CN204081297U - A kind of Sloping roof highrise building asphalt shingle roofing water-proof system - Google Patents

A kind of Sloping roof highrise building asphalt shingle roofing water-proof system Download PDF

Info

Publication number
CN204081297U
CN204081297U CN201420472523.1U CN201420472523U CN204081297U CN 204081297 U CN204081297 U CN 204081297U CN 201420472523 U CN201420472523 U CN 201420472523U CN 204081297 U CN204081297 U CN 204081297U
Authority
CN
China
Prior art keywords
layer
shingle
bituminized shingle
bituminized
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420472523.1U
Other languages
Chinese (zh)
Inventor
刘瑞明
李钦
赵玉林
张永强
黄文恒
王宽亮
李秀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd
BEIJING JINGOLD CONSTRUCTION Co Ltd
Original Assignee
BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd
BEIJING JINGOLD CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd, BEIJING JINGOLD CONSTRUCTION Co Ltd filed Critical BEIJING JINGOLD FIELD ROAD ENGINEERING CONSTRUCTION Co Ltd
Priority to CN201420472523.1U priority Critical patent/CN204081297U/en
Application granted granted Critical
Publication of CN204081297U publication Critical patent/CN204081297U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of Sloping roof highrise building asphalt shingle roofing water-proof system, be followed successively by reinforced concrete floor, mortar levelling layer, insulation layer, concrete base layer, double-sided self-adhesive waterproof coiled materials layer and bituminized shingle from the bottom to top, the first half of described bituminized shingle is watt skirt of a rectangle, the latter half of bituminized shingle is the lappet of three to four inverted trapezoidals, bituminized shingle is bonding with double-sided self-adhesive waterproof coiled materials layer, is also connected with double-sided self-adhesive waterproof coiled materials layer, concrete base layer by the nail followed closely on watt skirt between adjacent two lappets simultaneously.The utility model utilizes the elasticity of self-adhesive coiled material itself and good elongation per unit length to be connected with concrete base layer, can be good at solving because the phenomenon that quality problems cause bituminized shingle to destroy appears in waterproof matrix, and the self-healing function of self-adhesive coiled material self and bituminized shingle can also be utilized to form overall waterproofing course, preferably resolve the waterproof problem of Sloping roof, and construction sequence is reasonable, simple to operate.

Description

A kind of Sloping roof highrise building asphalt shingle roofing water-proof system
Technical field
The utility model relates to building roofing draining field, particularly relates to a kind of Sloping roof highrise building asphalt shingle roofing water-proof system.
Background technology
Bituminized shingle is also known as fiberglass tile, asphalt felt tile, fiberglass tyre asphalt tile, take glass fiber as carcass, after dip-coating quality oxide modified bitumen, upper surface covers colored basalt pellet, soffit spreads with the tiles roof waterproof sheet material of isolated material also made by part coating self-adhesive layer.It not only form attractive in appearance abundant, light weight is durable, and has the function of waterproof, is the domestic waterproof material being widely used in house pitched roof at present.Sloping roof is by (reinforced concrete roof board → heat insulation layer → mortar levelling layer → waterproofing course → C20 pea gravel concreten leveling layer → bituminized shingle) during the construction of conventional waterproof way, easily there are the quality problems such as dusting, shrinkage crack in waterproof matrix mortar levelling layer, quality is wayward, easily causes waterproofing course to destroy.The flexibility of bituminized shingle itself is poor, if be directly pasted onto on concrete leveling layer by fiberglass tile, if the defects such as local cracks appear in leveling layer self, fiberglass tile can cause draw crack, affects roof waterproof quality and has considerable influence to appearance effect.
Summary of the invention
The purpose of this utility model is to provide a kind of good water-proof effect, survivable Sloping roof highrise building asphalt shingle roofing water-proof system.
For achieving the above object, the utility model have employed following technical scheme: a kind of Sloping roof highrise building asphalt shingle roofing water-proof system, it is characterized in that: be followed successively by reinforced concrete floor, mortar levelling layer, insulation layer, concrete base layer, double-sided self-adhesive waterproof coiled materials layer and bituminized shingle from the bottom to top, and be provided with aluminum-pinch in the both sides of roofing.
The first half of described bituminized shingle is watt skirt of a rectangle, the latter half of bituminized shingle is the lappet of three to four inverted trapezoidals, bituminized shingle is bonding with double-sided self-adhesive waterproof coiled materials layer, is also connected with double-sided self-adhesive waterproof coiled materials layer, concrete base layer by the nail followed closely on watt skirt between adjacent two lappets simultaneously;
Between neighbouring bituminized shingle, on watt skirt between adjacent two lappets that the lappet of upside bituminized shingle is pressed in downside bituminized shingle, the splicing seams between adjacent two bituminized shingles of the nail on the bituminized shingle of downside and downside is covered.
Described mortar levelling layer can be the thick mortar levelling layer of 20mm.
Described concrete base layer can be the thick C20 arrangement of reinforcement pea gravel concreten layer of 50mm.
Described double-sided self-adhesive waterproof coiled materials layer 5 is the double-sided self-adhesive pitch composite S BS modified asphalt waterproof coiled material that 4mm is thick.
The beneficial effects of the utility model: the combined water-proof system adopting self-adhesive coiled material+bituminized shingle, the elasticity of self-adhesive coiled material itself and good elongation per unit length is utilized to be connected with concrete base layer, can be good at solving because the phenomenon that quality problems cause bituminized shingle to destroy appears in waterproof matrix, and the self-healing function of self-adhesive coiled material self and fiberglass tile can also be utilized to form overall waterproofing course, preferably resolve the waterproof problem of Sloping roof; And construction sequence is reasonable, simple to operate.Described bituminized shingle, by the double action of nail and double-sided self-adhesive waterproof coiled materials, can more firmly be fixed on concrete base layer.
Accompanying drawing explanation
Fig. 1 is section structure schematic diagram of the present utility model.
Fig. 2 is the schematic diagram laying bituminized shingle on double-sided self-adhesive waterproof coiled materials layer.
Fig. 3 is the schematic diagram of bituminized shingle.
1, reinforced concrete floor; 2, mortar levelling layer; 3, insulation layer; 4, concrete base layer (being also simultaneously the topping of insulation layer); 5, double-sided self-adhesive waterproof coiled materials layer; 6, bituminized shingle, 6.1, watt skirt, 6.2, lappet; 7, nail; 8, aluminum-pinch.
Detailed description of the invention
Below in conjunction with embodiment, the utility model is described further.
As Figure 1-3, this Sloping roof highrise building asphalt shingle roofing water-proof system, be followed successively by reinforced concrete floor 1, mortar levelling layer 2, insulation layer 3, concrete base layer 4, double-sided self-adhesive waterproof coiled materials layer 5 and bituminized shingle 6 from the bottom to top, and be provided with aluminum-pinch 8 in the both sides of roofing.
The first half of described bituminized shingle 6 is watt skirt 6.1 of a rectangle, the latter half of bituminized shingle 6 is the lappet 6.2 of three to four inverted trapezoidals, bituminized shingle 6 is bonding with double-sided self-adhesive waterproof coiled materials layer 5, is also connected with double-sided self-adhesive waterproof coiled materials layer 5, concrete base layer 4 by the nail 7 followed closely on watt skirt 6.1 between adjacent two lappets 6.2 simultaneously.
Between neighbouring bituminized shingle, on watt skirt 6.1 between adjacent two lappets 6.2 that the lappet 6.2 of upside bituminized shingle is pressed in downside bituminized shingle, the splicing seams between adjacent two bituminized shingles of the nail on the bituminized shingle of downside and downside is covered.The benefit that bituminized shingle 6 does like this is, can ensure that the roofing that bituminized shingle forms has good waterproof sealing performance, and form cellular external surface, outward appearance is more good-looking.
In the present embodiment, mortar levelling layer 2 is the mortar levelling layer that 20mm is thick, and concrete base layer 4 is the C20 arrangement of reinforcement pea gravel concreten layer that 50mm is thick, and double-sided self-adhesive waterproof coiled materials layer 5 is the double-sided self-adhesive pitch composite S BS modified asphalt waterproof coiled material that 4mm is thick.
A construction method for Sloping roof highrise building asphalt shingle roofing water-proof system, comprises the following steps:
(1) base layer construction
The basic unit of water-proof system is also the topping of roofing heat-insulating layer simultaneously, and it adopts 50mm thick C20 arrangement of reinforcement pea gravel concreten to build; Organize multiple construction section sequential production with ridge line, gutter line for boundary during construction, the division of construction section and build order should be reasonable, concreting is carried out according to the order of " from top to bottom, from both sides to centre "; Setting-up of construction joint is in gutter and ridge position; In order to ensure the smooth of concrete surface and reduce concrete sliding pendant, the concrete slump controls at 30 mm ~ 50 mm; Build together with watering after ridge partly with cornice when substrate concrete is built; Because the adhesive property between concrete and polystyrene thermal insulation plate is poor, in order to reduce concrete sliding pendant, adopt the mode that segmentation paves, every section of width paved controls at about 500 mm along gradient direction, by cornice position successively to ridge Directional Extension, concrete should first be poured on material loading platform, then by Manual to roofing;
(2) base treatment and examination
Cleaning finishing substrate surface, basic unit must solid, firm, smooth, non-loosening and have certain intensity; Base Smoothness requires that deviation is not more than 2mm within the scope of 2m, when adopting cement mortar screeding layer, answers secondary press polish, abundant maintenance after the floating receipts water of cement mortar, must not have loose, dusting, skin effect phenomenon; Drainage grade should meet designing requirement, and draining should be smooth and easy, without seeping phenomenon; Circular arc shaped must be smeared in all negative and positive angles, arc radius 50mm;
(3) base treatment agent is brushed
Basic unit after levelling brushes base treatment agent, and brushing requires thin and even, adopts and sprays or roller coating; Brushing twice altogether, first pass is brushing laterally, second time vertically brushing, often all over thickness 0. 5 mm ~ 1. 0 mm, must not have phenomenons such as leaking brush, pit, bubble, trickling;
(4) extra play is pasted
Roofing negative and positive angle, air channel root and pipe root etc. adopt 4mm adhesive waterproof coil to do 500mm wide cut extra play, first take adhesive waterproof coil side PE film off, the extra play cut out completely are sticked to place of thin portion, if sticky note loosely can do hot melt process;
Negative and positive angle extra play processes in the following manner:
A, interior extra play: cut out 250 mm waterproof rolls and do extra play, facade and plane respectively bond 125mm;
B, main water barrier: the coiled material of plane symphyses is upwards turned over to facade > 250 mm place;
C, outer extra play: cut out one piece of 250 mm × 250 mm square waterproof roll, cut out to square piece center from any mid point straight line, cut opening up, be pasted onto on the main water barrier of negative and positive angle, cut out and above-mentioned measure-alike square coiled material, clip, is pasted onto on negative and positive angle down again;
(5) adhesive waterproof coil is spread
Double-sided self-adhesive waterproof coiled materials layer adopts 4mm thick double-sided self-adhesive pitch composite S BS modified asphalt waterproof coiled material; Waterproof roll paving vertical with ridge, paving successively from the bottom to top, lap length 100mm between coiled material, takes off side PE film during construction of self viscous reel material, makes it to be pasted onto on roofing; Compacting should be flattened, coiled material and must to glue note between basal plane and each layer coiled material tight during waterproof roll paving; Coiled material seam crossing must glue note and obturage, and the lap width on two width coiled material minor faces and long limit all should not be less than 100mm; When adopting multilayer coiled material, seam that is two-layer and adjacent two width coiled materials should stagger 1/3 ~ 1/2 fabric width up and down, and two layers of coiled materials must not vertically paving mutually; In the corner of facade and plane, the seam of coiled material should be stayed in the plane, should not be less than 600mm apart from facade;
(6) asphalt watt
A, laying aspect snap the line: lay neat in order to ensure bituminized shingle, snap the line in aspect is being laid before laying, the center line of vertical direction is vertical with ridge, and be in roofing center, distance between each line of vertical direction, be 167mm for three lappet type bituminized shingles, be 125mm for four lappet type bituminized shingles, Article 1 horizon will bullet distance cornice 310mm place, 142mm is spaced apart between other horizons, each bituminized shingle top will with the horizon of bullet coincide, side is identical with vertical line;
B, laying initiation layer: before first floor bituminized shingle is laid, first will lay initiation layer, initiation layer watt removes the cutting of watt skirt by plain asphalt watt and forms; Initiation layer is directly laid along the bottom, slope of roofing, and end oil is smeared in the initiation layer watt face contacted with roofing, and is fixed on roofing with roofer's nail, and the nail in the middle of bituminized shingle initiation layer will be divided equally between the nail of two ends, figure cold adhesive around nail; During laying, initiation layer should stretch out cornice 10mm, and cornice place should arrange cornice flashing plate;
Between C, initiation layer to ridge, each layer is laid: based on initiation layer, upwards lay each layer bituminized shingle successively until ridge, adjacent two layers bituminized shingle watt groove should evenly stagger; During laying, first throw off barrier film, to good position, bituminized shingle and waterproof roll is made to glue note with the surface of little iron roll rolled asphalt watt firm, then face nailing special-purpose steel nail on bituminized shingle, the head of a nail must not be outside exposed, for three lappet type bituminized shingles, 4 nails, four lappet type bituminized shingles, 5 nails, when roof pitch is greater than 60 degree, or when having strong wind or an earthquake areas, suitably can increase roofer's nail, three lappet type bituminized shingles, 6 nails, four lappet type bituminized shingles, 8 nails;
The laying of D, ridge tiles: ridge tiles should overlap along peak frequency wind direction, and fully should put up two domatic bituminized shingles, and lap width must not be less than 100mm; The gland area of ridge tiles and ridge tiles is not less than 1/2 of ridge tiles area; First ridge tiles should from the leeward end of the bottom of oblique ridge or flat ridge paving, ridge tiles needs centrally line total length doubling, and during laying, ridge tiles both sides are respectively followed closely a nail and are fixed on the pitched roof of both sides, and nail will cover by second ridge tiles.

Claims (4)

1. a Sloping roof highrise building asphalt shingle roofing water-proof system, it is characterized in that: be followed successively by reinforced concrete floor (1), mortar levelling layer (2), insulation layer (3), concrete base layer (4), double-sided self-adhesive waterproof coiled materials layer (5) and bituminized shingle (6) from the bottom to top, and be provided with aluminum-pinch (8) in the both sides of roofing;
The first half of described bituminized shingle (6) is watt skirt (6.1) of a rectangle, the latter half of bituminized shingle (6) is the lappet (6.2) of three to four inverted trapezoidals, bituminized shingle (6) is bonding with double-sided self-adhesive waterproof coiled materials layer (5), is also connected with double-sided self-adhesive waterproof coiled materials layer (5), concrete base layer (4) by the nail (7) followed closely on watt skirt (6.1) between adjacent two lappets (6.2) simultaneously;
Between neighbouring bituminized shingle, on watt skirt (6.1) between adjacent two lappets (6.2) that the lappet (6.2) of upside bituminized shingle is pressed in downside bituminized shingle, the splicing seams between adjacent two bituminized shingles of the nail on the bituminized shingle of downside and downside is covered.
2. according to a kind of Sloping roof highrise building asphalt shingle roofing water-proof system described in claim 1, it is characterized in that: described mortar levelling layer (2) is the thick mortar levelling layer of 20mm.
3. according to a kind of Sloping roof highrise building asphalt shingle roofing water-proof system described in claim 1, it is characterized in that: described concrete base layer (4) is the thick C20 arrangement of reinforcement pea gravel concreten layer of 50mm.
4. according to a kind of Sloping roof highrise building asphalt shingle roofing water-proof system described in claim 1, it is characterized in that: described double-sided self-adhesive waterproof coiled materials layer (5) is the thick double-sided self-adhesive pitch composite S BS modified asphalt waterproof coiled material of 4mm.
CN201420472523.1U 2014-08-21 2014-08-21 A kind of Sloping roof highrise building asphalt shingle roofing water-proof system Expired - Fee Related CN204081297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420472523.1U CN204081297U (en) 2014-08-21 2014-08-21 A kind of Sloping roof highrise building asphalt shingle roofing water-proof system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420472523.1U CN204081297U (en) 2014-08-21 2014-08-21 A kind of Sloping roof highrise building asphalt shingle roofing water-proof system

Publications (1)

Publication Number Publication Date
CN204081297U true CN204081297U (en) 2015-01-07

Family

ID=52174031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420472523.1U Expired - Fee Related CN204081297U (en) 2014-08-21 2014-08-21 A kind of Sloping roof highrise building asphalt shingle roofing water-proof system

Country Status (1)

Country Link
CN (1) CN204081297U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153522A (en) * 2014-08-21 2014-11-19 北京金港建设股份有限公司 Asphalt shingle roof waterproof system of sloping roof high-rise building and construction method of asphalt shingle roof waterproof system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153522A (en) * 2014-08-21 2014-11-19 北京金港建设股份有限公司 Asphalt shingle roof waterproof system of sloping roof high-rise building and construction method of asphalt shingle roof waterproof system
CN104153522B (en) * 2014-08-21 2016-07-06 北京金港建设股份有限公司 A kind of construction method of Sloping roof skyscraper asphalt shingle roofing water-proof system

Similar Documents

Publication Publication Date Title
CN104153522B (en) A kind of construction method of Sloping roof skyscraper asphalt shingle roofing water-proof system
CN205077752U (en) Roofing flashing waterproofing membrane of department brick wall protection architecture
CN201695580U (en) Inverted roof structure
CN101914927A (en) Waterproof system for basement bottom board and wall surface and construction method thereof
CN107313560B (en) Reinforced waterproof roof of archaize building and construction method thereof
CN211313112U (en) Large-area large-gradient integrated waterproof heat-preservation tile-hanging roof
CN110080530B (en) Anchoring construction method for glazed tile slope roof in severe cold region
CN108457429B (en) Asphalt shingle for pitched roof and laying method thereof
CN109707114A (en) Tile roofing antiskid construction technology engineering method
CN112695959A (en) Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process
CN102733553A (en) Construction method for light glass fiber asphalt shingles of reinforced concrete steep-slope roofs
CN204081297U (en) A kind of Sloping roof highrise building asphalt shingle roofing water-proof system
CN203373918U (en) Waterproofing work construction structure of pseudo-classic architecture roof cornice
CN208329409U (en) A kind of parapet of roofing water leak-proof structure
CN214739146U (en) Arc roofing structure
CN104120837A (en) Construction method of waterproof roof
CN207905265U (en) A kind of fabricated roofing goes out roof pipeline waterproof construction
CN203654621U (en) Waterproof structure of small slope profiled steel sheet roof
CN212336545U (en) Oblique roofing tile hanging anti-leakage structure
CN212671027U (en) Leakage-proof structure for terrace roof
CN104005503A (en) Plane roof modularized structure
CN205116573U (en) Waterproof polyurethane roof boarding keeps warm
CN114645604A (en) Construction method for waterproof treatment node of deformation joint of accessible and parking roof
CN212772858U (en) Heat preservation pantile pitched roof and parapet junction node structure
CN211037568U (en) Plant vegetation roof waterproof construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20160821