CN208502205U - The high mobile operation platform of big layer - Google Patents
The high mobile operation platform of big layer Download PDFInfo
- Publication number
- CN208502205U CN208502205U CN201821085611.0U CN201821085611U CN208502205U CN 208502205 U CN208502205 U CN 208502205U CN 201821085611 U CN201821085611 U CN 201821085611U CN 208502205 U CN208502205 U CN 208502205U
- Authority
- CN
- China
- Prior art keywords
- layer
- upright
- bar
- operation platform
- upright bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model provides a kind of high mobile operation platform of big layer, the platform includes being connected the lower crosspiece layer of the quadrangular section formed by four cross bar first places respectively, middle part beam layer and upper cross bar layer, four upright bars are respectively adopted between each beam layer in the apex support connection of quadrangle, operating platform is laid on upper cross bar layer, and install guard rail additional, wherein the top of the upright bar for connecting upper cross bar layer is provided with several pairs of perforation, it can be with the height of flexible modulation upper cross bar layer, and it can also be according to the difference of working space height, spreading is carried out to each upright bar.The high mobile operation platform of big layer provided by the utility model be reasonable in design, safety and firmness, conveniently moving, highly can flexible modulation, be suitable for big layer high building interior decoration, maintenance activity.
Description
Technical field
The utility model belongs to construction engineering technical field, and in particular to a kind of big high mobile operation platform of layer.
Background technique
In the operations such as finishing, the maintenance of interior of building, it is often necessary to build scaffold as job platform, for big
For layer high building, because layer height is higher, for security consideration, generally requires and build steel pipe scaffold and construct, this steel
Heavy workload, material utilization amount are big when pipe scaffold building, build and dismantle it is all time-consuming and laborious, and steel pipe scaffold dismounting after
When needing to repair ceiling and inner wall surface, extra workload will increase.If using mobile combined bay, the single rack face of combined bay
Product is too small, and excessively high stability is insufficient combine in addition after, is unable to satisfy safe construction requirement.Therefore, urgent need will design a kind of suitable
For big layer high building interior decoration construction, conveniently moving, height-adjustable job platform.
Utility model content
In order to solve technical problem of the existing technology, the utility model provides a kind of job platform, the platform structure
Design rationally, safety and firmness, conveniently moving, highly can flexible modulation, be suitable for big layer high building interior decoration, maintenance make
Industry.
The technical solution of the utility model realization above-mentioned purpose are as follows:
Lower part connection is respectively adopted in a kind of high mobile operation platform of big layer, including four upright bars, the lower part of the upright bar
Part by the connection of four cross bars, four cross bars compositions perpendicular to upright bar lower crosspiece layer, the lower end of lower attachment respectively with
The connection of one directive wheel;It is connected using four cross bars and four upright bars by intermediate connector on the top of upright bar, in formation
Inter cross bar layer, the top of each upright bar is provided with several pairs of perforation on middle transverse rod layer, is provided with same size and connects to the top of perforation
Part is covered in upright bar and is fixed using reinforcing bar or screw rod, which connects four cross bars and form upper cross bar layer, upper
It is laid with operating platform in portion's beam layer, and installs guard rail additional.
The lower attachment and intermediate connector are both designed as the upright short steel pipes of about one welding flange, upright short
It welds the mutually lateral short steel pipes at right angle with ring flange, each ring flange of lower attachment and is respectively used to connect in steel pipe side
Upright bar, adjacent two cross bars and directive wheel;Each ring flange of middle part connector is respectively used to connect upright bar up and down and adjacent
Cross bar.
The upper attachment includes that one section of side is provided with upright short steel pipes to perforation, and it is straight that diameter of steel tube is greater than upright bar
Diameter, and in the mutual lateral short steel pipes with ring flange at right angle of side welding, upright bar passes through the upright short steel pipes, using spiral shell
Bar or reinforcing bar pass through the two and upright short steel pipes are fixed on upright bar top, fixed height of the upper attachment in upright bar to perforation
It is adjustable, to keep the height of job platform adjustable, to adapt to the high operation of different layers.
According to operation space height, in the upright bar between lower crosspiece layer, middle transverse rod layer and upper cross bar layer
It can be connected respectively with another upright bar again, carry out the spreading of upright bar;
For the intensity for further increasing job platform, the quadrangle facade where each adjacent upright bar it is diagonal between and
Each beam layer it is diagonal between be all made of oblique pull steel wire drawing and fix, it is specifically between the lateral short steel pipes of each connector and horizontal
To being respectively provided with floor of putting more energy between short steel pipes and the angle of upright short steel pipes, and in aperture on floor of putting more energy into, fixed using rope card
Wirerope is tightened using flower basket bolt in wirerope, centre.
The length of preferred each upright bar is identical in the utility model, and the length of each cross bar is identical.Each upright bar respectively with each cross bar
Layer is vertical.In addition to the upright bar of topmost, the equal welding flange in the both ends of other upright bars and cross bar, for the method on each connector
Blue disk is connected with each other.
The utility model preferably connects a support member on the outside of each lower attachment, and the effect of the support member is to increase
The stability for adding job platform reduces the stress of directive wheel.The specific structure of the support member is in each lower attachment
Outside weld two blocks of relatively parallel steel plates, beat pin shaft hole on the steel plate, a pin shaft and a movable supporting used on steel plate
One end of bar is flexibly connected, and the movable support rod can be rotated around pin shaft, and the other end of movable support rod is equipped with threaded hole, screw thread
In hole install an adjusting screw rod, the adjusting screw rod can in threaded hole rotation and lifting, so as to adjust the power on screw support ground
Degree.
In the utility model, in lay-up operation platform, stull is added in the vertical or horizontal centre of upper cross bar layer, by two
Block U-shaped steel plate is welded on the both ends of stull, then by the U-shaped steel board in the beam layer of upper layer, so as to be stuck in stull
On the cross bar of portion's beam layer, and it can horizontally slip and adjust spacing, then be laid with plank or steel in stull and upper cross bar layer again
Plate.
Equally, in order to improve the safety of protective fence, short steel pipes are welded in the cross bar top surface of upper cross bar layer, and use
Sleeve couple connects guard rail.It is formed and is intersected between the horizontal rails of the guard rail of adjacent two sides, infall is using straight
The connection of angle fastener fixing.
Mobile operation platform described in the utility model further includes hanging upper people's ladder, hanging upper people's ladder and each cross bar
Upright bar height on layer is identical, is suspended on the cross bar of each layer of beam layer convenient for hanging upper people's ladder.
In the utility model, the length and job platform height of cross bar are than control 1: 1~1: 4, preferably 1: 2~1: 3.
In the utility model, the directive wheel is equipped with lock foot, and lockable directive wheel increases the stability of job platform.
The finishing that the high mobile operation platform of the big layer of the utility model is able to satisfy big layer high building uses, and the finishing is flat
The height of platform can flexible modulation, conveniently moving, stability and highly-safe solves the only activity finishing foot hand combination in market
Height is insufficient afterwards, highly increases the problems such as rear stability is insufficient.
The high mobile operation platform of the big layer of the utility model can be set according to the special maintenance of user or different terrain environment
Meter is built, more light-weight than traditional scaffold, part standard, and no loose mail is easily installed, removes, carries, stores, with dress with,
It is moved easily, reusable, simple installation is quick, and occupied area is small.And the utility model mobile operation platform is furnished with
High-intensitive strap brake foot directive wheel arbitrarily can be moved and be locked without having to worry about pulley problem easy to wear, convenient in multiple and different operations
Place continuous use.And it can be according to the special maintenance of user or the job requirements of different terrain environment, special designing and manufacture.
Detailed description of the invention
Fig. 1 is the high mobile operation platform structural schematic diagram of the big layer of the utility model.
Fig. 2 is part A partial enlarged view in Fig. 1.
Fig. 3 is lower crosspiece layer plane structural schematic diagram.
Fig. 4 is part B partial enlarged view in Fig. 3.
Fig. 5 is upper cross bar layer plane structural schematic diagram.
Fig. 6 is lower attachment and intermediate connector structural schematic diagram.
Fig. 7 is upper attachment structural schematic diagram.
Fig. 8 is the upright bar structural schematic diagram of overpunch.
Fig. 9 is bar structure schematic diagram.
Figure 10 is transverse brace structure schematic diagram.
Figure 11 is hanging upper people's ladder structural schematic diagram.
Wherein, 1- upright bar, 2- lower attachment, 3- cross bar, 4- lower crosspiece layer, 5- directive wheel, 6- intermediate connector, 7-
Middle transverse rod layer, 8- are oblique to perforation, 9- upper attachment, 10- upper cross bar layer, 11- operating platform, 12- guard rail, 13-
Draw steel wire, 14- steel plate, 15- pin shaft, 16- movable support rod, 17- adjusting screw rod, 18- stull, 19-U shape steel plate, the short steel of 20-
Pipe, the hanging upper people's ladder of 21-, 22- are put more energy into floor, 23- ring flange, the upright short steel pipes of 24-, 25- transverse direction short steel pipes.
Specific embodiment
Clear, complete description is carried out to the technical solution in the utility model implementation with reference to the accompanying drawing.The specific reality
Applying technical solution described in mode should not be construed as a limitation of the present invention.
As shown in Figs. 1-5, the high mobile operation platform of big layer includes four upright bars 1, and the lower part of the upright bar 1 is respectively adopted
Lower attachment 2 is connected by four cross bars 3, lower crosspiece layer 4 of four compositions of cross bar 3 perpendicular to upright bar 1, lower attachment
2 lower ends are connect with a directive wheel 5 respectively;Connected using four cross bars and four upright bars by intermediate connector 6 on the top of upright bar
It picks up and, form middle transverse rod layer 7, the top of each upright bar is provided with several couples of 8 (shown in Fig. 8) of perforation on middle transverse rod layer, is provided with
Same size fixes 9 sets of upper attachment of perforation in upright bar and to perforation using reinforcing bar or screw rod, which connects
Fitting 9 includes that one section of side is provided with the upright short steel pipes to perforation, and diameter of steel tube is greater than upright bar diameter, and welding is mutually in side
The lateral short steel pipes (as shown in Figure 7) with ring flange at right angle, for connecting four cross bars on top, four cross on top
Bar forms upper cross bar layer 10, operating platform 11 is laid on upper cross bar layer, and install guard rail 12 additional, and guard rail adds
Dress mode is to weld short steel pipes 21 in the cross bar top surface of upper cross bar layer, and connect guard rail 12 using sleeve couple.
A support member is connected on the outside of each lower attachment 2, specific structure is in each lower attachment 2
Two blocks of relatively parallel steel plates 14 are welded in outside, beat pin shaft hole on the steel plate, are propped up on steel plate using a pin shaft 15 and an activity
One end of strut 16 is flexibly connected, and the movable support rod can be rotated around pin shaft, and the other end of movable support rod is equipped with threaded hole,
One adjusting screw rod 17 is installed in threaded hole.
As shown in fig. 6, lower attachment 2 and intermediate connector 6 are both designed as the upright short of about one welding flange 23
The mutually lateral short steel pipes 25 at right angle with ring flange 22 are welded in steel pipe 24, upright short steel pipes side, lower attachment 2
Each ring flange is respectively used to connecting upright pole 1, adjacent two cross bars 3 and directive wheel 5;Each ring flange of middle part connector 6 point
Upright bar 1 and adjacent crossbars 3 up and down Yong Yu not be connected, between lateral short steel pipes 25 and lateral short steel pipes 25 and upright short steel pipes 24
Angle between be respectively provided with floor 22 of putting more energy into, and in aperture on floor of putting more energy into.
Upper attachment 9 as shown in Figure 7 includes that one section of side is provided with the upright short steel pipes 24 to perforation, and diameter of steel tube is big
In upright bar diameter, and in the mutual lateral short steel pipes 25 with ring flange 23 at right angle of side welding, it is upright that upright bar passes through this
Short steel pipes 24 pass through the two using screw rod or reinforcing bar and upright short steel pipes are fixed on upright bar top to perforation, and upper attachment exists
Fixed height in upright bar is by corresponding different adjustable to perforation, to keep the height of job platform adjustable.Lateral short steel pipes
It is respectively provided with floor 22 of putting more energy between 25 and between lateral short steel pipes 25 and the angle of upright short steel pipes 24, and is opened on floor putting more energy into
Hole.
The quadrangle facade where each adjacent upright bar it is diagonal between and each beam layer it is diagonal between be all made of oblique pull
The drawing of steel wire 13 is fixed, the specifically aperture on the floor 22 of putting more energy into of each connector, blocks fixed wirerope using rope, centre uses
Flower basket bolt tightens wirerope.
As shown in figure 9, the equal welding flange 23 in the both ends of upright bar 1 and cross bar 3, the length of each upright bar is identical, each cross bar
Length is identical, and each upright bar is vertical with each beam layer respectively.
Figure 10 show the structural schematic diagram of stull 18, vertical or horizontal in upper cross bar layer in lay-up operation platform
Centre adds stull 18, and two blocks of U-shaped steel plates 19 are welded on to the both ends of stull 18, and the U shape steel plate is then stuck in upper layer cross bar
On layer, so as to be stuck in stull 18 on the cross bar 3 of upper cross bar layer, and it can horizontally slip and adjust spacing, then again in stull
18 and upper cross bar layer 10 on be laid with plank or steel plate.
Equally, in order to improve the safety of protective fence, short steel pipes 20 are welded in the cross bar top surface of upper cross bar layer, and
Guard rail 12 is connected using sleeve couple.It is formed and is intersected between the horizontal rails of the guard rail of adjacent two sides, infall
It is fixedly connected using right-angle coupler.
Mobile operation platform shown in the specific embodiment further includes hanging upper people's ladder 21, suspension type climbing stair and each cross
Upright bar height on bar layer is identical, and structure is as shown in figure 11.
In the specific embodiment, the length and job platform height ratio of cross bar are 1: 2.
Claims (10)
1. a kind of high mobile operation platform of big layer, including four upright bars (1), it is characterised in that the lower part of the upright bar (1)
Not Cai Yong lower attachment (2) by the connection of four cross bars (3), four cross bars compositions perpendicular to upright bar lower crosspiece layer (4),
The lower end of lower attachment (2) is connect with a directive wheel (5) respectively;It is logical using four cross bars and four upright bars on the top of upright bar
It crosses intermediate connector (6) to connect, be formed middle transverse rod layer (7), the top of each upright bar is provided with several right on middle transverse rod layer
It perforates (8), is provided with same size and the upper attachment (9) of perforation is covered in upright bar and is fixed using reinforcing bar or screw rod, top
Connector (9) connects four cross bars and forms upper cross bar layer (10), is laid with operating platform (11) on upper cross bar layer, and install additional
Guard rail (12).
2. the high mobile operation platform of big layer according to claim 1, it is characterised in that the lower attachment (2) and in
Between connector (6) be both designed as the upright short steel pipes (24) of about one welding flange (23), upright short steel pipes side welding is mutual
Lateral short steel pipes (25) at right angle with ring flange (23), each ring flange of lower attachment (2) are separately connected upright bar
(1), two adjacent cross bars (3) and directive wheel (5);Each ring flange of middle part connector (6) is separately connected upright bar (1) up and down
With adjacent crossbars (3).
3. the high mobile operation platform of big layer according to claim 1, it is characterised in that the upper attachment (9) includes
One section of side is provided with the upright short steel pipes (24) to perforation (8), and upright short steel pipes diameter is greater than upright bar diameter, and in upright short steel
It manages (24) side and welds the mutually lateral short steel pipes (25) at right angle with ring flange (23), upright bar passes through the upright short steel pipes,
The two is passed through using screw rod or reinforcing bar, upright bar top is fixed on by upright short steel pipes to perforation.
4. the high mobile operation platform of big layer according to claim 1, it is characterised in that the length of each upright bar is identical, each cross
The length of bar is identical, and each upright bar is vertical with each beam layer respectively.
5. the high mobile operation platform of big layer according to claim 1 or 4, it is characterised in that lower crosspiece layer (4), in
It is connected respectively with another upright bar in upright bar between Inter cross bar layer (7) and upper cross bar layer (10), carries out the spreading of upright bar.
6. the high mobile operation platform of big layer according to claim 1, it is characterised in that four where each adjacent upright bar
Side shape facade it is diagonal between and each beam layer it is diagonal between be all made of oblique pull steel wire (13) drawing fix.
7. the high mobile operation platform of big layer according to claim 1, it is characterised in that each lower attachment (2) outside
Side connects a support member, and the specific structure of the support member is to weld two pieces of phases in the outside of each lower attachment (2)
To parallel steel plate (14), pin shaft hole is beaten on the steel plate, uses a pin shaft (15) and a movable support rod (16) on steel plate
One end is flexibly connected, and the other end of movable support rod is equipped with threaded hole, installs an adjusting screw rod (17) in threaded hole.
8. the high mobile operation platform of big layer according to claim 1, it is characterised in that in lay-up operation platform, upper
Beam layer vertical or horizontal centre in portion's adds stull (18), and two pieces of U-shaped steel plates (19) are specifically welded on the two of stull (18)
Then end is laid with wood then by the U-shaped steel board in the beam layer of upper layer in stull (18) and upper cross bar layer (10) again
Plate or steel plate.
9. the high mobile operation platform of big layer according to claim 1, it is characterised in that on the cross bar top of upper cross bar layer
Short steel pipes (20) are welded in face, and using sleeve couple connection guard rail (12), the horizontal bar of the guard rail of adjacent two sides
It is formed and is intersected between bar, infall is fixedly connected using right-angle coupler.
10. the high mobile operation platform of big layer according to claim 1, it is characterised in that the mobile operation platform
It further include hanging upper people's ladder (21), hanging upper people's ladder is identical as the upright bar height in each beam layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821085611.0U CN208502205U (en) | 2018-07-10 | 2018-07-10 | The high mobile operation platform of big layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821085611.0U CN208502205U (en) | 2018-07-10 | 2018-07-10 | The high mobile operation platform of big layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208502205U true CN208502205U (en) | 2019-02-15 |
Family
ID=65283989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821085611.0U Active CN208502205U (en) | 2018-07-10 | 2018-07-10 | The high mobile operation platform of big layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208502205U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029804A (en) * | 2019-04-10 | 2019-07-19 | 中铁建设集团有限公司 | A kind of sizing steel operating platform |
-
2018
- 2018-07-10 CN CN201821085611.0U patent/CN208502205U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029804A (en) * | 2019-04-10 | 2019-07-19 | 中铁建设集团有限公司 | A kind of sizing steel operating platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN104074349B (en) | A kind of new-type protection type attachment type raise scaffold | |
CN105908761A (en) | Construction technology of hanging basket moving platform for high slope | |
CN101775896B (en) | Rigid suspended scaffold for installing pipeline of steel roof equipment | |
CN206487087U (en) | A kind of scissor stairs of sectional | |
CN206581577U (en) | Using housing construction builder's jack | |
CN208502205U (en) | The high mobile operation platform of big layer | |
CN100476146C (en) | High altitude placing steel pole inner concrete operating platform frame | |
CN107816209B (en) | The large-scale Roof Truss construction technology of installation is lifted across outer two sides | |
CN201635377U (en) | Rigid suspended type scaffold provided with large-span steel roof equipment pipeline | |
CN206144124U (en) | A scaffold for construction of tall and big space | |
CN205531271U (en) | Hanging flower basket moving platform constructional device | |
CN210239090U (en) | Movable operating platform | |
CN215859222U (en) | Simple and easy assembled safety protection canopy subassembly of encorbelmenting | |
CN205955164U (en) | Portable steel truss operation platform | |
CN207553565U (en) | A kind of crosshead of truss | |
CN115306137A (en) | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof | |
CN204826727U (en) | Reinforcing bar processing protection canopy that can dismantle, has enough to meet need | |
CN204940916U (en) | A kind of Super High Core Walls Structure emergency escape passage | |
CN201714103U (en) | Continuously recyclable edge protection structure | |
CN111979925B (en) | Construction method for pouring diaphragm plate in hollow thin-wall pier by using fabricated construction platform | |
CN107217685A (en) | A kind of Portable piping lane side wall formwork jumbo | |
CN203846841U (en) | Power transmission line iron tower and rest platform thereof | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN208347279U (en) | A kind of building faces side structural column construction protecting rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |