass fiber asphalt shingles are laid, and ensures long-term weather resistance and dustproof self-cleaning performances of surface colors. The method is suitable for waterproof roof engineering of reinforced concrete roof and wood roof with slope of 45-60 degrees in multi-layer and high-layer civil buildings, public buildings, and villa engineering.

Description

The job practices of steel concrete abrupt slope roofing light glass bituminized shingle
Technical field
The present invention relates to the job practices of a kind of steel concrete abrupt slope roofing light glass bituminized shingle.
Background technology
In the multistory building design; People to moulding, environmental protection and the facade effect of requirement of building and expect increasingly high, multilayer, highrise building, mostly the Roof Design of utilities building, high-grade villa is two slopes and three-dimensional pitched roof; Often the gradient is more than 20 degree, and the abrupt slope roofing reaches 45~60 degree.
Pitched roof common main material be generally cement encaustic tile, ceramic watt and colored glaze watt etc., when roof pitch is very steep, lay ordinary Portland cement encaustic tile, ceramic watt or colored glaze watt; From great; Fixing comparatively difficulty in long-term use, receives boisterous the influence; Landing easily exists bigger hidden danger.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the job practices of the steel concrete abrupt slope roofing light glass bituminized shingle of good working effect.
Technical solution of the present invention is:
The job practices of a kind of steel concrete abrupt slope roofing light glass bituminized shingle is characterized in that: comprise the following steps:
(1) pitched roof basic unit inspection: the leveling layer of construction thickness 30 ㎜ on the warming plate, surface finish is not more than 5 ㎜; In the junction of basic unit and outstanding roofing, and the corner of basic unit, arc chord angle all made;
(2) brushing pitch glue: brushing one deck pitch glue on leveling layer;
(3) play the vertical-horizontal marker line: eject horizontal control line along the pitched roof length direction, the difference of the width that exposes between layer and the layer during tiling is no more than ± 3 ㎜; Width along pitched roof ejects vertical control line, makes the Ornamental Stitching alignment of eaves between the ridge watt of mouth overlapping the slot or single layered tile mouth; Intersect the many pitched roofs that form hip for double-slope roof or two roofings, vertical line is divided equally toward both sides from the center of each side slope; Intersect the many pitched roofs that form gutter for two roofings, vertical line is divided equally to the gutter direction from the end that each side slope does not intersect; Each bar distance between centers of tracks of vertical direction is 167 ㎜, and article one horizon will eject the 184 ㎜ places, bottom apart from initial watt, is 143 ㎜ between other horizon, each layer watt the top will be same the horizon of bullet match;
(4) asphalt glass watt:
A) initiation layer is installed: initiation layer is directly to lay along the sloping bottom of difference roofing; Along gable cornice with the cornice initiation layer to stretch out cornice 10 ㎜; Initiation layer both sides end parts is 50 ㎜ and fix with a nail respectively apart from the place of side 25 ㎜ apart from the base, and along continuous straight runs evenly is provided with two nails between these two nails then;
B) first floor paving: also lay tile in order successively with whole watt of beginning; Guarantee to align along cornice with the edge of initiation layer watt; Two-layer watt closely links together, and the tile that nails, watt the limit end with the horizon alignment of bullet; Watt side with the vertical line alignment of bullet, to sew on the Ornamental Stitching and every layer watt be connected of guaranteeing single layered tile lower floor's dislocation;
C) second layer watt paving: the side of the side of the second layer watt and preceding one deck watt 167 ㎜ that stagger; Then with whole watt of down paving successively; The base of single layered tile should flush with the Ornamental Stitching top of first floor watt; The base of the second layer watt should flush with the double-deck operative tip of first floor watt, guarantee previous lay watt expose 143 ㎜, with nail tile is fixed;
D) three layer of watt of paving: the 3rd layer watt first cut whole watt 1/3; Make its side of first 167 ㎜ that stagger with the second layer watt; During the single layered tile paving, watt the base flush with the Ornamental Stitching top of the second layer watt, during double-deck watt of paving; Watt the base flush with the double-deck operative tip of the second layer watt, then with whole watt successively down paving fix; With nail tile is fixed
E) four layer of watt of paving: first tile of the 4th layer watt cut half of whole watt; Make it with side of first of three layer watt, 167 ㎜ that stagger; During the single layered tile paving, watt the base flush with three layer watt Ornamental Stitching top, during double-deck watt of paving; Watt the base flush with three layer watt double-deck operative tip, then with whole watt successively down paving fix; With nail tile is fixed
F) installation of layer 5 and later other layer repeats first to fourth layer paving step;
G) paving of gutter tile: intersect roofing on watt layer and on two roofings, lay or the separately construction separately of each roofing to the gutter direction simultaneously; All paving is to apart from gutter center line 300~700 ㎜ places, repaves the tile on the subsides gutter after having spread two tiles on the roofing, upwards lays first floor watt along the edge of one of them roofing; And stretched gutter; Make last watt of this layer reach adjacent roofing 300 ㎜, lay first floor watt along the eaves of adjacent roofing then, will stretch watt layer that gutter snaps into previous laying equally; And be woven together mutually, watt by tightly in gutter;
H) ridge tiles is installed: hip and ridge are before laying ridge tiles; Earlier each roofing on the roof watt to covering to another crossing roofing; And nail, each roofing watt cross ridge 100 ㎜, for the ease of closing up; The last watt of roof tile that will make when laying crest tile can cover top layer, and equate with the lap width of ridge both sides roofing;
When laying ridge tiles,, its distance in ridge or the extension of hip both sides is equated along every watt of center line total length doubling, and snap the line paving alignment, the preheating tile is answered in winter construction, till can freely bending;
Oblique ridge tiles is installed: fastening first watt at the eaves place, and cut out the first watt along the roofing edge; Be temporarily fixed at the peak of hip to an oblique ridge tiles with nail, to interim tiltedly line of side bullet of ridge tiles, interim tiltedly ridge tiles removed along the side of first oblique ridge tiles; From oblique ridge tiles bottom; Begin to install oblique ridge tiles, every tile is reserved the exposed parts of 143 ㎜, follows closely a nail on the both sides of every tile to fix; If the position of nail should be apart from side 25 ㎜, the place of adjacent self-adhesive; Cut out last ridge tiles on every hip, they are fitted in the confluce of roof central authorities naturally in first ridge, sever one section that grows 100 ㎜, and be fixed on its on the ridge; Two and half ridge tiles of bifurcated are placed on respectively on two crossing hips, and fixing; The nail that exposes is coated pitch glue;
Crest tile is installed: from the leeward end of ridge, on terminal fastening first watt of ridge; At the ridge other end interim crest tile that nails; Along line of two ridge tiles edge bullets; Remove interim watt; Follow closely a nail to fix at every watt of dual-side; Every ridge tiles is reserved the exposed face of 143 ㎜; Leeward end from ridge during laying begins, fixing every ridge tiles, and a nail is respectively established in both sides, and the position of nail is apart from the 175 ㎜ places, base of exposing the limit, apart from ridge tiles side 25 ㎜ places;
Roofing node tile is installed: comprise the following steps:
Eaves gutter cornices: cornice first floor watt is chosen into eaves gutter 10 ㎜ with initial watt, between cornice position tile and initial watt, and pitching glue;
The flashing of gable, outstanding roofing and wall, parapet: lay the wide modified asphalt waterproof coiled material extra play of 300 ㎜ at the inner corner trim place; Flat each 150 ㎜ of facade; Then tile is turned over the height to 150 ㎜ of portion, on plane 150 ㎜ and facade, tile uses pitch glue completely to be bonded in the basic unit;
During the tile paving, first full coat pitch glue at the tile back side, gluing thickness 3 ㎜ completely adhere to it in lower floor watt and the coiled material basic unit then;
Paving hot melten type polymer modified bituminous waterproof sheet material on the facade, laying highly is 250 ㎜, with the lap width of tile be 100 ㎜, modified bituminous pitch coiled material closing in place uses that steel nail is fixed, pitch glue seals steel nail spacing 200 ㎜; The thick ferro-cement topping of modified asphalt waterproof coiled material outside construction one deck 20 ㎜;
I) passing intersection's filled bitumen glue of roofing pipeline, permeability cell, rainwater pipe and roofing junction and bituminized shingle;
J) round-off work: all tile constructions finish, the scrappy material on the cleaning roofing, and inspection and cleaning roofing are checked whole roofing, the tile that replacement damages, correcting defect then.
Easy construction of the present invention, good working effect has vertical, horizontal resistance to tension, non-deformability and waterproof, ageing resistance preferably after mating formation, and guarantees the long-term weatherability and the dustproof self-cleaning property of surface color and polish.Be applicable to many, high-rise civil building, the water-proof roofing engineering of the reinforced concrete roof of utilities building and villa engineering, the wood shingle gradient 45~60 degree.
Below in conjunction with embodiment the present invention is described further.
The specific embodiment
The job practices of a kind of steel concrete abrupt slope roofing light glass bituminized shingle is characterized in that: comprise the following steps:
(1) pitched roof basic unit inspection: the leveling layer of construction thickness 30 ㎜ on the warming plate, surface finish is not more than 5 ㎜; In the junction of basic unit and outstanding roofing, and the corner of basic unit, arc chord angle all made;
(2) brushing pitch glue: brushing one deck pitch glue on leveling layer;
(3) play the vertical-horizontal marker line: eject horizontal control line along the pitched roof length direction, the difference of the width that exposes between layer and the layer during tiling is no more than ± 3 ㎜; Width along pitched roof ejects vertical control line, makes the Ornamental Stitching alignment of eaves between the ridge watt of mouth overlapping the slot or single layered tile mouth; Intersect the many pitched roofs that form hip for double-slope roof or two roofings, vertical line is divided equally toward both sides from the center of each side slope; Intersect the many pitched roofs that form gutter for two roofings, vertical line is divided equally to the gutter direction from the end that each side slope does not intersect; Each bar distance between centers of tracks of vertical direction is 167 ㎜, and article one horizon will eject the 184 ㎜ places, bottom apart from initial watt, is 143 ㎜ between other horizon, each layer watt the top will be same the horizon of bullet match;
(4) asphalt glass watt:
A) initiation layer is installed: initiation layer is directly to lay along the sloping bottom of difference roofing; Along gable cornice with the cornice initiation layer to stretch out cornice 10 ㎜; Initiation layer both sides end parts is 50 ㎜ and fix with a nail respectively apart from the place of side 25 ㎜ apart from the base, and along continuous straight runs evenly is provided with two nails between these two nails then;
B) first floor paving: also lay tile in order successively with whole watt of beginning; Guarantee to align along cornice with the edge of initiation layer watt; Two-layer watt closely links together, and the tile that nails, watt the limit end with the horizon alignment of bullet; Watt side with the vertical line alignment of bullet, to sew on the Ornamental Stitching and every layer watt be connected of guaranteeing single layered tile lower floor's dislocation;
C) second layer watt paving: the side of the side of the second layer watt and preceding one deck watt 167 ㎜ that stagger; Then with whole watt of down paving successively; The base of single layered tile should flush with the Ornamental Stitching top of first floor watt; The base of the second layer watt should flush with the double-deck operative tip of first floor watt, guarantee previous lay watt expose 143 ㎜, with nail tile is fixed;
D) three layer of watt of paving: the 3rd layer watt first cut whole watt 1/3; Make its side of first 167 ㎜ that stagger with the second layer watt; During the single layered tile paving, watt the base flush with the Ornamental Stitching top of the second layer watt, during double-deck watt of paving; Watt the base flush with the double-deck operative tip of the second layer watt, then with whole watt successively down paving fix; With nail tile is fixed
E) four layer of watt of paving: first tile of the 4th layer watt cut half of whole watt; Make it with side of first of three layer watt, 167 ㎜ that stagger; During the single layered tile paving, watt the base flush with three layer watt Ornamental Stitching top, during double-deck watt of paving; Watt the base flush with three layer watt double-deck operative tip, then with whole watt successively down paving fix; With nail tile is fixed
F) installation of layer 5 and later other layer repeats first to fourth layer paving step;
G) paving of gutter tile: intersect roofing on watt layer and on two roofings, lay or the separately construction separately of each roofing to the gutter direction simultaneously; All paving is to apart from gutter center line 300~700 ㎜ places, repaves the tile on the subsides gutter after having spread two tiles on the roofing, upwards lays first floor watt along the edge of one of them roofing; And stretched gutter; Make last watt of this layer reach adjacent roofing 300 ㎜, lay first floor watt along the eaves of adjacent roofing then, will stretch watt layer that gutter snaps into previous laying equally; And be woven together mutually, watt by tightly in gutter;
H) ridge tiles is installed: hip and ridge are before laying ridge tiles; Earlier each roofing on the roof watt to covering to another crossing roofing; And nail, each roofing watt cross ridge 100 ㎜, for the ease of closing up; The last watt of roof tile that will make when laying crest tile can cover top layer, and equate with the lap width of ridge both sides roofing;
When laying ridge tiles,, its distance in ridge or the extension of hip both sides is equated along every watt of center line total length doubling, and snap the line paving alignment, the preheating tile is answered in winter construction, till can freely bending;
Oblique ridge tiles is installed: fastening first watt at the eaves place, and cut out the first watt along the roofing edge; Be temporarily fixed at the peak of hip to an oblique ridge tiles with nail, to interim tiltedly line of side bullet of ridge tiles, interim tiltedly ridge tiles removed along the side of first oblique ridge tiles; From oblique ridge tiles bottom; Begin to install oblique ridge tiles, every tile is reserved the exposed parts of 143 ㎜, follows closely a nail on the both sides of every tile to fix; If the position of nail should be apart from side 25 ㎜, the place of adjacent self-adhesive; Cut out last ridge tiles on every hip, they are fitted in the confluce of roof central authorities naturally in first ridge, sever one section that grows 100 ㎜, and be fixed on its on the ridge; Two and half ridge tiles of bifurcated are placed on respectively on two crossing hips, and fixing; The nail that exposes is coated pitch glue;
Crest tile is installed: from the leeward end of ridge, on terminal fastening first watt of ridge; At the ridge other end interim crest tile that nails; Along line of two ridge tiles edge bullets; Remove interim watt; Follow closely a nail to fix at every watt of dual-side; Every ridge tiles is reserved the exposed face of 143 ㎜; Leeward end from ridge during laying begins, fixing every ridge tiles, and a nail is respectively established in both sides, and the position of nail is apart from the 175 ㎜ places, base of exposing the limit, apart from ridge tiles side 25 ㎜ places;
Roofing node tile is installed: comprise the following steps:
Eaves gutter cornices: cornice first floor watt is chosen into eaves gutter 10 ㎜ with initial watt, between cornice position tile and initial watt, and pitching glue;
The flashing of gable, outstanding roofing and wall, parapet: lay the wide modified asphalt waterproof coiled material extra play of 300 ㎜ at the inner corner trim place; Flat each 150 ㎜ of facade; Then tile is turned over the height to 150 ㎜ of portion, on plane 150 ㎜ and facade, tile uses pitch glue completely to be bonded in the basic unit;
During the tile paving, first full coat pitch glue at the tile back side, gluing thickness 3 ㎜ completely adhere to it in lower floor watt and the coiled material basic unit then;
Paving hot melten type polymer modified bituminous waterproof sheet material on the facade, laying highly is 250 ㎜, with the lap width of tile be 100 ㎜, modified bituminous pitch coiled material closing in place uses that steel nail is fixed, pitch glue seals steel nail spacing 200 ㎜; The thick ferro-cement topping of modified asphalt waterproof coiled material outside construction one deck 20 ㎜;
I) passing intersection's filled bitumen glue of roofing pipeline, permeability cell, rainwater pipe and roofing junction and bituminized shingle;
J) round-off work: all tile constructions finish, the scrappy material on the cleaning roofing, and inspection and cleaning roofing are checked whole roofing, the tile that replacement damages, correcting defect then.

Claims (1)

1. the job practices of a steel concrete abrupt slope roofing light glass bituminized shingle is characterized in that: comprise the following steps:
(1) pitched roof basic unit inspection: the leveling layer of construction thickness 30 ㎜ on the warming plate, surface finish is not more than 5 ㎜; In the junction of basic unit and outstanding roofing, and the corner of basic unit, arc chord angle all made;
(2) brushing pitch glue: brushing one deck pitch glue on leveling layer;
(3) play the vertical-horizontal marker line: eject horizontal control line along the pitched roof length direction, the difference of the width that exposes between layer and the layer during tiling is no more than ± 3 ㎜; Width along pitched roof ejects vertical control line, makes the Ornamental Stitching alignment of eaves between the ridge watt of mouth overlapping the slot or single layered tile mouth; Intersect the many pitched roofs that form hip for double-slope roof or two roofings, vertical line is divided equally toward both sides from the center of each side slope; Intersect the many pitched roofs that form gutter for two roofings, vertical line is divided equally to the gutter direction from the end that each side slope does not intersect; Each bar distance between centers of tracks of vertical direction is 167 ㎜, and article one horizon will eject the 184 ㎜ places, bottom apart from initial watt, is 143 ㎜ between other horizon, each layer watt the top will be same the horizon of bullet match;
(4) asphalt glass watt:
A) initiation layer is installed: initiation layer is directly to lay along the sloping bottom of difference roofing; Along gable cornice with the cornice initiation layer to stretch out cornice 10 ㎜; Initiation layer both sides end parts is 50 ㎜ and fix with a nail respectively apart from the place of side 25 ㎜ apart from the base, and along continuous straight runs evenly is provided with two nails between these two nails then;
B) first floor paving: also lay tile in order successively with whole watt of beginning; Guarantee to align along cornice with the edge of initiation layer watt; Two-layer watt closely links together, and the tile that nails, watt the limit end with the horizon alignment of bullet; Watt side with the vertical line alignment of bullet, to sew on the Ornamental Stitching and every layer watt be connected of guaranteeing single layered tile lower floor's dislocation;
C) second layer watt paving: the side of the side of the second layer watt and preceding one deck watt 167 ㎜ that stagger; Then with whole watt of down paving successively; The base of single layered tile should flush with the Ornamental Stitching top of first floor watt; The base of the second layer watt should flush with the double-deck operative tip of first floor watt, guarantee previous lay watt expose 143 ㎜, with nail tile is fixed;
D) three layer of watt of paving: the 3rd layer watt first cut whole watt 1/3; Make its side of first 167 ㎜ that stagger with the second layer watt; During the single layered tile paving, watt the base flush with the Ornamental Stitching top of the second layer watt, during double-deck watt of paving; Watt the base flush with the double-deck operative tip of the second layer watt, then with whole watt successively down paving fix; With nail tile is fixed
E) four layer of watt of paving: first tile of the 4th layer watt cut half of whole watt; Make it with side of first of three layer watt, 167 ㎜ that stagger; During the single layered tile paving, watt the base flush with three layer watt Ornamental Stitching top, during double-deck watt of paving; Watt the base flush with three layer watt double-deck operative tip, then with whole watt successively down paving fix; With nail tile is fixed
F) installation of layer 5 and later other layer repeats first to fourth layer paving step;
G) paving of gutter tile: intersect roofing on watt layer and on two roofings, lay or the separately construction separately of each roofing to the gutter direction simultaneously; All paving is to apart from gutter center line 300~700 ㎜ places, repaves the tile on the subsides gutter after having spread two tiles on the roofing, upwards lays first floor watt along the edge of one of them roofing; And stretched gutter; Make last watt of this layer reach adjacent roofing 300 ㎜, lay first floor watt along the eaves of adjacent roofing then, will stretch watt layer that gutter snaps into previous laying equally; And be woven together mutually, watt by tightly in gutter;
H) ridge tiles is installed: hip and ridge are before laying ridge tiles; Earlier each roofing on the roof watt to covering to another crossing roofing; And nail, each roofing watt cross ridge 100 ㎜, for the ease of closing up; The last watt of roof tile that will make when laying crest tile can cover top layer, and equate with the lap width of ridge both sides roofing;
When laying ridge tiles,, its distance in ridge or the extension of hip both sides is equated along every watt of center line total length doubling, and snap the line paving alignment, the preheating tile is answered in winter construction, till can freely bending;
Oblique ridge tiles is installed: fastening first watt at the eaves place, and cut out the first watt along the roofing edge; Be temporarily fixed at the peak of hip to an oblique ridge tiles with nail, to interim tiltedly line of side bullet of ridge tiles, interim tiltedly ridge tiles removed along the side of first oblique ridge tiles; From oblique ridge tiles bottom; Begin to install oblique ridge tiles, every tile is reserved the exposed parts of 143 ㎜, follows closely a nail on the both sides of every tile to fix; If the position of nail should be apart from side 25 ㎜, the place of adjacent self-adhesive; Cut out last ridge tiles on every hip, they are fitted in the confluce of roof central authorities naturally in first ridge, sever one section that grows 100 ㎜, and be fixed on its on the ridge; Two and half ridge tiles of bifurcated are placed on respectively on two crossing hips, and fixing; The nail that exposes is coated pitch glue;
Crest tile is installed: from the leeward end of ridge, on terminal fastening first watt of ridge; At the ridge other end interim crest tile that nails; Along line of two ridge tiles edge bullets; Remove interim watt; Follow closely a nail to fix at every watt of dual-side; Every ridge tiles is reserved the exposed face of 143 ㎜; Leeward end from ridge during laying begins, fixing every ridge tiles, and a nail is respectively established in both sides, and the position of nail is apart from the 175 ㎜ places, base of exposing the limit, apart from ridge tiles side 25 ㎜ places;
Roofing node tile is installed: comprise the following steps:
Eaves gutter cornices: cornice first floor watt is chosen into eaves gutter 10 ㎜ with initial watt, between cornice position tile and initial watt, and pitching glue;
The flashing of gable, outstanding roofing and wall, parapet: lay the wide modified asphalt waterproof coiled material extra play of 300 ㎜ at the inner corner trim place; Flat each 150 ㎜ of facade; Then tile is turned over the height to 150 ㎜ of portion, on plane 150 ㎜ and facade, tile uses pitch glue completely to be bonded in the basic unit;
During the tile paving, first full coat pitch glue at the tile back side, gluing thickness 3 ㎜ completely adhere to it in lower floor watt and the coiled material basic unit then;
Paving hot melten type polymer modified bituminous waterproof sheet material on the facade, laying highly is 250 ㎜, with the lap width of tile be 100 ㎜, modified bituminous pitch coiled material closing in place uses that steel nail is fixed, pitch glue seals steel nail spacing 200 ㎜; The thick ferro-cement topping of modified asphalt waterproof coiled material outside construction one deck 20 ㎜;
I) passing intersection's filled bitumen glue of roofing pipeline, permeability cell, rainwater pipe and roofing junction and bituminized shingle;
J) round-off work: all tile constructions finish, the scrappy material on the cleaning roofing, and inspection and cleaning roofing are checked whole roofing, the tile that replacement damages, correcting defect then.
CN2012102301057A 2012-07-05 2012-07-05 Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs Pending CN102733553A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102301057A CN102733553A (en) 2012-07-05 2012-07-05 Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102301057A CN102733553A (en) 2012-07-05 2012-07-05 Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs

Publications (1)

Publication Number Publication Date
CN102733553A true CN102733553A (en) 2012-10-17

Family

ID=46989799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102301057A Pending CN102733553A (en) 2012-07-05 2012-07-05 Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs

Country Status (1)

Country Link
CN (1) CN102733553A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122680A (en) * 2013-02-05 2013-05-29 中天建设集团有限公司 Circular arc double line roof flashing construction technology
CN104264911A (en) * 2014-09-30 2015-01-07 句容金猴机械研究所有限公司 Laying method of asphalt tile
CN106930476A (en) * 2017-04-28 2017-07-07 昆明市建筑设计研究院集团有限公司 A kind of Weng Ding Was old countries house is with natural couch grass tile laying method
CN107355078A (en) * 2016-05-09 2017-11-17 陈春来 Fiberglass tile construction technology
CN109184085A (en) * 2018-08-22 2019-01-11 北京定荣家科技有限公司 The bituminized shingle laying method of light steel villa

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11293864A (en) * 1998-04-14 1999-10-26 Taiheiyo Cement Corp Waterproofing method for construction and waterproof panel
CN101307635A (en) * 2008-06-25 2008-11-19 曾绍宏 Light flexible conjoined fiber glass brick and its construction method
CN101532323A (en) * 2009-04-01 2009-09-16 浙江省二建建设集团有限公司 Method for paving asphalt tile
KR101097482B1 (en) * 2011-05-02 2011-12-22 선구산업(주) Waterproof sheet with protective material in a body and method constructing the complex waterproof sheets

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11293864A (en) * 1998-04-14 1999-10-26 Taiheiyo Cement Corp Waterproofing method for construction and waterproof panel
CN101307635A (en) * 2008-06-25 2008-11-19 曾绍宏 Light flexible conjoined fiber glass brick and its construction method
CN101532323A (en) * 2009-04-01 2009-09-16 浙江省二建建设集团有限公司 Method for paving asphalt tile
KR101097482B1 (en) * 2011-05-02 2011-12-22 선구산업(주) Waterproof sheet with protective material in a body and method constructing the complex waterproof sheets

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
不详: "坡屋面单层玻纤瓦(沥青瓦)施工方案", 《建筑防水保温(HTTP://WWW.JZSWW.NET/NEWS/7410031.HTML)》 *
不详: "油毡瓦安装施工工艺", 《豆丁网(HTTP://WWW.DOCIN.COM/P-219865127.HTML)》 *
不详: "油毡瓦铺贴做法", 《百度文库(HTTP://WENKU.BAIDU.COM/VIEW/8DC39F4E767F5ACFA1C7CDD3.HTML)》 *
樊海琴: "油毡瓦施工工艺综述", 《山西建筑》 *
江泽维等: "沥青油毡瓦施工技术", 《建筑技术》 *
王勇等: "自粘玻纤沥青瓦在鄂尔多斯市住宅坡屋面工程中的应用", 《中国建筑防水》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122680A (en) * 2013-02-05 2013-05-29 中天建设集团有限公司 Circular arc double line roof flashing construction technology
CN104264911A (en) * 2014-09-30 2015-01-07 句容金猴机械研究所有限公司 Laying method of asphalt tile
CN107355078A (en) * 2016-05-09 2017-11-17 陈春来 Fiberglass tile construction technology
CN106930476A (en) * 2017-04-28 2017-07-07 昆明市建筑设计研究院集团有限公司 A kind of Weng Ding Was old countries house is with natural couch grass tile laying method
CN106930476B (en) * 2017-04-28 2019-03-15 昆明市建筑设计研究院集团有限公司 A kind of natural couch grass tile laying method in Weng Ding Wa old countries house
CN109184085A (en) * 2018-08-22 2019-01-11 北京定荣家科技有限公司 The bituminized shingle laying method of light steel villa
CN109184085B (en) * 2018-08-22 2020-05-05 北京定荣家科技有限公司 Asphalt tile laying method for light steel villa

Similar Documents

Publication Publication Date Title
EP2871053B1 (en) Reinforced water-resistant board
KR20140013737A (en) Waterproofing roof shingle structure and, repairing method for preventing the blowing of roof shingle
CN104153522A (en) Asphalt shingle roof waterproof system of sloping roof high-rise building and construction method of asphalt shingle roof waterproof system
CN102733553A (en) Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs
US11927017B2 (en) Roofing system and method
US20170145695A1 (en) Metal Roof Shingle System and Method of Installation
US11933051B2 (en) Rolled roof standing seam system and method of construction
Hetreed The damp House: A Guide to the causes and Treatment of Dampness
CN214739146U (en) Arc roofing structure
CN220058598U (en) Structure of Tang-style modern assembled eave
Brotrück Basics roof construction
CN112695959A (en) Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process
CN111350315A (en) Waterproof closing-in pre-embedding method for roof parapet
CN104264911B (en) A kind of laying method of bituminized shingle
CN212336545U (en) Oblique roofing tile hanging anti-leakage structure
CN210597802U (en) Flat change slope roofing node structure
US10344469B2 (en) Reinforced water-resistant board with traffic coat
CN111042420A (en) Roof construction process for light steel villa
CN204081297U (en) A kind of Sloping roof highrise building asphalt shingle roofing water-proof system
US20040200174A1 (en) Lightweight roofing slate
CN109184085B (en) Asphalt tile laying method for light steel villa
Molloy Roof Construction and Repair
EP3346070A1 (en) Reinforced water-resistant board with traffic coat
JP2000064520A (en) Plural-gutter roof plate device and plural-gutter roof plate
Siegemund Basics Roof Construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121017