CN207153178U - A kind of quick service type system of falling rainbow of easy cleaning precipitum - Google Patents

A kind of quick service type system of falling rainbow of easy cleaning precipitum Download PDF

Info

Publication number
CN207153178U
CN207153178U CN201720470063.2U CN201720470063U CN207153178U CN 207153178 U CN207153178 U CN 207153178U CN 201720470063 U CN201720470063 U CN 201720470063U CN 207153178 U CN207153178 U CN 207153178U
Authority
CN
China
Prior art keywords
settling tank
cup
precipitum
rear chamber
service type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720470063.2U
Other languages
Chinese (zh)
Inventor
李艳星
林龙海
张茂荣
刘凤英
陈吉林
陈清安
肖伟
王摩西
饶健辉
杨清堤
陈志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Municipal Construction And Development Co Ltd
XIAMEN MUNICIPAL ENGINEERING DESIGN INSTITUTE Co Ltd
Fujian North Hangzhou Construction Engineering Co Ltd
China Railway Construction Group Co Ltd
Third Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Original Assignee
Xiamen Municipal Construction And Development Co Ltd
XIAMEN MUNICIPAL ENGINEERING DESIGN INSTITUTE Co Ltd
Fujian North Hangzhou Construction Engineering Co Ltd
China Railway Construction Group Co Ltd
Third Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Municipal Construction And Development Co Ltd, XIAMEN MUNICIPAL ENGINEERING DESIGN INSTITUTE Co Ltd, Fujian North Hangzhou Construction Engineering Co Ltd, China Railway Construction Group Co Ltd, Third Engineering Co Ltd of China Railway 22nd Bureau Group Co Ltd filed Critical Xiamen Municipal Construction And Development Co Ltd
Priority to CN201720470063.2U priority Critical patent/CN207153178U/en
Application granted granted Critical
Publication of CN207153178U publication Critical patent/CN207153178U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of quick service type system of falling rainbow of easy cleaning precipitum.The quick service type system of falling rainbow of the easy cleaning precipitum includes at least one first settling tank, and each first settling tank includes by dividing plate being isolated and forming the first cup and the first rear chamber that top is connected;And the water inlet of first settling tank is provided with intake tunnel, the intake tunnel includes the main channel being connected with first cup and the wasteway being connected with first rear chamber, and the one end of the wasteway away from first rear chamber is also connected with the main channel;When the water inlet closing of first settling tank, the wasteway guides the water in the main channel to the second posterior cell.The beneficial effects of the utility model are:For the quick service type system of falling rainbow of the easy cleaning precipitum while quick service type system of the falling rainbow work is not influenceed, convenient the first cup to first settling tank carries out the cleaning of precipitum.

Description

A kind of quick service type system of falling rainbow of easy cleaning precipitum
Technical field
The system of falling rainbow of the utility model is related to, more particularly to a kind of quick service type system of falling rainbow of easy cleaning precipitum.
Background technology
In the municipal system of falling rainbow, often blocked by precipitums such as silts and cause the reduction of the system of the falling rainbow efficiency of falling rainbow, Even rainbow can not be fallen.But because the distribution of the falling Hong Qu point pole of the municipal system of falling rainbow is more, fall what Hong Qu was investigated to everywhere Time cost and human cost are high, and even if periodically being investigated to the progress of falling Hong Qu, underground fall Hong Qu cleaning difficulty it is very big; If Hong Qu is located at traffic main artery, urban transportation operation can be also influenceed.
If it is possible to carry out settlement treatment before water enters the municipal canal of falling rainbow, then the municipal system of falling rainbow can be reduced Cleaning work.
Utility model content
The purpose of this utility model be to provide can water carry out settlement treatment easy cleaning precipitum quick service type The system of falling rainbow.
To reach above-mentioned purpose, the utility model adopts the following technical scheme that:A kind of quick service type of easy cleaning precipitum The system of falling rainbow includes at least one first settling tank, and each first settling tank includes being isolated and formed top and be connected by dividing plate The first logical cup and the first rear chamber;And the water inlet of first settling tank is provided with intake tunnel, the intake tunnel bag The main channel being connected with first cup and the wasteway being connected with first rear chamber are included, the wasteway is away from institute The one end for stating the first rear chamber is also connected with the main channel;When the water inlet closing of first settling tank, the overflow Road guides the water in the main channel to the second posterior cell.
Preferably, the overfall that the wasteway is connected with the main channel is higher than the bottom surface of the main channel.
Preferably, in addition at least one second settling tank and first settling tank and second settling tank are connected Interface channel, each first settling tank is connected with least one second settling tank;Each second sedimentation Pond includes by dividing plate being isolated and forming the second cup and second posterior cell that top is connected, the first rear chamber of first settling tank It is connected with the second cup of second settling tank by the interface channel.
Preferably, in addition to located at the split channel between first settling tank and second settling tank and it is used for The water pump of flow in the split channel is controlled, the split channel is respectively communicated with first rear chamber and second cup; The interface channel is provided with valve close to one end of second settling tank, when the valve is closed, starts the water pump, then Water in first rear chamber branches to second cup by the split channel.
Compared to prior art, the technical solution of the utility model has the advantages that:
1st, in the quick service type system of falling rainbow of the easy cleaning precipitum, when the water inlet of first settling tank is closed When, the wasteway guides the water in the main channel to the second posterior cell, and water is bypassed into first by the wasteway Cup and be introduced directly into the second posterior cell, it is convenient to institute so as to while the quick service type system of falling rainbow work is not influenceed The first cup for stating the first settling tank carries out the cleaning of precipitum;
2nd, the overfall that the wasteway is connected with the main channel is higher than the bottom surface of the main channel, so that working as When water enters the first cup from main channel, water will not be caused from overflow track overflow, to cause the pollution to the first rear chamber;
3rd, the first rear chamber of first settling tank and the second cup of second settling tank pass through the interface channel It is connected, by setting the second settling tank, then can carries out further settlement treatment to water, improve the quick service type system of falling rainbow The settlement treatment effect of system water outlet;
4th, the interface channel is provided with valve close to one end of second settling tank, when the valve is closed, starts The water pump, then the water in first rear chamber second cup is branched to by the split channel, pass through the shunting The setting of passage, can be convenient that the interface channel is tieed up while the quick service type system of the falling rainbow work is not influenceed Shield maintenance.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding to of the present utility model, forms one of the present utility model Point, schematic description and description of the present utility model is used to explain the utility model, does not form to of the present utility model Improper restriction.In the accompanying drawings:
Fig. 1 is the structural representation of the quick service type system of falling rainbow for the easy cleaning precipitum that the utility model embodiment provides Figure.
Embodiment
In order that technical problem to be solved in the utility model, technical scheme and beneficial effect are clearer, clear, with Under in conjunction with the accompanying drawings and embodiments, the utility model is further elaborated.It is it should be appreciated that described herein specific real Example is applied only to explain the utility model, is not used to limit the utility model.
Referring to Fig. 1, the quick service type system of falling rainbow of easy cleaning precipitum provided by the utility model can be with municipal The mutual cooperation of falling Hong Qu is used.That is, sewage, rainwater etc. can finally be converged by the guiding of the quick service type system of falling rainbow Enter in the canal of falling rainbow of municipal.The quick service type system of falling rainbow goes for the places such as cell, greenbelt, park, so as to convection current The water for entering down Hong Qu carries out preliminary precipitation process.
Specifically, the quick service type system of falling rainbow of the easy cleaning precipitum includes at least one first settling tank 10, extremely Few second settling tank 20, connect the interface channel 30 of first settling tank 10 and second settling tank 20, located at institute State the split channel 40 between the first settling tank 10 and second settling tank 20 and flowed for controlling in the split channel 40 The water pump 50 of amount.In the present embodiment, each first settling tank 10 is connected with least one second settling tank 20.
Wherein, each first settling tank 10 includes being isolated by dividing plate 11 and forms the first cup that top is connected 101 and first rear chamber 102.In first settling tank 10, the water containing precipitum settles in first cup 101, So that precipitum is deposited on the bottom of first cup 101, and the clear water at the top of first cup 101 then by it is described every The overflow of plate 11 is to first rear chamber 102.
Moreover, the water inlet of first settling tank 10 is provided with intake tunnel 12, the intake tunnel 12 includes and institute State the main channel 121 that the first cup 101 is connected and the wasteway 122 being connected with first rear chamber 102, the wasteway 122 one end away from first rear chamber 101 are also connected with the main channel 121.
In the intake tunnel 12, when the water inlet of first settling tank 10 is opened, water is from the intake tunnel 12 main channel 121 enters first cup 101;
When the water inlet of first settling tank 10 is closed, water is entered by the overflow ducts 122 of the intake tunnel 12 Enter first rear chamber 102, and bypass first cup 101.
It should be appreciated that in order to realize the above-mentioned function of the intake tunnel 12, the wasteway 122 and the main channel 121 overfalls 123 being connected are higher than the bottom surface of the main channel 121.
Selectively, inlet gate 13, the inlet gate can be set in the water inlet of first settling tank 10 13 water inlet for turning off or on first settling tank 10.
Each second settling tank 20 includes being isolated by dividing plate 21 and forms the second cup 201 for being connected of top and the Two rear chambers 202, the first rear chamber 102 and the second cup 201 of second settling tank 20 of first settling tank 10 pass through institute Interface channel 30 is stated to be connected.Sedimentation principle in second settling tank 20 is identical with first settling tank 10, herein not Repeat.
Wherein, the interface channel 30 is provided with valve 31 close to one end of second settling tank 20.And the shunting is led to Road 40 is respectively communicated with first rear chamber 102 and second cup 201.
In the present embodiment, when the valve 31 is closed, the water pump 50 is started, then 102 in first rear chamber Water branches to second cup 201 by the split channel 40.
It should be noted that if necessary to clear up precipitum in the first cup 101 of first settling tank 10 When, it is necessary to close the water inlet of first settling tank 10 so that water from overflow ducts 122 enter first rear chamber 102, and first cup 101 is bypassed, precipitum in first cup 101 is cleared up so as to convenient;
During if necessary to carry out maintenance maintenance to the interface channel 30, then the valve 31 is closed, and start the water Pump 50, in first rear chamber 102 water is branched into second cup 201 by the split channel 40, so as to convenient Maintenance maintenance is carried out to the interface channel 30.
Preferred embodiment of the present utility model has shown and described in described above, as previously described, it should be understood that this practicality is new Type is not limited to form disclosed herein, is not to be taken as the exclusion to other embodiment, and available for various other groups Conjunction, modification and environment, and above-mentioned teaching or the technology of association area can be passed through in utility model contemplated scope described herein Or knowledge is modified.And the change and change that those skilled in the art are carried out do not depart from spirit and scope of the present utility model, then All should be in the protection domain of the appended claims for the utility model.

Claims (4)

  1. A kind of 1. quick service type system of falling rainbow of easy cleaning precipitum, it is characterised in that:Including at least one first settling tank, often One first settling tank includes by dividing plate being isolated and forming the first cup and the first rear chamber that top is connected;
    And the water inlet of first settling tank is provided with intake tunnel, the intake tunnel includes being connected with first cup Logical main channel and the wasteway being connected with first rear chamber, the one end of the wasteway away from first rear chamber also with The main channel is connected;
    When the water inlet closing of first settling tank, the wasteway guides the water in the main channel to described first Rear chamber.
  2. A kind of 2. quick service type system of falling rainbow of easy cleaning precipitum as claimed in claim 1, it is characterised in that:The overflow The overfall that road is connected with the main channel is higher than the bottom surface of the main channel.
  3. A kind of 3. quick service type system of falling rainbow of easy cleaning precipitum as claimed in claim 1, it is characterised in that:Also include extremely Few second settling tank and the interface channel for connecting first settling tank and second settling tank, each described first Settling tank is connected with least one second settling tank;
    Each second settling tank includes by dividing plate being isolated and forming the second cup and second posterior cell that top is connected, described First rear chamber of the first settling tank is connected with the second cup of second settling tank by the interface channel.
  4. A kind of 4. quick service type system of falling rainbow of easy cleaning precipitum as claimed in claim 3, it is characterised in that:Also include setting Split channel between first settling tank and second settling tank and for controlling flow in the split channel Water pump, the split channel are respectively communicated with first rear chamber and second cup;
    The interface channel is provided with valve close to one end of second settling tank, when the valve is closed, starts the water Pump, then the water in first rear chamber second cup is branched to by the split channel.
CN201720470063.2U 2017-04-30 2017-04-30 A kind of quick service type system of falling rainbow of easy cleaning precipitum Active CN207153178U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720470063.2U CN207153178U (en) 2017-04-30 2017-04-30 A kind of quick service type system of falling rainbow of easy cleaning precipitum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720470063.2U CN207153178U (en) 2017-04-30 2017-04-30 A kind of quick service type system of falling rainbow of easy cleaning precipitum

Publications (1)

Publication Number Publication Date
CN207153178U true CN207153178U (en) 2018-03-30

Family

ID=61710034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720470063.2U Active CN207153178U (en) 2017-04-30 2017-04-30 A kind of quick service type system of falling rainbow of easy cleaning precipitum

Country Status (1)

Country Link
CN (1) CN207153178U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107261570A (en) * 2017-04-30 2017-10-20 福建北杭建设工程有限公司 A kind of quick service type system of falling rainbow of easy cleaning precipitum

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107261570A (en) * 2017-04-30 2017-10-20 福建北杭建设工程有限公司 A kind of quick service type system of falling rainbow of easy cleaning precipitum

Similar Documents

Publication Publication Date Title
CN104310657B (en) A kind of Multistage settling gardens regeneration effluent system
CN104174191B (en) Integral grit chamber for treating rainwater and treating method
CN107747345B (en) Surface pollution control system and method for combined drainage pipe network system
CN105502752B (en) Mountain area rainwater potential energy recycling and cleansing and recycling integrated system and rainwater recycle purification method
CN105688457B (en) A kind of rainwater desilting pool device
CN104213599B (en) Zero energy consumption roof rain water reclaims Waste water utilization system
CN207153178U (en) A kind of quick service type system of falling rainbow of easy cleaning precipitum
CN203781979U (en) Ecological water purifying device
CN105169765B (en) Irrigation system inlet unit structure
CN207760992U (en) A kind of sponge urban cells rainwater-collecting purifies ecological utilization system of regulating and storing
CN106400927A (en) Rainwater collection integrated ecosystem
CN202569672U (en) Sloping panel sedimentation device
CN203989972U (en) A kind of integrated setting pot of processing rainwater
CN207727748U (en) A kind of rainwater energy dissipation tank with processing function
CN205742507U (en) A kind of integral type rainwater settling pit device
CN107261570A (en) A kind of quick service type system of falling rainbow of easy cleaning precipitum
CN107970679A (en) Concrete mixing plant sewage recovering system
CN107747346A (en) A kind of road rain water processing system and control method
CN209011283U (en) A kind of sponge novel urban rainwater separate system
CN208857918U (en) A kind of combined type modified form rainwater equipment
CN206174102U (en) Safe diverging device and use its rainwater recovery system and sewage return -flow system
CN206355722U (en) A kind of integrative water purifying device of water-saving and emission-reducing
CN207016579U (en) A kind of rainwater precipitates filter
CN206308731U (en) Across the basin low cost water transfer system of karst trough valley
CN106245749B (en) Safe part flow arrangement and apply its system for reclaiming rainwater and sewage backflow system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant