CN205596713U - City trade tree well - Google Patents

City trade tree well Download PDF

Info

Publication number
CN205596713U
CN205596713U CN201620199436.2U CN201620199436U CN205596713U CN 205596713 U CN205596713 U CN 205596713U CN 201620199436 U CN201620199436 U CN 201620199436U CN 205596713 U CN205596713 U CN 205596713U
Authority
CN
China
Prior art keywords
layer
boulder bed
tree well
water
path tree
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620199436.2U
Other languages
Chinese (zh)
Inventor
肖文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huadian Engineering Group Co Ltd
Original Assignee
China Huadian Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering Group Co Ltd filed Critical China Huadian Engineering Group Co Ltd
Priority to CN201620199436.2U priority Critical patent/CN205596713U/en
Application granted granted Critical
Publication of CN205596713U publication Critical patent/CN205596713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Protection Of Plants (AREA)

Abstract

The utility model discloses a city trade tree well, including protecting root layer, thin boulder bed and the brick that permeates water, the brick that permeates water is laid on the top of tree well, and thin boulder bed sets up in the below of the brick that permeates water, protects the root layer and sets up in the below of thin boulder bed, and the below of protecting the root layer is the planting soil layer, and the below on planting soil layer is provided with the permeability hole for backfilling the soil layer on the brick that permeates water. Compared with the prior art, the utility model discloses make the usable area grow on pavement, improved the capacity on pavement, eliminate the difference in height of tree well internal surface with the side walk slab top, avoided the influence of trade tree well to pedestrains safety, banketing in the tree well is no longer exposed, has reduced the city raise dust, the root layer is protected in the setting, has strengthened the water retention of soil, is favorable to the arboreal growth, the utility model discloses both satisfy the requirement of city environmental protection, satisfied city dwellers' humanized demand again.

Description

A kind of urban path tree pit
Technical field
This utility model relates to a kind of urban path tree pit, belongs to road engineering technical field.
Background technology
For beautifying city and improve urban air-quality, shade tree typically can be planted in urban road both sides.Shade tree in city at present Tree well go along with sb. to guard him edge mostly be square, occupy certain footpath area;And tree well inner surface and side walk slab push up it Between there is too high difference in height, easily trip pedestrian, the person of pedestrian damaged;Exposed earth is very easy to produce Raw airborne dust, the moisture of soil the most easily evaporates;Urban human path tree pit extruding footpath space, side of body personal safety and earth are naked These weak points of dew, are unfavorable for the hommization demand of urban environmental protection requirement and urbanite.
Utility model content
The purpose of this utility model is, it is provided that a kind of urban path tree pit, and this tree well makes the usable area of footpath become big; Also can shorten the difference in height of tree well inner surface and side walk slab top, reduce the probability that pedestrian is tripped;Make banketing not in tree well The most exposed, water retention property is good, decreases the generation of airborne dust.
For solving above-mentioned technical problem, this utility model adopts the following technical scheme that: a kind of urban path tree pit, including mulch Layer, thin boulder bed and water-permeable brick, water-permeable brick is laid on the top of tree well, and thin boulder bed is arranged at the lower section of water-permeable brick, mulch layer Being arranged at the lower section of thin boulder bed, the lower section of mulch layer is plantation soil layer, and the lower section of plantation soil layer is back fill course, on water-permeable brick It is provided with permeability hole.Permeability hole on water-permeable brick can be by irrigation water and rain penetration to tree well.Plantation soil layer is deposited for improving trees The soil rich in nutrient substance of motility rate, to ensure that trees normally survive after being transplanted to tree well.
In aforesaid a kind of urban path tree pit, the material of described mulch layer is Caulis et Folium Oryzae, straw, rotted leaf.Caulis et Folium Oryzae, straw, corruption Leaf has good water-retaining property, and it is alternatively arranged as organic nutrient substance, provides good living environment for the trees in tree well.
In aforesaid a kind of urban path tree pit, the material of described mulch layer is Caulis et Folium Oryzae and the mixture of straw or is that Caulis et Folium Oryzae is with rotten The mixture of leaf or be the mixture of straw and rotted leaf.
In aforesaid a kind of urban path tree pit, the thickness of described mulch layer is 5~10cm.
In aforesaid a kind of urban path tree pit, the thickness of described thin boulder bed is 2~5cm.
In aforesaid a kind of urban path tree pit, the height between the upper surface of described thin boulder bed and side walk slab top be 2~ 3cm。
In aforesaid a kind of urban path tree pit, described permeability hole is circular or regular hexagon.
In aforesaid a kind of urban path tree pit, the peripheral edge of described tree well is octagon or circle.
In aforesaid a kind of urban path tree pit, described water-permeable brick is positioned at same water towards the one side outside tree well with the road surface of footpath In plane, to eliminate the difference in height existed between tree well inner surface and side walk slab top, it is ensured that the safety of pedestrian.
Compared with prior art, this utility model makes the usable area of footpath become big, improves the traffic capacity of footpath; Eliminate the difference in height on tree well inner surface and side walk slab top, it is to avoid the path tree pit impact on pedestrains safety;Filling out in tree well Soil is the most exposed, decreases city raised dust;Mulch layer is set, enhances the water retention property of soil, beneficially arboreal growth, this Utility model had both met the requirement of urban environmental protection, met again the hommization demand of urbanite.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram of this utility model embodiment 1;
Fig. 3 is the schematic diagram of this utility model embodiment 2.
Reference: 1-mulch layer, the thin boulder bed of 2-, 3-water-permeable brick, 4-tree well, 5-kind plants soil layer, 6-back fill course, 7- Footpath, 8-permeability hole.
With detailed description of the invention, this utility model is further described below in conjunction with the accompanying drawings.
Detailed description of the invention
Embodiment 1 of the present utility model: as shown in Figure 1, 2, a kind of urban path tree pit, including mulch layer 1, thin boulder bed 2 and water-permeable brick 3, water-permeable brick 3 is laid on the top of tree well 4, and thin boulder bed 2 is arranged at the lower section of water-permeable brick 3, mulch layer 1 lower section being arranged at thin boulder bed 2, the lower section of mulch layer 1 is plantation soil layer 5, and the lower section of plantation soil layer 5 is back fill course 6, water-permeable brick 3 is provided with permeability hole 8.The material of mulch layer 1 is Caulis et Folium Oryzae, and the thickness of mulch layer 1 is 5cm.Thin boulder bed The thickness of 2 is 2cm.Height between upper surface and the footpath 7 plate top of thin boulder bed 2 is 2cm.The periphery sides of tree well 4 Edge is octagon.Permeability hole 8 is regular hexagon.
Embodiment 2 of the present utility model: as shown in Figure 1,3, a kind of urban path tree pit, including mulch layer 1, thin boulder bed 2 and water-permeable brick 3, water-permeable brick 3 is laid on the top of tree well 4, and thin boulder bed 2 is arranged at the lower section of water-permeable brick 3, mulch layer 1 lower section being arranged at thin boulder bed 2, the lower section of mulch layer 1 is plantation soil layer 5, and the lower section of plantation soil layer 5 is back fill course 6, water-permeable brick 3 is provided with permeability hole 8.The material of mulch layer 1 is the mixture of Caulis et Folium Oryzae and straw.The thickness of mulch layer 1 For 10cm.The thickness of thin boulder bed 2 is 5cm.Height between upper surface and the footpath 7 plate top of thin boulder bed 2 is 3cm.Permeability hole 8 is circular.The peripheral edge of tree well 4 is circular.Water-permeable brick 3 is towards the one side outside tree well 4 and footpath The road surface of 7 is positioned in same level.
Operation principle of the present utility model: kind tree time first back fill course 6 is filled up enough soil, then on planting soil upper berth If plantation soil layer 5, plantation soil layer 5 nutrient substance ensure that trees normally survive, then planting soil be provided above protect Root layer 1, at the thin boulder bed 2 of upper laying 2~5cm of mulch layer 1, ensures thin boulder bed 2 inner surface and footpath 7 plate simultaneously The difference of crest level is 2~3cm, re-lays water-permeable brick 3 on thin boulder bed 2, to shorten thin boulder bed 2 and footpath 7 plate top Between depth displacement, eliminate threat to pedestrian.

Claims (9)

1. a urban path tree pit, it is characterised in that include mulch layer (1), thin boulder bed (2) and water-permeable brick (3), described Water-permeable brick (3) is laid on the top of tree well (4), and described thin boulder bed (2) is arranged at the lower section of water-permeable brick (3), described Mulch layer (1) is arranged at the lower section of described thin boulder bed (2), and the lower section of described mulch layer (1) is plantation soil layer (5), The lower section of described plantation soil layer (5) is back fill course (6), and described water-permeable brick (3) is provided with permeability hole (8).
A kind of urban path tree pit the most according to claim 1, it is characterised in that the material of described mulch layer (1) is rice Grass, straw, rotted leaf.
A kind of urban path tree pit the most according to claim 1, it is characterised in that the material of described mulch layer (1) is Caulis et Folium Oryzae With the mixture of straw or be Caulis et Folium Oryzae and the mixture of rotted leaf or for the mixture of straw with rotted leaf.
4. according to a kind of urban path tree pit described in Claims 2 or 3, it is characterised in that the thickness of described mulch layer (1) is 5~10cm.
A kind of urban path tree pit the most according to claim 4, it is characterised in that the thickness of described thin boulder bed (2) is 2~5cm.
A kind of urban path tree pit the most according to claim 5, it is characterised in that the upper surface of described thin boulder bed (2) with Height between footpath (7) plate top is 2~3cm.
A kind of urban path tree pit the most according to claim 6, it is characterised in that described permeability hole (8) be circle or just Hexagon.
A kind of urban path tree pit the most according to claim 7, it is characterised in that the peripheral edge of described tree well (4) is eight Limit shape or circle.
A kind of urban path tree pit the most according to claim 8, it is characterised in that described water-permeable brick (3) is towards tree well (4) one side outward is positioned in same level with the road surface of footpath (7).
CN201620199436.2U 2016-03-15 2016-03-15 City trade tree well Expired - Fee Related CN205596713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620199436.2U CN205596713U (en) 2016-03-15 2016-03-15 City trade tree well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620199436.2U CN205596713U (en) 2016-03-15 2016-03-15 City trade tree well

Publications (1)

Publication Number Publication Date
CN205596713U true CN205596713U (en) 2016-09-28

Family

ID=56963143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620199436.2U Expired - Fee Related CN205596713U (en) 2016-03-15 2016-03-15 City trade tree well

Country Status (1)

Country Link
CN (1) CN205596713U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106718596A (en) * 2016-12-28 2017-05-31 北京市园林科学研究院 A kind of shade tree deep water supplement rejuvenation device and method of construction and application
CN108642994A (en) * 2018-07-05 2018-10-12 广州市花木公司 The tree pond of environmental protection breathable
CN110574626A (en) * 2019-10-23 2019-12-17 浙江建设职业技术学院 Pavement tree planting method for limiting surface arching
CN111608044A (en) * 2020-05-29 2020-09-01 上海新园林实业有限公司 Compromise street both sides afforestation structure of drainage and road guide

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106718596A (en) * 2016-12-28 2017-05-31 北京市园林科学研究院 A kind of shade tree deep water supplement rejuvenation device and method of construction and application
CN106718596B (en) * 2016-12-28 2023-04-18 北京市园林绿化科学研究院 Deep water replenishing and rejuvenating device for street trees and construction method and application
CN108642994A (en) * 2018-07-05 2018-10-12 广州市花木公司 The tree pond of environmental protection breathable
CN110574626A (en) * 2019-10-23 2019-12-17 浙江建设职业技术学院 Pavement tree planting method for limiting surface arching
CN110574626B (en) * 2019-10-23 2021-04-16 浙江建设职业技术学院 Pavement tree planting method for limiting surface arching
CN111608044A (en) * 2020-05-29 2020-09-01 上海新园林实业有限公司 Compromise street both sides afforestation structure of drainage and road guide

Similar Documents

Publication Publication Date Title
CN105103843B (en) Prevent and treat the vegetation arrangement method of dry-hot valley Mine production soil erosion
CN102656973B (en) A kind of method of Rocky Desertification Control and ecosystem restoration thereof
CN205596713U (en) City trade tree well
CN204377536U (en) Rocky Desertification Region plants planter
CN207062674U (en) A kind of ecology tree pond
CN105210494B (en) Loess steep slope is mixed to hand over Afforestation method
CN107027500B (en) Method for restoring land-tracking ecology
WO2015055862A1 (en) Preventive forest system for taming and extinguishing fires
CN107646606A (en) Salt-soda soil arbor method for transplanting
CN107155790A (en) A kind of method that saline-alkali soil is improved by microbial fermented stalk
CN102812837B (en) Irrigation-free sandbreak forest planting technique
CN104855252A (en) Method for planting morinda officinalis in stony desertification soil
CN112136408B (en) Greening method suitable for sand abrupt slope in high-altitude area
CN105850261B (en) A kind of sloping field type salt-soda soil collection rain desalinization of soil by flooding or leaching system
CN104846912B (en) Dune area water collection irrigation system
CN103314761A (en) Vegetation-type ecological concrete micro-plant cultivation method
CN103098629A (en) Method for planting trees with soil and film composite drought resistance tree-planting hopper
CN107881930A (en) Desert area railway bed both sides engineering and the sapling grid sand-protecting barrier of plant sand prevention
CN107905208A (en) A kind of water and soil conservation structure and its construction method for accelerating stony desertification area's rock weathering
CN207452747U (en) Desert area railway bed both sides engineering and the sapling grid sand-protecting barrier of plant sand prevention
CN103098630A (en) Irrigation and water retention and tree protection method with soil and film composite drought-resistant tree-planting hopper
CN102893796A (en) Irrigation water retention tree-protecting method employing ground surface-type drought-resisting tree-planting black film funnel
CN105442507A (en) Draining canal system for tea and fruit garden
KR20170100905A (en) Pit and mulching planting techniques to improve tree growth in windy and arid region
CN202603266U (en) Root inhibition planting disc

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20200315

CF01 Termination of patent right due to non-payment of annual fee