CN101832425B - Installation method of underwater tee joint of seabed pipeline - Google Patents

Installation method of underwater tee joint of seabed pipeline Download PDF

Info

Publication number
CN101832425B
CN101832425B CN2009100793727A CN200910079372A CN101832425B CN 101832425 B CN101832425 B CN 101832425B CN 2009100793727 A CN2009100793727 A CN 2009100793727A CN 200910079372 A CN200910079372 A CN 200910079372A CN 101832425 B CN101832425 B CN 101832425B
Authority
CN
China
Prior art keywords
tee joint
pipeline
pipe section
seabed
underwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100793727A
Other languages
Chinese (zh)
Other versions
CN101832425A (en
Inventor
黄�俊
贾旭
李新仲
侯金林
周晓红
范模
徐阳
罗世勇
矫滨田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical China National Offshore Oil Corp CNOOC
Priority to CN2009100793727A priority Critical patent/CN101832425B/en
Publication of CN101832425A publication Critical patent/CN101832425A/en
Application granted granted Critical
Publication of CN101832425B publication Critical patent/CN101832425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses an installation method of an underwater tee joint of a seabed pipeline, comprising the following steps of: (1) prefabricating a tee joint pipe section welded with rotary flanges at both ends and prefabricating a straight pipe section welded with rotary flanges at both ends, wherein the length of the straight pipe section is equal to the length of the tee joint pipe section; (2) connecting the straight pipe section in the step (1) to a pipeline to be laid and laying the straight pipe section on a seabed; and (3) replacing the straight pipe section in the step (2) on the seabed pipeline by using the tee joint pipe section in the step (2) to accomplish the installation of the underwater tee joint. The installation method of the underwater tee joint of the seabed pipeline has the advantages of less influence on the speed and equipment of pipe laying operations and less difficulty of process realization due to having no need of the construction of a pipe laying ship in the tee joint pipe section replacing operation at the later stage, thereby greatly reducing construction expenses.

Description

A kind of installation method of underwater tee joint of seabed pipeline
Technical field
The present invention relates to a kind of installation method of threeway, particularly relate to a kind of installation method of underwater tee joint of seabed pipeline.
Background technique
Increasing considerably of As China's oil resources consumption, the national energy strategy receives very big challenge, and how economic offshore oil resource, that develop China effectively and quickly receive much concern.At present, laid a large amount of submarine pipelines, how efficiently to have utilized existing submarine pipeline to become the important subject of new oil and gas development in marine site, China Bohai Sea.Through using underwater tee joint, in the seabed newly-built submarine pipeline and existing submarine pipeline are realized being connected, be the effective means that makes full use of existing submarine pipeline.
Summary of the invention
The installation method that the purpose of this invention is to provide a kind of underwater tee joint of seabed pipeline.
The application of underwater tee joint of seabed pipeline; The most important while also is maximum steps of expense input to be exactly underwater tee joint installation connects, if when underwater tee joint is installed, can less influence the normal laying of submarine pipeline; Then can simplify the offshore construction operation, save great amount of investment.For realizing above-mentioned purpose, underwater tee joint of seabed pipeline installation method of the present invention may further comprise the steps:
1) prefabricated two ends are welded with the threeway pipeline section of rotary flange, prefabricated two ends be welded with rotary flange with the isometric straight length of above-mentioned threeway pipeline section;
2) with above-mentioned steps 1) straight length be connected on the pipeline of prepare laying and be routed to the seabed;
3) with the above-mentioned steps 1 on the threeway pipeline section of the above-mentioned step 1) replacement submarine pipeline) straight length, accomplish the installation of underwater tee joint.
The installation method of underwater tee joint of seabed pipeline of the present invention has the following advantages: speed and equipment influence to the tubine operation are less, and later stage threeway pipeline section replacement operation need not the construction of pipe laying barge, and technology realizes that difficulty is little, thereby reduces operating expenses greatly.
Description of drawings
Fig. 1 is prefabricated threeway pipeline section
Fig. 2 is prefabricated isometric straight length
Fig. 3 is the prefabricated installation of isometric straight length on pipe laying barge
Fig. 4 is the location of casting anchor of engineering barge
Fig. 5 is for removing the prefabricated isometric straight length of threeway mounting point point
Fig. 6 is the entry of prefabricated threeway pipeline section
Fig. 7 is the installation of prefabricated threeway pipeline section
Embodiment
The installation of embodiment 1, underwater tee joint of seabed pipeline
Below in conjunction with accompanying drawing the installation of underwater tee joint of seabed pipeline is done and to be specified.
1) the threeway pipeline section is made in the requirement of combination construction drawing in advance, and this threeway pipeline section is two-way logical ball threeway 1, and is connected with ball valve 3, welds rotary flange 2 respectively at the two ends of this threeway pipeline section, and prefabricated threeway pipeline section is shown in Figure 1A and Figure 1B.
2) prefabricated one section two ends be welded with rotary flange equally with above-mentioned steps 1) the isometric straight length of threeway pipeline section, prefabricated isometric straight length is as shown in Figure 2.
3) in the submarine pipeline laid processes, when being applied to threeway mounting point point, at the direct welded flange on water inlet pipe one end of pipeline counterpart station 4 on the pipe laying barge; Do flaw detection, detect a flaw qualified after, with above-mentioned steps 2) rotary flange of prefabricated isometric straight length one end is connected with the flange on the water inlet pipe; Thereafter, move distance of ship, this distance equals above-mentioned steps 2) length of prefabricated isometric straight length; Then at a new end welded flange that gets into the pipeline of main production line 5 near welding station 6; Do flaw detection, detect a flaw qualified after, with this flange and above-mentioned steps 2) rotary flange of the prefabricated isometric straight length the other end is connected; On the pipe laying barge with above-mentioned steps 2) prefabricated isometric straight length is connected on the tubing with flange, then with undersea pipe-laying to the seabed.Above-mentioned steps 2) the prefabricated installation process of isometric straight length on pipe laying barge is as shown in Figure 3.
4) after threeway mounting point point 7 is crossed in the tubine operation; Another engineering barge 8 that is equipped with loop wheel machine, diving gear and setting tool by tugboat 9 towages of coordinative construction to the threeway mounting point point; The towage back that puts in place is assisted the tugboat location of casting anchor according to preset anchor point by the DGPS guiding, shown in Fig. 4 A and Fig. 4 B.Move engineering barge then, make the ship string of engineering barge one side be parallel to submarine pipeline 10, construction equipment equipment etc. is hung onto the construction seabed.
5) diver removes above-mentioned steps 3 at threeway mounting point point) in the prefabricated isometric straight length of installation, as shown in Figure 5.
6) with above-mentioned steps 1) in two ends threeway pipeline section that rotary flange is installed lift point to the threeway mounting point, as shown in Figure 6.
7) the threeway pipeline section replacement above-mentioned steps 3 of rotary flange is installed with the two ends in the above-mentioned step 1)) in be installed in the prefabricated isometric straight length on the submarine pipeline, accomplish the connection under water of threeway pipeline section, as shown in Figure 7.

Claims (1)

1. the installation method of a underwater tee joint of seabed pipeline may further comprise the steps:
1) prefabricated two ends are welded with the threeway pipeline section of rotary flange, prefabricated two ends be welded with rotary flange with the isometric straight length of above-mentioned threeway pipeline section;
2) with above-mentioned steps 1) straight length be connected on the pipeline of prepare laying and be routed to the seabed;
3) with the above-mentioned steps 1 on the threeway pipeline section of the above-mentioned step 1) replacement submarine pipeline) straight length, accomplish the installation of underwater tee joint.
CN2009100793727A 2009-03-09 2009-03-09 Installation method of underwater tee joint of seabed pipeline Active CN101832425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100793727A CN101832425B (en) 2009-03-09 2009-03-09 Installation method of underwater tee joint of seabed pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100793727A CN101832425B (en) 2009-03-09 2009-03-09 Installation method of underwater tee joint of seabed pipeline

Publications (2)

Publication Number Publication Date
CN101832425A CN101832425A (en) 2010-09-15
CN101832425B true CN101832425B (en) 2012-07-04

Family

ID=42716592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100793727A Active CN101832425B (en) 2009-03-09 2009-03-09 Installation method of underwater tee joint of seabed pipeline

Country Status (1)

Country Link
CN (1) CN101832425B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899842B (en) * 2014-04-23 2017-01-11 中国海洋石油总公司 Method for installing deepwater online tee joint
CN113464724A (en) * 2021-06-03 2021-10-01 海洋石油工程股份有限公司 Submarine pipeline expansion bend connection method suitable for high-precision underwater in-place control

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2015115A (en) * 1978-02-22 1979-09-05 Raymond Int Builders Method of installing a pipeline and a pipeline installed by this method
GB2082708A (en) * 1980-08-22 1982-03-10 Petroles Cie Francaise Process for tapping a pipe conveying a fluid
US4335752A (en) * 1975-11-28 1982-06-22 The Sea Horse Corporation Flanged pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4335752A (en) * 1975-11-28 1982-06-22 The Sea Horse Corporation Flanged pipe
GB2015115A (en) * 1978-02-22 1979-09-05 Raymond Int Builders Method of installing a pipeline and a pipeline installed by this method
GB2082708A (en) * 1980-08-22 1982-03-10 Petroles Cie Francaise Process for tapping a pipe conveying a fluid

Also Published As

Publication number Publication date
CN101832425A (en) 2010-09-15

Similar Documents

Publication Publication Date Title
CN101881148B (en) Jacket riser mounting method and special riser component thereof
CN101612683A (en) Underwater horizontal type diamond-wire saw
CN103123017A (en) Shallow sea long-distance submarine pipeline tension-free laying construction technology
CN102943942A (en) Novel ocean pipeline plugging device and method
CN201043642Y (en) Replacement pipeline structure preventing obstruction in oil pipeline under the ocean
CN101832425B (en) Installation method of underwater tee joint of seabed pipeline
CN202828026U (en) Pipe support frame for offshore pipe-laying ship
CN109667986A (en) Construction technology when marine double-layer submarine pipeline is laid in production line
CN106704705B (en) overwater pipeline assembling operation method and system
CN206054998U (en) A kind of hydraulic engineering conduit coupling
CN103926669A (en) Method for paving safety monitoring optical cable along with ocean oil and gas pipeline
CN102661444B (en) Installation method of deepwater double piping system of offshore platform
CN103925410B (en) Emergency repair device for submarine pipelines
CN103899842B (en) Method for installing deepwater online tee joint
CN101846228B (en) Fluid pipeline leakage stopping device and method
CN202388186U (en) Assistor for over-water butt weld of large-diameter steel pipes
CN102297315A (en) Under-pressure fluid-guiding sealing device for emergency repair of pipe
CN105179808A (en) Pipe laying construction method adopted after pre-ditching of long-distance subsea pipeline
CN104455742A (en) Clamp structure for underwater control cable
CN101265995B (en) Underwater pump tube and its construction method and concrete conveying method
CN201786039U (en) Off-shore steel platform reinforcing device adopting underwater grouting
CN202031490U (en) Spacer block device for deep sea tower type vertical pipe
CN201475565U (en) Three-way double-phase stainless steel pipeline
CN201764202U (en) Fluid pipeline plugging device
CN205896386U (en) Marine pipeline lays quick knock off joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Huang Jun

Inventor after: Jia Xu

Inventor after: Li Xinzhong

Inventor after: Hou Jinlin

Inventor after: Zhou Xiaohong

Inventor after: Fan Mo

Inventor after: Xu Yang

Inventor after: Luo Shiyong

Inventor after: Jiao Bintian

Inventor before: Huang Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG JUN TO: HUANG JUN JIA XU LI XINZHONG HOU JINLIN ZHOU XIAOHONG FAN MO XU YANG LUO SHIYONG JIAO BINTIAN

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100010 Beijing City, Dongcheng District Chaoyangmen No. 25 North Street CNOOC building

Patentee after: China National Offshore Oil Corporation

Patentee after: CNOOC Research Institute

Address before: 100010 Beijing City, Dongcheng District Chaoyangmen No. 25 North Street CNOOC building

Patentee before: China National Offshore Oil Corporation

Patentee before: CNOOC Research Center

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Co-patentee after: CNOOC research institute limited liability company

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Beijing City, Dongcheng District Chaoyangmen No. 25 North Street CNOOC building

Co-patentee before: CNOOC Research Institute

Patentee before: China National Offshore Oil Corporation