CN205636519U - 悬浇挂篮液压预压施工装置 - Google Patents

悬浇挂篮液压预压施工装置 Download PDF

Info

Publication number
CN205636519U
CN205636519U CN201620369298.8U CN201620369298U CN205636519U CN 205636519 U CN205636519 U CN 205636519U CN 201620369298 U CN201620369298 U CN 201620369298U CN 205636519 U CN205636519 U CN 205636519U
Authority
CN
China
Prior art keywords
plummer
basket
level
grade
box girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620369298.8U
Other languages
English (en)
Inventor
何未
赵永士
刘浩明
石鹏
王新华
李海梅
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620369298.8U priority Critical patent/CN205636519U/zh
Application granted granted Critical
Publication of CN205636519U publication Critical patent/CN205636519U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型涉及一种悬浇挂篮液压预压施工装置,它包括一级承载台、二级承载台和箱梁梁体,一级承载台上设有二级承载台,一级承载台与二级承载台之间设有千斤顶,二级承载台的上端两侧对称设有箱梁梁体,箱梁梁体的上方设有顶座,顶座上设有挂篮,挂篮通过吊杆连接底模,吊杆与箱梁梁体之间设有三角支撑架。本实用新型结构简单、设计合理,解决了传统挂篮预压的弊端,节省了作业空间,避免了采用堆载预压的复杂工序和安全隐患,保证了施工质量,减少了施工成本,加快了工程进度。

Description

悬浇挂篮液压预压施工装置
技术领域
本实用新型属于桥梁施工技术领域,具体涉及一种悬浇挂篮液压预压施工装置。
背景技术
悬臂浇筑施工法由于其独特的优越性,被广泛用于修建预应力T形刚构桥,预应力混凝土悬臂梁桥、连续梁桥、斜拉桥和拱桥等,挂篮是悬臂浇筑施工中主要的施工设备。为取得挂篮弹性变形与荷载线性关系,消除挂篮非弹性变形, 在其拼装上桥之前应模拟施工荷载进行预压试验,确定梁体各节块施工挠度调整值,确保挂篮在复杂工况下安全使用以及控制梁体施工线形精度。目前常用的预压方法有沙袋法、钢筋堆载和水箱法,具体操作是在挂篮的底模板上吊装沙袋或堆载钢筋,或者使用一组水箱,按照规范要求分级加载和卸载进行预压试验。这种做法在实际施工中存在以下问题,一是工序复杂,试验时间较长,成本较高;二是受场地局限和临近既有线路影响,对场地要求高,吊车作业极为困难,施工作业难度大;三是高空作业,堆载物高度高,预压时间长,存在很高的安全风险。
实用新型内容
为了克服现有技术中存在的不足而提供了一种新型桥梁减震支座,该结构简单紧凑、施工方便,适用范围广。
为实现上述目的,本实用新型采取的技术方案如下:
本实用新型提供了一种悬浇挂篮液压预压施工装置,它包括一级承载台、二级承载台和箱梁梁体,一级承载台上设有二级承载台,一级承载台与二级承载台之间设有千斤顶,二级承载台的上端两侧对称设有箱梁梁体,箱梁梁体的上方设有顶座,顶座上设有挂篮,挂篮通过吊杆连接底模,吊杆与箱梁梁体之间设有三角支撑架。
所述底模的一端固定在吊杆上,底模的另一端可拆卸地固定在二级承载台上。
所述挂篮包括上横梁、下横梁和支撑杆,支撑杆设置在上横梁与下横梁之间,所述吊杆的上端穿过上横梁并固定在上横梁上。
与现有技术相比,本实用新型取得的有益效果:
1. 本实用新型结构包括一级承载台、二级承载台和箱梁梁体,一级承载台上设有二级承载台,一级承载台与二级承载台之间设有千斤顶,二级承载台的上端两侧对称设有箱梁梁体,箱梁梁体的上方设有顶座,顶座上设有挂篮,挂篮通过吊杆连接底模,吊杆与箱梁梁体之间设有三角支撑架;二级承载台上进行预压操作,节省了施工作业面,对一些临近既有线路和施工场地受限的工点具有可操作性,吊杆与箱梁梁体之间设有的三角支撑架有利于挂篮整体结构稳定,施工效果好。
2. 本实用新型结构简单、设计合理,解决了传统挂篮预压的弊端,节省了作业空间,避免了采用堆载预压的复杂工序和安全隐患,提高了工作效率,保证了施工质量,减少了施工成本,加快了工程进度。
附图说明
图1为本实用新型结构示意图。
具体实施方式
下面结合附图对本实用新型进一步说明:
参照图1所示,本实用新型提供了一种悬浇挂篮液压预压施工装置,它包括一级承载台1、二级承载台2和箱梁梁体3,一级承载台1上设有二级承载台2,一级承载台1与二级承载台2之间设有千斤顶3,二级承载台2的上端两侧对称设有箱梁梁体4,箱梁梁体4的上方设有顶座9,顶座9上设有挂篮5,挂篮5通过吊杆6连接底模7,吊杆6与箱梁梁体3之间设有三角支撑架8;所述挂篮5包括上横梁51、下横梁52和支撑杆53,支撑杆53设置在上横梁51与下横梁52之间,吊杆6的上端穿过上横梁51并固定在上横梁上;所述底模7的一端固定在吊杆6上,底模7的另一端可拆卸地固定在二级承载台2上。

Claims (3)

1.悬浇挂篮液压预压施工装置,其特征在于:它包括一级承载台、二级承载台和箱梁梁体,一级承载台上设有二级承载台,一级承载台与二级承载台之间设有千斤顶,二级承载台的上端两侧对称设有箱梁梁体,箱梁梁体的上方设有顶座,顶座上设有挂篮,挂篮通过吊杆连接底模,吊杆与箱梁梁体之间设有三角支撑架。
2.根据权利要求1所述的悬浇挂篮液压预压施工装置,其特征在于:所述底模的一端固定在吊杆上,底模的另一端可拆卸地固定在二级承载台上。
3.根据权利要求1所述的悬浇挂篮液压预压施工装置,其特征在于:所述挂篮包括上横梁、下横梁和支撑杆,支撑杆设置在上横梁与下横梁之间,所述吊杆的上端穿过上横梁并固定在上横梁上。
CN201620369298.8U 2016-04-28 2016-04-28 悬浇挂篮液压预压施工装置 Expired - Fee Related CN205636519U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620369298.8U CN205636519U (zh) 2016-04-28 2016-04-28 悬浇挂篮液压预压施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620369298.8U CN205636519U (zh) 2016-04-28 2016-04-28 悬浇挂篮液压预压施工装置

Publications (1)

Publication Number Publication Date
CN205636519U true CN205636519U (zh) 2016-10-12

Family

ID=57060776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620369298.8U Expired - Fee Related CN205636519U (zh) 2016-04-28 2016-04-28 悬浇挂篮液压预压施工装置

Country Status (1)

Country Link
CN (1) CN205636519U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702906A (zh) * 2016-12-09 2017-05-24 中铁八局集团昆明铁路建设有限公司 一种挂篮预压装置及其预压方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106702906A (zh) * 2016-12-09 2017-05-24 中铁八局集团昆明铁路建设有限公司 一种挂篮预压装置及其预压方法

Similar Documents

Publication Publication Date Title
CN203546626U (zh) 钢管混凝土拱桥吊杆更换装置
CN207986489U (zh) 大直径桩基钢筋笼孔口吊挂调节装置
CN205223871U (zh) 一种悬索桥桥塔横梁支架预压装置
CN203334680U (zh) 混凝土浇筑用上返梁吊模
CN205501843U (zh) 加固刚架拱桥
CN205636519U (zh) 悬浇挂篮液压预压施工装置
CN204625045U (zh) 一种钢结构吊装用门型支架式吊装装置
CN204780909U (zh) 建筑预埋基桩夯实装置
CN209397510U (zh) 一种大跨度钢桁柔性拱桥拱肋整体液压提升施工装置
CN203129025U (zh) 一种挂篮的悬吊固定装置
CN205421890U (zh) 一种模架承重横梁
CN203479511U (zh) 铁路t梁静载试验台座
CN203755173U (zh) 用于桥梁高墩液压爬升的模板装置
CN205663175U (zh) 一种可调钢拉杆式悬挑脚手架
CN206174482U (zh) 一种无牛腿钢管柱的外包混凝土环梁钢筋整体安装装置
CN203270465U (zh) 悬浇挂篮液压预压施工装置
CN210766434U (zh) 一种连续梁挂篮施工预压加载装置
CN205529940U (zh) 一种桥梁支座抽取装置
CN203795318U (zh) 一种大型构件钢筋笼整体吊装系统
CN203755677U (zh) 钢筋混凝土楼板施工用下悬吊挂式吊挂装置
CN204212057U (zh) 一种移动模架主梁支撑用平衡梁装置
CN203530862U (zh) 连续梁直线段与边跨合拢段的浇筑模具系统
CN203403683U (zh) 一种双层穿筋装置
CN208280134U (zh) 一种桩基施工作业平台装置
CN207974021U (zh) 一种便于拆除的双肢薄壁墩工字钢承架

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20170428

CF01 Termination of patent right due to non-payment of annual fee