CN205442567U - Steel -pipe pole operation platform - Google Patents

Steel -pipe pole operation platform Download PDF

Info

Publication number
CN205442567U
CN205442567U CN201620009236.6U CN201620009236U CN205442567U CN 205442567 U CN205442567 U CN 205442567U CN 201620009236 U CN201620009236 U CN 201620009236U CN 205442567 U CN205442567 U CN 205442567U
Authority
CN
China
Prior art keywords
flat ladder
rear end
brace
lifting rope
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620009236.6U
Other languages
Chinese (zh)
Inventor
刘奎
马建春
刘禹
段洪龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingan Power Supply Company State Grid East Inner Mongolia Electric Power Co ltd
State Grid Liaoning Electric Power Co Ltd
Original Assignee
Xingan Power Supply Company State Grid East Inner Mongolia Electric Power Co ltd
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xingan Power Supply Company State Grid East Inner Mongolia Electric Power Co ltd, State Grid Liaoning Electric Power Co Ltd filed Critical Xingan Power Supply Company State Grid East Inner Mongolia Electric Power Co ltd
Priority to CN201620009236.6U priority Critical patent/CN205442567U/en
Application granted granted Critical
Publication of CN205442567U publication Critical patent/CN205442567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a steel -pipe pole operation platform, oblique pull rod including the peaceful terraced front end of flat ladder, the middle part of flat ladder is equipped with support no. 1, flat ladder passes through support no. 1 and two fixed connection on the support with oblique pull rod, insulating panel has been laid on the front end surface of flat ladder, flat terraced rear end all is equipped with the surrounding rod device with oblique pull rod rear end, the surrounding rod device includes the surrounding rod staple bolt and rather than the assorted chain, on the steel pipe pole is all located through the surrounding rod device is fixed to flat ladder and pull rod to one side, flat ladder is close to the both sides of rear end and turns over the board through fixed being equipped with of hinge, the rear end that the other end that turns over the board passes through jack device and oblique pull rod links to each other, the upper end of pull rod is fixed and is equipped with the lifting rope link to one side, lifting rope link fixedly connected with lifting rope, and the lifting rope passes the pulley and links to each other with the ground handling personnel. The beneficial effect of the utility model: the utility model discloses can be fit for different specification model's steel pipe pole, can install fast, dismantle, satisfy the installation requirement of transportation and high altitude, can satisfy high altitude construction's special requirement, improve the operating efficiency.

Description

Steel pipe pole operation platform
Technical field
This utility model relates to power supply maintenance apparatus technical field, it particularly relates to a kind of steel pipe pole operation platform.
Background technology
The features such as steel pipe pole is attractive in appearance due to its structure, and floor space is few, and capital construction is convenient, are widely used to ultra-high-tension power transmission line, have particularly obtained using on a large scale around urban district.But current steel pipe pole exists operation difficult problem in maintenance, cross-arm is long and narrow and borrows force, and as a example by modal 110kV power line steel tuble pole, its cross arm end only has the width of 10 25 centimetres, and a length of 1.5 2.5 meters.Operating personnel is mobile operation difficulty on cross-arm, maintenance construction time the most inconvenient, a lot of events in operation cannot be carried out, and bucket arm vehicle can only be used to carry out operation, and the operation of bucket arm vehicle is bigger by environment site influence, therefore the normal service maintenance work of circuit is very limited.And some multi circuit transmission lines safe distance is inadequate, can only power failure operation.
For the problem in above-mentioned correlation technique, effective solution is the most not yet proposed.
Utility model content
The purpose of this utility model is to provide a kind of steel pipe pole operation platform, to overcome currently available technology above shortcomings.
For realizing above-mentioned technical purpose, the technical solution of the utility model is achieved in that
nullA kind of steel pipe pole operation platform,Including flat ladder,Described flat ladder front end is provided with brace,The middle part of described flat ladder is provided with support one,Described flat ladder is connected by support one is fixing with brace,The front-end surface of described flat ladder is laid with insulating sheet material,Described flat ladder rear end is connected by support two is fixing with brace rear end,It is provided with cross bar between described support one and support two,Described flat ladder rear end is equipped with railing device with brace rear end,Described railing device includes railing anchor ear and the chain matched with it,Described flat ladder and brace are all fixed on steel pipe pole by railing device,Described flat ladder is fixed with turnover panel near the both sides of rear end by hinge,The other end of described turnover panel is connected with the rear end of brace by jack device,The upper end of described brace is fixed with lifting rope link,Described lifting rope link is fixedly connected with lifting rope,And described lifting rope is connected through pulley with surface personnel.
Further, described lifting rope link is fixed at brace and puts down at the middle branch of ladder weight.
Further, described brace is fixed with, with the junction of flat ladder, the rope link that hangs down, and described vertical rope link is fixedly connected with the rope that hangs down.
The beneficial effects of the utility model: this utility model can be suitable for the steel pipe pole of different size model, energy Fast Installation, dismounting, meets transport and high-altitude installation requirement, can meet the particular/special requirement of work high above the ground, improves working performance.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment will be briefly described below, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation according to the steel pipe pole operation platform described in this utility model embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained, broadly fall into the scope of this utility model protection.
nullAs shown in Figure 1,According to a kind of steel pipe pole operation platform described in embodiment of the present utility model,Including flat ladder 1,Described flat terraced 1 front end is provided with brace 2,The described flat middle part of terraced 1 is provided with support 1,Described flat terraced 1 is connected by support 1 is fixing with brace 2,The described flat front-end surface of terraced 1 is laid with insulating sheet material 6,Described flat terraced 1 rear end is connected by support 28 is fixing with brace 2 rear end,It is provided with cross bar 13 between described support 1 and support 28,Described flat terraced 1 rear end and brace 2 rear end are equipped with railing device 14,Described railing device 14 includes railing anchor ear 15 and the chain 7 matched with it,Described flat terraced 1 and brace 2 be all fixed on steel pipe pole by railing device 14,It is characterized in that,Described flat terraced 1 is fixed with turnover panel 16 near the both sides of rear end by hinge 17,The other end of described turnover panel 16 is connected with the rear end of brace 2 by jack device 9,The upper end of described brace 2 is fixed with lifting rope link 10,Described lifting rope link 10 is fixedly connected with lifting rope 11,And described lifting rope 11 is connected through pulley 12 with surface personnel.
In the present embodiment, described lifting rope link 10 is fixed at brace 2 and puts down at the middle branch of terraced 1 weight.
In the present embodiment, described brace 2 is fixed with, with the junction of flat ladder 1, the rope link 4 that hangs down, and described vertical rope link 4 is fixedly connected with vertical rope 3.
Understand technique scheme of the present utility model for convenience, below by way of in specifically used mode, technique scheme of the present utility model is described in detail.
When specifically used, electric power maintenance vehicle first assembles after reaching the spot, flat terraced 1 each several part is fitted together, and at the anterior laying insulation board of flat terraced 1, then brace 2 is fixed with flat ladder 1, being fixed with the rope link 4 that hangs down one end of vertical rope 3, fixed with lifting rope link 10 one end of lifting rope 11, the other end of lifting rope 11 passes pulley 12.Then install, first carried by operator and be installed with the pulley 12 of lifting rope 11 and climb up steel pipe pole, pulley 12 is fixed on correct position, then is pulled lifting rope 11 by other operator of ground, by railing device 14, brace 2 peace ladder 1 is fixed on steel pipe pole.Followed by constructing, the operator on steel pipe pole walk on flat terraced 1 with cross bar 13, complete steel pipe and change insulator, change the upkeep operation project of the transmission lines of electricity such as stockbridge damper, replacing suspension clamp, repairing inspection hitch point peripheral guidewires.Operator, according to the needs of operation, can put down turnover panel 16 by jack device 9, adapt to the needs of diverse location.Hang down rope 3 for being connected with ground fixing device, so that this steel pipe pole operation platform is more firm.
In sum, by means of technique scheme of the present utility model, this utility model can be suitable for the steel pipe pole of different size model, energy Fast Installation, dismounting, meets transport and high-altitude installation requirement, can meet the particular/special requirement of work high above the ground, improves working performance.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (3)

  1. null1. a steel pipe pole operation platform,Including flat ladder (1),Described flat ladder (1) front end is provided with brace (2),The middle part of described flat ladder (1) is provided with support one (5),Described flat ladder (1) is connected by support one (5) is fixing with brace (2),The front-end surface of described flat ladder (1) is laid with insulating sheet material (6),Described flat ladder (1) rear end is connected by support two (8) is fixing with brace (2) rear end,It is provided with cross bar (13) between described support one (5) and support two (8),Described flat ladder (1) rear end and brace (2) rear end are equipped with railing device (14),Described railing device (14) includes railing anchor ear (15) and the chain (7) matched with it,Described flat ladder (1) and brace (2) are all fixed on steel pipe pole by railing device (14),It is characterized in that,Described flat ladder (1) is fixed with turnover panel (16) near the both sides of rear end by hinge (17),The other end of described turnover panel (16) is connected with the rear end of brace (2) by jack device (9),The upper end of described brace (2) is fixed with lifting rope link (10),Described lifting rope link (10) is fixedly connected with lifting rope (11),And described lifting rope (11) is connected through pulley (12) with surface personnel.
  2. Steel pipe pole operation platform the most according to claim 1, it is characterised in that described lifting rope link (10) is fixed at brace (2) and puts down at the middle branch of ladder (1) weight.
  3. Steel pipe pole operation platform the most according to claim 2, it is characterised in that described brace (2) is fixed with, with the junction of flat ladder (1), rope link (4) that hangs down, and described vertical rope link (4) is fixedly connected with the rope (3) that hangs down.
CN201620009236.6U 2016-01-05 2016-01-05 Steel -pipe pole operation platform Expired - Fee Related CN205442567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620009236.6U CN205442567U (en) 2016-01-05 2016-01-05 Steel -pipe pole operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620009236.6U CN205442567U (en) 2016-01-05 2016-01-05 Steel -pipe pole operation platform

Publications (1)

Publication Number Publication Date
CN205442567U true CN205442567U (en) 2016-08-10

Family

ID=56601173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620009236.6U Expired - Fee Related CN205442567U (en) 2016-01-05 2016-01-05 Steel -pipe pole operation platform

Country Status (1)

Country Link
CN (1) CN205442567U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602464A (en) * 2016-12-20 2017-04-26 国家电网公司 Power transmission line steel pipe tower work platform
CN107508535A (en) * 2017-08-08 2017-12-22 中国电建集团贵州工程公司 A kind of photovoltaic solar installation work high above the ground support and system
CN111561663A (en) * 2020-05-20 2020-08-21 福建省伟志地理信息科学研究院 Urban pipe network measuring device and measuring method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106602464A (en) * 2016-12-20 2017-04-26 国家电网公司 Power transmission line steel pipe tower work platform
CN107508535A (en) * 2017-08-08 2017-12-22 中国电建集团贵州工程公司 A kind of photovoltaic solar installation work high above the ground support and system
CN111561663A (en) * 2020-05-20 2020-08-21 福建省伟志地理信息科学研究院 Urban pipe network measuring device and measuring method thereof

Similar Documents

Publication Publication Date Title
CA2732544C (en) Mobile training trailer for electric transmission lines
CN103001146B (en) Usage method of steel pipe pole operation platform
CN205442567U (en) Steel -pipe pole operation platform
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN202206066U (en) Electric power live crossing frame
CN106229889A (en) A kind of transmission line of electricity lifting device for aerial wires
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN203255914U (en) Unit-typed curtain wall lifting device
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN206712336U (en) Shaft tower cable platform work protective cradle
CN107217912B (en) A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction
CN108625275A (en) A kind of stiffening girder of suspension bridge section installation method
CN209805306U (en) Simple cable paying-off support using bridge stand column
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN104876165A (en) Mobile mounting and maintenance platform of photovoltaic component
CN202007522U (en) Safety construction device for pole tower
CN202906301U (en) Steel-pipe pole operation platform
CN204859074U (en) Portable installation and maintenance platform of photovoltaic module
CN104895391A (en) External inserted cross arm connecting device for steel pipe rods
CN103414120B (en) Transmission pressure removes plastic foreign body fire attack device
CN205304091U (en) Bridge electric power erects strutting arrangement
CN203271221U (en) Self-standing type ground combined derrick with equipment platform
CN212486098U (en) Pipeline laying device for electric power installation
CN205992711U (en) A kind of new it is easily assembled formula Stainless steel tee device
CN201247925Y (en) Safety hanging stair for maintaining cable terminal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20170105

CF01 Termination of patent right due to non-payment of annual fee