CN203528773U - Multi-function ship for shallow water pipeline construction - Google Patents
Multi-function ship for shallow water pipeline construction Download PDFInfo
- Publication number
- CN203528773U CN203528773U CN201320249711.3U CN201320249711U CN203528773U CN 203528773 U CN203528773 U CN 203528773U CN 201320249711 U CN201320249711 U CN 201320249711U CN 203528773 U CN203528773 U CN 203528773U
- Authority
- CN
- China
- Prior art keywords
- ship
- pipeline
- disposed
- stern
- windlass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Pipeline Systems (AREA)
Abstract
The utility model discloses a multi-function ship for shallow water pipeline construction. The multi-function ship for the shallow water pipeline construction in the utility model comprises a shipboard pipeline dragging system, a fore-and-aft mooring positioning system, an overwater pipeline butt-joint system, a pipeline prefabrication system, a living system, a dynamical system, a diving & underwater operation system and a ditching monitoring system, wherein each of the systems is installed on a barge; the pipeline dragging system is a winch disposed in the middle of a ship deck; the fore-and-aft mooring positioning system comprises positioning anchor machines disposed at four angles of the ship deck and an anchor machine system which is disposed at the fore ship body and has a high holding power anchor; the overwater pipeline butt-joint system on a ship board comprises a plurality of board davit disposed on one side of the ship deck; the pipeline prefabrication system is disposed in the middle or on the ship board of the ship deck; the living system, the dynamic system and the diving & underwater operation system are configured on the shop; and a stern A-shaped frame is disposed at the stern. With the utility model, ditching, pavement, dragging, on-sea lifting and underwater installation as well as other work of submarine pipelines are realized.
Description
Technical field
The utility model relates to submerged pipeline gathering system preparation of construction field, and shallow water pipeline construction multifunctional ship can be provided.
Background technology
Oil dock, refinery, off-shore oil field all need for the facility of oil tanker handling and supporting submerged pipeline.Submerged pipeline construction needs working procedures just can complete conventionally, for example ditching, and offshore pipelines is laid, and offshore pipelines is dilatory, the docking of the pipeline water surface, expansion bends is installed, and seabed manifold is installed etc.Conventionally construction can adopt different boats and ships to carry out different operations, can, a lot of wastings of resources in the moving demobilization of boats and ships, especially in underdeveloped backcountry, need a multi-functional construction ship like this.
Utility model content
Technical problem to be solved in the utility model is, overcomes described the deficiencies in the prior art above, and a kind of shallow water pipeline construction multifunctional ship is provided.
The utility model shallow water pipeline construction multifunctional ship, by following technical proposals, be achieved, comprise: comprise pipeline traction system on ship, bow stern mooring and positioning system, water borne conduit docking system, pipeline precast system, living system, power system, diving and underwater work system and ditching monitoring system, above-mentioned each system is arranged on barge; Pipeline traction system is the winch that is arranged at middle part, boat deck; Bow stern mooring and positioning system is to be arranged at the location windlass of four jiaos of boat decks and ship bow part with the windlass system of high holding power anchor; Board water borne conduit docking system is that the some sides of a ship that are arranged at boat deck one side hang; Pipeline precast system is arranged at middle part, boat deck or topside; On ship, configure living system, power system and diving and underwater work system; Stern is installed stern A type frame.
Described location windlass is wirerope windlass or chain link windlass.
The utility model has been realized the work such as the ditching, laying of submerged pipeline, dilatory, offshore lifting and installation under water.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
As shown in Figure 1, comprise pipeline traction system on ship, bow stern mooring and positioning system, water borne conduit docking system, pipeline precast system, living system, power system, diving and underwater work system and ditching monitoring system, above-mentioned each system is arranged on barge; Pipeline traction system is the winch 1 that is arranged at middle part, boat deck; Bow stern mooring and positioning system is to be arranged at the location windlass 2 of four jiaos of boat decks and ship bow part with the windlass system 3 of high holding power anchor; Board water borne conduit docking system is that the some sides of a ship that are arranged at boat deck one side hang 4; Pipeline precast system is arranged at middle part, boat deck or topside; On ship, configure living system 5, power system and diving and underwater work system 6; Stern is installed stern A type frame 7.
The utility model is realized pipeline drawing from land to sea by the pipeline traction system on ship.Use bow stern mooring and positioning system to position, also can be by pipeline precast system by all pipelines of submarine laying prefabricated pipe laying that carries out on this ship, utilize the side of a ship of board to lift up into the docking of row water borne conduit, diving outfit carries out the work such as under-water operation, and can be generally the superficial region of the depth of water according to its operating area, the width of taking to widen boats and ships reduces the drinking water of boats and ships, makes it carry out construction operation at shallow water area.
Embodiment recited above is described the utility model preferred implementation; not design of the present utility model and scope are limited; do not departing under the prerequisite of the utility model design philosophy; various distortion and improvement that in this area, common engineering staff make the technical solution of the utility model, all should belong to protection domain of the present utility model.
Claims (2)
1. a shallow water pipeline construction multifunctional ship, it is characterized in that, take pipeline traction system on ship as main, be aided with bow stern mooring and positioning system, water borne conduit docking system, pipeline precast system, living system, power system, diving and underwater work system and ditching monitoring system, above-mentioned each system is arranged on barge; Pipeline traction system is the winch that is arranged at middle part, boat deck; Bow stern mooring and positioning system is to be arranged at the location windlass of four jiaos of boat decks and ship bow part with the windlass system of high holding power anchor; Board water borne conduit docking system is that the some sides of a ship that are arranged at boat deck one side hang; Pipeline precast system is arranged at middle part, boat deck or topside; On ship, configure living system, power system and diving and underwater work system; Stern is installed stern A type frame.
2. according to right, want the shallow water pipeline construction multifunctional ship described in 1, it is characterized in that, described location windlass is wirerope windlass or chain link windlass.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320249711.3U CN203528773U (en) | 2013-05-10 | 2013-05-10 | Multi-function ship for shallow water pipeline construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320249711.3U CN203528773U (en) | 2013-05-10 | 2013-05-10 | Multi-function ship for shallow water pipeline construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203528773U true CN203528773U (en) | 2014-04-09 |
Family
ID=50415017
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320249711.3U Expired - Lifetime CN203528773U (en) | 2013-05-10 | 2013-05-10 | Multi-function ship for shallow water pipeline construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203528773U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106516021A (en) * | 2016-11-17 | 2017-03-22 | 中交第航务工程局有限公司 | Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes |
-
2013
- 2013-05-10 CN CN201320249711.3U patent/CN203528773U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106516021A (en) * | 2016-11-17 | 2017-03-22 | 中交第航务工程局有限公司 | Self-propelled carrying and installing all-in-one ship for underwater tunnel immersed tubes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101417693B (en) | Oceanography engineering module integral hoisting method | |
CN103910044B (en) | A kind of large-scale the floating structures semi-submersible type lifting platform and application process thereof | |
CN103661801B (en) | The installation ancillary system of ocean engineering underwater propeller and installation method | |
CN108860481B (en) | Omnibearing floating fuel oil supply system and operation method thereof | |
CN109780326A (en) | The method of submarine pipeline pipe abandon and recycling | |
CN101224784A (en) | Multifunctional small waterplane area ship of | |
US6676334B2 (en) | Work module support vessel | |
US6503022B1 (en) | Bouyant moon pool plug | |
CN203528773U (en) | Multi-function ship for shallow water pipeline construction | |
CN106704705B (en) | overwater pipeline assembling operation method and system | |
CN203902800U (en) | Semi-submersible type lifting platform for large floating offshore structure | |
MX2014013115A (en) | Method for dry-docking a floating unit. | |
EP3243734B1 (en) | Assembly of a vessel and a floating module | |
CN202953142U (en) | Steel cylinder transportation equipment | |
CN102267545B (en) | Ship form for semi-submersible type hoisting pipe-laying ship | |
CN201834176U (en) | Tooling for underwater anchor chock modification work | |
WO2018192128A1 (en) | Engineering ship and underwater material transportation and assembly method | |
CN104790368B (en) | A kind of can the off-shore structure structure of self-floating towing and construction method thereof | |
CN203996777U (en) | Boats and ships are opening cover plate under water | |
CN207631439U (en) | Large-tonnage synchronization lifting system | |
CN203094382U (en) | Floating production storage offloading (FPSO) dock mooring rope connection distributing structure | |
CN111564810A (en) | Laying process of marine interlocking row | |
JPS58218521A (en) | Construction, launching and installation of caisson | |
CN201258730Y (en) | Under deep water oil storage and oil production device with dynamic positioning float bowl | |
CN203832713U (en) | Butt joint type engineering ship |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140409 |