CN205499759U - Train piles up conveyer - Google Patents
Train piles up conveyer Download PDFInfo
- Publication number
- CN205499759U CN205499759U CN201620088931.6U CN201620088931U CN205499759U CN 205499759 U CN205499759 U CN 205499759U CN 201620088931 U CN201620088931 U CN 201620088931U CN 205499759 U CN205499759 U CN 205499759U
- Authority
- CN
- China
- Prior art keywords
- train
- subframe
- carriage
- link
- conveying arrangement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a train piles up conveyer, including at least one braced frame, braced frame include the carriage that is used for bearing the location train of a plurality of perpendicular range upon range of settings, set up the support column at between carriage adjacent two about, the carriage include the link and correspond the fixed wheel alignment frame that sets up at the link both ends, wheel alignment frame including two subframes of the separation left and right sides, the opposite side of two subframes be formed with side flange with through bolt fixed connection correspondingly, the interior side of subframe be used for bearing the weight of the train wheel. The utility model discloses in transit at the train, pile up the train through frame construction, make full use of cabin space, and the ship is insensitive to the weight of goods, with regard to like this great reduction the cost of transportation. The utility model discloses a frame construction adopts the mode of unit module concatenation the same basically to assemble together, and the train is fixed to every carriage in, compact structure.
Description
Technical field
This utility model relates to field of mechanical technique, particularly relates to a kind of train stacking conveying arrangement.
Background technology
The various train of open-top car, van, tank car, locomotive, motor train compartment etc. is when sea transport at present, for
Saving cost of transportation, what cost was minimum is the break-bulk carrier of backhaul, be not equipped with hierarchical structure inside this ship,
Only have a flat-bottom bin, and the highest side of a ship, and in existing means of transportation, for such ship flat
Cang Chu, places one layer of goods, goods has the biggest vacant space do not utilize, causes the wave in space
Take.Therefore some transport producer, has in board manufactured bigger non-removable framework, in order to place multilamellar
Goods, this frame structure complexity cost is the highest, and can not reuse, after first use transport return
The cost of boat is the highest, is therefore difficult to promote.
Meanwhile, according to the difference of train kind, the manufacture specification of framework also being had difference, this further results in
The increase of framework manufacturing cost, causes cost of transportation to remain high then.
Utility model content
The purpose of this utility model is for technological deficiency present in prior art, and provides a kind of train heap
Folded conveying arrangement.
Be the technical scheme is that by realizing the purpose of this utility model
A kind of train stacking conveying arrangement, including at least one support frame, described support frame includes many
The carriage in order to carry location train that individual stacked vertical is arranged, is arranged between two neighbouring carriages
Support column, described carriage includes link and the corresponding wheel alignment being fixedly installed on link two ends
Frame, described wheel alignment frame includes two subframes of the separation left and right sides, two described subframes
Opposite side has been correspondingly formed side adpting flange to be bolted to connection, the inner side edge of described subframe
In order to carry train wheel.
Including multiple support frames being arranged side by side and being fixedly connected.
Described support column includes the cylinder that lower end and subframe are hinged, fixes with described cylinder upper end and is connected
Altitude mixture control section, the top of described altitude mixture control section is provided with snap close, with described on described subframe
Snap close be correspondingly provided with lockhole and be connected with the fixing of bottom subframe with the subframe realizing top.
Described link includes two longitudinal beam connecteds and the multiple connection horizontal strokes being arranged between two longitudinal beam connecteds
Beam, described longitudinal beam connected two ends and subframe are correspondingly provided with holding adpting flange to be bolted
Connect, the end adpting flange on described subframe is provided with many group connecting holes to mate different train width
Degree.
The described subframe left and right sides the most outwardly is formed with one or two connecting portion, described
Support column lower end accordingly with the connecting portion one_to_one corresponding hinge of the subframe of the carriage in addition to top layer carriage
Connect.
Described subframe rear and front end is respectively formed with end adpting flange, outside described subframe before and after
Two ends are correspondingly formed slot and plate to realize the location of two adjacent wheel alignment framves.
A kind of way of transportation utilizing train stacking conveying arrangement, comprises the following steps,
1) according to the height of the horizontal spacing of type adjustment subframe, longitudinal pitch and the support column of train,
2) bottom the freight house of steamer, be fixedly installed the carriage of bottom, adjacent subframe is fixing connect and with
Steamer bundlees, and is fixed on the most one by one on carriage by lifting train,
3) support column erected and fix, the carriage of assembling last layer, lift and fix train;
4) step 3 is repeated) until loading the train of predetermined number of layers.
Described steamer is roll-on-roll-off ship, the break-bulk carrier maked a return voyage.
Compared with prior art, the beneficial effects of the utility model are:
1. this utility model is in train transports, and is stacked by train by frame structure, makes full use of cabin empty
Between, and ship is insensitive to the weight of goods, and cost of transportation is thus greatly reduced.
Frame structure the most of the present utility model uses the mode of essentially identical unit module splicing to be assembled into one
Rising, train is fixed in each carriage, compact conformation.Each support frame is led to adjacent support frame
Crossing bolt flange structure to be attached, final whole frame structure connects into an entirety, and overall structure is stable
Property is the strongest, it is ensured that transportation safety.
3. support frame is divided into two-layer or three layers, and top layer carriage does not has support column, simplifies structure.Below
Double-layer structure identical, which increase versatility and the interchangeability of structure.
The support column of two the most adjacent support frames is when being spliced into frame structure, and support column is mutual mistake
Opening, two support columns have shared a support column space, and the width dimensions of the most whole framework decreases, joint
Save capacity.Meanwhile, the outside of side support frame uses dual-gripper rod structure, and this structure is not wasting storehouse
The stability of structure is added on the premise of appearance.
The link of the most each support frame is to be customized according to each vehicle, has fully adapted to different length
The dimensional requirement of train, meanwhile, each carriage is played the effect of reinforcing by link, and this fully ensures that
Train is in transportation, and train body will not be by extra stress, it is ensured that the safety of train transport.Even
The hold-carrying flange aperture connect on frame is kidney-shaped, it is ensured that link can be installed smoothly and easily.
6. there is altitude mixture control section on the main body top of support column, can carry out short transverse according to different trains and enter
Row sum-equal matrix, has the train adaptability of height.Altitude mixture control section top have employed in the connection of container snap close
The carriage in portion, this technology application maturation, operative is familiar with.
The most each wheel alignment frame uses two subframes to be spliced, and junction uses Flange joint, structure
Stable.Flange joint can increase width adjusting section, adapts to the transport of the train of different width.I.e., often
There are eight holes on the end adpting flange that individual subframe is corresponding with link, choose four holes and carry out even with link
Connect, it is ensured that when width adjusting, it is possible to use same link, decrease the quantity of valuable module, subtract
Lack manufacturing cost.Support column in each module can be carried out folding, and after folding, module formation one is put down
Plate, dimension width direction is less than container, and module can carry out frame structure by cheap Container Transport
Transport work back, it is ensured that equipment can quickly be reused.
8. what each module of carriage was identical can exchange use, it is ensured that structure highly versatile.
Accompanying drawing explanation
Fig. 1 show the structural representation of train of the present utility model stacking conveying arrangement;
Fig. 2 show the decomposition state structural representation shown in Fig. 1;
Fig. 3 show edge side carriage structural representation;
Fig. 4 show center edge portion side structure schematic diagram,
Fig. 5 show sub-frame structures schematic diagram;
Fig. 6 show link structural representation.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model is described in further detail.Should be appreciated that
Specific embodiment described herein, only in order to explain this utility model, is not used to limit this utility model.
As shown in figures 1 to 6, train of the present utility model stacking conveying arrangement include four successively laterally Boulez and
The fixing support frame 100 connected, described support frame 100 includes multiple, such as 2,3 or 4
The carriage 1 in order to carry location train 200 that vertical corresponding stacking is arranged up and down, is arranged on two neighbouring
Support column 2 between carriage, described carriage 1 includes that strip plate frame-shaped link 11 and correspondence are fixed and sets
Putting the wheel alignment frame 12 at link 11 two ends, described wheel alignment frame includes the two of the left and right sides of living apart
Individual subframe 121,122, the inner side of described subframe has been correspondingly formed side adpting flange 123 to pass through
Bolt connects fixing for two subframes, and the inner side edge of described subframe is in order to carry train wheel.Wherein,
The plate and frame structure that described subframe is made up of beam in length and breadth, its length is corresponding with train wheel, with train
Wheels all can be stopped on its inner side edge and be advisable.
Support frame of the present utility model uses frame structure and utilizes support column to realize stacking setting, can be with heap
Folded two-layer or three layers, and whole carriage is connected with into an entirety by different unit modules.
Train is fixed on each carriage, and structure is the compactest.And the unit constituting carriage can exchange use,
Ensure structure highly versatile, use can be exchanged, improve steamer space utilization rate.Meanwhile, these frameworks
Disassembled function, it is ensured that can high efficiency it be returned from overseas transport after having transported, it is achieved equipment is many
Secondary use.
Specifically, for improving the matching of train model, described link 11 includes two longitudinal beam connecteds
And the multiple connecting cross beams being arranged between two longitudinal beam connecteds, described longitudinal beam connected with on corresponding subframe
Being correspondingly provided with holding adpting flange 111 to be bolted to connection, the end on described subframe connects
Be provided with on flange 124 and organize connecting hole more, so, when mate different in width train wheel away from time, described
The side adpting flange of subframe connects and can add backing plate or flange form regulation section easily, and nationality is corresponding to change two
Inner side edge spacing with the different train wheel of coupling away from, meanwhile, by the end of regulation link with subframe
On adpting flange 124, the fitted bolt of different group connecting holes connects, and is suitable for the train of different in width.And,
Also can add easily between subframe and link flange form regulation section to adapt to the train of different length,
Improve the general of important module, reduce manufacturing cost and use cost.
Meanwhile, the described subframe left and right sides the most outwardly is formed with a connecting portion 125, described
Connecting portion by fixing the base plate being connected with subframe and being bent to form side by the outer side edges of base plate is the most vertical
Plate is constituted, and described support column 2 includes that lower end is passed through the bearing pin cylinder 21 hinged with connecting portion accordingly and leads to
Cross bolt and be fixedly connected on the altitude mixture control section 23 of cylinder upper end, described altitude mixture control Duan Weiyu pole section
Long-pending identical column is also provided with adpting flange, and corresponding different train height can be selected for different height and adjusts
Sections, described altitude mixture control section top is formed with container snap close 24, is provided with on the base plate of connecting portion
Corresponding connecting hole is to connect by container snap close is fixing, and container snap close is ripe workpiece, application maturation
Operative is familiar with.
Meanwhile, it is also formed with stopper slot 126 in described connecting portion 125 side, sets in described stopper slot
Being equipped with fixture block, described fixture block holds mutually with the support column of folded state or upright state, its state is effectively ensured
Stability.
In actual use, preferably it is arranged side by side about multiple support frames and phase according to the capacity of steamer
Fixing connection.Then according to the difference of position after connecting, during support frame is divided into fixing connection abreast and is positioned at
Multiple central supported frames 101,102 in portion and two collateral support frames 103,104 of the separation left and right sides, center
Carriage and collateral support frame structure are essentially identical, and each carriage all passes through bolt flange with adjacent carriage
Structure is attached, and the connecting portion that adjacent supports frame connects on the subframe of side is staggered front to back setting,
Achieve saving spatially, reduce the overall width of framework, the stability that beneficially raising is overall, meanwhile,
For ensureing the support strength outside collateral support frame, it is preferable that be provided with two outside the subframe of side support frame
Former and later two connecting portions individual, each connecting portion is correspondingly arranged support column to improve side supports stability and intensity,
Final whole frame structure will connect into an entirety, overall structure stability is the strongest, it is ensured that structure is in fortune
Saving capacity maximum under stable secured premise time defeated.
Further, for ease of two support columns that are crisscross arranged, described subframe rear and front end is formed respectively
There is end adpting flange, so can be installed by the indistinction selecting end adpting flange to realize module, reduce system
Cause this, improve installation effectiveness.Preferably, for improving the annexation between adjacent supports frame, improve simultaneously
Locating effect, has been correspondingly formed slot 128 and has inserted outside two ends before and after the described subframe left and right sides
Plate 129, plugs together corresponding with slot for corresponding for two carriage sides adjacent plate, and follow-up bolt connects convenient,
And the cooperation of slot plate improves longitudinal stability, and avoid bolt by shearing force, less change
Shape, it is ensured that dismounting is convenient.
This utility model utilizes the way of transportation of train stacking conveying arrangement, comprises the following steps,
1) by selecting different link, adding backing plate or extension, adjustment link between two subframes
Connection from subframe and match the train model that different altitude mixture control section couplings is corresponding,
2) bottom the freight house of steamer, be fixedly installed the carriage of bottom, adjacent subframe is fixing connect and with
Steamer bundlees, and is fixed on the most one by one on carriage by lifting train, and described steamer is make a return voyage
Roll-on-roll-off ship, break-bulk carrier.
3) support column erected and utilize fixture block to fix, the carriage of assembling last layer, lift and fix train.
The most according to circumstances one layer or two-layer carriage are being set to load more trains.
Train is passed through the rolling that cost is higher for what present train used when sea transport by this utility model
Shipment transport, and in break-bulk carrier transports, use the problem that a Rotating fields is placed and the conevying efficiency that causes is low,
Devising a set of structure being spliced into multilamellar by a framework, train is placed in the space of multistory frame structure
Way of transportation.After transport completes, framework is resolved into the unit that volume is little, by container or ship
By the transportation and packing mode of skeletal container etc., the junior unit of frame structure is transported back.And achieve framework assembling or
Dismounting and train lifting synchronization are carried out, and during train lifting, interference is few, and lifting is fixing more convenient, improves simultaneously
The efficiency of loading and unloading.
The above is only preferred implementation of the present utility model, it is noted that lead for this technology
For the those of ordinary skill in territory, on the premise of without departing from this utility model principle, it is also possible to make some
Improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.
Claims (6)
1. a train stacking conveying arrangement, it is characterised in that include at least one support frame, described
Support frame includes the carriage in order to carry location train that multiple stacked vertical is arranged, and is arranged on about two
The adjacent support column between carriage, described carriage includes that link and correspondence are fixedly installed on link
The wheel alignment frame at two ends, described wheel alignment frame includes two subframes of the separation left and right sides, described
The opposite side of two subframes be correspondingly formed side adpting flange to be bolted to connection, described
The inner side edge of subframe is in order to carry train wheel.
2. train stacking conveying arrangement as claimed in claim 1, it is characterised in that include multiple setting side by side
The support frame put and be fixedly connected.
3. train stacking conveying arrangement as claimed in claim 1, it is characterised in that described support column bag
Include the cylinder that lower end is hinged with subframe, fix the altitude mixture control section being connected with described cylinder upper end, described
The top of altitude mixture control section be provided with snap close, described subframe is correspondingly provided with described snap close
Lockhole is connected with the fixing of bottom subframe with the subframe realizing top.
4. train stacking conveying arrangement as claimed in claim 1, it is characterised in that described link bag
Include two longitudinal beam connecteds and the multiple connecting cross beams being arranged between two longitudinal beam connecteds, described longitudinal beam connected two
End with subframe on be correspondingly provided with end adpting flange to be bolted to connection, on described subframe
End adpting flange on be provided with many group connecting holes to mate different train width.
5. train stacking conveying arrangement as claimed in claim 1, it is characterised in that described subframe is left
Right both sides the most outwardly are formed with one or two connecting portion, described support column lower end accordingly with
The connecting portion one_to_one corresponding of the subframe of the carriage in addition to top layer carriage is hinged.
6. train stacking conveying arrangement as claimed in claim 4, it is characterised in that before described subframe
Rear two ends are respectively formed with end adpting flange, outside described subframe before and after two ends be correspondingly formed slotting
Groove and plate are to realize the location of two adjacent wheel alignment framves.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620088931.6U CN205499759U (en) | 2016-01-29 | 2016-01-29 | Train piles up conveyer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620088931.6U CN205499759U (en) | 2016-01-29 | 2016-01-29 | Train piles up conveyer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205499759U true CN205499759U (en) | 2016-08-24 |
Family
ID=56723711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620088931.6U Expired - Fee Related CN205499759U (en) | 2016-01-29 | 2016-01-29 | Train piles up conveyer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205499759U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105584724A (en) * | 2016-01-29 | 2016-05-18 | 杨昌懿 | Train stacking and transporting device and method |
-
2016
- 2016-01-29 CN CN201620088931.6U patent/CN205499759U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105584724A (en) * | 2016-01-29 | 2016-05-18 | 杨昌懿 | Train stacking and transporting device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10301107B2 (en) | Stacked collapsible container | |
RU2692273C2 (en) | Kit for vehicle assembly | |
CN107208609A (en) | Wind turbine nacelle | |
CN101559824B (en) | Transport platform, transport unit and method for stacking large cargo | |
CN103158726A (en) | Railway wagon compartment suitable for small limitation bound | |
CN101173531B (en) | Heightened chamber type combined house | |
CN100473564C (en) | Transportable cage of chassis frame of semi-trailer, and loading method | |
CN108502384B (en) | Detachable transport exchange box and boxing method | |
CN205931899U (en) | Transportation frame of large -scale goods of pile and have its transportation unit | |
CN110001695A (en) | A kind of railway piggyback transport car and its chassis | |
CN205499759U (en) | Train piles up conveyer | |
CN105584724A (en) | Train stacking and transporting device and method | |
CN201071547Y (en) | Folding type box combination house | |
CN105416882A (en) | Integrated transport tool for vehicle body large components of rail transit vehicle | |
CN201211921Y (en) | Large-sized freight transportation platform and transportation unit | |
CN208265019U (en) | A kind of commuting case detachably transported | |
CN100546883C (en) | A kind of pallet and the method for utilizing its piling cargo | |
CN201484824U (en) | Transportation device for bulky cargo | |
CN102390602A (en) | Double-layer dismountable multifunctional diesel engine transportation frame | |
CN214030154U (en) | Detachable cargo-carrying frame box | |
CN205076243U (en) | A packing frame for placing radiator entablature | |
CN201102577Y (en) | Piling device van-type semitrailer case body | |
CN202201360U (en) | Movable container house and container house transport mould | |
CN110139779B (en) | Transportation platform | |
CN207208139U (en) | Pin-connected panel LED display transport vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 Termination date: 20180129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |