CN205501940U - A drainage structures for blocking disconnected valley construction sediment field - Google Patents
A drainage structures for blocking disconnected valley construction sediment field Download PDFInfo
- Publication number
- CN205501940U CN205501940U CN201620300350.4U CN201620300350U CN205501940U CN 205501940 U CN205501940 U CN 205501940U CN 201620300350 U CN201620300350 U CN 201620300350U CN 205501940 U CN205501940 U CN 205501940U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- water discharge
- river course
- discharge tunnel
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to a drainage structures for blocking disconnected valley construction sediment field. The utility model discloses an along the river, say the checkdam that width direction set up, river course coast still is equipped with entry end and checkdam upper river intercommunication, the drainage tunnel of exit end and checkdam low reaches river course intercommunication, the bottom plate of drainage tunnel is equipped with the partition wall along drainage tunnel length direction, make the drainage tunnel form two water channel, the entry end of drainage tunnel is provided with the lock chamber, be provided with the twice gate in the lock chamber, the gate is corresponding one by one with water channel, the drainage tunnel is close to river course one side and is equipped with drainage branch tunnel, drainage branch tunnel's entry end communicates in the drainage tunnel, the exit end communicates in the river course, be equipped with the dismountable interim shutoff body in the drainage tunnel, the low reaches of drainage branch tunnel entry end are located in the cooperation of the interim shutoff body.
Description
Technical field
The utility model relates to a kind of discharge structure building slag field for blocking disconnected cheuch, belongs to Hydraulic and Hydro-Power Engineering field.
Background technology
Currently, China's construction of hydropower facilities is concentrated mainly on western high-mountain gorge areas, when building Hydropower Buildings, needs substantial amounts of abandoning
Slag needs to deposit.At high-mountain gorge areas, available place and limited, it is generally required to leave on small-sized river course or raceway groove,
And occupied river course or raceway groove typically have current to pass through, and therefore, need to carry out ditch-water process before depositing waste.At high mountain
Narrow valley region, ditch-water processes mainly takes checkdam to block the current in disconnected ditch, then by the way of water discharge tunnel carrying-off ditch-water.
After possessing slag condition due to slag field, Hydraulic and Hydro-Power Engineering major project just possesses execution conditions.When water discharge tunnel is longer,
When engineering time is long, its duration directly influences the duration of major project.If can realize enabling part slag field in advance, make water power
Project possesses local execution conditions in advance, and this will save the whole project construction duration, and especially have the engineering that the completion time of project is urgent
Important meaning.
Utility model content
Technical problem to be solved in the utility model is: provides a kind of discharge structure building slag field for blocking disconnected cheuch, works as row
When water tunnel length length, construction period are crossed long, slag field can be used with pre-cooling.
The draining building slag field for blocking disconnected cheuch by solving above-mentioned technical problem the utility model be the technical scheme is that is tied
Structure, including the checkdam arranged along river course width, river course bank is additionally provided with arrival end and connects with checkdam upper river, goes out
The water discharge tunnel that mouth end connects with checkdam downstream river course, the base plate of water discharge tunnel is provided with partition wall along water discharge tunnel length direction, makes
Obtaining water discharge tunnel formation two and cross aquaporin, the arrival end of water discharge tunnel is provided with lock chamber, is provided with twice gate, lock in lock chamber
Door is the most corresponding with crossing aquaporin, and water discharge tunnel is provided with draining near side, river course and props up hole, and draining is propped up the arrival end in hole and is communicated in
Water discharge tunnel, the port of export are communicated in river course, are provided with detachable temporary plugging body in water discharge tunnel, and temporary plugging body coordinates to be located at
The downstream of hole arrival end is propped up in draining.
Further: partition wall is vertically installed in the center position of water discharge tunnel base plate.
The construction procedure of this discharge structure is:
A, build that hole is propped up in draining, water discharge tunnel arranges the upstream portion of temporary plugging body, and temporary plugging body be set at water discharge tunnel,
Prop up hole by draining, water discharge tunnel arranges the upstream portion of temporary plugging body and crosses stream;
B, build checkdam, draining is propped up hole and is arranged the downstream part of temporary plugging body;
C, close the gate away from side, river course in lock chamber so that current cross aquaporin and row from water discharge tunnel near side, river course
Water props up hole to be passed through;Remove the temporary plugging body away from side, river course in water discharge tunnel so that water discharge tunnel is away from the mistake of side, river course
Aquaporin connects;Then open the gate away from side, river course in lock chamber, and close the gate of close side, river course in lock chamber, make
Obtain current to pass through away from the aquaporin of crossing of side, river course from water discharge tunnel, remove the temporary plugging near side, river course in water discharge tunnel
Body so that the water discharge tunnel aquaporin of crossing near side, river course connects;Build at water discharge tunnel sidewall and prop up hole and enter for blocking draining
The occluding body of mouth end, whole piece water discharge tunnel is complete to be built, and possesses stream condition.
Step C is preferably carried out in dry season.
The beneficial effects of the utility model are: during enforcement, prop up hole by draining, water discharge tunnel arranges the upstream portion of temporary plugging body
When dividing stream, the river course between hole is propped up in checkdam and draining or raceway groove part gets final product slag, enables this part slag field in advance;Draining is propped up
Hole early stage can accelerate water discharge tunnel construction speed, it is achieved the effect that a hole is multiplex as working tunnel.
Accompanying drawing explanation
Fig. 1 is plane of the present utility model;
Fig. 2 is the partial view of water discharge tunnel arrival end;
Fig. 3 is the partial view that hole arrival end is propped up in draining;
Figure marks: 1-checkdam, 2-water discharge tunnel, 3-partition wall, 4-lock chamber, 5-gate, hole is propped up in 6-draining, 7-seals temporarily
Stifled body, 8-occluding body.
Detailed description of the invention
For ease of understanding and implementing the utility model, select preferred embodiment of the present utility model to combine accompanying drawing and be described further.
As shown in FIG. 1 to 3, the utility model include along river course width arrange checkdam 1, river course bank be additionally provided with into
The mouth water discharge tunnel 2 that end connects with checkdam 1 upper river, the port of export connects with checkdam 1 downstream river course, water discharge tunnel 2
Base plate be provided with partition wall 3 along water discharge tunnel 2 length direction so that water discharge tunnel 2 formed two cross aquaporins, water discharge tunnels 2
Arrival end be provided with lock chamber 4, lock chamber 4 is provided with twice gate 5, gate 5 is the most corresponding with crossing aquaporin, draining tunnel
Hole 2 is provided with draining near side, river course and props up hole 6, and draining props up that the arrival end in hole 6 is communicated in water discharge tunnel 2, the port of export is communicated in river
Road, is provided with detachable temporary plugging body 7 in water discharge tunnel 2, temporary plugging body 7 cooperation is located at draining and is propped up hole 6 arrival end
Downstream.
Preferably, partition wall 3 is vertically installed in the center position of water discharge tunnel 2 base plate so that two flows crossing aquaporin are identical,
More reasonable structure.And partition wall 2 height can determine according to water flow in dry season, should make partition wall 2 side can meet cross dry season stream want
Ask.Temporary plugging body 7 is located at draining and is propped up the downstream of hole 6 arrival end, and hole 6 arrival end is propped up in distance draining a segment distance, to adjust
Whole water discharge tunnel 2 enters draining and props up the fluidised form of hole 6 current.
Draining is propped up hole 6 and is arranged that should meet draining props up channel definition between hole 6 port of export and checkdam 1 and meet early stage slag requirement,
And hole 6 length is propped up in shortening water discharge tunnel 2 top half length and draining as far as possible.Draining is propped up hole 6 and is arranged at water discharge tunnel 2 temporarily
When the upstream portion of occluding body 7 is constructed, water discharge tunnel construction speed can be accelerated, it is achieved a hole is multiplex as working tunnel
Effect.
The construction procedure of this discharge structure is:
A, build that hole 6 is propped up in draining, water discharge tunnel 2 arranges the upstream portion of temporary plugging body 7, and arrange at water discharge tunnel 2 and face
Time occluding body 7, prop up hole 6 by draining, water discharge tunnel 2 arranges the upstream portion of temporary plugging body 7 and crosses stream;
B, build checkdam 1, draining is propped up hole 6 and is arranged the downstream part of temporary plugging body 7;
Away from the gate 5 of side, river course in C, closedown lock chamber 4 so that current lead near the water of crossing of side, river course from water discharge tunnel 2
Road and draining are propped up hole 6 and are passed through;Remove the temporary plugging body 7 away from side, river course in water discharge tunnel 2 so that water discharge tunnel 2 is remote
Aquaporin of crossing from side, river course connects;Then open the gate 5 away from side, river course in lock chamber 4, and close in lock chamber 4 and lean on
The gate 5 of nearly side, river course so that current pass through away from the aquaporin of crossing of side, river course from water discharge tunnel 2, remove water discharge tunnel 2
In near the temporary plugging body 7 of side, river course so that water discharge tunnel 2 crosses aquaporin connection near side, river course;At draining tunnel
Hole 2 sidewall builds the occluding body 8 propping up hole 6 arrival end for blocking draining, and complete the building of whole piece water discharge tunnel 2 possessed stream condition.
Step C is preferably carried out in dry season.So can reduce partition wall and tunnel scale, save construction cost.
Claims (2)
1. it is used for blocking disconnected cheuch and builds the discharge structure of slag field, including the checkdam (1) arranged along river course width, its feature
Be: river course bank be additionally provided with arrival end connect with checkdam (1) upper river, the port of export and checkdam (1) downstream river course
The water discharge tunnel (2) of connection, the base plate of water discharge tunnel (2) is provided with partition wall (3) along water discharge tunnel (2) length direction so that
Water discharge tunnel (2) forms two and crosses aquaporin, and the arrival end of water discharge tunnel (2) is provided with lock chamber (4), and lock chamber sets in (4)
Being equipped with twice gate (5), gate (5) is the most corresponding with crossing aquaporin, and water discharge tunnel (2) is provided with row near side, river course
Water props up hole (6), and draining props up that the arrival end in hole (6) is communicated in water discharge tunnel (2), the port of export is communicated in river course, water discharge tunnel (2)
Inside being provided with detachable temporary plugging body (7), temporary plugging body (7) cooperation is located at draining and is propped up the downstream of hole (6) arrival end.
2. it is used for blocking disconnected cheuch as claimed in claim 1 and builds the discharge structure of slag field, it is characterised in that: partition wall (3) hangs down
Directly it is arranged at the center position of water discharge tunnel (2) base plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620300350.4U CN205501940U (en) | 2016-04-12 | 2016-04-12 | A drainage structures for blocking disconnected valley construction sediment field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620300350.4U CN205501940U (en) | 2016-04-12 | 2016-04-12 | A drainage structures for blocking disconnected valley construction sediment field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205501940U true CN205501940U (en) | 2016-08-24 |
Family
ID=56736676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620300350.4U Withdrawn - After Issue CN205501940U (en) | 2016-04-12 | 2016-04-12 | A drainage structures for blocking disconnected valley construction sediment field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205501940U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672208A (en) * | 2016-04-12 | 2016-06-15 | 中国电建集团成都勘测设计研究院有限公司 | Water drainage structure used for cutting off valley to construct slag yard and construction method of water drainage structure |
CN109356097A (en) * | 2018-11-29 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | The water discharge tunnel makeup of the imports for ditch water process |
-
2016
- 2016-04-12 CN CN201620300350.4U patent/CN205501940U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105672208A (en) * | 2016-04-12 | 2016-06-15 | 中国电建集团成都勘测设计研究院有限公司 | Water drainage structure used for cutting off valley to construct slag yard and construction method of water drainage structure |
CN105672208B (en) * | 2016-04-12 | 2017-07-07 | 中国电建集团成都勘测设计研究院有限公司 | The discharge structure and its construction method of slag are built for blocking disconnected cheuch |
CN109356097A (en) * | 2018-11-29 | 2019-02-19 | 中国电建集团成都勘测设计研究院有限公司 | The water discharge tunnel makeup of the imports for ditch water process |
CN109356097B (en) * | 2018-11-29 | 2023-09-19 | 中国电建集团成都勘测设计研究院有限公司 | A drainage tunnel import structure for ditch water treatment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672208B (en) | The discharge structure and its construction method of slag are built for blocking disconnected cheuch | |
CN205501940U (en) | A drainage structures for blocking disconnected valley construction sediment field | |
CN106930262B (en) | Province pond is overlapped high-lift lock | |
CN105369784B (en) | Ditch water process scupper structure and ditch water process water discharge method | |
CN205712455U (en) | In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake | |
CN207485466U (en) | Gas at upper corner drainage device during high methane coal working face is just adopted | |
CN107858990B (en) | Diversion construction method of arrangement structure of canyon area high dam ditch water treatment engineering | |
CN205259201U (en) | Device is arranged in accuse of tunnel groundwater | |
CN108661674A (en) | A kind of high hydraulic pressure tunnel sluicing voltage-dropping type is pre-buried to safeguard grouting device | |
CN108677892A (en) | Diversion tunnel working tunnel is used as reconstruction structure of the ecology for water hole | |
CN204715318U (en) | Diversion tunnel gate shaft structure in mountain | |
CN110685256B (en) | Structure using hydropower station pressure pipeline construction branch tunnel as maintenance channel and construction method | |
CN106759161A (en) | A kind of big cross section diversion tunnel plugging structure and construction method by stages | |
CN102296962B (en) | Adverse slope excavating construction method of large-section tunnel in water-rich tunnel section | |
CN108316259A (en) | Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method | |
CN204662388U (en) | Diversion tunnel shutoff head exhaust structure | |
CN112030886A (en) | Diversion channel arrangement method combining diversion channel with bottom transparent navigation wall | |
CN105178268A (en) | Construction method and structure for combining diversion tunnel and flood discharge tunnel | |
CN203891831U (en) | Double-pipe aggregate pouring device with orifice | |
CN208252157U (en) | A kind of dual-drainage structure of Tunnel Karst crevice water | |
CN104264642B (en) | The scupper processed for ditch-water and water discharge method | |
CN206189365U (en) | A water conservancy diversion block structure that is used for diversion tunnel shutoff body to pour | |
CN203383853U (en) | Buffering system for solving problem of insufficient drainage ability of tunnel central ditch | |
CN203383822U (en) | Seepage-proofing well wall | |
CN208965520U (en) | Diversion tunnel working tunnel is used as ecology for the reconstruction structure in water hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160824 Effective date of abandoning: 20170707 |