CN205275016U - 2 centering hoist device of glomeration mode brickwork wall piece - Google Patents

2 centering hoist device of glomeration mode brickwork wall piece Download PDF

Info

Publication number
CN205275016U
CN205275016U CN201620076515.4U CN201620076515U CN205275016U CN 205275016 U CN205275016 U CN 205275016U CN 201620076515 U CN201620076515 U CN 201620076515U CN 205275016 U CN205275016 U CN 205275016U
Authority
CN
China
Prior art keywords
wall sheet
balance beam
centering
block mode
hanging apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620076515.4U
Other languages
Chinese (zh)
Inventor
王凤来
刁领双
孙绪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201620076515.4U priority Critical patent/CN205275016U/en
Application granted granted Critical
Publication of CN205275016U publication Critical patent/CN205275016U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

2 centering hoist device of glomeration mode brickwork wall piece, it relates to a building lifting device. The utility model discloses a solve current blockwork piece and in the easy run -off the straight of hoist and mount in -process, receive the damage, can't hoist to the safety and stability problem at construction position. 2 centering hoist device of glomeration mode brickwork wall piece includes lifting hook, compensating beam, ligature roof beam and two wire rope handling wares, the middle part of lifting hook setting directly over the compensating beam, and the lower extreme of compensating beam is equipped with two wire rope handling wares, and the wire rope handling ware is gone up along the length direction of compensating beam and is slided, and the ligature roof beam sets up in the below of compensating beam, is connected through hoisting rope down respectively between ligature roof beam and two the wire rope handling wares. The utility model is used for the hoist and mount of blockwork piece.

Description

Collection block mode Masonry Wall sheet 2 centering hanging apparatus
Technical field
The utility model relates to a kind of building lifting equipment, is specifically related to collection block mode Masonry Wall sheet 2 centering hanging apparatus.
Background technology
Assemblingization is produced, and owing to it has, speed of application is fast, cost is low, quality easily controls, artificial usage quantity is little and occupy certain share in construction market, is also the developing direction of building operation in the future. Abroad, during its extensive recovery rising various countries after World War II is built; At home before nineties in 20th century then, there is more application. It is mainly used in steel construction, timber structure, skeleton construction at present. In masonry structure, apply less; External current in holllow building block, also there is the application of part fabricated construction, mainly it is used in the construction of a font wall sheet, in reinforced masonry house, currently also not applying, the lifting problem of the hollowed-block masonry wall sheet of the different shape in the prefabricated construction in reinforced masonry house is not yet resolved.
Owing to concrete hollow block wall sheet relies on mortar that the building block of dispersion is bonded to entirety, its globality will be low compared with reinforced concrete member many, simple as reinforced concrete member built-in fitting can not be utilized to lift, therefore in hoisting process, wall sheet easily tilts, it is damaged, construction part cannot be lifted into security and stability.
Practical novel content
The utility model easily tilts in hoisting process to solve existing blockwork sheet, is damaged, cannot be lifted into the problem of construction part with security and stability, and then proposes collection block mode Masonry Wall sheet 2 centering hanging apparatus.
The utility model is solve the problems of the technologies described above the technical scheme taked to be: the utility model comprises suspension hook, balance beam, colligation beam and two threading devices, the upper end edge length direction symmetry of balance beam is connected with two upper hangers, suspension hook is arranged on the middle part directly over balance beam, it is connected by upper lifting rope respectively between suspension hook hanger upper with two, the lower end of balance beam is provided with two threading devices, threading device slides along the length direction of balance beam, on the lower surface of threading device, eye vertical direction is arranged with two holding bolts, the end of holding bolt is against on balance beam, colligation beam is arranged on the lower section of balance beam, it is connected by lower lifting rope respectively between colligation beam with two threading devices.
The useful effect that the utility model compared with prior art comprises is:
1, by the form of 2 liftings, the wall sheet of arbitrary shape of can slinging;
2, by regulating the removable threading device on balance beam to make itself and the hoisting point position selected in advance on same bar vertical line, thus ensure that the center of gravity of suspension hook in hoisting process, balance beam and wall sheet is at same vertical line, it is achieved fast and safely lift by crane;
3, colligation beam may arrange hang a little position encryption setting hang a little, the position hung a little can conveniently be set;
4, the utility model by carrying out reasonable colligation, rationally determine lifting point to wall sheet, is only hung by two that a little wall sheet to be lifted into predetermined position quickly and safely in place, avoids the generation upset of wall sheet in hoisting process to destroy, simplifies construction, and hoisting process is stable.
Accompanying drawing explanation
Fig. 1 is the integrally-built schematic diagram of the utility model;
Fig. 2 is the connection structural representation of balance beam 2 in the utility model, threading device 3 and upper hanger;
Fig. 3 is the structural representation of threading device 3 in the utility model;
Fig. 4 is the structural representation of the utility model hoisting process;
Fig. 5 is the structural representation of the upper surface of a font wall sheet, and wherein black circle represents the center of gravity of wall sheet, and hollow initial point represents lifting point;
Fig. 6 is the structural representation of the upper surface of T-shaped wall sheet, and wherein black circle represents the center of gravity of wall sheet, and hollow initial point represents lifting point;
Fig. 7 is the structural representation of the upper surface of L-shaped wall sheet, and wherein black circle represents the center of gravity of wall sheet, and hollow initial point represents lifting point.
Embodiment
Embodiment one: composition graphs 1 to Fig. 7 illustrates present embodiment, collect block mode Masonry Wall sheet 2 centering hanging apparatus described in present embodiment and comprise suspension hook 1, balance beam 2, colligation beam 4 and two threading devices 3, the upper end edge length direction symmetry of balance beam 2 is connected with two upper hangers 5, suspension hook 1 is arranged on the middle part directly over balance beam 2, it is connected by upper lifting rope 6 respectively between suspension hook 1 hanger 5 upper with two, the lower end of balance beam 2 is provided with two threading devices 3, threading device 3 slides along the length direction of balance beam 2, on the lower surface of threading device 3, eye vertical direction is arranged with two holding bolt 3-1, the end of holding bolt 3-1 is against on balance beam 2, colligation beam 4 is arranged on the lower section of balance beam 2, it is connected by lower lifting rope 7 respectively between colligation beam 4 with two threading devices 3.
Collection block mode be the bulk of dispersion is built by laying bricks or stones by " cord wood ", " integration " assembling be integrated into the novel industrialization mode of green building, the i.e. building block of factorial praluction, concentrate through scene build by laying bricks or stones, flooring assembling, arrangement of reinforcement, concrete perfusion in hole, form load larrying member, merge the energy-conservation and guard technology of autonomous innovation, build the model of integration of green building by new concept and the new production system. Here bulk, refers generally to small concrete block masonry. Collection block mode Masonry Wall sheet, refers to entirely fill with the reinforcing bars building block Masonry Wall sheet of core, is also exactly the wall sheet that hollow block wall sheet inserts reinforcing bar, concrete perfusion formation.
The hanging method of collection block mode Masonry Wall sheet 2 centering hanging apparatus is utilized to comprise the steps:
Step one: colligation wall sheet: the colligation beam 4 becoming same shape according to the combination of shapes of wall sheet upper surface, ties up by multiple ties of uniform setting on colligation beam 4 by wall sheet;
Step 2: the level attitude determining suspension hook 1: by calculating the position of centre of gravity waiting to lift wall sheet, this position of centre of gravity is the level attitude at suspension hook 1 place;
Step 3: the position determining threading device 3: selected two are hung position a little, ensure that the position of centre of gravity of wall sheet hangs on line a little at two, the position of two threading devices 3 on adjustment balance beam 2, make each threading device 3 respectively correspondence be arranged on one and hang on a little, the projection that when ensureing lifting, the center of gravity of balance beam 2 vertically goes up with the center of gravity of wall sheet overlaps, and positions locking with holding bolt 3-1 simultaneously;
Step 4: the height determining suspension hook 1: the length of lifting rope 6 in adjustment, to determine the height of suspension hook 1;
Step 5: connect colligation beam 4: the top that suspension hook 1 is moved to wall sheet, the lifting point on colligation beam 4 is chosen in position according to threading device 3, lifting point is positioned at the underface of threading device 3, one end of lower lifting rope 7 is connected with threading device 3, and the other end of lower lifting rope 7 is connected with the lifting point on colligation beam 4;
Step 6: start lifting: lift suspension hook 1, carries out the lifting of wall sheet.
In described step 4, upper lifting rope 6 is not less than 60 �� with the angle of horizontal plane.
Embodiment two: composition graphs 1 and Fig. 4 illustrate present embodiment, the shape of the cross section of balance beam 2 described in present embodiment is work font. Technology feature unexposed in present embodiment is identical with embodiment one.
Embodiment three: composition graphs 1 and Fig. 4 illustrate present embodiment, the shape of colligation beam 4 described in present embodiment is identical with the shape of wall sheet upper surface. Technology feature unexposed in present embodiment is identical with embodiment one.
Colligation beam 4 is arranged at wall sheet top, is used for lifting the beam of wall sheet. By tie, wall sheet is tied up on colligation beam 4 so that the load of wall sheet passes to colligation beam 4 by tie. Like this, when lifting, the power at suspension hook 1 place can distribute to each colligation point by colligation beam 4. And wall sheet by colligation on colligation beam 4, it is to increase overall rigidity, avoids the impact of the unbalance stress suddenly of colligation beam 4 simultaneously.
Embodiment four: composition graphs 1 to Fig. 3 illustrates present embodiment, the upper end edge width of present embodiment threading device 3 is provided with dovetail-indent 3-2, and dovetail-indent 3-2 is sleeved on the lower cross plate of balance beam 2, and the lower end of threading device 3 is connected with lower hanger 3-3. Technology feature unexposed in present embodiment is identical with embodiment two or three.
So design is using the slideway of the lower cross plate of balance beam 2 as threading device 3, by adjusting the position of threading device 3, for mating the position of lifting point on colligation beam 4, it is achieved suspension hook 1 overlaps with wall sheet center of gravity. The structure of dovetail-indent 3-2 makes threading device 3 more steady in moving process, it may also be useful to time is connected on lower hanger 3-3 by one end of lower lifting rope 7, and the other end of lower lifting rope 7 is connected on colligation beam 4, connects more firm.
Embodiment five: composition graphs 1 to Fig. 2 illustrates present embodiment, former and later two end faces of balance beam 2 described in present embodiment are respectively equipped with spacing steel plate 8, and the lower end of spacing steel plate 8 is vertical with the lower surface of balance beam 2 lower cross plate to be connect admittedly. Technology feature unexposed in present embodiment is identical with embodiment four.
So design can prevent threading device 3 landing effectively.
Embodiment six: composition graphs 1 illustrates present embodiment, colligation beam 4 described in present embodiment comprises multiple floor 4-1, and multiple floor 4-1 is arranged from front to back successively according to the shape of wall sheet, and two adjacent floor 4-1 connect successively admittedly. Technology feature unexposed in present embodiment is identical with embodiment five.
Wall sheet conventional in engineering has various shape, such as a font, L-shaped, T-shaped etc., in order to reduce the quantity of colligation beam 4, adopts combined method to arrange colligation beam 4. Basic size modulus (200,400) according to building block, the length of setting floor 4-1, then the shape of the colligation beam 4 of various needs it is made up of these floors 4-1.
Embodiment seven: composition graphs 1 illustrates present embodiment, present embodiment each floor 4-1 is respectively equipped with multiple erection opening 4-2 along its length. Technology feature unexposed in present embodiment is identical with embodiment six.
Embodiment eight: composition graphs 1 and Fig. 4 illustrate present embodiment, described in present embodiment, lower lifting rope 7 is vertically arranged. Technology feature unexposed in present embodiment is identical with embodiment one, two, three, five, six or seven.
Principle of work
The lifting of Masonry Wall sheet is the problem of most critical in reinforcing bars building block masonry prefabricated construction process. The utility model proposes a kind of hanging apparatus. First, by tie, wall sheet being carried out reasonable colligation by the colligation beam 4 being located at wall sheet top, wall sheet is fixed on colligation beam 4 by tie and forms a stiffener, is convenient to lifting; Suspension hook 1 is restricted by upper lifting and 6 is sling balance beam 2, and suspension hook 1 position in the planes is consistent with balance beam 2; At balance beam 2 times ends, threading device 3 is set, can slide and fastening in its position on balance beam 2, the center of gravity of suspension hook 1 (being also simultaneously balance beam 2) is overlapped with the center of gravity of wall sheet, the position of the threading device 3 on rotational equilibrium beam 2, adjustment balance beam 2, make lower lifting rope 7 can keep vertically connecting balance beam 2 and colligation beam 4, now the center of gravity of wall sheet (containing colligation beam 4), balance beam 2 and suspension hook 1 is all on a vertical line, it is achieved steadily lift by crane.

Claims (8)

1. collect block mode Masonry Wall sheet 2 centering hanging apparatus, it is characterized in that: described collection block mode Masonry Wall sheet 2 centering hanging apparatus comprise suspension hook (1), balance beam (2), colligation beam (4) and two threading devices (3), the upper end edge length direction symmetry of balance beam (2) is connected with two upper hangers (5), suspension hook (1) is arranged on the middle part directly over balance beam (2), it is connected by upper lifting rope (6) respectively between suspension hook (1) hanger (5) upper with two, the lower end of balance beam (2) is provided with two threading devices (3), threading device (3) slides along the length direction of balance beam (2), on the lower surface of threading device (3), eye vertical direction is arranged with two holding bolts (3-1), the end of holding bolt (3-1) is against on balance beam (2), colligation beam (4) is arranged on the lower section of balance beam (2), it is connected by lower lifting rope (7) respectively between colligation beam (4) with two threading devices (3).
2. collect block mode Masonry Wall sheet 2 centering hanging apparatus according to claim 1, it is characterised in that: the shape of the cross section of described balance beam (2) is work font.
3. collect block mode Masonry Wall sheet 2 centering hanging apparatus according to claim 1, it is characterised in that: the shape of described colligation beam (4) is identical with the shape of wall sheet upper surface.
4. according to Claims 2 or 3, collect block mode Masonry Wall sheet 2 centering hanging apparatus, it is characterized in that: the upper end edge width of threading device (3) is provided with dovetail-indent (3-2), dovetail-indent (3-2) is sleeved on the lower cross plate of balance beam (2), and the lower end of threading device (3) is connected with lower hanger (3-3).
5. collect block mode Masonry Wall sheet 2 centering hanging apparatus according to claim 4, it is characterized in that: be respectively equipped with spacing steel plate (8) on former and later two end faces of described balance beam (2), the lower end of spacing steel plate (8) is vertical with the lower surface of balance beam (2) lower cross plate to be connect admittedly.
6. collect block mode Masonry Wall sheet 2 centering hanging apparatus according to claim 5, it is characterized in that: described colligation beam (4) comprises multiple floor (4-1), multiple floor (4-1) is arranged from front to back successively according to the shape of wall sheet, and two adjacent floors (4-1) connect successively admittedly.
7. collect block mode Masonry Wall sheet 2 centering hanging apparatus according to claim 6, it is characterised in that: each floor (4-1) is respectively equipped with multiple erection opening (4-2) along its length.
8. according to claim 1,2,3,5,6 or 7, collect block mode Masonry Wall sheet 2 centering hanging apparatus, it is characterised in that: described lower lifting rope (7) is vertically arranged.
CN201620076515.4U 2016-01-26 2016-01-26 2 centering hoist device of glomeration mode brickwork wall piece Active CN205275016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620076515.4U CN205275016U (en) 2016-01-26 2016-01-26 2 centering hoist device of glomeration mode brickwork wall piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620076515.4U CN205275016U (en) 2016-01-26 2016-01-26 2 centering hoist device of glomeration mode brickwork wall piece

Publications (1)

Publication Number Publication Date
CN205275016U true CN205275016U (en) 2016-06-01

Family

ID=56059612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620076515.4U Active CN205275016U (en) 2016-01-26 2016-01-26 2 centering hoist device of glomeration mode brickwork wall piece

Country Status (1)

Country Link
CN (1) CN205275016U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105438965A (en) * 2016-01-26 2016-03-30 哈尔滨达城绿色建筑技术开发股份有限公司 Two-point centering hoisting device and method of integrated mode brickwork wall piece
CN106592985A (en) * 2016-12-08 2017-04-26 哈尔滨达城绿色建筑技术开发股份有限公司 Binding system for concrete hollow building block wall piece in agglomeration building and binding method thereof
CN109573834A (en) * 2018-11-27 2019-04-05 湖北三威路桥机械有限公司 A kind of road and bridge hoisting mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105438965A (en) * 2016-01-26 2016-03-30 哈尔滨达城绿色建筑技术开发股份有限公司 Two-point centering hoisting device and method of integrated mode brickwork wall piece
CN106592985A (en) * 2016-12-08 2017-04-26 哈尔滨达城绿色建筑技术开发股份有限公司 Binding system for concrete hollow building block wall piece in agglomeration building and binding method thereof
CN106592985B (en) * 2016-12-08 2019-02-01 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building concrete hollow block wall piece banding system and its binding method
CN109573834A (en) * 2018-11-27 2019-04-05 湖北三威路桥机械有限公司 A kind of road and bridge hoisting mechanism

Similar Documents

Publication Publication Date Title
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN205275016U (en) 2 centering hoist device of glomeration mode brickwork wall piece
CN105438965B (en) The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece
CN101845882B (en) Combined device of a mould frame for hanging and casting cement for high-rise buildings and handling and hanging box for building materials
CN104032967A (en) Hoisting construction method for prefabricated assembly-type frame structure members
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN109667416B (en) Elevator shaft integral lifting operation platform and lifting method thereof
CN208168317U (en) A kind of lower extension platform of high-altitude construction
CN214167097U (en) Lifting appliance for integral steel reinforcement framework of railway box girder
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN207436503U (en) Efficient construction of precast floorslab hangs membrane module
CN106836255B (en) The integral prefabricated structure of basement bottom board catch pit steel mesh and method of construction
CN202441045U (en) Rail-type electric attached lifting scaffold
CN202926333U (en) Hanging system of whole-circle integral upside down hanging formwork
CN104499706A (en) Elevator well template platform and construction method thereof
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN104404888A (en) Large hoisting system allowing gradient to be adjusted in air and application
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN203127986U (en) Adjustable lifting tool for T joist steel formwork of high-speed rail
CN205840190U (en) A kind of pin key connects the mounting structure of prefabricated bench
CN102720360B (en) Combination device of secondary high building supported lifted and poured cement formwork and building material lifting and lifting box
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN207436515U (en) The hoisting beam of efficient construction of precast floorslab
CN206418512U (en) Basement bottom board catch pit bar-mat reinforcement is layered precast construction
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant