CN205277014U - Guard railing for building construction - Google Patents

Guard railing for building construction Download PDF

Info

Publication number
CN205277014U
CN205277014U CN201521094454.6U CN201521094454U CN205277014U CN 205277014 U CN205277014 U CN 205277014U CN 201521094454 U CN201521094454 U CN 201521094454U CN 205277014 U CN205277014 U CN 205277014U
Authority
CN
China
Prior art keywords
sleeve
steel pipe
base
reinforcing ring
vertical pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521094454.6U
Other languages
Chinese (zh)
Inventor
吴锦涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521094454.6U priority Critical patent/CN205277014U/en
Application granted granted Critical
Publication of CN205277014U publication Critical patent/CN205277014U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a guard railing for building construction, the on -line screen storage device comprises a base, the base upper end is provided with the reinforcing ring, be provided with the dead lever in the reinforcing ring centre bore, the dead lever be fixed in base upper end and the reinforcing ring between have a clearance, swing joint has vertical pipe in the clearance, vertical pipe passes through the bolt and links to each other with the dead lever, base left and right sides symmetry is equipped with the wash port, the wash port extends to the reinforcing ring inner wall and is linked together with the clearance, the vertical pipe right side is provided with the sleeve that the vertical direction equidistance in a plurality of edges was arranged, be provided with the telescopic link in the sleeve, be provided with the lock nut who is used for adjusting the telescopic link on the sleeve. This novel structural design is reasonable, and the width of rail guard is adjustable and it is convenient to adjust, labour saving and time saving, make things convenient for and remind night constructor to notice, the telescopic link is swift convenient with the sleeve separation, after -separating for easy storage, vertical pipe is difficult for appearing buckling, is difficult to the fracture and can not be corroded because of ponding.

Description

A kind of construction guard rail
Technical field
This utility model relates to a kind of architectural furniture, specifically a kind of construction guard rail.
Background technology
In the work progress of engineering construction, the various unlimited edge in construction operation place is required for carrying out security protection, and with prevention work, personnel fall from eminence, it is to avoid cause workman's casualty accident and unnecessary loss. Current common practices is to use scaffolding steel pipe to set up simple guard rail, the column of this guard rail, cross bar all use scaffolding steel pipe to set up, it is connected by fastener to connect, fixing at concrete floor, metope etc., with embedded iron parts and steel pipe or firm with reinforcement welding. Existing guard rail need first embedded iron parts when having drawbacks in that fixing, install and dismounting difficulty, set up and relatively take a lot of work, relatively costly, not easily carry out turnover use, do not reach safety construction requirement, it is impossible to implementation tool, canalization, for a long time repeat turnover use purpose.
Utility model content
The purpose of this utility model is in that to provide a kind of construction guard rail, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme:
A kind of construction guard rail, including base, described base upper end is provided with fixing collar, it is provided with fixing bar in described fixing collar centre bore, described fixing bar be fixed on base upper end and and fixing collar between there is gap, being connected with vertical steel pipe in described gap, described vertical steel pipe is connected with fixing bar by latch; The described base left and right sides is arranged with osculum, and described osculum extends to fixing collar inwall and is connected with gap; It is provided with the sleeve of multiple vertically disposed at equal distance on the right side of described vertical steel pipe, in described sleeve, is provided with expansion link, described sleeve is provided with the locking nut for adjustable telescopic rod; Described expansion link right-hand member is all connected with vertical rod, and described vertical rod lower end is provided with transverse slat, and described transverse slat lower end is provided with universal wheel.
As further program of the utility model: described vertical steel pipe and vertical rod are provided with fluorescent belt.
As this utility model further scheme: described vertical rod is provided with handle.
Compared with prior art, the beneficial effects of the utility model are: during use, promote universal wheel to make expansion link move in sleeve, adjust required width, locked by locking nut, make sleeve and expansion link fix, after using, expansion link separates with sleeve, conveniently deposits; Fluorescent belt is set, facilitates night prompting workmen to note; Handle is set, conveniently pulls vertical rod; Arranging fixing collar, add the bonding strength between the fixing bar on vertical steel pipe and base, when weight collision is on guard rail, owing to intensity increases, not easily there is bending in vertical steel pipe, it is not easy to fracture, it is possible to meet the needs of safe construction; Osculum is set, it is prevented that vertically corrode because of fixing collar internal water accumulation bottom steel pipe; Latch is set, it is simple to fixing vertical steel pipe, it is prevented that it rotates so that vertical rod can not be stably fixed to a place, does not have the effect of guardrail.
In sum, this new structural design is reasonable, and the width of guard rail is adjustable and easy to adjust, time saving and energy saving; Night prompting workmen is facilitated to note; Expansion link separates efficient and convenient with sleeve, deposits conveniently after separation; Not easily there is bending in vertical steel pipe, it is not easy to ruptures and will not be corroded because of hydrops.
Accompanying drawing explanation
Fig. 1 is the structural representation of construction guard rail.
In figure: 1-base, 2-osculum, 3-fixing collar, 4-fixes bar, 5-latch, the vertical steel pipe of 6-, 7-fluorescent belt, 8-sleeve, 9-locking nut, 10-expansion link, 11-vertical rod, 12-transverse slat, 13-universal wheel, and 14-shakes hands.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments. Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
Refer to Fig. 1, a kind of construction guard rail, including base 1, described base 1 upper end is provided with fixing collar 3, it is provided with fixing bar 4 in described fixing collar 3 centre bore, described fixing bar 4 be fixed on base 1 upper end and and fixing collar 3 between there is gap, be connected with vertical steel pipe 6 in described gap, described vertical steel pipe 6 is connected with fixing bar 4 by latch 5; Described base 1 left and right sides is arranged with osculum 2, and described osculum 2 extends to fixing collar 3 inwall and is connected with gap; It is provided with the sleeve 8 of multiple vertically disposed at equal distance on the right side of described vertical steel pipe 6, in described sleeve 8, is provided with expansion link 10, described sleeve 8 is provided with the locking nut 9 for adjustable telescopic rod 10; Described expansion link 10 right-hand member is all connected with vertical rod 11, and described vertical rod 11 lower end is provided with transverse slat 12, and described transverse slat 12 lower end is provided with universal wheel 13.
Operation principle of the present utility model is: during use, promotes universal wheel 13 to make expansion link 10 mobile in sleeve 8, adjusts required width, locked by locking nut 9, make sleeve 8 and expansion link 10 fix, after using, expansion link 10 separates with sleeve 8, conveniently deposits; Fluorescent belt 7 is set, facilitates night prompting workmen to note; Handle 14 is set, conveniently pulls vertical rod 11; Arranging fixing collar 3, add the bonding strength between the fixing bar 4 on vertical steel pipe 6 and base 1, when weight collision is on guard rail, owing to intensity increases, not easily there is bending in vertical steel pipe 6, it is not easy to fracture, it is possible to meet the needs of safe construction; Osculum 2 is set, it is prevented that vertically corrode because of fixing collar 3 internal water accumulation bottom steel pipe 6; Latch 5 is set, it is simple to fixing vertical steel pipe 6, it is prevented that it rotates so that vertical rod 11 can not be stably fixed to a place, does not have the effect of guardrail.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and when without departing substantially from spirit of the present utility model or basic feature, it is possible to realize this utility model in other specific forms. Therefore, no matter from which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes in the implication of the equivalency dropping on claim and scope included in this utility model. Any accompanying drawing labelling in claim should be considered as the claim that restriction is involved.
In addition, it is to be understood that, although this specification is been described by according to embodiment, but not each embodiment only comprises an independent technical scheme, this narrating mode of description is only for clarity sake, description should be made as a whole by those skilled in the art, and the technical scheme in each embodiment through appropriately combined, can also form other embodiments that it will be appreciated by those skilled in the art that.

Claims (3)

1. a construction guard rail, including base, it is characterized in that, described base upper end is provided with fixing collar, it is provided with fixing bar in described fixing collar centre bore, described fixing bar be fixed on base upper end and and fixing collar between there is gap, be connected with vertical steel pipe in described gap, described vertical steel pipe is connected with fixing bar by latch; The described base left and right sides is arranged with osculum, and described osculum extends to fixing collar inwall and is connected with gap; It is provided with the sleeve of multiple vertically disposed at equal distance on the right side of described vertical steel pipe, in described sleeve, is provided with expansion link, described sleeve is provided with the locking nut for adjustable telescopic rod; Described expansion link right-hand member is all connected with vertical rod, and described vertical rod lower end is provided with transverse slat, and described transverse slat lower end is provided with universal wheel.
2. construction guard rail according to claim 1, it is characterised in that be provided with fluorescent belt on described vertical steel pipe and vertical rod.
3. construction guard rail according to claim 1, it is characterised in that be provided with handle in described vertical rod.
CN201521094454.6U 2015-12-26 2015-12-26 Guard railing for building construction Expired - Fee Related CN205277014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521094454.6U CN205277014U (en) 2015-12-26 2015-12-26 Guard railing for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521094454.6U CN205277014U (en) 2015-12-26 2015-12-26 Guard railing for building construction

Publications (1)

Publication Number Publication Date
CN205277014U true CN205277014U (en) 2016-06-01

Family

ID=56061598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521094454.6U Expired - Fee Related CN205277014U (en) 2015-12-26 2015-12-26 Guard railing for building construction

Country Status (1)

Country Link
CN (1) CN205277014U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439198A (en) * 2019-07-26 2019-11-12 中铁十八局集团有限公司 A kind of piece for assembling type fence for steel structural rod piece high-altitude intelligent operation
CN111577000A (en) * 2020-06-01 2020-08-25 张学伟 Protective fence equipment for engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439198A (en) * 2019-07-26 2019-11-12 中铁十八局集团有限公司 A kind of piece for assembling type fence for steel structural rod piece high-altitude intelligent operation
CN111577000A (en) * 2020-06-01 2020-08-25 张学伟 Protective fence equipment for engineering
CN111577000B (en) * 2020-06-01 2021-08-17 湖南筑邦鸿昇建筑科技有限公司 Protective fence equipment for engineering

Similar Documents

Publication Publication Date Title
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN206144172U (en) Equipment standard platform of unloading of encorbelmenting
CN205421538U (en) Novel steel construction
CN206859719U (en) A kind of efficient assembled safety barrier for edge protection
CN205277014U (en) Guard railing for building construction
CN203639011U (en) Safety climbing channel for sized tower crane for building engineering
CN105908960A (en) Construction rack for construction of high and large space
CN210976543U (en) Cage platform for tensioning construction
CN206581579U (en) A kind of track-type facilities of elevating scaffold
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN204752026U (en) Tower crane escape way
CN210239090U (en) Movable operating platform
CN211524150U (en) Steel beam edge protection device
CN205742975U (en) A kind of direct plugging type scaffold
CN202055502U (en) Basket-type operating platform for construction of high-rise building construction
CN203640257U (en) Support of overhanging type scaffold
CN202706749U (en) Device for connecting building safety protection door and scaffold
CN205224636U (en) Rail guard for building of can be adjusted freely width
CN205954972U (en) Steel structure floor slab
CN202788018U (en) Storey near edge temporary guard rail
CN204754280U (en) Hole reinforcement structure is opened to reinforced concrete roof beam
CN210888118U (en) Building faces limit structure post construction protection frame
CN209703874U (en) Fashioned iron lightweight concrete stair
CN208502205U (en) The high mobile operation platform of big layer
CN207377096U (en) Overlength large girder scaffold building structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20171226

CF01 Termination of patent right due to non-payment of annual fee