CN205896386U - Marine pipeline lays quick knock off joint - Google Patents

Marine pipeline lays quick knock off joint Download PDF

Info

Publication number
CN205896386U
CN205896386U CN201620929044.7U CN201620929044U CN205896386U CN 205896386 U CN205896386 U CN 205896386U CN 201620929044 U CN201620929044 U CN 201620929044U CN 205896386 U CN205896386 U CN 205896386U
Authority
CN
China
Prior art keywords
pipe clamp
pipe
pipe strap
connecting pin
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620929044.7U
Other languages
Chinese (zh)
Inventor
许凤雪
吴敏
王守成
魏涛
张金峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HAISHENG OCEAN ENGINEERING GROUP Co Ltd
Original Assignee
SHANDONG HAISHENG OCEAN ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HAISHENG OCEAN ENGINEERING GROUP Co Ltd filed Critical SHANDONG HAISHENG OCEAN ENGINEERING GROUP Co Ltd
Priority to CN201620929044.7U priority Critical patent/CN205896386U/en
Application granted granted Critical
Publication of CN205896386U publication Critical patent/CN205896386U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a marine pipeline lays quick knock off joint, including pipe strap a plurality of and flotation pontoon fixed connection, the pipe strap is including half curved first pipe strap and second pipe strap, be equipped with the go -between on the link of first pipe strap and second pipe strap respectively, be equipped with the connecting pin that is used for connecting first pipe strap and second pipe strap tip in the go -between, another link of first pipe strap and second pipe strap is equipped with perpendicularly respectively connects the arch, all be equipped with the connecting hole in the connection arch, it has the rope of connection all to run through in the connecting hole, connects the rope for two and links together through the euphroe. The utility model discloses it is rational in infrastructure, can realize quick chucking and fast pelican hook, improve the operating efficiency, the pipe strap can used repeatedly, reduces extravagantly, and the power of breaking off relations is little, and it is accurate to guarantee that submarine pipeline sinks the location, guarantees that submarine pipeline lays construction precision, reduces the volume of adjusting under water.

Description

Quick unhooking device laid by submerged pipeline
Technical field
This utility model is related to a kind of submerged pipeline laying apparatus and in particular to a kind of submerged pipeline laying rapid unhooking fills Put.
Background technology
At present, submerged pipeline laying is an important content, the main technique of pipe laying in offshore oil production production capacity project Laying two ways in scene after the completion of being divided into the laying of pipe laying barge scene, land sea pipe prefabricated.It is directed to that extra large pipe land is prefabricated to complete The mode of scene laying afterwards, extra large pipe is transported to job site from land to be needed to transport using floating drum, reaches when floating drum transports extra large pipe Behind job site, how to depart from floating drum with extra large pipe becomes problem demanding prompt solution.The unhook mode adopting at present is steel wire rope Using external force, the mode of the tear fracture by force of the binding strap between floating drum and extra large pipe is broken off relations, there have that security risk is big, extra large pipe sinks to be fixed The shortcomings of affect later stage ditching attachment is existed on inaccurate, the extra large pipe outer wall in position more.
Content of the invention
The purpose of this utility model is aiming at the defect of prior art presence, provides a kind of rational in infrastructure, enables fast Fast clamping and rapid unhooking, improve working performance, and pipe clamp can be reused, and reduce and waste, and unhook power is little it is ensured that extra large pipe sinks Accurate positioning, it is ensured that pipe laying construction precision, reduces the submerged pipeline laying Quick unhooking device adjusting workload under water.
Its technical scheme is: submerged pipeline laying Quick unhooking device, including multiple pipe clamps being fixedly connected with floating drum, institute State the first pipe clamp and the second pipe clamp that pipe clamp includes half arc, on a connection end of described first pipe clamp and the second pipe clamp respectively It is provided with connection ring, in described connection ring, be provided with the connecting pin for connecting the first pipe clamp and the second pipe clamp end;
Another connection end of described first pipe clamp and the second pipe clamp is respectively perpendicular and is provided with connection bump, in described connection bump It is equipped with connecting hole, described connection in the hole all runs through connecting rope, two connecting ropes are linked together by euphroe.
Described connecting pin is provided with the steel wire rope being connected with hoist engine.
Be provided between described connecting pin and connection ring for prevent connecting pin be disconnected ring band.
The binding nose being fixedly connected with floating drum is arranged with described first pipe clamp.
Described pipe clamp inner surface is provided with buffering braiding layer.
This utility model compared with prior art, has the advantage that rational in infrastructure, enables quick clamping and quick Break off relations, improve working performance, pipe clamp can reuse, reduce and waste, unhook power little it is ensured that extra large pipe sinking accurate positioning, really Protect pipe laying construction precision, reduce and adjust workload under water.
Brief description
It is presented herein below and in conjunction with the accompanying drawings and embodiments this utility model is further illustrated.
Fig. 1 is the structural representation of the outer spraying device of this utility model;
Fig. 2 is the structural representation at this utility model connecting pin 5;
In figure: 1. floating drum;2. the first pipe clamp;3. the second pipe clamp;4. connection ring;5. connecting pin;6. connection bump;7. connect Hole;8. connecting rope;9. euphroe;10. steel wire rope;11. bands;12. binding noses;13. buffering braiding layers.
Specific embodiment
With reference to Fig. 1, Quick unhooking device laid by submerged pipeline, including multiple pipe clamps being fixedly connected with floating drum 1.I.e. floating drum It is uniformly arranged multiple pipe clamps on 1.
As Fig. 2, pipe clamp includes the first pipe clamp 2 and second pipe clamp 3 of half arc, one of the first pipe clamp 2 and the second pipe clamp 3 Connection ring 4 is respectively equipped with connection end, is provided with connecting pin 5 in connection ring 4.Can be by the first pipe clamp 2 and by connecting pin 5 One end phase of two pipe clamps 3 is fixed.
Another connection end of the first pipe clamp 2 and the second pipe clamp 3 is respectively perpendicular and is provided with connection bump 6, and connection bump 6 is all provided with There is connecting hole 7, all running through in connecting hole 7 has connecting rope 8, two connecting ropes 8 of the first pipe clamp 2 and the second pipe clamp 3 end are led to Cross euphroe 9 to link together.Can by the other end of the first pipe clamp 2 and the second pipe clamp 3 even by connecting rope 8 and euphroe 9 Connect fixation.
The steel wire rope 10 being connected with hoist engine is provided with connecting pin 5.Steel wire rope is pulled by hoist engine, can be with steel wire rope Quickly move, thus connecting pin 5 is pulled out in connection ring 4, mobile 21 meters about it is possible to complete the laying of 600 mitrons;Oil After pipe sinks, withdraw steel wire rope, withdraw floating drum 1 simultaneously, operation can complete.
Be provided between connecting pin 5 and connection ring 4 for prevent connecting pin 5 be disconnected ring 4 band 11.By pricking Band 11 can prevent rustless steel connecting pin 5 from voluntarily breaking off relations in the case of accident it is ensured that sea pipe does not occur in transit voluntarily to take off The marine situation of hook landing.
The binding nose 12 being fixedly connected with floating drum 1 is arranged with the first pipe clamp 2.By connecting steel in binding nose 12 Cord can be fixedly connected with floating drum 1.
It is provided with buffering braiding layer 13 in pipe clamp inner surface.By buffering braiding layer 13, extra large pipe surface can be played with buffer protection work With.
Operation principle:
Complete being fixedly connected of pipe clamp and floating drum 1 first.This utility model can be as needed uniform 4 or 6 on floating drum 1 Individual pipe clamp, and be fixedly connected with binding nose 12 on pipe clamp with iron chains or stainless steel wire rope.
Operating process: under oil pipe during water, floating drum 1 is hung to above oil pipe and (contacts), pipe clamp is just in the oil naturally drooping Pipe both sides, is first plugged connecting pin 5, and ties band 11, more quickly tightens connecting rope 8 with euphroe 9;Second floating drum hangs To be the distance setting with first floating drum when putting, connect pipe clamp with same method, so constantly repeat;Under oil pipe is continuous Water, the steel wire rope 10 connecting connecting pin 5, also with lower water, so descends water operation to complete;After the position of oil pipe determines, need the company of pulling out During pin 5, provide signal, little hoist engine starts, under the pulling force of hoist engine, steel wire rope 10 quickly moves steel wire rope 10, mobile 21 meters about it is possible to complete the laying of 600 mitrons;After oil pipe sinks, withdraw steel wire rope 10, withdraw floating drum 1, operation is complete simultaneously Become.
This utility model is connected using euphroe 9 and connecting pin 5, tight rope, and 9 realize quick clamping, and connecting pin 5 can be realized Overall pull-off, the quick clamping of energy and rapid unhooking, improve working performance;Whole pipe clamp is fixed together with floating drum 1, connecting pin 5 Float with floating drum 1 after pulling out support, pipe clamp can be reused, reduce and waste;Because pipe clamp is not left on oil pipe, for subsequently digging Ditch provides convenient;Using quick band 11, during can preventing from laying extra large pipe, connecting pin 5 is when stormy waves or other carelessly touch Naturally the problem disengaging;Connecting pin 5 on same floating drum is deviate from simultaneously, and the connecting pin on adjacent floating drum can a little later 1 point take off Go out, it is less to realize dynamics of pulling pin, and unhook order is to start to break off relations from one end of extra large pipe, solve extra large pipe positioning of sinking inaccurate Really, the problem easily occurring to deviate with original route.The extra large pipe of submerged pipeline laying Quick unhooking device minimizing ties up and sea pipe is de- Hook program, effectively saves that land is prefabricated and the offshore construction time, guarantees pipe laying construction precision simultaneously, reduces and adjust work under water Measure, it is to avoid potential safety hazard.
This utility model is not limited to above-mentioned embodiment, in the ken that those skilled in the art possess, Can also make a variety of changes on the premise of without departing from this utility model objective, the content after change still falls within this utility model Protection domain.

Claims (5)

1. submerged pipeline laying Quick unhooking device, including multiple pipe clamps being fixedly connected with floating drum it is characterised in that: described pipe Card includes the first pipe clamp and second pipe clamp of half arc, and a connection end of described first pipe clamp and the second pipe clamp is respectively equipped with Connection ring, is provided with the connecting pin for connecting the first pipe clamp and the second pipe clamp end in described connection ring;
Another connection end of described first pipe clamp and the second pipe clamp is respectively perpendicular and is provided with connection bump, and described connection bump is all provided with There is connecting hole, described connection in the hole all runs through connecting rope, two connecting ropes are linked together by euphroe.
2. submerged pipeline according to claim 1 laying Quick unhooking device it is characterised in that: described connecting pin is provided with The steel wire rope being connected with hoist engine.
3. submerged pipeline according to claim 2 laying Quick unhooking device it is characterised in that: described connecting pin be connected It is provided between ring for preventing connecting pin to be disconnected the band of ring.
4. submerged pipeline according to claim 1 laying Quick unhooking device it is characterised in that: right on described first pipe clamp Claim to be provided with the binding nose being fixedly connected with floating drum.
5. submerged pipeline according to claim 1 laying Quick unhooking device it is characterised in that: described pipe clamp inner surface sets There is buffering braiding layer.
CN201620929044.7U 2016-08-24 2016-08-24 Marine pipeline lays quick knock off joint Active CN205896386U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620929044.7U CN205896386U (en) 2016-08-24 2016-08-24 Marine pipeline lays quick knock off joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620929044.7U CN205896386U (en) 2016-08-24 2016-08-24 Marine pipeline lays quick knock off joint

Publications (1)

Publication Number Publication Date
CN205896386U true CN205896386U (en) 2017-01-18

Family

ID=57777868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620929044.7U Active CN205896386U (en) 2016-08-24 2016-08-24 Marine pipeline lays quick knock off joint

Country Status (1)

Country Link
CN (1) CN205896386U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114044096A (en) * 2021-12-03 2022-02-15 浙江海洋大学 Deepwater S-shaped pipe laying device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114044096A (en) * 2021-12-03 2022-02-15 浙江海洋大学 Deepwater S-shaped pipe laying device

Similar Documents

Publication Publication Date Title
CN102269296B (en) Laying process for submarine pipeline traversing floating type production oil-storing device system
CN102332695B (en) Lifting method of submarine cable terminal landing platform
CN102269328B (en) Offshore oil and gas transportation flexible vertical pipeline
CN109506044A (en) A kind of pipeline under the ocean construction technology
CN101280862A (en) Seabed PE pipe rim spreading and imbedding construction method
CN108571621A (en) Floating box type water floats gantry crane method pipeline Immersed tunnel method
CN107166092A (en) A kind of pipeline underwater mating method
CN102588675B (en) Method for protectively recovering flexible tube from deep water
CN110409509B (en) Connection construction device and construction method for submarine suspension tunnel and underground tunnel
CN106979382A (en) The starting laying process of deepwater S-shaped submarine pipeline
CN102221128B (en) Seabed oil and gas transportation hose line fixed on the basis of anchor pier
CN105952967B (en) A kind of immersed tube operational method using floating ball sinking pipeline
CN205896386U (en) Marine pipeline lays quick knock off joint
CN105805415A (en) Deepwater submarine pipeline initial laying method
CN103926669A (en) Method for paving safety monitoring optical cable along with ocean oil and gas pipeline
CN105346677B (en) A kind of folding plate anchor and its application method
CN103407548A (en) Quick release method and device of anchor chain for permanently mooring on-water floating type platform
CN203159060U (en) Connecting device for immersing barged tube segment
CN102661444B (en) Installation method of deepwater double piping system of offshore platform
CN202388186U (en) Assistor for over-water butt weld of large-diameter steel pipes
CN101832425B (en) Installation method of underwater tee joint of seabed pipeline
CN107140129A (en) Submerged wreck tether system
CN203996790U (en) Cable wire guiding, location sand pump dredger wet excavation system
CN109163144A (en) Submarine pipeline terminates the repositioning method of submarine pipeline terminal when being laid with
CN208219547U (en) A kind of suspension mounting structure of harbour lower section shore protection block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Xu Fengxue

Inventor after: Wang Shoucheng

Inventor after: Wei Tao

Inventor after: Zhang Jinfeng

Inventor before: Xu Fengxue

Inventor before: Wu Min

Inventor before: Wang Shoucheng

Inventor before: Wei Tao

Inventor before: Zhang Jinfeng

CB03 Change of inventor or designer information