CN203094382U - Floating production storage offloading (FPSO) dock mooring rope connection distributing structure - Google Patents

Floating production storage offloading (FPSO) dock mooring rope connection distributing structure Download PDF

Info

Publication number
CN203094382U
CN203094382U CN 201220742054 CN201220742054U CN203094382U CN 203094382 U CN203094382 U CN 203094382U CN 201220742054 CN201220742054 CN 201220742054 CN 201220742054 U CN201220742054 U CN 201220742054U CN 203094382 U CN203094382 U CN 203094382U
Authority
CN
China
Prior art keywords
dock
mooring
fpso
hull
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220742054
Other languages
Chinese (zh)
Inventor
向小斌
周庆
杨清松
莫莠君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd
Original Assignee
COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd filed Critical COSCO SHIPYARD (SHANGHAI) ENGINEERING Co Ltd
Priority to CN 201220742054 priority Critical patent/CN203094382U/en
Application granted granted Critical
Publication of CN203094382U publication Critical patent/CN203094382U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

Provided is a floating production storage offloading (FPSO) dock mooring rope connection distributing structure. A landing mooring rope point (5) is arranged on the edge, next to water, of a dock (2), a far shore mooring rope point (4) is arranged at the position, behind the water contacting edge and having the same distance as the width of a ship body (1), of the dock (2), a mooring rope is connected between the side board, next to the dock (2), of the ship body (1) and the landing mooring rope point (5), and mooring ropes are connected between the bow part of the side board, close to the dock (2), of the ship body (1) and the far shore mooring rope point (4) and between the stern part of the side board, next to the dock (2), of the ship body (1) and the far shore mooring rope point (4). By utilization of the fact that a plurality of mooring rope points are distributed in a plane mode, the rotating torque and the moving tension of all important parts on FPSO are effectively and evenly decomposed on a bigger loading area of the dock, the anti-drawing ability of the mooring ropes is improved, the total length of the mooring ropes is effectively shortened, engineering investment is reduced, the problem that the FPSO is poor in multi-point mooring performance in a dock area is solved, the FPSO dock mooring rope connection distributing structure can be widely applied to single side multi-point mooring of the FPSO in all kinds of floating type structure forms, operation is safe and stable, the effect is obvious, and the mooring level is remarkably improved.

Description

FPSO pier mooring cable connects distributed architecture
Technical field
The utility model relates to International Classification of Patents B63B boats and ships equipment and technology, and especially FPSO pier mooring cable connects distributed architecture.
Background technology
In the prior art, mooring is to instigate safety such as ship, buoy, platform to stay in the system or the process of anchor or sinker, bank or mooring buoy, generally in the mooring process, need make ship or other buoyancy aids system reside in assigned address with hawser or anchor chain.
FPSO is storage and the transportation of the oil of exploitation being carried out Oil-gas Separation, processing oily sewage, dynamic power, heat supply, crude oil products, the comprehensive large-scale offshore oil production base that integrates the personnel's inhabitation and the chain of command in production.Compare with other form oil production platforms, FPSO have capacity of anti-storm strong, adapt to that depth of water scope is wide, storage/emptying ability is big, and transferable, reusable advantage, extensively be suitable for the exploitation of deep-sea, shallow sea area and marginal oil field, become the main flow mode of production of offshore oil and gas field exploitation away from seashore.
The FPSO mooring system mainly with the FPSO mooring in the operation oil field.FPSO mooring system when the operation of marine site adopts one or more anchor points, one or more standpipe, floating or fixed type floating drum, capstan head or skeleton.FPSO mooring mode has two kinds of permanent mooring and the moorings of releasable formula.Certainly, just begin to play a significant role in FPSO construction phase mooring system.
In the prior art, FPSO mooring technology is constantly brought forth new ideas, as, the mooring of FPSO device of new generation mostly is the radial mooring of rotary type tower multiple spot, and what have also is equipped with a plurality of side thrusters at the bow stern.Spread mooring employing anchor chain and wirerope are combined, and the high anti-corrosion high-strength polyester fiber of employing and the combined mode of anchor chain are also arranged; According to the characteristics that current FPSO hull size increases and operational capability strengthens, newly-built FPSO is also corresponding to be equipped with powerful power system, and design adopts thruster screw propeller technology to improve the viability of large scale hull under vuthan, the quick performance when guaranteeing normally to navigate by water.
In addition, FPSO and other modifications or the newly-built facility waterborne that floats are the same, need the interim mooring of stopping in the depressed place or during harbour, this link outbalance, because the FPSO hull is big and cost is higher, the cable connection technology when it stops mooring also obtains extensive concern.
Chinese patent application CN94101402.9 vessel mooring system, the ocean mooring system comprises: boats and ships, have a hull, a ring-type mooring groove is arranged at its bottom; One floating mooring gear has a top, and it can engage with the mooring groove in the hull bottom; A plurality of cables connect mooring gear in the seabed, and mooring gear remains on the following a certain degree of depth place of hull bottom usually; Be used for promoting the device of this mooring gear to combine with the mooring groove of hull bottom from the previously selected degree of depth, be used for by the water inlet among the mooring groove hastily extracting seawater enter the device of hull, to reduce to act on the downward hydrostatic pressure on mooring gear top when mooring gear and the mooring fillister joint.
Chinese patent application 200980153909.8 is used for the system of the large vessel (10) that mooring is used for production of hydrocarbons, this ship (10) for example is the FPSO ship, described mooring system comprises at least two floating main bodys (17) that hang type, this floating main body is complied with spread anchoring system (12) by means of difference and is moored to sea bed, allows large vessel (10) partly to swing with weather; Riser systems (13,14), it extends to each floating main body (17) from sea bed, and the device that is used for transmitting to large vessel (10) fluid from two floating main bodys (17), floating main body (17) and large vessel (10) are provided with locked plug-in unit (16), sentence the mechanical rigid mode at the bow of ship (10) and stern floating main body (17) is locked onto large vessel (10), thereby the fixing rigidly unit of the integral type that comprises large vessel (10) and floating main body (17) is provided.
Application number: 200610079141.2 1 kinds of offshore float-positioning combined mooring ropes, it is characterized in that: it comprises that an end connects the anchor chain of marine float, the other end connection one of described anchor chain and the fixing anchor fitting in seabed, be arranged at intervals with one group of pouring weight on the described undersea anchor chain, described anchor chain is connected with the sidewall of described anchor fitting, and is embedded in the seabed with anchor chain that described anchor fitting sidewall is connected an end.
The utility model content
The purpose of this utility model is to provide a kind of FPSO pier mooring cable to connect distributed architecture, with the FPSO relative fixed in harbour, and each the significant points rotating torque on the FPSO and mobile tension force effectively is dispersed in big load region on the harbour.
Realize that the measure of the utility model purpose is: the heaving pile point that pulls in to shore is settled at the edge of the nearly water of harbour, settle bank heaving pile point far away in the harbour water receiving edge rear distance identical with beam of hull, hull the go to dock side board and the connection cable between heaving pile point that pulls in to shore, the hull connection cable between bow, stern and the bank heaving pile point far away of side board that goes to dock.
Advantage of the present utility model is, utilization is a plurality of heaving pile points of horizontal distribution, each significant points rotating torque on the FPSO and mobile tension force effectively are dispersed in big load region on the harbour, not only improve the anti-pulling ability of mooring fast, shortened the overall length of mooring fast effectively, reduce construction investment, also solved the difficult problem of FPSO in dock area spread mooring poor performance, can be widely used for the one-sided spread mooring of FPSO of various floating structure forms, the job safety stablizing effect is obvious, significantly improves the mooring level.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Reference numeral comprises: hull (1), and harbour (2), bow, stern heaving pile point (3), bank heaving pile point (4) far away, heaving pile point (5) pulls in to shore.
The specific embodiment
Further specify below by way of embodiments and drawings.
As shown in Figure 1, the heaving pile point (5) that pulls in to shore is settled at the edge of the nearly water of harbour (2), settle bank heaving pile point far away (4) in the distance that harbour (2) water receiving edge rear is identical with hull (1) width, hull (1) go to dock (2) side board and the connection cable between heaving pile point (5) that pulls in to shore, hull (1) connection cable between bow, stern and the bank heaving pile point (4) far away of (2) side board that goes to dock.
In aforementioned, go to dock (2) back bow, the stern correspondence position outside of the edge of the nearly water of harbour (2) and hull (1) settled and leaned on bow, stern heaving pile point (3), hull (1) bow, stern away from the height point of harbour (2) side board outer end and level attitude respectively with bow, stern heaving pile point (3) downlink connection hawser.
In aforementioned, hull (1) goes to dock (2) side board near the floating line top position and the connection cable between heaving pile point (5) that pulls in to shore, hull (1) the go to dock high point of bow, the stern position of (2) side board and connection cable between bank heaving pile point (4) far away.
In aforementioned, hull (1) goes to dock between bow, stern and the bank heaving pile point (4) far away of (2) side board, and the bonded assembly hawser effectively is connected distance and bow, stern heaving pile are put 3 connection cable active distances in 1-2 hull (1) width.
As embodiment, the utility model is finished the hawser mooring by totally 14 heaving pile points and is connected, to satisfy the stop under the FPSO hull maximum load situation.
The utility model when the more shallow harbour of the stop or the depth of water is stopped in dock, can be arranged bilge keel is seated on the water-bed supporting construction when using, and by diver's underwater inspection.
The utility model compared with prior art, mooring fast connects economy, safety, effectively, range of use is wide, data are accurate, capacity of anti-storm is strong.

Claims (4)

1.FPSO the pier mooring cable connects distributed architecture, it is characterized in that: the heaving pile point (5) that pulls in to shore is settled at the edge of the nearly water of harbour (2), settle bank heaving pile point far away (4) in the distance that harbour (2) water receiving edge rear is identical with hull (1) width, hull (1) go to dock (2) side board and the connection cable between heaving pile point (5) that pulls in to shore, hull (1) connection cable between bow, stern and the bank heaving pile point (4) far away of (2) side board that goes to dock.
2. FPSO pier mooring cable as claimed in claim 1 connects distributed architecture, it is characterized in that, go to dock (2) back bow, the stern correspondence position outside of the edge of the nearly water of harbour (2) and hull (1) settled and leaned on bow stern heaving pile point (3), the height point of hull (1) bow, stern harbour far away (2) side board outer end and level attitude respectively with bow stern heaving pile point (3) downlink connection hawser.
3. FPSO pier mooring cable as claimed in claim 1 connects distributed architecture, it is characterized in that, hull (1) goes to dock (2) side board near the floating line top position and the connection cable between heaving pile point (5) that pulls in to shore, hull (1) the go to dock high point of bow, the stern position of (2) side board and connection cable between bank heaving pile point (4) far away.
4. FPSO pier mooring cable as claimed in claim 2 connects distributed architecture, it is characterized in that, hull (1) the bonded assembly hawser that goes to dock between bow, stern and the bank heaving pile point (4) far away of (2) side board effectively is connected distance and bow stern heaving pile point (3) downlink connection hawser active distance in 1-2 hull (1) width.
CN 201220742054 2012-12-28 2012-12-28 Floating production storage offloading (FPSO) dock mooring rope connection distributing structure Expired - Lifetime CN203094382U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220742054 CN203094382U (en) 2012-12-28 2012-12-28 Floating production storage offloading (FPSO) dock mooring rope connection distributing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220742054 CN203094382U (en) 2012-12-28 2012-12-28 Floating production storage offloading (FPSO) dock mooring rope connection distributing structure

Publications (1)

Publication Number Publication Date
CN203094382U true CN203094382U (en) 2013-07-31

Family

ID=48845809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220742054 Expired - Lifetime CN203094382U (en) 2012-12-28 2012-12-28 Floating production storage offloading (FPSO) dock mooring rope connection distributing structure

Country Status (1)

Country Link
CN (1) CN203094382U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110696963A (en) * 2019-09-05 2020-01-17 海洋石油工程(青岛)有限公司 Ship wharf mooring method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110696963A (en) * 2019-09-05 2020-01-17 海洋石油工程(青岛)有限公司 Ship wharf mooring method

Similar Documents

Publication Publication Date Title
US20080274655A1 (en) Floating LNG import terminal and method for docking
CN100393576C (en) Berthing method and system
CN201140778Y (en) Flexible connection mooring apparatus for oil transportation on the sea
CN103085946B (en) Docking circular table Floating Production oil storage system
CA2963093C (en) Taut inverted catenary mooring system
CN108860481B (en) Omnibearing floating fuel oil supply system and operation method thereof
WO2007097610A1 (en) Semi-submersible vessel, method for operating a semi-submersible vessel and method for manufacturing a semi-submersible vessel
Sharma et al. Issues in offshore platform research-Part 1: Semi-submersibles
US6485343B1 (en) Dynamic positioning dock-loading buoy (DPDL-buoy) and method for use of such a DPDL-buoy
CN101503110B (en) Offshore shipping mooring apparatus
KR880002109B1 (en) Work platform
CN101224784A (en) Multifunctional small waterplane area ship of
WO2000027692A1 (en) Device for positioning of vessels
CN105644705A (en) Small water plane twin-hull platform
CN103074878A (en) Construction method for artificial island platform
Rutkowski A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore
WO2010020026A2 (en) Support vessel for offshore activities
AU2008239946B2 (en) System for loading of hydrocarbons from a floating vessel
CN112455613A (en) Logistics support floating base for open sea oil and gas resource development
CN202879763U (en) Stabilizing system for marine engineering working/living multifunctional vessel
CN203094382U (en) Floating production storage offloading (FPSO) dock mooring rope connection distributing structure
AU2008268434B2 (en) Vessel mooring systems and methods
CN203094380U (en) Floating production storage offloading (FPSO) temporary mooring device
CN107107994A (en) It is tensioned inverted catenary formula anchoring system
CN103074879B (en) Artificial island manufacture method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130731