CN205296802U - Well steel platform - Google Patents

Well steel platform Download PDF

Info

Publication number
CN205296802U
CN205296802U CN201520801919.0U CN201520801919U CN205296802U CN 205296802 U CN205296802 U CN 205296802U CN 201520801919 U CN201520801919 U CN 201520801919U CN 205296802 U CN205296802 U CN 205296802U
Authority
CN
China
Prior art keywords
platform
steel
utility
square
secondary joist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520801919.0U
Other languages
Chinese (zh)
Inventor
徐国凯
吴安路
吴传庆
边新瑞
蒋俊
万玉博
张建明
孙沐
刘志超
宋昊
李森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING BODA-JINGKAI CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BEIJING BODA-JINGKAI CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING BODA-JINGKAI CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING BODA-JINGKAI CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201520801919.0U priority Critical patent/CN205296802U/en
Application granted granted Critical
Publication of CN205296802U publication Critical patent/CN205296802U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a well steel platform, including a plurality of support built -in fittings, platform limit fossil fragments, secondary joist and checkered steel plate, it inserts in the hole in the well to support the built -in fitting, the square skeleton that platform limit fossil fragments formed for the channel -section steel welding, platform limit fossil fragments are placed on supporting the built -in fitting, the secondary joist welds in the inboard of platform limit fossil fragments, the utility model discloses the material guarantees for the channel -section steel welding that the platform has sufficient rigidity, satisfies the construction load requirement to guarantee construction operating personnel's safety, simple installation in the use can not restrict the time limit for a project, only need when needing to promote hoist tower crane for the platform, places the mounting in the square hole of reserving on the upper strata, puts down quick completion platform with the platform again and promotes, and the mounting adopts the I -steel, and is whole firm.

Description

A kind of hoistway steel platform
Technical field
This utility model relates to elevator construction equipment field, specifically a kind of hoistway steel platform.
Background technology
For multilayer structure, especially the engineering with ventilation shaft, elevator etc., in hoistway wall body structure work progress, needing to arrange operating platform in hoistway and ensure personnel construction safety and satisfied construction needs in hoistway, common practices is to set up platform with universal building steel pipe, fixes by steel pipe and structure, platform completely spreads the way of scaffold board, this kind of way is cumbersome when platform needs to promote, and loses time more, operator are existed bigger potential safety hazard.
Utility model content
The purpose of this utility model is in that to provide a kind of hoistway steel platform, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme:
A kind of hoistway steel platform, including multiple supporting embedded parts, platform edges Os Draconis, secondary joist and checkered steel plate, described supporting embedded part inserts in the hole in hoistway, and described platform edges Os Draconis are the quadrate framework that channel-section steel is welded, and platform edges Os Draconis are positioned on supporting embedded part; Described secondary joist is welded in the inner side of platform edges Os Draconis, and is welded with multiple round steel suspension ring being square and placing on described secondary joist; Described checkered steel plate is laid on the square platform of platform edges Os Draconis and secondary joist composition; Described checkered steel plate is welded with the steel pipe fitting placed that is square.
As further program of the utility model: described supporting embedded part adopts I-steel to make.
As this utility model further scheme: the thickness of described checkered steel plate is 4mm, and checkered steel plate is square plate.
Compared with prior art, the beneficial effects of the utility model are: this utility model material is channel-section steel welding, ensure that platform has enough rigidity, meet construction loads requirement, thus ensureing the safety of constructing operation personnel, simple installation in use procedure, the duration will not be restricted, need only need to be sling by platform tower crane when promoting, fixture is placed in the square hole that upper strata is reserved, again platform is put down and be rapidly completed platform lifting, fixture adopts I-steel, overall firm, Stability Analysis of Structures is unlikely to deform, platform operations face adopts checkered steel plate, prevent because of phenomenons such as sleet cause the scope of operation wet and slippery, product material is gathered materials on the spot, make simple, with low cost, use can be had enough to meet the need be widely applied as unit in charge of construction's good economic benefit of creation and social benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of hoistway steel platform of this utility model.
In figure: 1-supporting embedded part, 2-platform edges Os Draconis, 3-secondary joist, 4-round steel suspension ring, 5-checkered steel plate, 6-steel pipe fitting.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments. Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 1, in this utility model embodiment, a kind of hoistway steel platform, including multiple supporting embedded parts 1, platform edges Os Draconis 2, secondary joist 3 and checkered steel plate 5, described supporting embedded part 1 inserts in the hole in hoistway, the quadrate framework that described platform edges Os Draconis 2 are welded for channel-section steel, platform edges Os Draconis 2 are positioned on supporting embedded part 1; Described secondary joist 3 is welded in the inner side of platform edges Os Draconis 2, and is welded with multiple round steel suspension ring 4 being square and placing on described secondary joist 3; Described checkered steel plate 5 is laid on the square platform of platform edges Os Draconis 2 and secondary joist 3 composition; Described checkered steel plate 5 is welded with the steel pipe fitting 6 placed that is square.
Described supporting embedded part 1 adopts I-steel to make.
The thickness of described checkered steel plate 5 is 4mm, and checkered steel plate 5 is square plate.
Operation principle of the present utility model is: elevator steel platform size is determined according to lift shaft dimensions size, and girder adopts 4 14# channel-section steels to divide two bond pads, and secondary beam adopts 10# channel-section steel, and landing slab adopts 4mm thickness checkered steel plate to weld. At the reserved 120X120 square hole of body of wall, adopting that 4 14# I-steel are through walls to be supported as support body, I-steel stretches out the interior borehole wall and is not less than 300mm, and termination employing 300mm*300mm*4mm steel plate carries out full weld. Platform upper 4 �� 60 steel pipe sleeve pipes of welding, crosshead vertical rod is fixed in sleeve pipe and adopts screw rod to be attached. Use and describe: be placed in hole by the I-steel built-in fitting processed fixation after wall body structure construction, the steel platform tower crane processed is placed on built-in fitting along hoistway. The size of steel platform and hoistway length and width size reduced scale cannot be greater than 100mm; The hole of the fixing embedded part of superstructure placement platform position indwelling before platform needs lifting, sling needing the platform crane gear promoted, the fixture of lower floor is taken out in the hole to be provided of placement upper strata, then platform has been fallen a platform and has promoted, the saving engineering time simple to operate.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and when without departing substantially from spirit of the present utility model or basic feature, it is possible to realize this utility model in other specific forms. Therefore, no matter from which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes in the implication of the equivalency dropping on claim and scope included in this utility model. Any accompanying drawing labelling in claim should be considered as the claim that restriction is involved.
In addition, it is to be understood that, although this specification is been described by according to embodiment, but not each embodiment only comprises an independent technical scheme, this narrating mode of description is only for clarity sake, description should be made as a whole by those skilled in the art, and the technical scheme in each embodiment through appropriately combined, can also form other embodiments that it will be appreciated by those skilled in the art that.

Claims (3)

1. a hoistway steel platform, it is characterized in that, including multiple supporting embedded parts (1), platform edges Os Draconis (2), secondary joist (3) and checkered steel plate (5), described supporting embedded part (1) inserts in the hole in hoistway, the quadrate framework that described platform edges Os Draconis (2) are welded for channel-section steel, platform edges Os Draconis (2) are positioned on supporting embedded part (1);Described secondary joist (3) is welded in the inner side of platform edges Os Draconis (2), and is welded with multiple round steel suspension ring (4) being square and placing on described secondary joist (3); On the square platform that described checkered steel plate (5) is laid in platform edges Os Draconis (2) and secondary joist (3) is constituted; Described checkered steel plate (5) is welded with the steel pipe fitting (6) placed that is square.
2. hoistway steel platform according to claim 1, it is characterised in that described supporting embedded part (1) adopts I-steel to make.
3. hoistway steel platform according to claim 1, it is characterised in that the thickness of described checkered steel plate (5) is 4mm, and checkered steel plate (5) is square plate.
CN201520801919.0U 2015-10-16 2015-10-16 Well steel platform Expired - Fee Related CN205296802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520801919.0U CN205296802U (en) 2015-10-16 2015-10-16 Well steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520801919.0U CN205296802U (en) 2015-10-16 2015-10-16 Well steel platform

Publications (1)

Publication Number Publication Date
CN205296802U true CN205296802U (en) 2016-06-08

Family

ID=56438650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520801919.0U Expired - Fee Related CN205296802U (en) 2015-10-16 2015-10-16 Well steel platform

Country Status (1)

Country Link
CN (1) CN205296802U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643366A (en) * 2018-07-06 2018-10-12 中国人民解放军63926部队 A kind of device and localization method pre-buried suitable for vertical shaft bar shaped keel high-precision
CN113882646A (en) * 2021-11-22 2022-01-04 中国十九冶集团有限公司 Construction protection system for high-rise building elevator shaft
CN114033147A (en) * 2021-11-05 2022-02-11 中建四局第六建设有限公司 Construction method for dismantling and modifying I-steel of overhanging scaffold in hoistway

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643366A (en) * 2018-07-06 2018-10-12 中国人民解放军63926部队 A kind of device and localization method pre-buried suitable for vertical shaft bar shaped keel high-precision
CN108643366B (en) * 2018-07-06 2023-08-15 中国人民解放军63926部队 High-precision pre-burying device and positioning method suitable for vertical shaft bar-shaped keels
CN114033147A (en) * 2021-11-05 2022-02-11 中建四局第六建设有限公司 Construction method for dismantling and modifying I-steel of overhanging scaffold in hoistway
CN113882646A (en) * 2021-11-22 2022-01-04 中国十九冶集团有限公司 Construction protection system for high-rise building elevator shaft

Similar Documents

Publication Publication Date Title
CN103195256B (en) Hanging column type steel structure jig frame construction method
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN204311719U (en) External hanging type scaffold
CN205296802U (en) Well steel platform
CN103075025A (en) Integral lifting construction method for giant cantilever steel asymmetric structure of high-rise building
CN107558719A (en) For high-rise frame steel construction adjustable mobile operating platform and its construction method
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN106368714A (en) Tire type automatic lifting assembly rack for tunnel excavation construction
CN207903788U (en) A kind of steel column drum rack alternating brace type steel platform and tower crane synchronous hoisting device
CN204645570U (en) One can have enough to meet the need elevator shaft protective platform
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN103206075A (en) Suspension platform for construction of steel reinforced concrete cantilever structure
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
CN106149748A (en) A kind of tower crane steel structure base
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN106320681A (en) Elevator shaft standard operation platform and implementation platform
CN107905379A (en) Totally-enclosed layer construction method in high-rise building Core Walls Structure
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN206174441U (en) Elevator shaft operation platform
CN206376275U (en) A kind of construction elevator base apparatus on basement roof
CN204728675U (en) A kind of high rise elevator well is with layer activity operations frame
CN108979152A (en) Fetal membrane and its construction method for the high-altitude segmented assembly of large span steel truss
CN205742952U (en) Elevator civil engineering mobile platform
CN203257073U (en) Elevator shaft operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20171016