CN104120837A - Construction method of waterproof roof - Google Patents

Construction method of waterproof roof Download PDF

Info

Publication number
CN104120837A
CN104120837A CN201310154442.7A CN201310154442A CN104120837A CN 104120837 A CN104120837 A CN 104120837A CN 201310154442 A CN201310154442 A CN 201310154442A CN 104120837 A CN104120837 A CN 104120837A
Authority
CN
China
Prior art keywords
layer
construction method
waterproof
roof
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310154442.7A
Other languages
Chinese (zh)
Inventor
杨哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310154442.7A priority Critical patent/CN104120837A/en
Publication of CN104120837A publication Critical patent/CN104120837A/en
Pending legal-status Critical Current

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a construction method of a waterproof roof. The construction method of the waterproof roof comprises the following steps that (1) a reinforced concrete roof is cleaned; (2) a slope is made on the reinforced concrete roof, and the gradient of the slope layer ranges from 2 percent to 3 percent; (3) a heat-preservation layer is laid on the slope layer; (4) the heat-preservation layer is leveled through cement mortar, and the leveling layer is 20-30 mm thick; (5) modified asphalt waterproof coiled materials are laid; (6) a protective layer is poured on the waterproof coiled material layer. The construction method of the waterproof roof is simple in process, is low in cost, largely improves the waterproof performance of the roof, and prolongs the service life of the waterproof roof.

Description

A kind of construction method of water-proof roofing
?
Technical field
The construction method that the present invention relates to a kind of water-proof roofing, belongs to technical field of building construction.
Background technology
Roof is that going along with sb. to guard him of covering effect and load-carrying members play in the house the superiors, and one of its topmost function is " rain of becalming ".Roofing, according to drainage grade difference, can be divided into flat roof deck and pitched roof.The gradient of general flat roof deck is below 10%, and the most frequently used gradient is 2 ~ 3%, and the gradient of pitched roof is more than 10%.China's building adopts pitched roof traditionally, has two-sided slope, slope, four sides etc.This roof pitch is larger, capable of expansion and contraction, and draining is rapid, waterproof effect is also relatively good.Since the sixties, for alleviating roofing deadweight, reduce construction costs, improving prefabricated roof assembling degree, generally change reinforced concrete flat roof into, adopt prefabricated circular hole roof panel and cast-in-situ steel reinforced concrete roof panel etc. more.Flat roof deck cost is lower, easy construction, simple structure, and outward appearance is succinct, is applicable to various shapes and big or small architectural plane, and current this class roofing is most widely used.
Once there is the situation that roof leakage rate is high in the building construction of China, has had a strong impact on the use function in house.Built house roofing generation leakage problem, directly have influence on people's life, working and learning, fundamentally solve built house roof leakage water problems, will set about from aspects such as the design of waterproofing, construction, material and management maintenances, carry out system management, integrated control.To improve waterproofing quality, stopping seepage is target, starts with from construction, maintains strict control over quality of materials pass, improves design level and strengthens management, and takes the concrete measures targetedly and carries out integrated control.
Summary of the invention
Goal of the invention: the object of the invention is to for the deficiencies in the prior art, a kind of construction method of water-proof roofing is provided, the method is mainly by waterproof coiled material, and technique is simple, with low cost, and the water proofing property of roofing is greatly improved.
Technical scheme: the construction method of a kind of water-proof roofing of the present invention, comprises the steps:
(1) reinforced concrete roof is cleared up;
(2) reinforced concrete roof is looked for to slope, the sloping layer gradient is 2%-3%;
(3) on sloping layer, lay insulation layer;
(4) insulation layer is adopted to cement mortar screeding, levelling bed thickness 20-30mm;
(5) lay modified asphalt waterproof coiled material;
(6) on waterproof roll layer, build topping.
Further improve technique scheme, in described step (), reinforced concrete roof is assembled steel reinforced concrete slab, and the pea gravel concreten that adopts strength grade to be not less than C20 is filled with packing in fact by plate seam.
Further improve technique scheme, described step (four) adopts cement mortar screeding, and thickness is 20mm, and cement and mortar volume are frequently 1:2.5~1:3, and cement grade is more than or equal to 42.5, and is added with waterproof agent in described cement mortar.
Further improve technique scheme, in described step (five), coiled material laying direction is that parallel ridge is laid, and paving coiled material adopts splicing processes, and the lap side seam of levels and adjacent two width coiled materials should stagger.
Further improve technique scheme; the working procedure of described step (six) is: first at waterproof aspect upper berth 300mm × 300mm expanded perlite heat insulation; add in the above again one deck 3cm solid cement mortar cover; cloth gauze wire cloth in this layer; topping is established dividing joint; in seam, fill with encapsulant, protect better waterproofing course.
Compared with prior art, its beneficial effect is in the present invention: the construction method of water-proof roofing of the present invention, technique is simple, with low cost, and the water proofing property of roofing is greatly improved, and has extended the service life of water-proof roofing.
Detailed description of the invention
Below technical solution of the present invention is elaborated, but protection scope of the present invention is not limited to described embodiment.
embodiment 1:a construction method for water-proof roofing, is characterized in that, comprises the steps:
(1) reinforced concrete roof is cleared up;
(2) reinforced concrete roof is looked for to slope, the sloping layer gradient is 2%-3%;
(3) on sloping layer, lay insulation layer;
(4) insulation layer is adopted to cement mortar screeding, levelling bed thickness 20-30mm;
(5) lay modified asphalt waterproof coiled material;
(6) on waterproof roll layer, build topping.
Wherein: described step () is when reinforced concrete roof is assembled steel reinforced concrete slab, and the pea gravel concreten that adopts strength grade to be not less than C20 is filled with packing in fact by plate seam.
Described step (four) adopts cement mortar screeding, and thickness is 20mm, and cement and mortar volume are frequently 1:2.5~1:3, and cement grade is more than or equal to 42.5, and is added with waterproof agent in described cement mortar.
In described step (five), coiled material laying direction is that parallel ridge is laid, and paving coiled material adopts splicing processes, and the lap side seam of levels and adjacent two width coiled materials should stagger.
The working procedure of described step (six) is: at waterproof aspect upper berth 300mm × 300mm expanded perlite heat insulation; add in the above again one deck 3cm solid cement mortar cover, cloth gauze wire cloth in this layer, topping is established dividing joint; in seam, fill with encapsulant, protect better waterproofing course.
As mentioned above, although represented and explained the present invention with reference to specific preferred embodiment, it shall not be construed as the restriction to the present invention self.Not departing under the spirit and scope of the present invention prerequisite of claims definition, can make in the form and details various variations to it.

Claims (5)

1. a construction method for water-proof roofing, is characterized in that, comprises the steps:
(1) reinforced concrete roof is cleared up;
(2) reinforced concrete roof is looked for to slope, the sloping layer gradient is 2%-3%;
(3) on sloping layer, lay insulation layer;
(4) insulation layer is adopted to cement mortar screeding, levelling bed thickness 20-30mm;
(5) lay modified asphalt waterproof coiled material;
(6) on waterproof roll layer, build topping.
2. the construction method of water-proof roofing according to claim 1, is characterized in that, in described step (), reinforced concrete roof is assembled steel reinforced coagulation, and the pea gravel concreten that adopts strength grade to be greater than C20 is filled with packing in fact by plate seam.
3. the construction method of water-proof roofing according to claim 1, is characterized in that, described step (four)
Adopt cement mortar screeding, leveling layer thickness is 20mm, and cement is with mortar volume than being 1:2.5~1:3, and cement grade is more than or equal to 42.5, and is added with waterproof agent in described cement mortar.
4. the construction method of water-proof roofing according to claim 1, is characterized in that, in described step (five), coiled material laying direction is that parallel ridge is laid, and paving coiled material adopts splicing processes, and the lap side seam of levels and adjacent two width coiled materials should stagger.
5. the construction method of water-proof roofing according to claim 1; it is characterized in that; the working procedure of described step (six) is: first at waterproof aspect upper berth 300mm × 300mm expanded perlite heat insulation; add in the above again one deck 3cm solid cement mortar cover; cloth gauze wire cloth in this layer; topping is established dividing joint, in seam, fills with encapsulant, protects better waterproofing course.
CN201310154442.7A 2013-04-28 2013-04-28 Construction method of waterproof roof Pending CN104120837A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310154442.7A CN104120837A (en) 2013-04-28 2013-04-28 Construction method of waterproof roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310154442.7A CN104120837A (en) 2013-04-28 2013-04-28 Construction method of waterproof roof

Publications (1)

Publication Number Publication Date
CN104120837A true CN104120837A (en) 2014-10-29

Family

ID=51766453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310154442.7A Pending CN104120837A (en) 2013-04-28 2013-04-28 Construction method of waterproof roof

Country Status (1)

Country Link
CN (1) CN104120837A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533029A (en) * 2015-01-06 2015-04-22 当代节能置业股份有限公司 Roof construction technology with self-slope-finding structure and roof
CN110080530A (en) * 2019-05-13 2019-08-02 甘肃第六建设集团股份有限公司 Severe cold area glazed tiles pitched roof pastes anchor construction method
CN111021638A (en) * 2019-05-20 2020-04-17 安徽省中功立业建设工程有限责任公司 Anti-seepage method for constructional engineering
CN114809474A (en) * 2022-04-07 2022-07-29 中国二十二冶集团有限公司 Waterproof construction method for slope roof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533029A (en) * 2015-01-06 2015-04-22 当代节能置业股份有限公司 Roof construction technology with self-slope-finding structure and roof
CN110080530A (en) * 2019-05-13 2019-08-02 甘肃第六建设集团股份有限公司 Severe cold area glazed tiles pitched roof pastes anchor construction method
CN110080530B (en) * 2019-05-13 2021-05-28 甘肃第六建设集团股份有限公司 Anchoring construction method for glazed tile slope roof in severe cold region
CN111021638A (en) * 2019-05-20 2020-04-17 安徽省中功立业建设工程有限责任公司 Anti-seepage method for constructional engineering
CN114809474A (en) * 2022-04-07 2022-07-29 中国二十二冶集团有限公司 Waterproof construction method for slope roof

Similar Documents

Publication Publication Date Title
CN100570098C (en) A kind of thermal insulation waterproof roof covering gas-guiding drainage system and job practices thereof
CN204753940U (en) A concrete structure for sloping open valley
CN208293929U (en) A kind of roofing flashing structure
CN205935437U (en) Parapet wall body structure
CN104806017A (en) Construction method of assembly type reinforced concrete waterproof roof
CN104153521A (en) Roof waterproof structure and roof maintenance method
CN104120837A (en) Construction method of waterproof roof
CN110565883A (en) Vibration-isolating roofing equipment foundation structure
CN204715638U (en) A kind of roof covering water-proof structure
CN207017545U (en) Foam concrete heat-preserving roofing optimizes architectural construction and local structure
CN103669746A (en) Inverted roofing heat insulation system and construction method thereof
CN106703302A (en) Foam-concrete roof structure
CN111255101A (en) Flush joint waterproof construction of roofing movement joint
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN203654621U (en) Waterproof structure of small slope profiled steel sheet roof
CN213268014U (en) Corrugated cover plate mounting structure for advanced construction of roof post-cast strip
CN202483092U (en) Vapor-proof thermal insulation walkable roof
CN103572783B (en) Comprehensive method for preventing crack and water of basement project
CN211007341U (en) Building top layer heat insulation structure
CN211286311U (en) Roof waterproof structure
CN207919877U (en) A kind of prefabricated GRC assembled wall boards
CN210238953U (en) Waterproof and heat preservation node structure of roofing equipment foundation
CN209958622U (en) Waterproof and heat-preservation integrated roof
CN207776290U (en) A kind of horizontal type water for flat roof waterproof system falls mouth structure
CN110805208A (en) Roof waterproof structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141029