CN205712455U - In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake - Google Patents

In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake Download PDF

Info

Publication number
CN205712455U
CN205712455U CN201620314863.0U CN201620314863U CN205712455U CN 205712455 U CN205712455 U CN 205712455U CN 201620314863 U CN201620314863 U CN 201620314863U CN 205712455 U CN205712455 U CN 205712455U
Authority
CN
China
Prior art keywords
municipal drainage
hydraulic pressure
hydraulic
pressure gate
hydraulic brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620314863.0U
Other languages
Chinese (zh)
Inventor
托马斯·官力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hanside water technology (Shanghai) Co., Ltd
Original Assignee
German Hst Intelligent Drainage Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by German Hst Intelligent Drainage Technology Co Ltd filed Critical German Hst Intelligent Drainage Technology Co Ltd
Priority to CN201620314863.0U priority Critical patent/CN205712455U/en
Application granted granted Critical
Publication of CN205712455U publication Critical patent/CN205712455U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

In municipal drainage pipe network that this utility model relates to or draining river course, intelligent wash retains hydraulic brake, it applies in municipal drainage pipeline, Vatch basin and draining river course, including hydraulic brake housing, hydraulic pressure gate, hydraulic axis and flashboard gathering sill, pass through the technical program, inertial thinking of breaking the normal procedure designs, and can accurately regulate accumulation water body, and intellectuality carries out systematicness, preventative flushing to municipal drainage pipe network, prevent silting, anti-water-stop body from pouring in down a chimney;Equipment does not produce water resistance, does not affect water body flow, when there is power-off fault, hydraulic pressure gate can rely on own wt, automatically open downwards flashboard, drainage accident, the technical program will not be caused due to power failure to can be used for the erosion and deposition work of pipeline in municipal drainage pipe network, by remotely controlling, arranging erosion and deposition water level, timing need to carry out erosion and deposition work, and the self space of available city planting ductwork surely, rain flood is regulated and stored it can also be used to the reservoir storage in other draining river courses regulates.

Description

In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake
Technical field
This utility model relates to flow device for controlling water level in a kind of municipal drainage pipe network or draining river course, particularly relates to intelligent wash in a kind of municipal drainage pipe network or draining river course and retains hydraulic brake.
Background technology
In recent years, urban waterlogging is commonplace in the whole nation, and China has more than 600 city at present, doing statistics according to country is anti-, since 2008, the city flooded every year is all more than 130, within 2010, reaching 258,2013 is 234, occurs in that the awkward situation of city " seeing sea " again and again.Urban construction is fast-developing, and more existing municipal drainage facilities are not suitable for, cause pipeline local stoppages or impeded drainage, make sewage outflow phenomenon often occur.
Traditional Municipal drainage pipeline dredging method, have and manually draw clearly method, China is at present manually to draw clearly dredging, draw clearly workload big, generally to account for the 60-80% of whole municipal drainage pipeline maintenance work amount, use the instruments such as big ferrum spoon, spades, bamboo pole, inefficiency, labor intensity is big, and manual work potential safety hazard is many simultaneously, often has casualty accident to occur;Winch dredging method, equipment includes winch, pulley yoke etc., and it is mainly characterized by needing to wear bamboo chip from a well head to another one well head, the most manually to have gone into the well, work under bad environment, and work inconvenience also endangers workers ' health;High-pressure water jet desilting method, with a high-pressure injection car, water under high pressure is sent into jetting shower nozzle, and shower nozzle jetting backward, under reaction force acts, shower nozzle is made to travel forward together with sebific duct, when shower nozzle arrives downstream inspection shaft, and flexible pipe regained by winch, and the drift being washed in inspection shaft is siphoned away by suction-type sewer scavenger, this mode desilting equipment is expensive, and dredging operation is relatively costly.
In the prior art, waterpower dredging device in general sense is a kind of electric gate valve upwards opened or the gate being manually lifted up, the electric or hand gate upwardly opened, civil engineering needs to leave certain upper space on top, it is easy to park when gate upwardly opens, when having a power failure or break down, if gate is closed, cannot open in time, have and form the danger blocked water;Artificial starting gate, manpower is needed to open and close, time-consuming long, labor intensity is high, is not suitable for the pipe flushing of systematicness, bad environments in blocking pipeline, for avoiding health is produced impact, people are often unwilling to work in such circumstances in person, and this is also required to a kind of flush equipment automatically controlled and completes to wash away, prevent alluvial, it is to avoid the impeded drainage waterlogging phenomenon caused due to pipe network blocking.
Being upwardly open additionally, retain gate in tradition river course, when pipeline or box culvert position are the deepest, or time just below design surface of the street, traditional retains gate or due to fitting depth, or affects the reasons such as traffic above-ground during due to unlatching, it is impossible to install and use.
Utility model content
In view of this, main purpose of the present utility model is to provide intelligent wash in a kind of municipal drainage pipe network or draining river course to retain hydraulic brake, pass through the technical program, pumping equipment earth construction can be reduced with systematicness, planned and preventative pipeline is washed away, reduces the resistance that water body is produced by equipment in the duct, not only can realize automatic flushing, and the pipeline being prevented from causing due to power failure artificially blocks, and will not be to people, the land operations of car produces any impact.
In order to achieve the above object, the technical solution of the utility model is achieved in that
In a kind of municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake, including mounting structure well and municipal drainage pipeline, apply in municipal drainage pipeline and Vatch basin and draining river course, described mounting structure well both sides are connected with municipal drainage pipeline respectively, also include hydraulic brake housing, hydraulic pressure gate, hydraulic axis and flashboard gathering sill, both sides and the bottom of described hydraulic brake housing are respectively arranged with flashboard gathering sill, hydraulic pressure gate is inserted in the flashboard gathering sill on hydraulic brake housing, hydraulic axis is vertically arranged on hydraulic brake housing both sides, the movable end of two hydraulic axis is connected with hydraulic pressure gate respectively, hydraulic brake housing surrounding secondary last with mounting structure well pours fixing, mounting structure downhole be provided be available for hydraulic pressure gate move down unlatching space.
Being respectively arranged with sealing strip on two sides before and after described flashboard gathering sill, hydraulic pressure gate is inserted in flashboard gathering sill, and the sealing strip in flashboard gathering sill is pressed on the front and back of hydraulic pressure gate respectively, plays sealing and anti-leakage effect.
Described hydraulic pressure gate upper end can determine hydraulic pressure gate upper limb shape, curved or rectangle according to the true form of drainage pipeline networks, and hydraulic pressure gate is consistent with municipal drainage pipeline structure when opening, and does not produce water conservancy loss.
In the technical program, hydraulic pressure gate is opened downwards, it is not necessary to other surface structures, saves space.
In the technical program, the washing time in pipeline or river course can be set by user by gate according to the practical situation of pipeline, and adjusts the water-retention water yield fact.
Provide the benefit that after using technique scheme: in a kind of municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake, pass through the technical program, inertial thinking of breaking the normal procedure designs, can accurately regulate accumulation water body, and according to concrete weather condition and displacement, the savings water yield is adjusted, drainage pipeline in municipal drainage pipe network is carried out systematicness, controllability, preventative washes away, prevent silting, it is possible to be arranged on discharge outlet or open draining river course in case water-stop body pours in down a chimney;Equipment does not produce water resistance, does not affect water body flow;When power-off fault occurs, hydraulic pressure gate can rely on own wt, automatically flashboard is opened downwards, the phenomenon that blocks water, the technical program will not be caused the erosion and deposition work of the municipal drainage pipeline in municipal drainage pipe network is can be used for, by remotely controlling due to power failure, erosion and deposition water level is set, timing need to carry out erosion and deposition work surely, and utilizes the self space in municipal administration grid, work of regulating and storing rainwater flood.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model closed mode.
Fig. 2 is the cross section structural representation of Fig. 1.
Fig. 3 is the plan structure figure of utility model works state.
Fig. 4 is the diagrammatic side-view cross-sectional schematic diagram of Fig. 3.
Fig. 5 is duty gate structural representation when opening downwards.
In figure, 1 municipal drainage pipeline, 2 mounting structure wells, 3 sealing strips, 4 upper limb shapes, 5 hydraulic brake housings, 6 hydraulic pressure gates, 7 hydraulic axis, 8 flashboard gathering sills, 9 unlatching spaces.
Detailed description of the invention
Below in conjunction with accompanying drawing to this utility model being embodied as be described in further detail.
nullAs Figure 1-Figure 5,In municipal drainage pipe network that this utility model relates to or draining river course, intelligent wash retains hydraulic brake,Including mounting structure well 2 and municipal drainage pipeline 1,Apply in municipal drainage pipeline 1 and Vatch basin and draining river course,Described mounting structure well 2 both sides are connected with municipal drainage pipeline 1 respectively,Also include hydraulic brake housing 5、Hydraulic pressure gate 6、Hydraulic axis 7 and flashboard gathering sill 8,Both sides and the bottom of described hydraulic brake housing 5 are respectively arranged with flashboard gathering sill 8,Hydraulic pressure gate 6 is inserted in the flashboard gathering sill 8 on hydraulic brake housing 5,Hydraulic axis 7 is vertically arranged in hydraulic brake housing 5 left and right sides,The movable end of two hydraulic axis 7 is connected with hydraulic pressure gate 6 respectively,Hydraulic brake housing 5 surrounding secondary last with mounting structure well pours fixing,Mounting structure downhole is provided with and is available for hydraulic pressure gate 6 and moves down the space 9 of unlatching.
As further embodiment, it is respectively arranged with sealing strip 3 on two sides before and after described flashboard gathering sill 8, hydraulic pressure gate 6 is inserted in flashboard gathering sill 8, and the sealing strip 3 in flashboard gathering sill 8 is pressed on the front and back of hydraulic pressure gate 6 respectively, plays sealing and anti-leakage effect.
Described hydraulic pressure gate 6 upper end determines hydraulic pressure gate 6 upper limb shape 4, curved or short shape according to the true form of municipal drainage pipeline 1, and hydraulic pressure gate 6 is consistent with municipal drainage pipeline 1 structure when opening, and does not produce water conservancy loss.
At work, hydraulic axis 7 is controlled by being arranged on the switch board on ground, and in the case of normal drought stream, hydraulic pressure gate 6 drops at maximum opening, and sewage municipal drainage pipeline 1 in municipal drainage pipe network is flowed into downstream wastewater treatment plant and processes;When municipal drainage pipeline 1 is washed away erosion and deposition by needs, hydraulic pressure gate 6 is raised above under the effect of hydraulic axis 7, hydraulic pressure gate 6 water-retention height is set according to actual needs, form water-retention weir, upstream water body starts accumulation, when the water level of accumulation water body reaches design water level, signal is passed to switch board by level sensor, switch board commander's hydraulic axis 7 drives hydraulic pressure gate 6 rapidly moving downward, quickly open and reach maximum opening, abrupt release current form water wave, wash away municipal drainage pipeline 1, after having washed away, can be according to the working procedure set by practical situation and switch board, hydraulic pressure gate 6 is opened maximum opening, or it is re-closing off water-retention, repeatedly flushing pipe.
In municipal drainage pipe network, owing to municipal drainage pipeline 1 is longer, the coverage of once flushing is limited, depends on the head potential energy of accumulation, the technical program can be carried out multistage setting, and segmentation is rinsed.
When the technical program is applied in opening draining river course, by water level and traffic probe, hydraulic pressure gate 6 can rise under the effect of hydraulic axis 7 as required or decline;The height of hydraulic pressure gate 6 is set according to actual needs, forms water-retention weir, to the accumulation regulation of upstream water body, it is possible to rise according to hydraulic pressure gate 6 level of tail water situation, prevent flow backwards.
The above, preferable possible embodiments the most of the present utility model, it is not limited to scope of the present utility model.

Claims (3)

1. in a municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake, including mounting structure well and municipal drainage pipeline, apply in municipal drainage pipeline and Vatch basin and draining river course, described mounting structure both sides are connected with municipal drainage pipeline respectively, it is characterized in that, also include hydraulic brake housing, hydraulic pressure gate, hydraulic axis and flashboard gathering sill, both sides and the bottom of described hydraulic brake housing are respectively arranged with flashboard gathering sill, hydraulic pressure gate is inserted in the flashboard gathering sill on hydraulic brake housing, hydraulic axis is vertically arranged on hydraulic brake housing both sides, the movable end of two hydraulic axis is connected with hydraulic pressure gate respectively, hydraulic brake housing surrounding secondary last with mounting structure well pours fixing, mounting structure downhole is provided with and is available for hydraulic pressure gate and moves down the space of unlatching.
In municipal drainage pipe network the most according to claim 1 or draining river course, intelligent wash retains hydraulic brake, it is characterized in that, it is respectively arranged with sealing strip on two sides before and after described flashboard gathering sill, hydraulic pressure gate is inserted in flashboard gathering sill, sealing strip in flashboard gathering sill is pressed on the front and back of hydraulic pressure gate respectively, plays sealing and anti-leakage effect.
In municipal drainage pipe network the most according to claim 1 and 2 or draining river course, intelligent wash retains hydraulic brake, it is characterized in that, described hydraulic pressure gate upper end determines hydraulic pressure gate upper limb shape according to the true form of drainage pipeline networks, curved or rectangle, hydraulic pressure gate is consistent with municipal drainage pipeline structure when opening, and does not produce water conservancy loss.
CN201620314863.0U 2016-04-15 2016-04-15 In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake Active CN205712455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620314863.0U CN205712455U (en) 2016-04-15 2016-04-15 In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620314863.0U CN205712455U (en) 2016-04-15 2016-04-15 In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake

Publications (1)

Publication Number Publication Date
CN205712455U true CN205712455U (en) 2016-11-23

Family

ID=57307883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620314863.0U Active CN205712455U (en) 2016-04-15 2016-04-15 In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake

Country Status (1)

Country Link
CN (1) CN205712455U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403453A (en) * 2018-12-06 2019-03-01 武汉圣禹排水系统有限公司 A kind of flow adjustable gate, the well body structure and control system for installing the gate
CN110761395A (en) * 2019-11-27 2020-02-07 汩鸿(上海)环保工程设备有限公司 Large-scale impoundment washing door
CN113897917A (en) * 2021-10-12 2022-01-07 安徽福苗建设有限公司 River channel diversion plugging device for municipal hydraulic engineering and application method thereof
CN114045915A (en) * 2021-12-06 2022-02-15 北京清源华建环境科技有限公司 System that dams that has function of washing to rain sewage deposit in pipe network
CN115110627A (en) * 2022-06-09 2022-09-27 长江生态环保集团有限公司 Scheduling system and method for rainwater pipe network cleaning

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403453A (en) * 2018-12-06 2019-03-01 武汉圣禹排水系统有限公司 A kind of flow adjustable gate, the well body structure and control system for installing the gate
CN110761395A (en) * 2019-11-27 2020-02-07 汩鸿(上海)环保工程设备有限公司 Large-scale impoundment washing door
CN113897917A (en) * 2021-10-12 2022-01-07 安徽福苗建设有限公司 River channel diversion plugging device for municipal hydraulic engineering and application method thereof
CN114045915A (en) * 2021-12-06 2022-02-15 北京清源华建环境科技有限公司 System that dams that has function of washing to rain sewage deposit in pipe network
CN115110627A (en) * 2022-06-09 2022-09-27 长江生态环保集团有限公司 Scheduling system and method for rainwater pipe network cleaning

Similar Documents

Publication Publication Date Title
CN205712455U (en) In municipal drainage pipe network or draining river course, intelligent wash retains hydraulic brake
CN103410130B (en) Multi-purpose tunnel arrangement structure
WO2011018141A2 (en) Shaft power plant
CN201762694U (en) Dam flow guiding device
CN204919482U (en) Utilize steel pipe to clap quick block structure of diversion tunnel of door
CN203222771U (en) Sand and sludge discharge disturbance device
CN109853492B (en) Gate valve pipeline type fish passing method
CN209761279U (en) air bag type waterproof device for entrance and exit
CN103290804A (en) Method and structure for providing downstream ecological flow after gate locking of stream guidance water release structure
CN207582227U (en) A kind of improved road surface drainage device
CN203383853U (en) Buffering system for solving problem of insufficient drainage ability of tunnel central ditch
CN206815504U (en) A kind of self-cleaning storm detention tank based on water-jet
CN202718071U (en) Barrage structure capable of lowering silt of reservoir area
CN205895309U (en) Prevention of seepage water system for pitshaft driving
CN202000379U (en) Blocking device for reserved port on bottom plate of basement
CN205557473U (en) Remote control type floodwall dam gate
CN113186972A (en) Cement concrete pavement soil retaining device
CN203939009U (en) Checkdam
CN109208693B (en) Water taking and draining device for high-dam reservoir engineering
CN101654906A (en) Method for treating Yellow River and preventing flood
CN112030905A (en) Structure for emptying and taking water by using diversion tunnel and control method
CN203393688U (en) Multipurpose tunnel arrangement structure
CN209443431U (en) Water intake system
CN212561370U (en) Landscape drop dam with water storage and drainage functions
CN204212124U (en) The anti-flood system of impact type unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200410

Address after: Room a2148, building 3, No.235 Yuanhe Road, Baoshan District, Shanghai

Patentee after: Hanside water technology (Shanghai) Co., Ltd

Address before: Messed, Germany

Patentee before: HST SYSTEMTECHNIK GMBH AND CO KG