CN202788018U - Storey near edge temporary guard rail - Google Patents

Storey near edge temporary guard rail Download PDF

Info

Publication number
CN202788018U
CN202788018U CN 201220385563 CN201220385563U CN202788018U CN 202788018 U CN202788018 U CN 202788018U CN 201220385563 CN201220385563 CN 201220385563 CN 201220385563 U CN201220385563 U CN 201220385563U CN 202788018 U CN202788018 U CN 202788018U
Authority
CN
China
Prior art keywords
near edge
storey
temporary guard
guard rail
pipe box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220385563
Other languages
Chinese (zh)
Inventor
李海东
闫永红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shanxi Sijian Group Co Ltd
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CN 201220385563 priority Critical patent/CN202788018U/en
Application granted granted Critical
Publication of CN202788018U publication Critical patent/CN202788018U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a construct auxiliary tool, in particular to a storey near edge temporary guard rail. The storey near edge temporary guard rail achieves temporary guard on the near edge portion of a high-rise building and comprises connecting pieces and steel tubes. Each connecting piece is composed of a fixing plate and a tube sleeve. A connecting bolt is arranged on each fixing plate. A fixing bolt penetrates through a wall of the tube sleeve. Each steel tube penetrates each tube sleeve. The storey near edge temporary guard rail is simple in structure so that standard component can be manufactured to use and cycle by using existing materials in a construction site, convenient to carry, convey and install, cost-saving and capable of guarding the near edge portion effectively and rapidly and removing potential safety hazard of the construction site.

Description

Floor edge provisional protection hurdle
Technical field
The utility model relates to a kind of building aid, is specially a kind of floor edge provisional protection hurdle.
Background technology
Civil building engineering is generally multilayer, high-rise frame, frame and cuts class formation, in constructure construction procedure, a lot of floor edges and stair side are not also installed the permanent protection hurdle, and this very little details concerns constructor's safety, so are important contents of safety in production to the security protection at these positions.Traditional fado of doing is directly set up with steel tube fastener, increases that brace supports or with timber wedge, galvanized wire etc. and structural strengthening.The shortcoming of these practices has:
(1) be building site fastener lock steel pipe commonly used owing to what use, the workman is quick detachable to use for other purposes, and causes potential safety hazard;
(2) use steel pipe, fastener many, take and tear open slowly, take material, take a lot of work, time-consuming;
(3) not attractive in appearance, set up and the reinforcement means disunity causes impression poor;
(4) use timber wedge, the fastness that galvanized wire etc. are reinforced is poor.
Summary of the invention
The utility model provides a kind of floor edge provisional protection hurdle for the technical problem of the provisional protection that solves high-rise building Lin Bianchu.
The technical solution of the utility model is, a kind of floor edge provisional protection hurdle, and structure comprises connector, steel pipe, and connector is made of fixed head and pipe box, and fixed head is provided with connecting bolt, and the pipe box wall has been uploaded set bolt, and steel pipe is through in the pipe box.
One of described connecting-piece structure is the parallel connection with pipe box of fixed head, and this kind structure can be used for both sides without the floor limit of side wall (post), connector is fixed on the interior facade of wall (post) of both sides, hole, wears steel pipe fastening and gets final product;
Two of described connecting-piece structure is connected with pipe box is vertical for fixed head.This kind structure is used for side wall (post), connector is fixed in the side of wall (post), wearing the A48 steel pipe fastening gets final product, the ground heel piece that the connector of this kind structure also can be used as the A48 vertical rod uses, limit (both sides non-structure wall, post) is faced at the hole that surpasses 5.8m such as length, the doors structure staggered floor faces the limit, all can support the use with this ground heel piece when staircase etc. must be set up bar.
Apparatus structure described in the utility model is simple, can utilize the existing materials processing in building site, is processed into the standard component turnover and uses.Be convenient for carrying and shift, be convenient to install, saved cost, make the position of facing the limit be able to effective quick protection, got rid of the potential safety hazard in building site.
Description of drawings
Fig. 1 is one of connecting-piece structure schematic diagram of the present utility model
Fig. 2 is the lateral view of Fig. 1
Fig. 3 is one of use state diagram of the present utility model
Fig. 4 is two of connecting-piece structure schematic diagram of the present utility model
Fig. 5 is the lateral view of Fig. 4
Fig. 6 is two of use state diagram of the present utility model
Among the figure: 1-fixed head, 2-pipe box, 3-connecting bolt, 4-set bolt, 5-steel pipe.
The specific embodiment
A kind of floor edge provisional protection hurdle, structure comprises connector, steel pipe 5, and connector is made of fixed head 1 and pipe box 2, and fixed head 1 is provided with connecting bolt 3, and pipe box 2 walls have been uploaded set bolt 4, and steel pipe 5 is through in the pipe box 2.
As schematically shown in Figure 1, 2, one of described connecting-piece structure is fixed head 1 and pipe box 2 parallel connections, this kind structure can be used for both sides without the floor limit of side wall (post), as schematically shown in Figure 3, connector is fixed on the interior facade of wall (post) of both sides, hole by connecting bolt, wears steel pipe and then get final product with set bolt is fastening;
Such as Fig. 4,5 signals, two of described connecting-piece structure is fixed head 1 and 2 vertical connections of pipe box.This kind structure is used for side wall (post), as schematically shown in Figure 6, connector is fixed in the side of wall (post), and two sleeve pipes are relative, wears steel pipe and gets final product with fastening bolt is fastening.
Certainly according to the design feature in place, fixed head 1 and pipe box 2 can also have the connected mode of other angles, to adapt to the conversion of multiple environment.

Claims (3)

1. floor edge provisional protection hurdle, it is characterized in that: structure comprises connector, steel pipe (5), connector is made of fixed head (1) and pipe box (2), fixed head (1) is provided with connecting bolt (3), pipe box (2) wall has been uploaded set bolt (4), and steel pipe (5) is through in the pipe box (2).
2. floor edge provisional protection according to claim 1 hurdle, it is characterized in that: one of described connecting-piece structure is fixed head (1) and the parallel connection of pipe box (2).
3. floor edge provisional protection according to claim 1 hurdle, it is characterized in that: two of described connecting-piece structure is fixed head (1) and vertical connection of pipe box (2).
CN 201220385563 2012-08-06 2012-08-06 Storey near edge temporary guard rail Expired - Fee Related CN202788018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220385563 CN202788018U (en) 2012-08-06 2012-08-06 Storey near edge temporary guard rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220385563 CN202788018U (en) 2012-08-06 2012-08-06 Storey near edge temporary guard rail

Publications (1)

Publication Number Publication Date
CN202788018U true CN202788018U (en) 2013-03-13

Family

ID=47815296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220385563 Expired - Fee Related CN202788018U (en) 2012-08-06 2012-08-06 Storey near edge temporary guard rail

Country Status (1)

Country Link
CN (1) CN202788018U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314320A (en) * 2014-11-17 2015-01-28 南通华新建工集团有限公司 Wall hole tool type near-the-edge protection fixture
CN104652836A (en) * 2015-02-13 2015-05-27 贵州建工集团第二建筑工程有限责任公司 Rapid installation type building edge guard railing fixing device and guard railing construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314320A (en) * 2014-11-17 2015-01-28 南通华新建工集团有限公司 Wall hole tool type near-the-edge protection fixture
CN104652836A (en) * 2015-02-13 2015-05-27 贵州建工集团第二建筑工程有限责任公司 Rapid installation type building edge guard railing fixing device and guard railing construction method thereof
CN104652836B (en) * 2015-02-13 2016-06-29 贵州建工集团第二建筑工程有限责任公司 The fixing device of a kind of ready-package building frontier defense guardrail and guard rail construction method thereof

Similar Documents

Publication Publication Date Title
CN204023778U (en) The connected node of prefabricated assembled concrete beam column
CN104196222B (en) The suspension scaffold of tools type section steel builder's jack
CN104131688B (en) The special external hanging type job platform of assembled architecture and method of operating thereof
CN204571384U (en) A kind of sizing chemoprevention pounds switchbox protection canopy
CN204001650U (en) Overhanging scaffold for building
CN202788018U (en) Storey near edge temporary guard rail
CN204023777U (en) The connected node of prefabricated assembled concrete beam column
CN202157581U (en) Foundation-pit limb shaping protection device
CN202194395U (en) Tool type edge protector rack
CN203097310U (en) Horizontal opening protective covering plate device of high-rise building face
CN201714103U (en) Continuously recyclable edge protection structure
CN204001702U (en) A kind of J-shaped wall plastic formwork
CN203640257U (en) Support of overhanging type scaffold
CN207110662U (en) Hang assembled and face limit guard rail
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN205277014U (en) Guard railing for building construction
CN202047581U (en) Wall connecting piece for scaffold
CN204715720U (en) The attachment supporting arrangement of the attachment type raise scaffold outside the building section of receipts within the walls
CN203583906U (en) Disassembling-free floor edge guardrail in decoration stage
CN203361672U (en) Novel shape-fixed steel plate net protective barrier
CN203160668U (en) Buckled type scaffold floor
CN202482891U (en) Basement template structure
CN104372935A (en) Scaffold
CN206071080U (en) A kind of scalable faces side protection tool
CN205804999U (en) The attachment structure of prefabrication tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20180806

CF01 Termination of patent right due to non-payment of annual fee