CN205530231U - 一种可加固型钻孔灌注桩结构 - Google Patents

一种可加固型钻孔灌注桩结构 Download PDF

Info

Publication number
CN205530231U
CN205530231U CN201620117028.8U CN201620117028U CN205530231U CN 205530231 U CN205530231 U CN 205530231U CN 201620117028 U CN201620117028 U CN 201620117028U CN 205530231 U CN205530231 U CN 205530231U
Authority
CN
China
Prior art keywords
pile
bored concrete
concrete pile
reinforcing
reinforcement type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620117028.8U
Other languages
English (en)
Inventor
曹慧
许利东
王晓曙
涂伟
陈明
徐金鑫
彭小毅
崔洪
潘延连
王项敏
余琨琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan construction investment foundation engineering Co., Ltd.
Original Assignee
YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd filed Critical YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING Co Ltd
Priority to CN201620117028.8U priority Critical patent/CN205530231U/zh
Application granted granted Critical
Publication of CN205530231U publication Critical patent/CN205530231U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种可加固型钻孔灌注桩结构,在灌注桩(1)内沿径向预设有可插入加固桩(2)的通孔(3)。在进行灌注桩施工过程中根据预设孔位数量和位置预先插入直立的钢管或PVC管,在施工完毕的灌注桩中形成预设通孔;当需要对灌注桩加固时,将预先做好的加固桩插入预设通孔中,加固桩底端插入灌注桩底部的地质层中。采用本实用新型的可加固型钻孔灌注桩结构,在施工后期若桩基不能满足结构稳定性要求,可以通过预设孔位采用加固桩进行加固施工在满足当前桩基结构稳定性要求和使用功能要求的同时,为后期加固或加强施工预留施工条件。对于特殊工程地质条件下的桩基工程,本实用新型可有效解决桩基沉降不均匀或是桩底承载力不足等工程难题。

Description

一种可加固型钻孔灌注桩结构
技术领域
本实用新型属于建筑桩基工程技术领域,具体涉及一种钻孔灌注桩结构。
背景技术
随着我国基础建设的逐步推进,基坑工程、边坡工程、桥梁工程等各类建筑工程随之涌现。在上述工程中,桩基工程必不可少。近年来,石灰岩(岩溶)地区、深厚泥炭质土地区等特殊工程地质条件下的桩基工程越来越多。由于特殊地质条件的多样性及相关理论研究不足等因素,造成施工勘察结果与实际工程地质环境条件不一致,从而导致设计和施工不能很好的解决实际问题,很多桩基工程在施工后都会出现不均匀沉降、桩底下还存在溶洞等工程问题,所以不得不针对已建桩基工程进行加固或是重新施工。现有的加固方法主要有三种,方案一是桩底桩侧压力注浆加固,方案二是钻孔灌注桩补桩加固,方案三是增加锚杆静压桩加固。但这三种加固方法存在一定的局限性及施工难度,如方案一需要求事先在桩身钢筋笼外侧安装注浆管,若事先没有安装,方案一难以实现,同时在岩溶地质条件下,该方案压浆量难以估算,效果也需通过试验验证;方案二是在原桩前后各增设一根桩,通过连系梁将原桩连成一体,该方案要求加桩对原建筑基础没有影响,同时该方案受施工工艺影响较大且造价较高;方案三是在原桩周增设锚杆静压桩,通过承台连成一体,该方案在深厚软土地区使用受限,难以达到提高承载力的加固目的。而重新施工不仅影响工期,还造成了人力物力的巨大浪费。
发明内容
本实用新型的目的在于解决现有技术的不足,提供一种结构简单、易于对已建桩基工程进行加固或加强、并可避免重新施工,以节约工程材料和工期的可加固型钻孔灌注桩结构。
本实用新型的目的通过如下技术方案实现:
一种可加固型钻孔灌注桩结构,在灌注桩内沿径向预设有可插入加固桩的通孔。
本实用新型在灌注桩内预设的通孔为孔位呈等边三角形关系布置的三个孔。采用钢管或PVC管在灌注桩预设孔位,预设孔位直径为160~200mm。插入通孔内的加固桩的顶面与灌注桩顶面平齐。加固桩底端向下延伸至底面超出灌注桩底面。
采用本实用新型的可加固型钻孔灌注桩结构,在施工后期若桩基不能满足结构稳定性要求,可以通过预设孔位采用加固桩进行加固施工在满足当前桩基结构稳定性要求和使用功能要求的同时,为后期加固或加强施工预留施工条件。对于特殊工程地质条件下的桩基工程,本实用新型可有效解决桩基沉降不均匀或是桩底承载力不足等工程难题,具有较高的实际工程价值。
附图说明
图1为本实用新型未插入加固桩时的径向截面示意图;
图2为本实用新型插入加固桩后的径向截面示意图;
图3为图2的A-A截面图。
具体实施方式
如图1、图2、图3所示,本实用新型所述可加固型钻孔灌注桩结构,是在灌注桩1内沿径向预设有可插入加固桩2的通孔3。在灌注桩1内预设的通孔3通常为三个孔,其孔位呈等边三角形关系布置。灌注桩1桩径一般不小于1m。一般采用钢管或PVC管在灌注桩1预设孔位,预设孔位直径一般为160~200mm。加固桩2可预先做好备用,加固桩的桩径与预设孔位直径匹配,桩身材料强度等级与灌注桩1一致。
本实用新型所述可加固型钻孔灌注桩结构的施工方法步骤如下:
a.根据施工勘察报告和桩基结构稳定性要求,确定包括钻孔灌注桩直径、桩长的施工参数;
b.桩机就位,按现有技术施工方法进行灌注桩施工;在施工过程中根据预设孔位数量和位置预先插入直立的钢管或PVC管,在施工的灌注桩中形成预设通孔;
c.当需要对灌注桩加固时,将预先做好的加固桩插入预设通孔中,加固桩的顶面与灌注桩顶面平齐,加固桩底端向下延伸至底面超出灌注桩底面,插入灌注桩底部的地质层中,插入深度不小于1m。加固桩的桩长根据实际施工环境条件和稳定性要求确定。

Claims (5)

1.一种可加固型钻孔灌注桩结构,其特征在于,在灌注桩(1)内沿径向预设有可插入加固桩(2)的通孔(3)。
2.根据权利要求1所述的一种可加固型钻孔灌注桩结构,其特征在于,在灌注桩(1)内预设的通孔(3)为孔位呈等边三角形关系布置的三个孔。
3.根据权利要求1或2所述的一种可加固型钻孔灌注桩结构,其特征在于,采用钢管或PVC管在灌注桩(1)预设孔位,预设孔位直径为160~200mm。
4.根据权利要求1或2所述的一种可加固型钻孔灌注桩结构,其特征在于,插入通孔内的加固桩(2)的顶面与灌注桩(1)顶面平齐。
5.根据权利要求1或2所述的一种可加固型钻孔灌注桩结构,其特征在于,所述加固桩(2)底端向下延伸至底面超出灌注桩(1)底面。
CN201620117028.8U 2016-02-05 2016-02-05 一种可加固型钻孔灌注桩结构 Expired - Fee Related CN205530231U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620117028.8U CN205530231U (zh) 2016-02-05 2016-02-05 一种可加固型钻孔灌注桩结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620117028.8U CN205530231U (zh) 2016-02-05 2016-02-05 一种可加固型钻孔灌注桩结构

Publications (1)

Publication Number Publication Date
CN205530231U true CN205530231U (zh) 2016-08-31

Family

ID=56778137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620117028.8U Expired - Fee Related CN205530231U (zh) 2016-02-05 2016-02-05 一种可加固型钻孔灌注桩结构

Country Status (1)

Country Link
CN (1) CN205530231U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714770A (zh) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 一种可加固型钻孔灌注桩结构及其施工方法
CN108086307A (zh) * 2017-12-26 2018-05-29 中铁第四勘察设计院集团有限公司 钢管混凝土挖孔灌注复合微型桩
CN108104113A (zh) * 2017-12-26 2018-06-01 中铁第四勘察设计院集团有限公司 用于施工过程中抗滑桩变形超标的加固结构及施工方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105714770A (zh) * 2016-02-05 2016-06-29 云南建工基础工程有限责任公司 一种可加固型钻孔灌注桩结构及其施工方法
CN108086307A (zh) * 2017-12-26 2018-05-29 中铁第四勘察设计院集团有限公司 钢管混凝土挖孔灌注复合微型桩
CN108104113A (zh) * 2017-12-26 2018-06-01 中铁第四勘察设计院集团有限公司 用于施工过程中抗滑桩变形超标的加固结构及施工方法

Similar Documents

Publication Publication Date Title
WO2018210019A1 (zh) 潜孔冲击旋喷复合桩成桩方法
CN1926287B (zh) 头部延伸桩的施工方法
CN110735600B (zh) 一种用于喀斯特地质的机械成孔桩施工工艺
CN102767180A (zh) 一种静压锚杆桩补强基础施工方法
CN205530231U (zh) 一种可加固型钻孔灌注桩结构
CN113186903A (zh) 组合式桩型结构及采用组合式桩型结构处理深基坑施工桩承载力不足的施工方法
CN201250408Y (zh) 回收式钢结构基坑围护装置
CN105649073A (zh) 一种静钻根植桩的施工方法
CN111485544A (zh) 一种嵌岩桩基底下伏溶洞处置检测结构及方法
CN109594575A (zh) 一种沉井周边注浆加固土体施工方法
CN105625418A (zh) 一种设有加芯扩大头旋喷桩的灌注桩结构及其施工方法
CN105386610A (zh) 非对称深基坑坑顶天然地基古建筑保护施工方法
CN105464105A (zh) 一种无摩擦桩成桩结构及成桩方法
CN205382482U (zh) 一种设有加芯扩大头旋喷桩的灌注桩结构
CN105714770A (zh) 一种可加固型钻孔灌注桩结构及其施工方法
CN102626946A (zh) 一种混凝土异形围护桩的制备方法
CN102493436A (zh) 矩形抗滑桩人工掘进新工法
CN216239904U (zh) 一种既有建筑托换加固连接结构
CN103967025B (zh) 人工挖孔扩孔方法以及人工挖孔扩孔稳定结构
CN206368375U (zh) 一种输电铁塔用基础
CN210507517U (zh) 一种适用于挡土墙加高的组合构件
CN103726673A (zh) 后生根新型复合桩基础
CN103790190B (zh) 预制空心打入桩基补救加固方法
CN109680978B (zh) 地下室增层托换施工方法
CN112854245A (zh) 基于深度与中风化岩埋深的土岩基坑支护分类设计方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Patentee after: Yunnan construction investment foundation engineering Co., Ltd.

Address before: 650501 Yunnan city of Kunming Province Economic and Technological Development Zone Forest Road No. 188

Patentee before: YANTAI CONSTRUCTION ENGINEERING FOUNDATION ENGINEERING CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20200205

CF01 Termination of patent right due to non-payment of annual fee