CN205501940U - A drainage structures for blocking disconnected valley construction sediment field - Google Patents

A drainage structures for blocking disconnected valley construction sediment field Download PDF

Info

Publication number
CN205501940U
CN205501940U CN201620300350.4U CN201620300350U CN205501940U CN 205501940 U CN205501940 U CN 205501940U CN 201620300350 U CN201620300350 U CN 201620300350U CN 205501940 U CN205501940 U CN 205501940U
Authority
CN
China
Prior art keywords
tunnel
water discharge
river course
discharge tunnel
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620300350.4U
Other languages
Chinese (zh)
Inventor
周顺文
张有山
彭云强
银登林
雷运华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201620300350.4U priority Critical patent/CN205501940U/en
Application granted granted Critical
Publication of CN205501940U publication Critical patent/CN205501940U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a drainage structures for blocking disconnected valley construction sediment field. The utility model discloses an along the river, say the checkdam that width direction set up, river course coast still is equipped with entry end and checkdam upper river intercommunication, the drainage tunnel of exit end and checkdam low reaches river course intercommunication, the bottom plate of drainage tunnel is equipped with the partition wall along drainage tunnel length direction, make the drainage tunnel form two water channel, the entry end of drainage tunnel is provided with the lock chamber, be provided with the twice gate in the lock chamber, the gate is corresponding one by one with water channel, the drainage tunnel is close to river course one side and is equipped with drainage branch tunnel, drainage branch tunnel's entry end communicates in the drainage tunnel, the exit end communicates in the river course, be equipped with the dismountable interim shutoff body in the drainage tunnel, the low reaches of drainage branch tunnel entry end are located in the cooperation of the interim shutoff body.

Description

The discharge structure of slag field is built for blocking disconnected cheuch
Technical field
The utility model relates to a kind of discharge structure building slag field for blocking disconnected cheuch, belongs to Hydraulic and Hydro-Power Engineering field.
Background technology
Currently, China's construction of hydropower facilities is concentrated mainly on western high-mountain gorge areas, when building Hydropower Buildings, needs substantial amounts of abandoning Slag needs to deposit.At high-mountain gorge areas, available place and limited, it is generally required to leave on small-sized river course or raceway groove, And occupied river course or raceway groove typically have current to pass through, and therefore, need to carry out ditch-water process before depositing waste.At high mountain Narrow valley region, ditch-water processes mainly takes checkdam to block the current in disconnected ditch, then by the way of water discharge tunnel carrying-off ditch-water.
After possessing slag condition due to slag field, Hydraulic and Hydro-Power Engineering major project just possesses execution conditions.When water discharge tunnel is longer, When engineering time is long, its duration directly influences the duration of major project.If can realize enabling part slag field in advance, make water power Project possesses local execution conditions in advance, and this will save the whole project construction duration, and especially have the engineering that the completion time of project is urgent Important meaning.
Utility model content
Technical problem to be solved in the utility model is: provides a kind of discharge structure building slag field for blocking disconnected cheuch, works as row When water tunnel length length, construction period are crossed long, slag field can be used with pre-cooling.
The draining building slag field for blocking disconnected cheuch by solving above-mentioned technical problem the utility model be the technical scheme is that is tied Structure, including the checkdam arranged along river course width, river course bank is additionally provided with arrival end and connects with checkdam upper river, goes out The water discharge tunnel that mouth end connects with checkdam downstream river course, the base plate of water discharge tunnel is provided with partition wall along water discharge tunnel length direction, makes Obtaining water discharge tunnel formation two and cross aquaporin, the arrival end of water discharge tunnel is provided with lock chamber, is provided with twice gate, lock in lock chamber Door is the most corresponding with crossing aquaporin, and water discharge tunnel is provided with draining near side, river course and props up hole, and draining is propped up the arrival end in hole and is communicated in Water discharge tunnel, the port of export are communicated in river course, are provided with detachable temporary plugging body in water discharge tunnel, and temporary plugging body coordinates to be located at The downstream of hole arrival end is propped up in draining.
Further: partition wall is vertically installed in the center position of water discharge tunnel base plate.
The construction procedure of this discharge structure is:
A, build that hole is propped up in draining, water discharge tunnel arranges the upstream portion of temporary plugging body, and temporary plugging body be set at water discharge tunnel, Prop up hole by draining, water discharge tunnel arranges the upstream portion of temporary plugging body and crosses stream;
B, build checkdam, draining is propped up hole and is arranged the downstream part of temporary plugging body;
C, close the gate away from side, river course in lock chamber so that current cross aquaporin and row from water discharge tunnel near side, river course Water props up hole to be passed through;Remove the temporary plugging body away from side, river course in water discharge tunnel so that water discharge tunnel is away from the mistake of side, river course Aquaporin connects;Then open the gate away from side, river course in lock chamber, and close the gate of close side, river course in lock chamber, make Obtain current to pass through away from the aquaporin of crossing of side, river course from water discharge tunnel, remove the temporary plugging near side, river course in water discharge tunnel Body so that the water discharge tunnel aquaporin of crossing near side, river course connects;Build at water discharge tunnel sidewall and prop up hole and enter for blocking draining The occluding body of mouth end, whole piece water discharge tunnel is complete to be built, and possesses stream condition.
Step C is preferably carried out in dry season.
The beneficial effects of the utility model are: during enforcement, prop up hole by draining, water discharge tunnel arranges the upstream portion of temporary plugging body When dividing stream, the river course between hole is propped up in checkdam and draining or raceway groove part gets final product slag, enables this part slag field in advance;Draining is propped up Hole early stage can accelerate water discharge tunnel construction speed, it is achieved the effect that a hole is multiplex as working tunnel.
Accompanying drawing explanation
Fig. 1 is plane of the present utility model;
Fig. 2 is the partial view of water discharge tunnel arrival end;
Fig. 3 is the partial view that hole arrival end is propped up in draining;
Figure marks: 1-checkdam, 2-water discharge tunnel, 3-partition wall, 4-lock chamber, 5-gate, hole is propped up in 6-draining, 7-seals temporarily Stifled body, 8-occluding body.
Detailed description of the invention
For ease of understanding and implementing the utility model, select preferred embodiment of the present utility model to combine accompanying drawing and be described further.
As shown in FIG. 1 to 3, the utility model include along river course width arrange checkdam 1, river course bank be additionally provided with into The mouth water discharge tunnel 2 that end connects with checkdam 1 upper river, the port of export connects with checkdam 1 downstream river course, water discharge tunnel 2 Base plate be provided with partition wall 3 along water discharge tunnel 2 length direction so that water discharge tunnel 2 formed two cross aquaporins, water discharge tunnels 2 Arrival end be provided with lock chamber 4, lock chamber 4 is provided with twice gate 5, gate 5 is the most corresponding with crossing aquaporin, draining tunnel Hole 2 is provided with draining near side, river course and props up hole 6, and draining props up that the arrival end in hole 6 is communicated in water discharge tunnel 2, the port of export is communicated in river Road, is provided with detachable temporary plugging body 7 in water discharge tunnel 2, temporary plugging body 7 cooperation is located at draining and is propped up hole 6 arrival end Downstream.
Preferably, partition wall 3 is vertically installed in the center position of water discharge tunnel 2 base plate so that two flows crossing aquaporin are identical, More reasonable structure.And partition wall 2 height can determine according to water flow in dry season, should make partition wall 2 side can meet cross dry season stream want Ask.Temporary plugging body 7 is located at draining and is propped up the downstream of hole 6 arrival end, and hole 6 arrival end is propped up in distance draining a segment distance, to adjust Whole water discharge tunnel 2 enters draining and props up the fluidised form of hole 6 current.
Draining is propped up hole 6 and is arranged that should meet draining props up channel definition between hole 6 port of export and checkdam 1 and meet early stage slag requirement, And hole 6 length is propped up in shortening water discharge tunnel 2 top half length and draining as far as possible.Draining is propped up hole 6 and is arranged at water discharge tunnel 2 temporarily When the upstream portion of occluding body 7 is constructed, water discharge tunnel construction speed can be accelerated, it is achieved a hole is multiplex as working tunnel Effect.
The construction procedure of this discharge structure is:
A, build that hole 6 is propped up in draining, water discharge tunnel 2 arranges the upstream portion of temporary plugging body 7, and arrange at water discharge tunnel 2 and face Time occluding body 7, prop up hole 6 by draining, water discharge tunnel 2 arranges the upstream portion of temporary plugging body 7 and crosses stream;
B, build checkdam 1, draining is propped up hole 6 and is arranged the downstream part of temporary plugging body 7;
Away from the gate 5 of side, river course in C, closedown lock chamber 4 so that current lead near the water of crossing of side, river course from water discharge tunnel 2 Road and draining are propped up hole 6 and are passed through;Remove the temporary plugging body 7 away from side, river course in water discharge tunnel 2 so that water discharge tunnel 2 is remote Aquaporin of crossing from side, river course connects;Then open the gate 5 away from side, river course in lock chamber 4, and close in lock chamber 4 and lean on The gate 5 of nearly side, river course so that current pass through away from the aquaporin of crossing of side, river course from water discharge tunnel 2, remove water discharge tunnel 2 In near the temporary plugging body 7 of side, river course so that water discharge tunnel 2 crosses aquaporin connection near side, river course;At draining tunnel Hole 2 sidewall builds the occluding body 8 propping up hole 6 arrival end for blocking draining, and complete the building of whole piece water discharge tunnel 2 possessed stream condition.
Step C is preferably carried out in dry season.So can reduce partition wall and tunnel scale, save construction cost.

Claims (2)

1. it is used for blocking disconnected cheuch and builds the discharge structure of slag field, including the checkdam (1) arranged along river course width, its feature Be: river course bank be additionally provided with arrival end connect with checkdam (1) upper river, the port of export and checkdam (1) downstream river course The water discharge tunnel (2) of connection, the base plate of water discharge tunnel (2) is provided with partition wall (3) along water discharge tunnel (2) length direction so that Water discharge tunnel (2) forms two and crosses aquaporin, and the arrival end of water discharge tunnel (2) is provided with lock chamber (4), and lock chamber sets in (4) Being equipped with twice gate (5), gate (5) is the most corresponding with crossing aquaporin, and water discharge tunnel (2) is provided with row near side, river course Water props up hole (6), and draining props up that the arrival end in hole (6) is communicated in water discharge tunnel (2), the port of export is communicated in river course, water discharge tunnel (2) Inside being provided with detachable temporary plugging body (7), temporary plugging body (7) cooperation is located at draining and is propped up the downstream of hole (6) arrival end.
2. it is used for blocking disconnected cheuch as claimed in claim 1 and builds the discharge structure of slag field, it is characterised in that: partition wall (3) hangs down Directly it is arranged at the center position of water discharge tunnel (2) base plate.
CN201620300350.4U 2016-04-12 2016-04-12 A drainage structures for blocking disconnected valley construction sediment field Withdrawn - After Issue CN205501940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620300350.4U CN205501940U (en) 2016-04-12 2016-04-12 A drainage structures for blocking disconnected valley construction sediment field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620300350.4U CN205501940U (en) 2016-04-12 2016-04-12 A drainage structures for blocking disconnected valley construction sediment field

Publications (1)

Publication Number Publication Date
CN205501940U true CN205501940U (en) 2016-08-24

Family

ID=56736676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620300350.4U Withdrawn - After Issue CN205501940U (en) 2016-04-12 2016-04-12 A drainage structures for blocking disconnected valley construction sediment field

Country Status (1)

Country Link
CN (1) CN205501940U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672208A (en) * 2016-04-12 2016-06-15 中国电建集团成都勘测设计研究院有限公司 Water drainage structure used for cutting off valley to construct slag yard and construction method of water drainage structure
CN109356097A (en) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 The water discharge tunnel makeup of the imports for ditch water process

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672208A (en) * 2016-04-12 2016-06-15 中国电建集团成都勘测设计研究院有限公司 Water drainage structure used for cutting off valley to construct slag yard and construction method of water drainage structure
CN105672208B (en) * 2016-04-12 2017-07-07 中国电建集团成都勘测设计研究院有限公司 The discharge structure and its construction method of slag are built for blocking disconnected cheuch
CN109356097A (en) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 The water discharge tunnel makeup of the imports for ditch water process
CN109356097B (en) * 2018-11-29 2023-09-19 中国电建集团成都勘测设计研究院有限公司 A drainage tunnel import structure for ditch water treatment

Similar Documents

Publication Publication Date Title
CN105672208B (en) The discharge structure and its construction method of slag are built for blocking disconnected cheuch
CN205501940U (en) A drainage structures for blocking disconnected valley construction sediment field
CN106930262B (en) Province pond is overlapped high-lift lock
CN105369784B (en) Ditch water process scupper structure and ditch water process water discharge method
CN205712455U (en) In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake
CN207485466U (en) Gas at upper corner drainage device during high methane coal working face is just adopted
CN107858990B (en) Diversion construction method of arrangement structure of canyon area high dam ditch water treatment engineering
CN205259201U (en) Device is arranged in accuse of tunnel groundwater
CN108661674A (en) A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device
CN108677892A (en) Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole
CN204715318U (en) Diversion tunnel gate shaft structure in mountain
CN110685256B (en) Structure using hydropower station pressure pipeline construction branch tunnel as maintenance channel and construction method
CN106759161A (en) A kind of big cross section diversion tunnel plugging structure and construction method by stages
CN102296962B (en) Adverse slope excavating construction method of large-section tunnel in water-rich tunnel section
CN108316259A (en) Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method
CN204662388U (en) Diversion tunnel shutoff head exhaust structure
CN112030886A (en) Diversion channel arrangement method combining diversion channel with bottom transparent navigation wall
CN105178268A (en) Construction method and structure for combining diversion tunnel and flood discharge tunnel
CN203891831U (en) Double-pipe aggregate pouring device with orifice
CN208252157U (en) A kind of dual-drainage structure of Tunnel Karst crevice water
CN104264642B (en) The scupper processed for ditch-water and water discharge method
CN206189365U (en) A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour
CN203383853U (en) Buffering system for solving problem of insufficient drainage ability of tunnel central ditch
CN203383822U (en) Seepage-proofing well wall
CN208965520U (en) Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160824

Effective date of abandoning: 20170707