CN102983528B - Overhead cable scaffold - Google Patents

Overhead cable scaffold Download PDF

Info

Publication number
CN102983528B
CN102983528B CN201210521693.XA CN201210521693A CN102983528B CN 102983528 B CN102983528 B CN 102983528B CN 201210521693 A CN201210521693 A CN 201210521693A CN 102983528 B CN102983528 B CN 102983528B
Authority
CN
China
Prior art keywords
stand
crossbearer
overhead cable
fixed head
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210521693.XA
Other languages
Chinese (zh)
Other versions
CN102983528A (en
Inventor
崔吉林
于庆龙
房浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201210521693.XA priority Critical patent/CN102983528B/en
Publication of CN102983528A publication Critical patent/CN102983528A/en
Application granted granted Critical
Publication of CN102983528B publication Critical patent/CN102983528B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a kind of overhead cable scaffold, comprise two stands be arranged in parallel, be connected with telescopic crossbearer between two end faces of described stand, the end face of described stand be fixedly connected with holder line platform.Roller bearing on holder line platform of the present invention can make pulling cable more laborsaving, also can not damage cable in the process pulled simultaneously, its upper limit roller effect avoids cable because pull the improper puzzlement falling stand and bring to construction, the present invention can also regulate the length of crossbearer according to spanning length, a large amount of time is saved compared to by many modes with rod member splicing assembling, improve the efficiency of construction, stand and crossbearer are also enclosed with insulation rubber, coefficient of safety is high, and rate of failure is low.

Description

Overhead cable scaffold
Technical field
The present invention relates to work transmission line field, be specifically related to a kind of overhead cable scaffold.
Background technology
Along with the tremendous development of national basis Facilities Construction, undergoing an unusual development of power engineering is rapid, high-tension line spreads all over motherland on both sides of the Changjiang River, in Poling Construction, allly run into Midspan sag and the highway that passes through can not be interrupted, the power line that can not land, order wire, building and flimsy young crops booth etc. all need to set up crossing frame or take other to cross over interim measure to ensure that circuit passes through.The mode of crossing frame is generally adopted to solve the transition problem of overhead transmission line at present, the crossing frame of existing overhead wire is comparatively simple, at barrier both sides erecting scaffold, electric wire is followed pull rope and is passed through from barrier overhead, this stringing mode danger coefficient is larger, once construction wrong or run into severe natural conditions, electric wire easily comes off from scaffold, so just very easily cause great traffic accident, if drop on damage existing line causing existing line, great economic loss will certainly be caused.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of overhead cable scaffold, and reliability is high, applied widely, improves the fail safe of power construction.
A kind of overhead cable scaffold, comprises two stands be arranged in parallel, is connected with telescopic crossbearer, the end face of described stand is fixedly connected with holder line platform between two end faces of described stand.
The further improvement project of the present invention is, the tetragonal body that described stand is some montants, cross bar, brace are formed by connecting, and the upper plane that described stand is stretched out in described montant upper end is connected with described holder line platform.
Further improvement of the present invention scheme is, described holder line platform by fixed head, the bearing being located at fixed head bottom surface, and is fixed on the some axis of rolling compositions above fixed head; Described bearing is distributed on corner, described fixed head bottom surface, and described bearing is inserted respectively or is inserted in the montant upper end of described stand.
Further improvement of the present invention scheme is, described axis of rolling level is equidistant to be arranged on described fixed head, and the both sides edge near described fixed head between the described adjacent axis of rolling is provided with spacing roller bearing.
Further improvement of the present invention scheme is, described crossbearer is made up of some expansion links and the vertical pole be connected between expansion link, described expansion link comprises mobile jib and adjusting rod, and described mobile jib is hollow structure, and one end of described adjusting rod is inserted mobile jib link and is fixedly connected with.
Further improvement of the present invention scheme is, the two ends cutting ferrule of described expansion link is connected on the cross bar of described stand.
Further improvement of the present invention scheme is, the two ends of described expansion link are provided with clip, and described cross bar is fixedly connected with through the card chamber of described clip.
Further improvement of the present invention scheme is, the frame top of described stand is provided with the drag-line be fixedly connected with ground.
Further improvement of the present invention scheme is, the outer surface of described stand and crossbearer is all enclosed with insulation rubber.
Further improvement of the present invention scheme is, the below of described crossbearer is provided with insulation net.
The present invention compared with prior art has the following advantages:
One, the roller bearing on holder line platform of the present invention can make pulling cable more laborsaving, also can not damage cable in the process pulled, its upper limit roller effect avoids cable because pulling is that undue force falls stand to the puzzlement brought of constructing simultaneously.
Two, the present invention is provided with crossbearer between two stands, and make structure firmer, security performance is higher, crossbearer is made up of expansion link, suitably can regulate the length of crossbearer according to spanning length, save a large amount of time compared to by many modes with rod member splicing assembling, improve the efficiency of construction.
Three, the present invention is firm in structure, and have the protector such as bracing wire, insulation net, stand and crossbearer are also enclosed with insulation rubber, and coefficient of safety is high, and rate of failure is low.
Accompanying drawing explanation
Fig. 1 is front elevational schematic of the present invention.
Fig. 2 is schematic top plan view of the present invention.
The enlarged diagram of I in Fig. 3 Fig. 1.
Embodiment
A kind of overhead cable scaffold as shown in Figure 1, 2, comprise two stands 1 be arranged in parallel, telescopic crossbearer 2 is connected with between two end faces of described stand 1, the end face of stand 1 is fixedly connected with holder line platform 4, in order to ensure the safety of constructing, the below of crossbearer 2 is also provided with insulation net 3, and the outer surface of stand 1 and crossbearer 2 is all enclosed with insulation rubber.The outside of two stands 1 is provided with the drag-line 5 be fixedly connected with ground from frame top.
Still as shown in Figure 1, 2, in the present embodiment, holder line platform 4 is by fixed head 41, the bearing 42 be located on corner, fixed head 41 bottom surface, and equidistant three axis of rolling 43 be arranged in above fixed head 41 of level form; The tetragonal body that stand 1 is some montants 11, cross bar 12, brace 13 are formed by connecting, the upper plane of stand 1 is stretched out in montant 11 upper end, and the upper end that the bearing 42 on holder line platform 4 inserts montant 11 is fixed.The axis of rolling 43 on holder line platform 4 can make pulling cable more laborsaving, also can not damage cable in the process pulled simultaneously.Both sides edge near described fixed head 41 between adjacent two axis of rolling 43 is provided with spacing roller bearing 44.Avoid when pulling because undue force cable falls stand thus the puzzlement brought to construction.
As shown in Figure 1, 2, 3, crossbearer 2 is made up of some expansion links 21 and the vertical pole 22 be connected between expansion link 21, expansion link 21 comprises mobile jib 211 and adjusting rod 212, and wherein mobile jib 211 is hollow structure, and one end of adjusting rod 212 is inserted mobile jib 211 link and is fixedly connected with.The structure of expansion link 21, the length of the length adjustment crossbearer can crossed over according to reality, saves a large amount of time by many modes with rod member splicing assembling than ever mutually, improves the efficiency of construction.The two ends of expansion link 21 are provided with clip 213, and clip 213 centrally axle is divided into two, and cross bar 12 is through behind card chamber, and with bolt fixing hoop 213, the connected mode of clip is fixing reliable, and is easy to operation.

Claims (7)

1. overhead cable scaffold, is characterized in that: comprise two stands (1) be arranged in parallel, be connected with telescopic crossbearer (2) between two end faces of described stand (1), the end face of described stand (1) is fixedly connected with holder line platform (4); Described crossbearer (2) is made up of some expansion links (21) and the vertical pole (22) be connected between expansion link (21), described expansion link (21) comprises mobile jib (211) and adjusting rod (212), described mobile jib (211) is hollow structure, and one end of described adjusting rod (212) is inserted mobile jib (211) link and is fixedly connected with; The two ends cutting ferrule of described expansion link (21) is connected on the cross bar (12) of described stand (1); The two ends of described expansion link (21) are provided with clip (213), and described cross bar (12) is fixedly connected with through the card chamber of described clip (213).
2. overhead cable scaffold as claimed in claim 1, it is characterized in that: the tetragonal body that described stand (1) is some montants (11), cross bar (12), brace (13) are formed by connecting, the upper plane that described stand (1) is stretched out in described montant (11) upper end is connected with described holder line platform (4).
3. overhead cable scaffold as claimed in claim 2, it is characterized in that: described holder line platform (4) by fixed head (41), the bearing (42) being located at fixed head (41) bottom surface, and is fixed on some axis of rolling (43) composition above fixed head (41); Described bearing (42) is distributed on described fixed head (41) corner, bottom surface, and described bearing (42) is inserted respectively or is inserted in montant (11) upper end of described stand (1).
4. overhead cable scaffold as claimed in claim 3, it is characterized in that: the described axis of rolling (43) level is equidistant to be arranged on described fixed head (41), the both sides edge near described fixed head (41) between the described adjacent axis of rolling is provided with spacing roller bearing (44).
5. overhead cable scaffold as claimed in claim 1, is characterized in that: the frame top of described stand (1) is provided with the drag-line (5) be fixedly connected with ground.
6. overhead cable scaffold as claimed in claim 1, is characterized in that: the outer surface of described stand (1) and crossbearer (2) is all enclosed with insulation rubber.
7. overhead cable scaffold as claimed in claim 1, is characterized in that: the below of described crossbearer (2) is provided with insulation net (3).
CN201210521693.XA 2012-12-07 2012-12-07 Overhead cable scaffold Expired - Fee Related CN102983528B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210521693.XA CN102983528B (en) 2012-12-07 2012-12-07 Overhead cable scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210521693.XA CN102983528B (en) 2012-12-07 2012-12-07 Overhead cable scaffold

Publications (2)

Publication Number Publication Date
CN102983528A CN102983528A (en) 2013-03-20
CN102983528B true CN102983528B (en) 2015-11-18

Family

ID=47857351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210521693.XA Expired - Fee Related CN102983528B (en) 2012-12-07 2012-12-07 Overhead cable scaffold

Country Status (1)

Country Link
CN (1) CN102983528B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109672112B (en) * 2017-10-16 2020-09-25 温州承玥机械设备有限公司 Construction method of tension type power line protection net
CN112152152A (en) * 2020-10-10 2020-12-29 国网新疆电力有限公司昌吉供电公司 Power transmission line crossing device and using method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201252366Y (en) * 2008-09-09 2009-06-03 福建省莆田电业局 Insulating crossing structure for live working
CN101949117A (en) * 2010-08-23 2011-01-19 江苏省电力公司宜兴市供电公司 Safety insulating net structure of highway
CN101997280A (en) * 2010-09-15 2011-03-30 山西省电力公司临汾供电分公司 A rolling rack for tensioning wires of transmission lines
CN201887387U (en) * 2010-12-14 2011-06-29 江西景德镇供电公司 Universal-type telescopic insulator cradle
CN202282576U (en) * 2011-10-25 2012-06-20 湖北省输变电工程公司 Moso bamboo crossing frame
CN202957531U (en) * 2012-12-07 2013-05-29 中铁十九局集团电务工程有限公司 High-altitude spanning cable construction frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201252366Y (en) * 2008-09-09 2009-06-03 福建省莆田电业局 Insulating crossing structure for live working
CN101949117A (en) * 2010-08-23 2011-01-19 江苏省电力公司宜兴市供电公司 Safety insulating net structure of highway
CN101997280A (en) * 2010-09-15 2011-03-30 山西省电力公司临汾供电分公司 A rolling rack for tensioning wires of transmission lines
CN201887387U (en) * 2010-12-14 2011-06-29 江西景德镇供电公司 Universal-type telescopic insulator cradle
CN202282576U (en) * 2011-10-25 2012-06-20 湖北省输变电工程公司 Moso bamboo crossing frame
CN202957531U (en) * 2012-12-07 2013-05-29 中铁十九局集团电务工程有限公司 High-altitude spanning cable construction frame

Also Published As

Publication number Publication date
CN102983528A (en) 2013-03-20

Similar Documents

Publication Publication Date Title
CN204151692U (en) A kind of modular assembly formula connection system for guide rail
CN204651769U (en) A kind of erection portable transmission overhead line crossing construction device easily
CN102983528B (en) Overhead cable scaffold
CN202957531U (en) High-altitude spanning cable construction frame
CN202206066U (en) Electric power live crossing frame
CN105390941A (en) 220KV sail combined type outdoor GIS outlet wire arrangement structure
CN106368495B (en) One kind is novel to wear straight line narrow base tower
CN104577871B (en) Portable transmission overhead line crossing construction device
CN202282576U (en) Moso bamboo crossing frame
CN106532557B (en) Across 10KV line construction platform tools devices
CN212175478U (en) Bridge guardrail
CN103956683A (en) Crossing frame system used for 220-KV outgoing line engineering wire erection of 500-KV transformer substation
CN205752997U (en) Substation framework based on wire arranged vertically
CN205025183U (en) Safe electric power steel pole
CN203755780U (en) Glass fiber reinforced plastic insulation cross arm
CN206370670U (en) A kind of high voltage transmission line makes somebody a mere figurehead wind-deviation flashover device
CN203924870U (en) Queen post is bored more pylon structure
CN206976600U (en) One kind can interconnection system soft graphite earthing pole
CN202226576U (en) Tie rod systems for luffing jib tower cranes and luffing jib tower cranes
CN205265148U (en) Construction equipment is crossed over to high -speed railway of not stopping transport
CN206220629U (en) One kind is new to wear straight line narrow base tower
CN212376389U (en) 110kV drum type double-loop composite cross arm tower
CN103510534B (en) Tower pile foundation exposure lifting structure and construction method
CN203430707U (en) Wind protection device for blade rear edges of wind driven generator
CN102277999A (en) Large-section portal steel structure holding pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Cui Jilin

Inventor after: Yu Qinglong

Inventor after: Fang Hao

Inventor before: Cui Jilin

Inventor before: Fang Hao

Inventor before: Yu Qinglong

Inventor before: Dou Changhao

Inventor before: Chen Guyue

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20211207

CF01 Termination of patent right due to non-payment of annual fee