CN204352600U - Butterfly settling vessel - Google Patents
Butterfly settling vessel Download PDFInfo
- Publication number
- CN204352600U CN204352600U CN201420834815.5U CN201420834815U CN204352600U CN 204352600 U CN204352600 U CN 204352600U CN 201420834815 U CN201420834815 U CN 201420834815U CN 204352600 U CN204352600 U CN 204352600U
- Authority
- CN
- China
- Prior art keywords
- guide shell
- phase guide
- internal layer
- inlet pipe
- water inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of butterfly settling vessel, it is installed in vertical sedimentation basin, and it comprises water inlet pipe and the internal layer two-phase guide shell of sealed bottom set gradually from the inside to the outside and the outer two-phase guide shell of bottom-open; Bottom described outer two-phase guide shell, protection support lattice plate is installed, is fixed on protection support lattice plate bottom described internal layer two-phase guide shell; Described water inlet pipe is communicated with internal layer two-phase guide shell through outer two-phase guide shell, and the delivery port of water inlet pipe upward; The bottom of described internal layer two-phase guide shell is provided with discharge pipeline, and the outer two-phase guide shell of described discharge pipeline pass-out is outside; Be provided with liberation port below described protection support lattice plate, described liberation port is communicated with sedimentation basin, is provided with reflecting plate below liberation port.This brand-new water distribution manner and structure, make current be distributed in more uniformly and effectively on the cross-section of river in each stage, makes the suspended particulate Collision coagulation in each stage more thorough, improve sedimentation basin hydraulic surface loading and reduce pond body construction cost.
Description
Technical field
The utility model belongs to field of sewage treatment equipment, particularly relates to a kind of butterfly settling vessel.
Background technology
Traditional vertical sedimentation basin adopts the mode of individual layer central draft tube to carry out water distribution, and such water distribution manner easily produces undercurrent, and water-flow equation more uneven, there is waterpower dead angle; This just makes, and the deposition efficiency of sedimentation basin reduces, hydraulic detention time increases, hydraulic surface loading reduces.Simultaneously long hydraulic detention time also easily causes the appearance of turning over mud phenomenon, thus causes that sedimentation effect is not good, construction investment increases.Therefore build rational cloth water-bound, the deposition efficiency improving sedimentation basin becomes problem demanding prompt solution in sewage treatment project.
Summary of the invention
The purpose of this utility model is to provide a kind of delicate structure, significantly promotes the butterfly settling vessel of sedimentation basin deposition efficiency.
The technical scheme realizing the utility model object is: a kind of butterfly settling vessel, and it is installed in vertical sedimentation basin, and it comprises water inlet pipe and the internal layer two-phase guide shell of sealed bottom set gradually from the inside to the outside and the outer two-phase guide shell of bottom-open; Bottom described outer two-phase guide shell, protection support lattice plate is installed, is fixed on protection support lattice plate bottom described internal layer two-phase guide shell; Described water inlet pipe is communicated with internal layer two-phase guide shell through outer two-phase guide shell, and the delivery port of water inlet pipe upward; The bottom of described internal layer two-phase guide shell is provided with discharge pipeline, and the outer two-phase guide shell of described discharge pipeline pass-out is outside; Be provided with liberation port below described protection support lattice plate, described liberation port is communicated with sedimentation basin, is provided with reflecting plate below liberation port.
In order to better technique effect, the technical solution of the utility model can also do following improvement:
1, described reflecting plate is fixedly connected with by gripper shoe assembly with liberation port.By directly fixing liberation port and reflecting plate, making equipment shaping by the traffic requirement of setting, alleviating Assembling workload.
2, the delivery port of described water inlet pipe is up big and down small bell mouth shape.Up big and down small bell mouth shape makes current be emitted through in journey because discharge section area becomes large at antigravity rapids of gushing, make the loss of current longitudinal velocity head serious, water inlet process, extends the current time of staying, improves the probability that suspended particulate is gathered into sheet floccule body.
3, described liberation port is up-small and down-big bell mouth shape.When up-small and down-big bell mouth shape makes current accelerate to flow downward to protection support lattice Board position by outer two-phase guide shell, because the unexpected change of cross-section of river section is large, current thus rapids inject liberation port; In liberation port, the cross-section of river is become continuously large gradually, therefore current within it remain longitudinally accelerate to flow downward, the turbulence state of laterally fierce turbulent fluctuation, improve current to the impulsive force of reflecting plate, improve the efficiency that current rapids injects the settling zone of sedimentation basin.
The settling vessel that the utility model realizes has inside and outside double-deck guide shell, its particular design makes current experienced by three hydraulics changes and twice precipitation, and current all show as the turbulence state of the fierce turbulent fluctuation of horizontal rotary roll, particle collision, blending under each hydraulics, substantially increase the probability of the mutual Collision coagulation of suspended particulate, facilitate suspended particulate and be gathered into sheet floccule body; Moreover, the suspended particulate in current also experienced by the Collision coagulation under continuous three different hydraulics, and the probability making suspended particulate be gathered into sheet floccule body obtains and greatly improves, for follow-up stratification sinks to providing good condition; When current enter settling zone, turbulent motion due to current makes it under settling zone, stage casing have lost most of energy, for being in settling zone, the floccule body in blocks of epimere is unlikely destroyedly provides advantage, thus makes the stratification of floccule body in blocks sink to becoming inevitable.The flow process of current in settling vessel is gone up for a moment for a moment, the track that circles in the air when dancing in the air like butterfly, this brand-new water distribution manner and structure, current are made to be distributed on the cross-section of river in each stage more uniformly and effectively, the suspended particulate Collision coagulation making each stage is more thorough, finally reaches current water outlet SS and turbidity is low, extend sedimentation basin hydraulic detention time, improve sedimentation basin hydraulic surface loading and reduce the object of pond body construction cost.
Accompanying drawing explanation
Fig. 1 is the top view of butterfly settling vessel described in the utility model embodiment;
Fig. 2 is that the A-A of Fig. 1 is to sectional view.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model preferred embodiment is described further.
As depicted in figs. 1 and 2, a kind of butterfly settling vessel, it is installed in vertical sedimentation basin 100, comprises water inlet pipe 1 and the internal layer two-phase guide shell 2 of sealed bottom set gradually from the inside to the outside and the outer two-phase guide shell 3 of bottom-open; Bottom described outer two-phase guide shell 3, protection support lattice plate 4 is installed, is fixed on protection support lattice plate 4 bottom described internal layer two-phase guide shell 2; Described water inlet pipe 1 is communicated with internal layer two-phase guide shell 2 through outer two-phase guide shell 3, and upward, its shape is up big and down small bell mouth shape to the delivery port 11 of water inlet pipe; The bottom of described internal layer two-phase guide shell 2 is provided with discharge pipeline 5, and the outer two-phase guide shell 3 of described discharge pipeline 5 pass-out is outside; Be provided with liberation port 6 below described protection support lattice plate 4, described liberation port 6 shape is up-small and down-big bell mouth shape; Described liberation port 6 is communicated with sedimentation basin 100, is provided with reflecting plate 7 below liberation port 6, and described reflecting plate 7 is fixedly connected with by gripper shoe assembly 8 with liberation port 6.
The structure of the two-phase of internal layer described in the present embodiment guide shell 2, outer two-phase guide shell 3, waffle slab 4, reflecting plate 7 is conventional structure, and therefore not to repeat here.
In embodiment, liberation port also can be directly fixed on the support in sedimentation basin, but reflecting plate is directly fixedly connected with liberation port, complete equipment is dispatched from the factory just molded, can alleviate on-site installation work amount.
During work, current are carried through water inlet pipe 1, internal layer two-phase guide shell 2 is entered again by the horn-like delivery port 11 of antigravity, this process there occurs first time hydraulics change, be specially: current to be penetrated and under discharge section area becomes suddenly large acting in conjunction at antigravity rapids of gushing, make the loss of current longitudinal velocity head serious, macroscopically show as longitudinal initial velocity to diminish, longitudinal acceleration is the deceleration ascending motion of the horizontal turbulent fluctuation of slowing down, microcosmic shows as the horizontal rotary roll of particle, collision, the deceleration ascending motion of blending, flow energy is then converted into potential energy by kinetic energy and pressure energy.This just make the suspended particulate in water body can in internal layer two-phase guide shell 2 mutual Collision coagulation slabbing floccule body, larger floccule body then can be deposited in internal layer two-phase guide shell 2 in deceleration is risen, and discharge eventually through internal layer discharge pipeline 5, this is first time precipitation.
After this current overflow into outer two-phase guide shell 3 by internal layer two-phase guide shell 2 upper opening, this process there occurs the change of second time hydraulics, be specially: when current by internal layer two-phase guide shell 2 slow down rise to have a common boundary with outer two-phase guide shell 3 time, because gravity, upper strata hydraulic pressure and discharge section area become suddenly large acting in conjunction, longitudinal rate of climb of current reduces to zero substantially; Immediately, under the acting in conjunction of gravity and upper strata hydraulic pressure, current start to do the downward accelerated motion that initial velocity is zero in the vertical, horizontal then turbulent fluctuation before continuity, and flow energy is converted into kinetic energy and pressure energy by potential energy.This process not only makes current distribute on the cross-section of river more evenly effectively, also makes little micro-suspended particulate of failing to precipitate in internal layer two-phase guide shell 2 carry out mutual Collision coagulation further, too increases hydraulic detention time simultaneously.
Then current enter liberation port 6 by outer two-phase guide shell 3 through protection support lattice plate 4, now protection support lattice plate not only plays the effect supporting internal layer two-phase guide shell, further promote the homogenizing of current, then current impact on reflecting plate 7 by liberation port 6 again, last current inject the settling zone of vertical sedimentation basin by the peripheral effluent mouth rapids between liberation port 6 and reflecting plate 7, this process there occurs third time hydraulics change, be specially: when current accelerate to flow downward to protection support lattice plate 4 position by outer two-phase guide shell 3, because the unexpected change of cross-section of river section is large, make current thus rapids inject liberation port 6, in liberation port 6, the cross-section of river is become continuously large gradually, therefore current within it remain longitudinally accelerate to flow downward, the turbulence state of laterally fierce turbulent fluctuation, when current flow near reflecting plate 7, now current longitudinal velocity be increased to maximum, potential energy is converted into kinetic energy and pressure energy reaches maximum, particle momentum reaches maximum, so can the time of water impact reflecting plate 7 be considered as instantaneous, now particle momentum changes is maximum, cause current inverse change will occur in water velocity direction after shock-wave reflection plate 7, become from original acceleration the rapid settling zone injecting sedimentation basin effectively that rises evenly that slows down downwards.
Continue to do that longitudinal deceleration is risen, the turbulent motion of laterally fierce turbulent fluctuation after current rapids injects settling zone, make little micro-suspended particulate Collision coagulation mutually again.Little micro-suspended particulate, after the Collision coagulation under continuous three different hydraulics, substantially increases it forms sheet floccule body probability in settling zone, thus substantially increases it carries out stratification precipitation probability in settling zone.This is second time precipitation.
The design of butterfly settling vessel makes current experienced by three hydraulics changes and twice precipitation, the secondary hydraulics change of more vertical two-phase water conservancy diversion separator and primary sedimentation, under equal conditions, effectively extend sedimentation basin hydraulic detention time, suspended particulate Collision coagulation more thoroughly, improve that sedimentation basin hydraulic surface loading, sludge settling are more thorough, current water outlet SS and turbidity lower; Under equal conditions, can make that pond body specification reduces further, pond body construction investment is saved further, land seizure reduces further.
The vertical sedimentation basin internal structure being provided with butterfly settling vessel is simple, operation maintenance is convenient and simple, outlet effect is good, construction investment economizes.Designer can carry out reasonable selection according to the design water yield, water quality characteristics and process water Effluent criteria, thus goes out applicable vertical sedimentation basin according to its parameter designing; Combination design can also be carried out according to actual conditions and media filtration pond.Thus, the flexibility of the butterfly settling vessel as one of vertical sedimentation basin nucleus equipment, diversity, adaptability and actual effect has been fully demonstrated.
The foregoing is only the utility model preferred embodiment; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model description and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present utility model.
Claims (4)
1. a butterfly settling vessel, it is installed in vertical sedimentation basin (100), it is characterized in that, it comprises water inlet pipe (1) and the internal layer two-phase guide shell (2) of sealed bottom set gradually from the inside to the outside and the outer two-phase guide shell (3) of bottom-open; Described outer two-phase guide shell (3) bottom is provided with protection support lattice plate (4), and described internal layer two-phase guide shell (2) bottom is fixed on protection support lattice plate (4); Described water inlet pipe (1) is communicated with internal layer two-phase guide shell (2) through outer two-phase guide shell (3), and the delivery port (11) of water inlet pipe upward; The bottom of described internal layer two-phase guide shell (2) is provided with discharge pipeline (5), and outer two-phase guide shell (3) of described discharge pipeline (5) pass-out is outside; Described protection support lattice plate (4) below is provided with liberation port (6); Described liberation port (6) is communicated with sedimentation basin (100), and liberation port (6) below is provided with reflecting plate (7).
2. butterfly settling vessel according to claim 1, is characterized in that, described reflecting plate (7) is fixedly connected with by gripper shoe assembly (8) with liberation port (6).
3. butterfly settling vessel according to claim 1, is characterized in that, the delivery port (11) of described water inlet pipe is up big and down small bell mouth shape.
4. the butterfly settling vessel according to claim 1-3 any one, is characterized in that, described liberation port (6) is up-small and down-big bell mouth shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420834815.5U CN204352600U (en) | 2014-12-25 | 2014-12-25 | Butterfly settling vessel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420834815.5U CN204352600U (en) | 2014-12-25 | 2014-12-25 | Butterfly settling vessel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204352600U true CN204352600U (en) | 2015-05-27 |
Family
ID=53254098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420834815.5U Withdrawn - After Issue CN204352600U (en) | 2014-12-25 | 2014-12-25 | Butterfly settling vessel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204352600U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104524821A (en) * | 2014-12-25 | 2015-04-22 | 福建环球环保科技发展有限公司 | Butterfly-type precipitator |
-
2014
- 2014-12-25 CN CN201420834815.5U patent/CN204352600U/en not_active Withdrawn - After Issue
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104524821A (en) * | 2014-12-25 | 2015-04-22 | 福建环球环保科技发展有限公司 | Butterfly-type precipitator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200964584Y (en) | Defoaming antifogging pressure type dissipator overflow weir | |
CN104878829B (en) | Anti-clogging inverted siphon sewage pipe system | |
CN209221573U (en) | A kind of settling pit | |
CN204147604U (en) | A kind of hang plate sedimentation basin for coal separation | |
CN102424488B (en) | Integrated-process rural water purifier based on micro-eddy flocculation | |
CN202530433U (en) | Flaring pier structure of flood discharge and energy dissipation system in hydraulic and hydro-power engineering | |
CN102561273B (en) | Self-adjusting water intake device | |
CN104524821B (en) | Butterfly depositor | |
CN203227334U (en) | Secondary inclined-tube sedimentation tank | |
CN204352600U (en) | Butterfly settling vessel | |
CN201873973U (en) | Energy dissipater structure in water transporting tunnel | |
CN204676677U (en) | Silting blocking formula inverted-siphon sewer system | |
CN111777178A (en) | Vertical oxidation ditch micro-power water treatment system | |
CN103981842B (en) | Trapezoidal contraction outlet X-type flaring gate pier | |
CN103395872B (en) | Low hydraulic head hydropower coagulation process method | |
CN204767638U (en) | Zhou jinzhou goes out two heavy ponds of spoke STREAMING | |
CN105019414B (en) | Composite lock chamber structure for narrow water intake of mountain hydropower project | |
CN206667363U (en) | A kind of submergence type culvert water inlet structure | |
CN203319763U (en) | IC (internal circulation) anaerobic reactor | |
CN205953622U (en) | Modular vortex street aperture eye net response device | |
CN211898237U (en) | Energy dissipation spillway | |
CN202199173U (en) | Triangle mesh water treatment flocculating reaction tank | |
CN202705104U (en) | Vertical two-phase diversion separator | |
CN204780815U (en) | Dragon inhales building collection and presses tower water transfer power station device | |
CN220633144U (en) | Combined sand sedimentation tank structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20150527 Effective date of abandoning: 20160928 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |