Prior art keywords
barge
water inlet
controlled valve
ballast tank
main sewer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521010378.6U
Other languages
Chinese (zh)
Inventor
卿文
聂臆瞩
王红军
孙宏硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN BMESC OCEAN ENGINEERING Co Ltd
Original Assignee
TIANJIN BMESC OCEAN ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN BMESC OCEAN ENGINEERING Co Ltd filed Critical TIANJIN BMESC OCEAN ENGINEERING Co Ltd
Priority to CN201521010378.6U priority Critical patent/CN205418021U/en
Application granted granted Critical
Publication of CN205418021U publication Critical patent/CN205418021U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a system of carrying is transferred to marine installation barge of large -scale module, it is including installing the laser rangefinder sensor on every spud leg butt joint unit, all install level sensor in each ballast tank of barge, the inlet tube of installing the drain pipe that is equipped with automatically controlled valve respectively and be equipped with automatically controlled valve in each ballast tank, drain pipe in each ballast tank is linked together with the main sewer, inlet tube in each ballast tank is linked together with water inlet manifold, installing into in water inlet manifold's one end, the water accent carries a pump, install the automatically controlled valve of water inlet manifold and this end is linked together with outside sea water at water inlet manifold's the other end, install the drainage in the one end of main sewer and transfer a year pump, install the automatically controlled valve of main sewer and this end is linked together with outside sea water at the other end of main sewer, barge angular transducer installs and puts in barge upper deck central point. The efficiency of carrying was transferred to the barge during this system of adoption had improved large -scale marine module installation effectively.

Description

Heavy die block Attention problems process barge adjusts loading system
Technical field
This utility model relates to barge and adjusts loading system, particularly relates to heavy die block Attention problems process barge and adjusts loading system.
Background technology
Huge resource is contained in ocean, and wherein the exploitation of offshore petroleum resources has had many decades history.Along with the high speed development of science and technology, marine resources development equipment also presents the development trend of maximization, heavy-duty, and heavy die block sea floating support mounting technology solves a lifting difficult problem for heavy module.During module floating support mounting, the carrier modulation technique of barge is of great significance for the safety tool of installation process.
Heavy die block Attention problems is to cause the column of heavy die block to fall in spud leg docking unit (LMU) of catheterostat by the regulation of barge ballast water makes barge sink, need during this water yield constantly adjusting each ballast tank of barge to ensure the guarantee closely located with corresponding LMU of each module column its to fall into time of LMU the most identical, avoid causing single LMU stress to concentrate owing to the tilt of boats and ships makes certain column individually fall in LMU, reduce LMU and the damage of barge.The barge carrier modulation technique of existing heavy die block Attention problems process relies primarily on Field Force and observes column and LMU and align situation and distance feeds back to tune and carries operator, the most rule of thumb carries out adjusting to carry controlling.When barge by wind wave action original to positive status destroy after, existing manual tune load mode is poor by personal observations's accuracy and operator lack experience and limited, installation exercise is inefficient, and the reliability adjusting loading system is poor, easily occurs barge to tilt to cause the situation that LMU or barge damage.
Summary of the invention
The purpose of this utility model is to overcome the shortcoming of prior art, it is provided that the barge that controls of a kind of effect adjusts the heavy die block Attention problems process barge carrying precision raising working performance and safety to adjust loading system.
This utility model be the technical scheme is that
nullHeavy die block Attention problems process barge of the present utility model adjusts loading system,It includes the laser range sensor being arranged on each spud leg docking unit,Described laser range sensor is for detecting the relative distance of each column below the module that barge is adjusted during load on barge and corresponding spud leg docking unit,It is mounted on liquid level sensor in each ballast tank of barge,The drain pipe equipped with electrically-controlled valve and the water inlet pipe equipped with electrically-controlled valve it is separately installed with in each ballast tank,The described drain pipe in each ballast tank is connected with main sewer,The described water inlet pipe in each ballast tank is connected with water inlet manifold,It is provided with in one end of described water inlet manifold to adjust into water and carries pump,The other end at described water inlet manifold is provided with water inlet manifold electrically-controlled valve and this end connects with external sea aqueous phase,Draining is installed in one end of described main sewer and adjusts load pump,The other end at described main sewer is provided with main sewer electrically-controlled valve and this end connects with external sea aqueous phase,Barge obliquity sensor is installed on barge upper deck center,Computer is respectively by data wire and laser range sensor、Liquid level sensor、Barge obliquity sensor、Drain pipe、Water inlet pipe、Electrically-controlled valve on water inlet manifold and main sewer、Water inlet adjusts load pump to adjust load pump to be connected with draining.
The beneficial effects of the utility model: dock cell distance according to each column of module with spud leg and calculate each ballast tank tune carrying capacity and then automatically adjust load, it is effectively improved barge in Large marine module installation process and adjusts the efficiency carried, improve the safety of installation process, improve the ability of reply burst stormy waves, simultaneously by display and alarm module in real time, it is achieved that adjust the visualization of load process.
Accompanying drawing explanation
Fig. 1 is the structural representation that heavy die block Attention problems process barge of the present utility model adjusts loading system;
Fig. 2 is the control figure that heavy die block Attention problems process barge of the present utility model adjusts loading system.
Detailed description of the invention
With specific embodiment, this utility model is illustrated below in conjunction with the accompanying drawings.
Heavy die block Attention problems process barge of the present utility model as shown in drawings adjusts loading system, it includes the laser range sensor 4 being arranged on each spud leg docking unit 3, and described laser range sensor 4 is for detecting the relative distance of each column 5 below the module 6 that barge is adjusted during load on barge 2 and corresponding spud leg docking unit 3.nullIt is mounted on liquid level sensor 12 in each ballast tank 11 of barge 2,The drain pipe equipped with electrically-controlled valve 13 and the water inlet pipe equipped with electrically-controlled valve it is separately installed with in each ballast tank 11,The described drain pipe in each ballast tank 11 is connected with main sewer 10,The described water inlet pipe in each ballast tank 11 is connected with water inlet manifold 8,It is provided with in one end of described water inlet manifold 8 to adjust into water and carries pump 7,The other end at described water inlet manifold 8 is provided with water inlet manifold electrically-controlled valve and this end connects with external sea aqueous phase,Draining is installed in one end of described main sewer 10 and adjusts load pump 9,The other end at described main sewer 10 is provided with main sewer electrically-controlled valve and this end connects with external sea aqueous phase,Barge obliquity sensor is installed on barge upper deck center,Computer is respectively by data wire and laser range sensor 4、Liquid level sensor 12、Barge obliquity sensor、Drain pipe、Water inlet pipe、Electrically-controlled valve on water inlet manifold and main sewer、Water inlet adjusts load pump 7 to adjust load pump 9 to be connected with draining.
The work process of native system is as follows:
Measurement result according to laser range sensor 4, computer judge need into, the ballast tank 11 of draining, the electrically-controlled valve 13 controlled on respective ballast tanks 11 pipeline opens and closes, the tune realizing each ballast tank 11 carries, until the measured value of the laser range sensor 4 on each spud leg docking unit LMU3 differs in allowed limits, close each ballast tank to enter, the electrically-controlled valve 13 of outlet pipe, open the electrically-controlled valve 13 of all ballast tank water inlet pipes, barge 2 integral sinking, if the measured value difference of each laser range sensor 4 is beyond the scope allowed, repeat above procedure, until each column of module 65 docks completely with corresponding spud leg docking unit LMU3, this heavy die block Attention problems process completes.

Claims (1)

  1. null1. heavy die block Attention problems process barge adjusts loading system,It is characterized in that: it includes the laser range sensor being arranged on each spud leg docking unit,Described laser range sensor is for detecting the relative distance of each column below the module that barge is adjusted during load on barge and corresponding spud leg docking unit,It is mounted on liquid level sensor in each ballast tank of barge,The drain pipe equipped with electrically-controlled valve and the water inlet pipe equipped with electrically-controlled valve it is separately installed with in each ballast tank,The described drain pipe in each ballast tank is connected with main sewer,The described water inlet pipe in each ballast tank is connected with water inlet manifold,It is provided with in one end of described water inlet manifold to adjust into water and carries pump,The other end at described water inlet manifold is provided with water inlet manifold electrically-controlled valve and this end connects with external sea aqueous phase,Draining is installed in one end of described main sewer and adjusts load pump,The other end at described main sewer is provided with main sewer electrically-controlled valve and this end connects with external sea aqueous phase,Barge obliquity sensor is installed on barge upper deck center,Computer is respectively by data wire and laser range sensor、Liquid level sensor、Barge obliquity sensor、Drain pipe、Water inlet pipe、Electrically-controlled valve on water inlet manifold and main sewer、Water inlet adjusts load pump to adjust load pump to be connected with draining.
CN201521010378.6U 2015-12-08 2015-12-08 System of carrying is transferred to marine installation barge of large -scale module Active CN205418021U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521010378.6U CN205418021U (en) 2015-12-08 2015-12-08 System of carrying is transferred to marine installation barge of large -scale module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521010378.6U CN205418021U (en) 2015-12-08 2015-12-08 System of carrying is transferred to marine installation barge of large -scale module

Publications (1)

Publication Number Publication Date
CN205418021U true CN205418021U (en) 2016-08-03

Family

ID=56515164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521010378.6U Active CN205418021U (en) 2015-12-08 2015-12-08 System of carrying is transferred to marine installation barge of large -scale module

Country Status (1)

Country Link
CN (1) CN205418021U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107682678A (en) * 2017-11-03 2018-02-09 四川中科水务科技有限公司 Waters security video monitoring and display systems
CN111409781A (en) * 2020-04-29 2020-07-14 上海交通大学 Ship load regulation system based on PID controller
CN111470001A (en) * 2019-01-22 2020-07-31 中集海洋工程研究院有限公司 Method for building ultra-large ship

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107682678A (en) * 2017-11-03 2018-02-09 四川中科水务科技有限公司 Waters security video monitoring and display systems
CN111470001A (en) * 2019-01-22 2020-07-31 中集海洋工程研究院有限公司 Method for building ultra-large ship
CN111409781A (en) * 2020-04-29 2020-07-14 上海交通大学 Ship load regulation system based on PID controller

Similar Documents

Publication Publication Date Title
CN205418021U (en) System of carrying is transferred to marine installation barge of large -scale module
CN103395476B (en) The installation method of a kind of subduction floating drum in ultra-deep-water
CN101881148B (en) Jacket riser mounting method and special riser component thereof
CN106218828B (en) Removable wellhead platform and application method for offshore marginal oilfield exploitation
CN102963494B (en) Buoyancy mounting method for blocks
CN108626078B (en) Auxiliary transportation and erection process for offshore wind turbine Spar type floating foundation barge
CN104743058A (en) Floating installation method for upper assembling block of tension leg platform
CN201685997U (en) Shipbuilding tooling utilizing floating dock
CN102530189A (en) Catamaran for ocean engineering
CN104250969A (en) Piling-assisting submersible production oil storage and discharge platform penetrating upper ship body and lower ship body
CN204056207U (en) A kind of ballast water for ship tapping equipment
CN101817393A (en) Shipbuilding method by utilizing floating dock
CN106704705B (en) overwater pipeline assembling operation method and system
CN102661444B (en) Installation method of deepwater double piping system of offshore platform
EA014151B1 (en) Device and method for the towing of underwater pipelines
CN203383796U (en) Ultra-deep water-oil-gas development system based on dry-type Christmas tree
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof
CN115310768A (en) Intelligent integrated management system for transportation operation of semi-submersible barge
CN204623785U (en) A kind of jack up underwater buoyant body tension leg platform
CN101832425B (en) Installation method of underwater tee joint of seabed pipeline
CN206049982U (en) A kind of platform supply vessel mooring gear
CN103277583B (en) Submarine pipeline seaborne horizontal opening butt joint method without mounting residual stress
CN103669303A (en) Wave energy generating set and installation method thereof
CN203996827U (en) A kind of improved dual-purpose ship
CN203528773U (en) Multi-function ship for shallow water pipeline construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant