CN205304091U - Bridge electric power erects strutting arrangement - Google Patents

Bridge electric power erects strutting arrangement Download PDF

Info

Publication number
CN205304091U
CN205304091U CN201521114973.4U CN201521114973U CN205304091U CN 205304091 U CN205304091 U CN 205304091U CN 201521114973 U CN201521114973 U CN 201521114973U CN 205304091 U CN205304091 U CN 205304091U
Authority
CN
China
Prior art keywords
column
base
hydraulic support
electric power
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201521114973.4U
Other languages
Chinese (zh)
Inventor
梁富华
张国庆
孙立功
柴俊虎
史爱超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yangdao Municipal Engineering Group Co Ltd
Original Assignee
Beijing Yangdao Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yangdao Municipal Engineering Group Co Ltd filed Critical Beijing Yangdao Municipal Engineering Group Co Ltd
Priority to CN201521114973.4U priority Critical patent/CN205304091U/en
Application granted granted Critical
Publication of CN205304091U publication Critical patent/CN205304091U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型提供一种桥梁电力架设支撑装置,包括支架顶梁、立柱、平衡千斤顶、掩护梁、后连杆、前连杆、液压支架底座和底座,立柱连接在支架顶梁的下表面中间靠左,掩护梁连接在支架顶梁的右侧,平衡千斤顶设置在立柱和掩护梁之间,后连杆一端连接掩护梁的末端,另一端连接液压支架底座,前连杆分别连接掩护梁和液压支架底座,立柱和液压支架底座都连接底座,本实用新型设计合理,使用方便,能够进行远程控制,节省人力,有效保证操作人员的安全性,有很好的应用前景。

The utility model provides a supporting device for bridge electric erection, which includes a support top beam, a column, a balance jack, a cover beam, a rear connecting rod, a front connecting rod, a hydraulic support base and a base, and the column is connected to the middle of the lower surface of the support top beam. Left, the cover beam is connected to the right side of the top beam of the support, the balance jack is set between the column and the cover beam, one end of the rear link is connected to the end of the cover beam, the other end is connected to the base of the hydraulic support, and the front link is respectively connected to the cover beam and hydraulic pressure The support base, the column and the hydraulic support base are all connected to the base. The utility model is reasonable in design, easy to use, capable of remote control, saving manpower, effectively ensuring the safety of operators, and has a good application prospect.

Description

一种桥梁电力架设支撑装置A bridge electric erection support device

技术领域 technical field

本实用新型具体涉及一种桥梁电力架设支撑装置。 The utility model specifically relates to a supporting device for bridge electric erection.

背景技术 Background technique

桥梁建设有时候需要铺设架空电线,来达到输送电能的目的,对于电线的铺设,通常采用施工人员爬上桥梁,徒手拉电线至铁索位置,然后另一个工作人员固定铁索与电缆,该方法较为繁琐,操作难度系数大,工作量也十分巨大,对施工人员体力是个很大的考验,工作的危险系数不低,由于传统方法的种种弊端,从而导致施工效率低下,影响电缆的铺设进度。 Bridge construction sometimes requires the laying of overhead wires to achieve the purpose of transmitting electric energy. For the laying of wires, construction workers usually climb up the bridge, pull the wires to the position of the iron cables with bare hands, and then another worker fixes the iron cables and cables. This method is more cumbersome , the operation difficulty coefficient is high, and the workload is also very large. It is a great test for the physical strength of the construction personnel. The risk factor of the work is not low. Due to the various drawbacks of the traditional methods, the construction efficiency is low and the progress of cable laying is affected.

实用新型内容 Utility model content

本实用新型的目的是为解决上述不足,提供一种桥梁电力架设支撑装置。 The purpose of this utility model is to provide a bridge electric erection support device to solve the above-mentioned deficiencies.

本实用新型的目的是通过以下技术方案实现的: The purpose of this utility model is achieved by the following technical solutions:

一种桥梁电力架设支撑装置,包括支架顶梁、立柱、平衡千斤顶、掩护梁、后连杆、前连杆、液压支架底座和底座,立柱连接在支架顶梁的下表面中间靠左,掩护梁连接在支架顶梁的右侧,平衡千斤顶设置在立柱和掩护梁之间,后连杆一端连接掩护梁的末端,另一端连接液压支架底座,前连杆分别连接掩护梁和液压支架底座,立柱和液压支架底座都连接底座。 A support device for bridge electric erection, including a support top beam, a column, a balance jack, a cover beam, a rear link, a front link, a hydraulic support base and a base, the column is connected to the middle left of the lower surface of the support top beam, and the cover beam Connected to the right side of the top beam of the support, the balance jack is set between the column and the cover beam, one end of the rear link is connected to the end of the cover beam, the other end is connected to the base of the hydraulic support, the front link is respectively connected to the cover beam and the base of the hydraulic support, and the column Both the base and the hydraulic support base are connected to the base.

支架顶梁为凹式结构。 The support top beam is a concave structure.

液压支架底座采用前宽后窄中部圆滑的结构。 The base of the hydraulic support adopts a smooth structure with a wide front and a narrow rear.

掩护梁、后连杆、前连杆和液压支架底座构成四连杆机构。 The shield beam, the rear connecting rod, the front connecting rod and the base of the hydraulic support form a four-bar linkage mechanism.

本实用新型具有如下有益的效果: The utility model has the following beneficial effects:

本实用新型设计合理,使用方便,能够进行远程控制,节省人力,有效保证操作人员的安全性,有很好的应用前景。 The utility model is reasonable in design, easy to use, capable of remote control, saves manpower, effectively ensures the safety of operators, and has good application prospects.

附图说明 Description of drawings

图1为本实用新型的整体结构示意图。 Figure 1 is a schematic diagram of the overall structure of the utility model.

具体实施方式 detailed description

下面结合附图对本实用新型作进一步的说明: Below in conjunction with accompanying drawing, the utility model is further described:

如图1所示,一种桥梁电力架设支撑装置,包括支架顶梁1、立柱2、平衡千斤顶3、掩护梁4、后连杆5、前连杆6、液压支架底座7和底座8,立柱2连接在支架顶梁1的下表面中间靠左,掩护梁4连接在支架顶1梁的右侧,平衡千斤顶3设置在立柱2和掩护梁4之间,后连杆5一端连接掩护梁4的末端,另一端连接液压支架底座7,前连杆6分别连接掩护梁4和液压支架底座7,立柱2和液压支架底座7都连接底座8。 As shown in Figure 1, a bridge power erection support device includes a support top beam 1, a column 2, a balance jack 3, a cover beam 4, a rear link 5, a front link 6, a hydraulic support base 7 and a base 8, and the column 2 is connected to the middle left of the lower surface of the support top beam 1, the cover beam 4 is connected to the right side of the support top 1 beam, the balance jack 3 is arranged between the column 2 and the cover beam 4, and one end of the rear link 5 is connected to the cover beam 4 The other end is connected to the hydraulic support base 7, and the front link 6 is connected to the shield beam 4 and the hydraulic support base 7 respectively, and the column 2 and the hydraulic support base 7 are all connected to the base 8.

支架顶梁为凹式结构。 The support top beam is a concave structure.

液压支架底座采用前宽后窄中部圆滑的结构。 The base of the hydraulic support adopts a smooth structure with a wide front and a narrow rear.

掩护梁、后连杆、前连杆和液压支架底座构成四连杆机构。 The shield beam, the rear connecting rod, the front connecting rod and the base of the hydraulic support form a four-bar linkage mechanism.

采用单立柱、单平衡千斤顶结构,后部与四连杆机构连接,既节约了空间又具有较强的稳定性,由于空间限制,支架前连杆、后连杆及掩护梁均采用单杆形式,保证了支架整体稳定性;支架四连杆机构在支架极限位置均设计有限位装置,保证支架顶梁上下摆动范围在+10°,防止摆动范围过大,损坏平衡千斤顶,或者导致支架出现重心不稳等安全性问题;支架顶梁采用短而小的结构,顶板上加装耐磨材料制作的钢条,均匀地焊接在顶梁顶板9上,以增加顶梁与顶板的摩擦力及耐磨性。 The structure of single column and single balance jack is adopted, and the rear part is connected with the four-bar linkage mechanism, which not only saves space but also has strong stability. Due to space constraints, the front link, rear link and cover beam of the bracket are all in the form of a single bar. , to ensure the overall stability of the bracket; the four-bar linkage mechanism of the bracket is designed with a limit device at the extreme position of the bracket to ensure that the top beam of the bracket can swing up and down at + 10°, preventing the swing range from being too large, damaging the balance jack, or causing the center of gravity of the bracket to appear Instability and other safety issues; the support top beam adopts a short and small structure, and steel bars made of wear-resistant materials are installed on the top plate, which are evenly welded on the top beam top plate 9 to increase the friction between the top beam and the top plate. Abrasive.

Claims (4)

1. a bridge electric power erection support arrangement, including set cap, column, balance jack, caving shield, back link, front rod, hydraulic support foundation and base, it is characterized in that: column is connected in the middle of the lower surface of set cap and keeps left, caving shield is connected to the right side of set cap, balance jack is arranged between column and caving shield, back link one end connects the end of caving shield, the other end connects hydraulic support foundation, front rod connects caving shield and hydraulic support foundation, column and hydraulic support foundation respectively and all connects base.
2. a kind of bridge electric power erection support arrangement according to claim 1, it is characterised in that: described set cap is female structure.
3. a kind of bridge electric power erection support arrangement according to claim 1, it is characterised in that: described hydraulic support foundation adopts the structure that front wide and rear narrow middle part is round and smooth.
4. an a kind of bridge electric power erection support arrangement according to claim 1, it is characterised in that: described caving shield, back link, front rod and hydraulic support foundation constitute quadric chain.
CN201521114973.4U 2015-12-30 2015-12-30 Bridge electric power erects strutting arrangement Expired - Lifetime CN205304091U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521114973.4U CN205304091U (en) 2015-12-30 2015-12-30 Bridge electric power erects strutting arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521114973.4U CN205304091U (en) 2015-12-30 2015-12-30 Bridge electric power erects strutting arrangement

Publications (1)

Publication Number Publication Date
CN205304091U true CN205304091U (en) 2016-06-08

Family

ID=56474411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521114973.4U Expired - Lifetime CN205304091U (en) 2015-12-30 2015-12-30 Bridge electric power erects strutting arrangement

Country Status (1)

Country Link
CN (1) CN205304091U (en)

Similar Documents

Publication Publication Date Title
CN202578117U (en) Rod straightening device
CN202217968U (en) Distribution line conductor lifting type pay-off tackle
CN202967920U (en) Hanging overhaul device of load switch of transformer
CN205304091U (en) Bridge electric power erects strutting arrangement
CN102191874B (en) Insulating cross arm with movable arc grooves
CN205029246U (en) Novel portable electric power support frame
CN201440587U (en) a pay-off tackle
CN206712336U (en) Shaft tower cable platform work protective cradle
CN201868786U (en) Special repairing lifter for 220KV lightning wire of power transmission line
CN204633283U (en) A kind of built on stilts general cable hook suspension device
CN203787859U (en) Portable derrick applied to transmission line overhauling
CN203461619U (en) Rope guider
CN203545458U (en) Concrete pipe piece lifting appliance
CN203545559U (en) Electric meter box hoisting tool
CN203782765U (en) Multifunctional shovel for electric power
CN202586164U (en) Head clamp of concrete-pole cross arm
CN205692652U (en) A kind of combination type distribution transformer stand
CN206915608U (en) Sliding support for electric armour clamp detection experiment
CN206611160U (en) A kind of mobile service cable suspension arrangement
CN204782201U (en) Steel pipe pole is with steel pipe cross arm of eight arris variable cross sections
CN205151615U (en) Small -size hoisting machine suitable for cable shaft well head
CN205777552U (en) A kind of new concrete material distributing machine
CN202423986U (en) Spacer installation device
CN202750351U (en) Pole-used optical network terminal communication box
CN205151577U (en) Fix small -size hoisting machine on steel support of groove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20160608

CX01 Expiry of patent term