CN205088049U - Duct assembly for hydraulic engineering - Google Patents

Duct assembly for hydraulic engineering Download PDF

Info

Publication number
CN205088049U
CN205088049U CN201520899167.6U CN201520899167U CN205088049U CN 205088049 U CN205088049 U CN 205088049U CN 201520899167 U CN201520899167 U CN 201520899167U CN 205088049 U CN205088049 U CN 205088049U
Authority
CN
China
Prior art keywords
storehouse
sludge box
settling
rising pipe
settling chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520899167.6U
Other languages
Chinese (zh)
Inventor
刘亚龙
高歌
刘晓钰
彭莹
孔文苑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520899167.6U priority Critical patent/CN205088049U/en
Application granted granted Critical
Publication of CN205088049U publication Critical patent/CN205088049U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The utility model discloses a duct assembly for hydraulic engineering relates to hydraulic engineering equipment technical field. It includes inlet tube, outlet pipe, settling chamber, settling chamber's inner chamber subsides the storehouse through separating two about the baffle, the inlet tube switches on with the left storehouse of subsiding at settling chamber's left side top, the outlet pipe switches on on settling chamber's the top right side and the storehouse of subsiding on right side, in outlet pipe and inlet tube lower part, two upper portions of subsiding the storehouse all are fixed with A stationary flow sponge board at the horizontal direction, the middle part of baffle sets up the through -hole, the through -hole internal fixation has B stationary flow sponge board, install supersonic generator at settling chamber's top, the supersonic generator lower extreme is provided with two towards controlling the ultrasound transducers who subsides the storehouse, every subsides the bottom in storehouse and has laid activated carbon adsorption layer. The utility model discloses can be effectively subside the gravel and sand of aquatic, prevent to cause the irrigation equipment to block up.

Description

Hydro project conduit assembly
Technical field
The utility model hydro project equipment technical field.
Background technology
As everyone knows, pipeline is that a kind of being exclusively used in guides gas-liquid to guide the off-set facility of absorption in direction according to the rules, is widely used in every field, and water pipeline is then be exclusively used in irrigation field to carry out irrigation flow to the off-set facility controlled; For the irrigation in farmland, general most area adopts high-water to dig the form that approach channel carries out flood irrigation, and this traditional irrigation form water resource waste is comparatively large, and operating efficiency is low, and cost is high.The modes such as the many employing sprinkling irrigations of novel irrigation technique or drip irrigation, this irrigation method is relatively high to the requirement of water quality, can not have the foreign material such as pasture and water, sandstone, earth, easy blocking pipe or shower nozzle.Because regional water most in reality is deficienter, the irrigation in farmland is adopted more to the mode of deep-well pumping, in water, sandstone are more, and usually cause the equipment of irrigation to block, bad cleaning, affects irrigation operation, also increases operation labor intensity.
Utility model content
Technical problem to be solved in the utility model is the technical deficiency for above-mentioned existence, provides a kind of hydro project conduit assembly, and the sandstone in water effectively can be carried out sedimentation by it, prevents from causing irrigation equipment to block.
The technical solution adopted in the utility model is: provide a kind of hydro project conduit assembly, comprise water inlet pipe, rising pipe, sludge box; The inner chamber of sludge box is by being separated out two settling bins about dividing plate; The left side top of water inlet pipe at sludge box and the settling bin conducting in left side; The top right side of rising pipe at sludge box and the settling bin conducting on right side; In rising pipe and water inlet pipe bottom, the top of two settling bins is fixed with A current stabilization sponge plate all in the horizontal direction; The middle part of dividing plate arranges through hole; Through hole internal fixtion has B current stabilization sponge plate; Be provided with ultrasonic generator at the top of sludge box, ultrasonic generator lower end is provided with the ultrasonic vibrator that two lead to left and right settling bin; The bottom of each settling bin is equipped with activated carbon adsorption layer.
Further optimization the technical program, the rising pipe of hydro project conduit assembly is provided with filter assemblies, and filter assemblies seals docking by two symmetrically arranged funnel-form housing major parts and forms; The binding surface place of two funnel-form housings is provided with filtering net; In the front side of filter assemblies, rising pipe is provided with water pressure gauge.
Further optimization the technical program, the inwall of the sludge box of hydro project conduit assembly is blasted rough face.
The utility model beneficial effect is:
1, the water containing sandstone enters after in the settling bin in left side from water inlet pipe, and first through A current stabilization sponge plate, flow velocity and surging force are by A current stabilization sponge plate slowly-releasing, underlying space can not be stirred, equally, B current stabilization sponge plate also plays the effect of slowly-releasing flow velocity and surging force, can stationary flow.Ultrasonic wave wave energy puts on settling bin upper surface, and utilize sound wave to propagate with longitudinal waves in a liquid, ultrasonic wave can produce the characteristics such as huge acceleration amplitude simultaneously, makes suspended substance negative buoyancy in water that the qualitative change of huge increase occur, thus realizes its acceleration sinking.Under the effect of ultrasonic vibrator, the sandstone in settling bin accelerate deposition, and the sandstone of deposition decline and are adsorbed on activated carbon adsorption layer, can prevent flow action from again being swept away by sandstone.
2, on rising pipe, filter assemblies is installed, the sandstone in settling bin can be prevented to be further subject to water currents take out of, and funnel-form housing can increase the open area of filtering net, reduce the resistance of current, can the hydraulic pressure at interpretation filter assemblies place by water pressure gauge, hydraulic pressure is too high, can judge that filtering net blocks, prompting cleaning in time or replacing filtering net.
3, inwall is more smooth, then be more not easy to adhere to sandstone and form settled layer, the inwall of sludge box is blasted rough face, can adhere to more sandstone, forms settled layer, this makes it possible to the deposition reducing irrigation equipment.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation in another direction of Fig. 1.
In figure, 1, water inlet pipe; 2, rising pipe; 3, sludge box; 4, dividing plate; 5, settling bin; 6, A current stabilization sponge plate; 7, B current stabilization sponge plate; 8, ultrasonic generator; 9, ultrasonic vibrator; 10, activated carbon adsorption layer; 11, funnel-form housing; 12, water pressure gauge.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, hydro project conduit assembly comprises water inlet pipe 1, rising pipe 2, sludge box 3; The inner chamber of sludge box 3 is separated out two settling bins 5 by dividing plate about 4; The left side top of water inlet pipe 1 at sludge box 3 and settling bin 5 conducting in left side; The top right side of rising pipe 2 at sludge box 3 and settling bin 5 conducting on right side; In rising pipe 2 and water inlet pipe 1 bottom, the top of two settling bins 5 is fixed with A current stabilization sponge plate 6 all in the horizontal direction; The middle part of dividing plate 4 arranges through hole; Through hole internal fixtion has B current stabilization sponge plate 7; Be provided with ultrasonic generator 8 at the top of sludge box 3, ultrasonic generator 8 lower end is provided with the ultrasonic vibrator 9 that two lead to left and right settling bin 5; The bottom of each settling bin 5 is equipped with activated carbon adsorption layer 10; Rising pipe 2 is provided with filter assemblies, and filter assemblies seals docking by two symmetrically arranged funnel-form housing 11 major parts and forms; The binding surface place of two funnel-form housings 11 is provided with filtering net; In the front side of filter assemblies, rising pipe 2 is provided with water pressure gauge 12; The inwall of sludge box 3 is blasted rough face.
Water containing sandstone enters after in the settling bin 5 in left side from water inlet pipe 1, and first through A current stabilization sponge plate 6, flow velocity and surging force are by A current stabilization sponge plate 6 slowly-releasing, underlying space can not be stirred, equally, B current stabilization sponge plate 7 also plays the effect of slowly-releasing flow velocity and surging force, can stationary flow.Ultrasonic wave wave energy puts on settling bin upper surface, and utilize sound wave to propagate with longitudinal waves in a liquid, ultrasonic wave can produce the characteristics such as huge acceleration amplitude simultaneously, makes suspended substance negative buoyancy in water that the qualitative change of huge increase occur, thus realizes its acceleration sinking.Under the effect of ultrasonic vibrator 9, the sandstone in settling bin 5 accelerate deposition, and the sandstone of deposition decline and are adsorbed on activated carbon adsorption layer 10, can prevent flow action from again being swept away by sandstone.
In the present embodiment, sludge box 3 can adopt transparent high-strength engineering plastic material, the coarse process of inwall blasting craft, and the deposit thickness of the inside sandstone can observed like this, accomplishes timely replacing.Further, the thickness of A current stabilization sponge plate 6 and B current stabilization sponge 6 according to the water intake velocity of water inlet pipe 1 and flow adjustment, can be as the criterion with the sandstone do not kicked up in settling bin 5.
This device often uses under open-air atmosphere out of doors, and can arrange solar photovoltaic assembly is that ultrasonic generator 8 is powered.

Claims (3)

1. a hydro project conduit assembly, is characterized in that: comprise water inlet pipe (1), rising pipe (2), sludge box (3); The inner chamber of sludge box (3) is separated out two settling bins (5) by dividing plate (4) left and right; The left side top of water inlet pipe (1) at sludge box (3) and settling bin (5) conducting in left side; The top right side of rising pipe (2) at sludge box (3) and settling bin (5) conducting on right side; In rising pipe (2) and water inlet pipe (1) bottom, the top of two settling bins (5) is fixed with A current stabilization sponge plate (6) all in the horizontal direction; The middle part of dividing plate (4) arranges through hole; Through hole internal fixtion has B current stabilization sponge plate (7); Be provided with ultrasonic generator (8) at the top of sludge box (3), ultrasonic generator (8) lower end is provided with the ultrasonic vibrator (9) that two lead to left and right settling bin (5); The bottom of each settling bin (5) is equipped with activated carbon adsorption layer (10).
2. hydro project conduit assembly according to claim 1, is characterized in that: (2) are provided with filter assemblies with rising pipe, and filter assemblies seals docking by two symmetrically arranged funnel-form housing (11) major parts and forms; The binding surface place of two funnel-form housings (11) is provided with filtering net; In the front side of filter assemblies, rising pipe (2) is provided with water pressure gauge (12).
3. hydro project conduit assembly according to claim 1, is characterized in that: the inwall of sludge box (3) is blasted rough face.
CN201520899167.6U 2015-11-12 2015-11-12 Duct assembly for hydraulic engineering Expired - Fee Related CN205088049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520899167.6U CN205088049U (en) 2015-11-12 2015-11-12 Duct assembly for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520899167.6U CN205088049U (en) 2015-11-12 2015-11-12 Duct assembly for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN205088049U true CN205088049U (en) 2016-03-16

Family

ID=55478754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520899167.6U Expired - Fee Related CN205088049U (en) 2015-11-12 2015-11-12 Duct assembly for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN205088049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112691407A (en) * 2020-12-26 2021-04-23 圆角科技发展(佛山)有限公司 Ultrasonic quicksand separator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112691407A (en) * 2020-12-26 2021-04-23 圆角科技发展(佛山)有限公司 Ultrasonic quicksand separator

Similar Documents

Publication Publication Date Title
CN104696175A (en) Low water head energy collecting device and method
CN204710539U (en) A kind of hydraulic grading device of sand
CN204014781U (en) Outdoor circulating water culture system
CN205088049U (en) Duct assembly for hydraulic engineering
CN205399531U (en) Deep water negative pressure desilting system
CN202893482U (en) Construction rubbish wood waste water concentrator
CN103585802A (en) Novel gravity-type valveless filtering pool
CN204824441U (en) A on -board integration treatment facility for dredging yu shui online processing
CN103435148A (en) Horizontal suspension sludge air-lift backflow method
CN203021334U (en) Efficient tiny air bubble floatation oil removing and COD (Chemical Oxygen Demand) elimination device
CN102763620A (en) Purifying and oxygen filling device for processing high-density aquatic water by water aerosol
CN207153178U (en) A kind of quick service type system of falling rainbow of easy cleaning precipitum
CN205294957U (en) Pulse water distribution generating device
CN104524821A (en) Butterfly-type precipitator
CN104920270A (en) Pearl cultivation system
CN219349682U (en) Indoor tide simulation small-sized device
CN204352600U (en) Butterfly settling vessel
CN212174655U (en) Fish culture sewage treatment pond
CN205007652U (en) Novel just heavy pond
CN203763920U (en) Automatic UPD solid-liquid separation and purification device
CN103768847A (en) Fast dehydration device and method for high-water-content slurry
CN212532455U (en) System for be used for aeration tank not clear up can desilting silt sand
CN214105939U (en) Large-flow continuous slag-water separation device
CN201560134U (en) Slag-absorbing and bubbling device of air flotation machine
CN203090544U (en) Skimming and spraying device of sedimentation tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160316

Termination date: 20161112