CN202206066U - Electric power live crossing frame - Google Patents
Electric power live crossing frame Download PDFInfo
- Publication number
- CN202206066U CN202206066U CN2011202904290U CN201120290429U CN202206066U CN 202206066 U CN202206066 U CN 202206066U CN 2011202904290 U CN2011202904290 U CN 2011202904290U CN 201120290429 U CN201120290429 U CN 201120290429U CN 202206066 U CN202206066 U CN 202206066U
- Authority
- CN
- China
- Prior art keywords
- electric power
- frame
- bar
- power live
- overlap joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model provides an electric power live crossing frame, and belongs to an electric power device, which mainly comprises a substrate and a frame body. The electric power live crossing frame is characterized in that: the substrate is formed by overlap joint of an insulated vertical tube rod and horizontal tube rods; the horizontal tube rods are subjected to overlap joint to form a quadrilateral shape, and the vertical tube rod is positioned on the overlap joint position of the two horizontal tube rods; a stable tube rod is subjected to overlap joint along the diagonal line on the lateral side of the substrate; the frame body consists of insulated stand columns which are subjected to overlap joint on the substrate, and supporting tube rods are subjected to overlap joint between adjacent stand columns and among four square planes enclosed by the four stand columns, and the crossing frame is subjected to overlap joint in a splicing and buckling mode. The electric power live crossing frame is convenient in assembly, reliable in connection and flexible in application, and has the effects of high mechanical strength, light weight and convenience in transportation.
Description
Technical field
The utility model belongs to electric device, and particularly a kind of power circuit scissors crossing construction is with crossing over frame.
Background technology
Along with developing rapidly of industrial and agricultural production, power circuit construction construction is like a raging fire.The power circuit of various electric pressures is ubiquity circuit scissors crossing problem in construction; Particularly the newly-built relatively line electricity of working line is forced down; Newly-built circuit must be striden handing over above the working line; Must have a power failure when friendship is striden, cause the contradiction of power customer and power circuit construction construction.In circuit scissors crossing when construction,, the general employing crossed over frame, and it is conventional method that present leap frame is set up what continue to use always; Mainly be steel pipe pole (using the screw snapping), China fir, bamboo pole (using the iron wire colligation) built, exist time-consuming, take a lot of work, require great effort, inefficiency; Dangerous; Expense is high, poor stability, because of being nearly electric operation, is prone to danger.
Summary of the invention
The purpose of the utility model is to provide a kind of electric power live across frame of crossing over 110KV and following alive circuit and railway, highway, communication line that is applicable to.
The utility model is achieved in that
Electric power live across frame mainly comprises pedestal and support body, it is characterized in that: said pedestal is formed by the vertical duct bar and the transverse pipe bar overlap joint of insulation, and the transverse pipe bar is overlapped to form quadrangle, and the vertical duct bar is positioned at the lap-joint of two transverse pipe bars; Diagonal along the pedestal side is overlapped with stable pipe bar; Said support body is made up of the column of insulation of overlap joint on pedestal, is overlapped with stay tube pole between the adjacent upright posts and between the square plane that surrounds of four root posts.
After the utility model adopts said structure, adopt insulated pipes used moistureproof, high mechanical properties, through peg graft, the snapping mode is overlapped to form the power ride-through frame, and is easy for installation, connect reliable, applying flexible.Can realize multiple application combination according to the site operation needs, split freely that the support body height is easy to adjust.And can use no spillage of material repeatedly.Have mechanical strength height, in light weight, the effect being convenient to transport.
Description of drawings
Fig. 1 is a kind of structural representation of the utility model, and Fig. 2 is the user mode reference diagram of the utility model.
In the accompanying drawing, 1 is that vertical duct bar, 2 is the reinforced pipe bar for cross pipe bar, 9 for end face pipe bar, 8 for cable wind rope, 7 for stay tube pole, 6 for column, 5 for stable pipe bar, 4 for transverse pipe bar, 3.
Embodiment
Embodiment to the utility model elaborates below in conjunction with accompanying drawing.
As shown in Figure 1, the utility model is an electric power live across frame, mainly comprises pedestal, support body.Pedestal is formed with transverse pipe bar 2 overlap joints by the vertical duct bar 1 of insulation, and transverse pipe bar 2 is overlapped to form quadrangle, and vertical duct bar 1 is positioned at the lap-joint of two transverse pipe bars 2; Diagonal along the pedestal side is overlapped with stable pipe bar 3, forms stable tripod structure, improves the stabilization of support body, and guarantees that pedestal is perpendicular to the ground.Vertical duct bar 1 is unified with transverse pipe bar 2 models, is convenient to generally, improves practicality.Adopt between the transverse pipe bar 2 that overlaps and between transverse pipe bar 2 and the vertical duct bar 1 and peg graft and two kinds of forms of snapping; At the pipe boom end clasp is set during snapping, will manages bar through snap-hook structure and snap together; At the pipe boom end plug, slot are set respectively during grafting, the plug through cooperatively interacting, inserting slot construction are with together pipe lever connected.Said support body is made up of four root posts 4 of insulation of overlap joint on pedestal, is overlapped with stay tube pole 5 between the adjacent upright posts 4 and between the square plane that surrounds of four root posts 4.Stay tube pole 5 adopts frame structure or cross structure, also can adopt chi structure, and 4 on column 4 and column are combined together each other, guarantees the stable of whole leap frame.Also overlap through grafting and two kinds of forms of snapping between column 4 and the pedestal and between stay tube pole 5 and the column 4, bridging arrangement is identical with the overlapping mode of pedestal.Said pedestal and support body material all adopt high strength insulated tube pole stock, with the raising support strength, and guarantee insulation property.
When increase crossing over the height of frame, as shown in Figure 2, can on support body, overlap other support body again, analogize in proper order and reach the requirement height.When crossing over the frame height and surpass 20 meters, should be on support body column 4 middle parts and support body tractive cable wind rope 6, cable wind rope 6 fixes on the ground.End face at the superiors' support body is overlapped with end face pipe bar 7 and cross pipe bar 8 or inclined tube bar, is used to bind; Add the slip wheel shaft on the end face pipe bar 7, overhead ground wire or the lead being convenient to set up pass through, and cross over and lay the nylon wire protection between the frame.
During use, general circuit adopts four to cross over frame (two of every sides); When construction line and crossed line angle are big, adopts six leap framves (three of every sides); Adopt two to cross over framves when highway, the leap of railway both sides; It is single getting final product that connection is crossed over frame.When employing is crossed over frame more than two, overlap joint reinforced pipe bar 9 between the adjacent leap frame, bracing piece can adopt inclined or staggered form, also can adopt the run-in index structure.
Cross over the main designing technique parameter of frame:
Cross over distance: 4~45 meters.
Crossing over maximum binds highly: 25 meters.
Maximum axial load (rated load) 20KN that allows.
The single static pressure 2.3kN that bears of insulated tube pole stock does not have distortion, and insulating properties is not less than 175KV/m,
Industrial frequency withstand voltage 1min requirement.
Design safety factor (DSF): 1.5.
Claims (7)
1. electric power live across frame; Mainly comprise pedestal and support body; It is characterized in that: said pedestal is formed by the vertical duct bar (1) and transverse pipe bar (2) overlap joint of insulation, and transverse pipe bar (2) is overlapped to form square, and vertical duct bar (1) is positioned at the lap-joint of two transverse pipe bars (2); Diagonal along the pedestal side is overlapped with stable pipe bar (3); Said support body is made up of the column (4) of insulation of overlap joint on pedestal, is overlapped with stay tube pole (5) between the adjacent upright posts (4) and between the square plane that surrounds of four root posts (4).
2. electric power live across frame according to claim 1 is characterized in that: said stay tube pole (5) adopts frame structure or cross structure.
3. electric power live across frame according to claim 1 and 2 is characterized in that: snap together through snap-hook structure between the transverse pipe bar (2) that overlaps and between transverse pipe bar (2) and the vertical duct bar (1); Also snap together between column (4) and the pedestal and between stay tube pole (5) and the column (4) through snap-hook structure.
4. electric power live across frame according to claim 1 and 2 is characterized in that: between the said transverse pipe bar (2) that overlaps and transverse pipe bar (2) between vertical duct bar (1), be plugged on through plug, inserting slot construction; Column (4) also is plugged on through plug, inserting slot construction between pedestal and between stay tube pole (5) and the column (4).
5. according to the said electric power live across of claim 4 frame, it is characterized in that: also be overlapped with another support body on the said support body, tractive has cable wind rope (6) on the support body.
6. according to the said electric power live across of claim 5 frame, it is characterized in that: the end face at the superiors' support body is overlapped with end face pipe bar (7) and cross pipe bar (8); Add the slip wheel shaft on the end face pipe bar (7).
7. according to the said electric power live across of claim 6 frame, it is characterized in that: cross between the frame for two and be overlapped with reinforced pipe bar (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202904290U CN202206066U (en) | 2011-08-05 | 2011-08-05 | Electric power live crossing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202904290U CN202206066U (en) | 2011-08-05 | 2011-08-05 | Electric power live crossing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202206066U true CN202206066U (en) | 2012-04-25 |
Family
ID=45970164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202904290U Expired - Fee Related CN202206066U (en) | 2011-08-05 | 2011-08-05 | Electric power live crossing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202206066U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103453219A (en) * | 2013-08-26 | 2013-12-18 | 中国能源建设集团广东省电力设计研究院 | Cable river-crossing bridge |
CN103532048A (en) * | 2013-10-18 | 2014-01-22 | 上海送变电工程公司 | Quickly combined large lattice type crossing frame |
CN103758025A (en) * | 2014-01-10 | 2014-04-30 | 国家电网公司 | Road crossing device for power grid construction |
CN103956683A (en) * | 2014-05-09 | 2014-07-30 | 国网上海市电力公司 | Crossing frame system used for 220-KV outgoing line engineering wire erection of 500-KV transformer substation |
CN103972836A (en) * | 2014-03-24 | 2014-08-06 | 于永洋 | Electric transmission line drilling method |
CN111917090A (en) * | 2020-08-07 | 2020-11-10 | 国网湖南省电力有限公司 | 10kV line live crossing frame and erection method thereof |
-
2011
- 2011-08-05 CN CN2011202904290U patent/CN202206066U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103453219A (en) * | 2013-08-26 | 2013-12-18 | 中国能源建设集团广东省电力设计研究院 | Cable river-crossing bridge |
CN103453219B (en) * | 2013-08-26 | 2016-03-02 | 中国能源建设集团广东省电力设计研究院有限公司 | Cable crosses the river crane span structure |
CN103532048A (en) * | 2013-10-18 | 2014-01-22 | 上海送变电工程公司 | Quickly combined large lattice type crossing frame |
CN103532048B (en) * | 2013-10-18 | 2016-05-11 | 上海送变电工程公司 | A kind of large-scale lattice crossing frame of Rapid Combination |
CN103758025A (en) * | 2014-01-10 | 2014-04-30 | 国家电网公司 | Road crossing device for power grid construction |
CN103972836A (en) * | 2014-03-24 | 2014-08-06 | 于永洋 | Electric transmission line drilling method |
CN103956683A (en) * | 2014-05-09 | 2014-07-30 | 国网上海市电力公司 | Crossing frame system used for 220-KV outgoing line engineering wire erection of 500-KV transformer substation |
CN111917090A (en) * | 2020-08-07 | 2020-11-10 | 国网湖南省电力有限公司 | 10kV line live crossing frame and erection method thereof |
CN111917090B (en) * | 2020-08-07 | 2022-03-11 | 国网湖南省电力有限公司 | 10kV line live crossing frame and erection method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202206066U (en) | Electric power live crossing frame | |
CN204662661U (en) | The two rope truss string structure system of the two case beam of large span | |
CN105298201A (en) | Electric-transmission-line cable-terminal three-dimensional downwards-leading device | |
CN206071141U (en) | Transformer substation framework beam | |
CN205116866U (en) | Device is down drawn to transmission line cable termination solid | |
CN104314355B (en) | A kind of T connection steel pipe pole of cross-arm abnormity | |
CN104563578A (en) | Combined framework pillar for 500kV transformer substation and mounting method of combined framework pillar | |
CN204645793U (en) | A kind of emergent repairing tower of transmission line of electricity | |
CN201238184Y (en) | Dual-loop steel pipe column for wires with 2X630 and 4X300 cross section of 220kV power transmission line | |
CN205442567U (en) | Steel -pipe pole operation platform | |
CN205046911U (en) | Triangle -shaped section steel pylons | |
CN104863407A (en) | Repairing tower of power transmission line | |
CN103956683A (en) | Crossing frame system used for 220-KV outgoing line engineering wire erection of 500-KV transformer substation | |
CN201574616U (en) | 35KV four-circuit steel pipe rod | |
CN201319483Y (en) | Cable terminal pole | |
CN204030438U (en) | A kind of ground wire raiser of ultra-high-tension power transmission line | |
CN201252365Y (en) | Construction charged crossover device of ultra-high and special-high voltage transmission line | |
CN203617651U (en) | Steady and reliable abacus connector | |
CN102277999B (en) | Large-section portal steel structure holding pole | |
CN210629052U (en) | Inlet wire structure of 500kV transformer substation with extremely small inlet wire span | |
CN204126354U (en) | A kind of high voltage power transmission tower | |
CN205165660U (en) | Novel preparation of acting as go -between device | |
CN102983528B (en) | Overhead cable scaffold | |
CN204098598U (en) | A kind of T connection steel pipe pole of cross-arm abnormity | |
CN104895391A (en) | External inserted cross arm connecting device for steel pipe rods |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |